    Resume CV : Commissioning Start Up Engineer/Supervisor/Operator

    Dear Sir/Madam,
    I wish to introduce myself as a Diploma chemical Technology from Tamil Nadu Technical Education,India, an Institution with a good Academic Record in Diploma in chemical Technology. The fast paced life at Oil&Gas Industries (in India, Abudhabi &Yemen), has equipped me to face the challenges of the future professional life with confidence.

    I have 16+ years experience in Oil and Gas,LNG,NGL Recovery, petrochemical and chemical industries as Commissioning engineer,Start Up Engineer, Commissioning Supervisor, Process/Operation /Area/DCS-Panel Operator. Area specialized in Commissioning, Start ups, Operations-production, maintenances, manpower handling etc.,If,there is any vacancy,

    Please, refer my CV, attached here...

    With Regards

    B.Thirukkumar

  2. Post Count Number #2
    Guest Poster
    Join Date
    August 14th, 2008
    Location
    Your Heart, Delhi
    Posts
    76,213

    CV of Cesar B. Ledesma

    RESUME :
    CESAR B. LEDESMA
    Email : toque28 AT yahoo.com or toque28 AT gmail.com

    EDUCATIONAL ATTAINMENT :
    School and Education Year Degree/Course Earned :
    Binalbagan Elementary School 1959-1965 Elementary Binalbagan, Neg. Occ.
    Hinigaran High School 1965-1969 Secondary Hinigaran, Neg. Occ.
    University of San Agustin 1969-1976 B.S.M.E.

    GOVERNMENT/BOARD EXAMINATION TAKEN :
    Name of Board Date Taken License No.
    Certified Plant Mechanic October 1982 7519 (General Written)

    EXPERIENCES :
    Position Company Address Year :
    1. Sr. Shift Engineer/Supervisor Jubail Energy Company August 24, 2004
    P.O. Box 11515 to Jubail Industrial City 31961 Present K.S.A.
    2. Project Manager Energy and Aviation Support August 11, 2003 Corporation to No. 3 Lizares Ave. Bacolod City March 31, 2004 Negros Occidental, Philippines
    3. SHIFT OPERATOR Stone & Webster Engr. Co. June 12, 2002 Pha Lai 2 Power Station to ( 2 x 300 MW ) Dec. 28, 2002 Pha Lai, Vietnam
    4. COMMISIONING ENGR-- Hitachi Works, Hitachi Ltd. --- March 15, 2000 Sucursal del Peru, Carretera to Costanera Km. 26 Ilo-Peru Sept. 30, 2000 ( Latin-America )
    5. Field Operation Supervisor --AG&P Honiron Div. Jan. 18, 1996 2nd Tacoma Street to Port Area, Manila Oct. 31, 1998
    6.Turbine Commissioning “A”--Marubeni Engineering Oct. 21, 1994
    (West Africa) Lt. To for Hitachi Project of NEPA Nov. 17, 1995 Plot 1652, Olosa, P.O. Box 917 Lagos (Nigeria)
    7. Power Plant Shift --- Hitachi Work Ltd/ Dec. 18, 1991 Supervising Engineer Public Utility Board to (Commissioning Section) Station Stage II Feb. 20, 1993
    8. Power Plant Shift In-Charge-- DEA Sugar Milling Co.May 30, 1989 Talisay, Neg. Occ. to Dec. 10, 1991
    9. Power Plant Operation & --- RST International Ltd. Sept. 1, 1988 Maintenance Foreman P.O. Box. 2839 to Angola, West Africa April 29,1989
    10. Commissioning Power Plant --Mitsubishi Heavy Ind.Aug. 20, 1987 Operator Ltd. Nagasaki, Japan to P.O. Box 14 Nagasaki Aug. 17, 1988 Qurayyah Site Project K.S.A. (Power Plant)
    11. Turbine Operator Kongsber Saudi Arabia Aug. 31, 1986 Ltd. P.O. Box 11144, to Jeddah 21453 K.S.A. Feb. 26, 1987
    12. Master Mechanic Kafou Corporation July 31, 1985 to P.O. Box. 790, ABHA K.S.A. June 16, 1986
    13. Power Plant Senior Dacongcogon Sugar & May 23, 1979 Mechanic/Diesel & Turbine Rice Milling Co., Inc. to Tabugon, Kabankalan July 30, 1985 Negros Occidental

    SCOPE OF WORK :
    1) Position Held : Sr. Shift Engineer
    Employer : Jubail Energy Company
    Address ; P.O. Box 11515
    Jubail Industrial City 31961
    K.S.A.
    Date : August 24, 2004 to Present

    Job Function :( Cogeneration Plant from Commissioning to Commercial Operation)
    The Shift Engineer will be responsible for leading an Operations Shift Team to ensure the plant meets the required availability, reliability, efficiency, generation and cost targets, safely and within strict environmental limits. This will include responsibility for making accurate and timely decisions on matters affecting plant processes and performance and consulting with the Plant Operations Manager when necessary. The role will require a detailed understanding and practical experience of the technologies associated to operating a modern Gas Turbine plant, Desalination plant and a wide range of auxiliary equipment. This plant has two units Gas Turbine Model W501DA by Siemens/ Westinghouse & two units Heat Recovery Steam Generator by Doosan of Korea. Each unit have each own Auxiliaries like Wet Compression Pump, Compressor Blade washing Pump, Water Injection Pump, Fuel Gas Compressor, Duct Burner, Demin Plant Water treatment station, Nitrogen Gas station, Auxiliary (4.16 kV) & Main Transformer (230kV), Stationary Diesel Engine for emergency use only (500Kilowatt), Feed Water Booster pump, Chemical Sampling Station, Phosphate & Nalco Pump Station, Auxiliary oil Pump, Mist Eliminator, Main oil Pump, Emergency oil Pump, Jacking oil Pump ( Generator only) , Starting Motor ; C.T. Intake Pulse Air Compressor & Instrument air compressor.

    Specific Function
    :
    1) Direct report to Operation Manager & Mech. Maint. Manager
    2) Supervise control room / field operator in start-up & Shut-down and operation settings for C.T. for its Auxiliaries & during Preventive Maintenance Overhauling (Combustor Inspection; Hot Gas Path Inspection & General Overhauling).
    3) Log-in all activities during 12 hrs. shift operation and make turn over to the next shift.
    4) Enter to the Plant Performance Spread sheet data’s reflecting steam exported ( t/h), ambient temperature ( °C ), load exported ( MW ), relative humidity ( % ), close cooling water temperature (°C ), air ambient pres., air temperature, Ambient Wet Air Bulb Temp. ( degrees C ), Nox in ppm, CLCW temp. (°C); steam Pressure & Temp..
    5) Adjust power output using wet compression pump water flow and bias of water injection pump water flow.
    6) Make day ahead availability declaration notification ( one day ahead) and send to client thru electronic mailing address and thru Fax Machine.
    7) Make Inspection Schedule activities (using Bar Chart) for General Overhauling, Combustor Inspection & Hot Gas Path Inspection of the Gas Turbine.
    8) Supervise Water Treatment Plant Operation especially water Quality production & Back washing & Regeneration processes .
    9) Attained the following training/ seminar fire fighting, first aid, simulation training at Siemens AG in Germany ( TXP Version 7.0 ) & Training for the operation & Maintenance of Gas turbine & HRSG.
    10) Make operation and shutdown procedure for all the Mechanical equipment involved in the plant & Daily Operation Report & send to Operation Manager for approval.
    11) Make procedure about the Conforming & Non- conforming Gas and utilities.
    12) Approved work permit ; confine space & hot work permit & enter thru maximo for the future reference.
    13) Make incident report especially C.T. trips and equipments abnormalities.
    14) Conduct Training & written examination for the newly hire personnel in the operation & personnel to be promoted.
    14) Preside the morning meeting for the overall Plant reports & Plant condition.

    General Qualifications :
    1. Should have 4 - 5 years of increasingly responsible experience in the operation & maintenance of power generation equipment, preferably combustion turbines.
    2. Must be willing and able to direct the activities of his employ¬ees towards meeting operating objectives in a safe, fair and consistent manner.
    3. Thorough understanding of the principles of power generation, electrical grid frequency and voltage response, rotating equipment and thermal dynamics.
    4. Must be able to communicate in writing and verbally to peers, superiors and subordinates.

    Typical Duties :
    1. Directs the activities of the other shift operators towards safe, reliable and effi¬cient operation of the plant while meeting the appropriate legal and regulatory requirements affecting the plant.
    2. Directs activities of operators to test and maintain plant operation within limits of environmental permits and water chemistry requirements.
    3. Directs activities of operators to maintain accurate records of fuel consumed.
    4. Directs activities of fuel handling crew, as required.
    5. Evaluates the performance of all employees reporting to me.
    6. Maintains a logbook and prepares reports as required by plant management.
    7. Directs the immediate response to situations such as fires, injuries, equipment failures, etc.
    8. Reviews and approves requests for maintenance submitted by operating personnel.
    9. Assists in the operation of all plant equipment as needed for emergency situations or short term absences of operating employees.
    10. Supervises other plant employees and monitors contractor performance on backshifts and weekends as required by plant management.
    11. Implements the requirements of the environmental and safety programs, including Tag out/Lockout, confined space entry, hot-work, etc.

    2) Position Held : Project Manager
    Employee : Energy And Aviation Support Corp.
    Address : No. 3 Lizares Ave. Bacolod City
    Negros Occ., Philippines
    Date : Aug. 11, 2003 to March 31, 2004
    Project Client : Victorias Milling Company ( VMC )

    Job Function : ( Power Generation Construction / Modification of Steam Line )
    In-charge for the 400 psig steam piping modification for the ff : bolers, JTA# 2 ( stm. rate of 154,000 lbs/hr.), Yoshimine ( 125,000 lbs/hr.), Riley# 4 ( 120,000 lbs/hr.), Riley#1 ( 120,000 lbs/hr.), Riley#3 ( 120,000 lbs/hr.), Riley#2 ( 120,000 lbs/hr.) & JTA#2 ( 154,000 lbs/ hr.). This project is worth 18,000,000 pesos in a turn key basis. The steam that produces of every boilers is t generate the ff: machine , Siemens Turbine (6,500kw), Turbine “A” (3,00kw), Turbine “B” ( 800kw), Turbine “C” (1,100kw), & Turbine “D” (900kw) AT 400psig, Temp. 620°F and 250psig, Temp.450F respectively. Boilers Riley#2 & JTA#2 steam produces are supplied to Mill “A” w/ capacity of 25,000 tons/hr. and boilers Riley#1 & Riley# 3 steam produces are supplied to Mill “ C” w/ capacity of 10,000tons/hr.. The main purpose of this steam piping modification is to reduce pressure drop from 20% to 3.43% from existing boilers to Power Generation station.

    Specific Function
    :
    1. Implement the propose design of steam piping based on the result of working formulas, especially for new headers to be installed and piping sizes modification.
    2. Make itemize materials estimate for every boilers for steam piping, enlarger, elbows, valves and flanges.
    3. Make propose budget reflecting the salaries of workers, materials estimate( local and Indent materials).
    4. Make project Gantt chart schedule, reflecting the final awarding of contract, mobilization, assessment/verification of plant status and parameters, engineering of steam line, preparation of final drawings, purchase of foreign and local components, fabrication of pipe shoe, pipes and headers supports, Installation of steam piping of every boilers, Installation of header supports, static and dynamic testing of new pipe lines (x-ray), claddings, tapping points/ blowing-out, restoration, commissioning, acceptance, demobilization of replaced piping and demobilization .
    5. Make daily and weekly accomplishment report w/ attached weather report.
    6. Make blowing-out procedure.
    7. Make commissioning procedure.
    8. Make tapping points and stm. Blowing-out schedule ( using Gantt chart)
    9. Attain weekly meeting to discuss project progress and any revises that needed in the project.
    10. Make request for payment or monthly billing.

    3) Position Held : Shift Operator ( FGD ) / BOP Contrl. Rm Optr.
    Stone & Webster Engineering Company
    Pha Lai 2 Power Station ( 2 x 300 MW )
    Pha Lai, Vietnam
    Job Function : ( For FGD ) ( Coal Fired Power Plant Commissioning)
    Involve in operation & Maintenance as Commissioning Shift Operator both Local & Control Room & Maintenance for the following station in Flow Gas Desulfurization System under the Electricity of Vietnam ( EVN ).
    a) Booster Fan b) Absorber c) Flue Gas Streams d) Wash water mist Eliminator e) Absorber Sump f) Limestone Slurry g) Limestone Preparation h) Vacuum Belt Filter or Dewatering I) Filtrate Pit j) Hydro clone bleed System k) Limestone Handling L) Oxidation Air Compressors.
    Specific Function :
    At load of main station of 70 %, FGD is to be prepare to inter into system by running the following equipments : Assuming that M.E. Pump, Absorber sump pump, Slurry feed pump is running.
    a) Two units of recycle pump
    b) Oxidation Air Compressor – Unload Position
    c) Open outlet Guillotine Damper
    d) Open inlet Guillotine Damper
    e) At 100% open both inlet & outlet guillotine Damper put Oxidation Air Compressor to Load Position
    f) Start Booster Fan, maneuver the inlet control damper vs. by-pass louver damper to attain the elimination of SO2 from Flue Gas AT about 92%. Considering that PH & Density AT Absorber station are 5.7 & 10% respectively.
    g) When Density of slurry AT Absorber station reaching to 15%, start Dewatering to maintain its Density to 10 % , PH is to be maintain from 5.2 to 5.7.

    Specific Function
    : ( For BOP Contrl. Rm. Optr. )
    In-charge for the start-up and shut down procedure for the ff : equipments, BFP, CEP, STEAM GLAND EXHAUSTER, STEAM JET AIR EJECTOR, ACWP, CCWP, VACUUM-UP, CHLORINATION PLANT, HYDROGEN PLANT, CWP, CATHODIC PROTECTION PLANT, INSTRUMENT & SERVICE AIR COMPRESSOR, WATER TREATMENT PLANT AND CHEMICAL PLANT.
    Adjust heaters level from low and high pressure
    Locate the normal water level of every heaters by using carpenter water hose level.

    4) Position Held : Commissioning Engineer
    Employer : Hitachi Ltd. Sucursal del Peru
    Address : Carretera Costanera Km. 26 Ilo-Peru
    Date : March 15, 2000 to September 30, 2000
    JOB FUNCTION : ( Coal Fired Power Plant Commissioning)
    - Report to the Commissioning Manager.
    - Assist the Documentation Controller with the development of Commissioning Acceptance Forms and QA/QC criteria for all sit equipment.
    - Supervise all pre-commissioning, commissioning and start-up activities of equipment.
    - Assist Operational Group with commissioning activities, example, preparing systems for flushing, testing, blowing, and reinstatement of systems.
    - Preparing rotating equipment for start-up, final check out of systems and trouble shooting equipment problems.
    - Supervising a group of mechanical technicians (pipe fitters, mechanical fitters and labours) for commissioning activities requiring removal & reinstalling of components, cleaning of systems, temporary piping and hoses, etc.
    - Attending commissioning progress meetings when required by PPS Commissioning Manager.
    - Assisting OWNER Mechanical Staff for taking over maintenance of equipment.
    - Interlock – Sequence Testing base on Logic Diagram for Turbine and Generator or Boiler, Turbine and Generator group.
    - Carry out Operational Loop & Function Testing according to Operational requirements.
    - Check out all systems instrumentation within the commissioning schedule
    - Computer literate for Microsoft word, e-mail operation & others.
    - Trouble Shooting instrumentation problems.
    - Assisting OWNER Instrumentation Staff for taking over maintenance of instrumentation.
    - Final check out of electrical systems before energizing a system.
    - Control the Switch Gear room in a safe manner, including “locking out” ’etc.
    - Assisting with the DCS vendors, construction , vendors and sub-contractors working on the instrumentation and controls of the plant.
    - Assisting the Commissioning Group with Operational loop and function testing, setting up simulation signal as required.
    - Support the discipline coordinator to compile the test forms procedure sheet.
    - Works with P&I diagrams, control diagrams, wiring diagrams etc.
    - Control and check activity test by vendors.
    - Shift in charge or Shift operator for carrying on the post commissioning activities especially for heat run test of equipments & Load testing for Steam Turbine from 25% to 100%.
    - Coordinate the operation safety officer for PTW matter and safety clearance certification.
    - Operate for Gland steaming, Vacuum-up test, Over speed testing, Load swing test and other testing to be made in the main steam turbine.
    - Supervise all operational pre-commissioning, commissioning and start-up activities from control room or directly from field verify it works in the normal safe conditions.
    - Communicate with each discipline supervisors for commissioning activities which are effected, or related to the process systems.
    - Supervise and assist with the final P & ID checking.
    - Keep daily Log Book of all Operational Activities.
    - Supervise all operational pre-commissioning, commissioning and start –up activities from control room.
    - Compiling all operational Acceptance Forms and operational testing Forms.
    - Supervise with the operations for solo or heat-run test.
    - Do final Check out of each process and equipment before operations.

    5) Position Held : Field Operation Supervisor
    Employer : AG&P-Honiron Division
    Address : 2nd Tacoma Street, Port Area, Manila
    Date : January 18, 1996 – October 31, 1998
    JOB FUNCTION : ( Construction of Power Generation & Storage Tank)
    Assigned to Negros Occidental as Project OIC to Distiller Bago Inc., for installation of Package type boiler with steam rate of 50 tons/hour and Steam Turbine with capacity of 4.5 megawatts, extraction type. In-charge of this project from civil works to commissioning with 105 workers.
    SPECIFIC FUNCTION :
    - In-charge for the ground preparation and materials requisition needed in the project.
    - Make project work for schedule reflecting the S-curve, Man-hour and Load Factor.
    - Make reports for weekly accomplishments and submitted to project consultant.
    - Make monthly billings according to the accomplishments based on the load factor.
    - Perform weekly meeting for project workers.
    - Strictly implements to follow the safety precautions procedures at site area.
    - Perform everyday routine check at site area the behavior & accomplishment of every worker.
    - Implement revision advice by the project consultants.
    - Make project re-commendation or turn over of the project to end-user.

    6) Position Held : Steam Turbine Commissioning “A” (Power Plant)
    Employer : Marubeni Engineering (West Africa) LTD.
    For Hitachi Project of NEPA
    Address : Plot 1652, Olosa Street, Victoria Island
    P.O. Box 9117, Lagos (Nigeria)
    Date : October 21, 1994 – November 17, 1995
    JOB FUNCTION : (Thermal Power Plant General Overhauling/ Re-
    Commissioning )
    1. Undertake work supervision in Overhauling of steam Turbine Auxiliaries, especially Condensate Extraction Pump, Booster Pumps, Boiler Feed Pumps, Closed Circuit Cooling Water Pumps, Circulating Water Pumps and main and Auxiliary Oil Pumps.
    2. In-charge of Supervision in Calibration of Pressure Switches, Level switches, Limit Switches, temperature Switches, Pressure Gauges and Temperature gauges.
    3. In-charge of Turbine Control Valves Setting, Tripping Device clearances, main Turbine Oil Flushing and Commissioning Test Result Report for the following :
    a. Control valves characteristics for MSV (Left & Right), RSV (Left & Right), ICV (Left & Right).
    b. Vacuum-up Test
    c. Stretch out running to rated speed
    d. Speed-up to rated speed & no load heat run test
    e. Main Turbine Safety Device Test (no load)
    f. Shaft Vibration
    g. Turbine Safety Device Test
    h. ¼ Load Heat Run Test
    i. Full Load Heat Run Test
    4. In-charge of supervision and instruction for proper operation, especially start-up and shut-down operation for Steam Turbine, 220 MW capacities.

    7) Position Held : Power Plant Shift Engineer
    (Commissioning Section)
    Employer : HITACHI WORK LTD.
    Address : Public Utility Board, Station Stage II,
    Pulau Seraya, Singapore
    Date : December 18, 1991 to February 20, 1993
    JOB FUNCTION :
    1. Instruct the proper operation and maintenance, in putting into service three units 250 MW Steam Turbine Power Generating and each accessories, to the Newly hired Operators for Stage II Power Station at Pulau Seraya, Singapore.
    2. In-charge from start-up and Shut down operation of 250 MW Thermal Generating Power Plant and each accessories at Seraya no. 2 for PUB Singapore.

    SPECIFIC FUNCTION
    :
    A. Calibration
    1. Pressures Gauges
    2. Thermometer Gauges
    3. Vacuum Gauges
    4. Level Controllers
    5. Level Transmitters
    6. Level Switches
    7. Pressure Switches
    B. Motors & Pumps Heat Run Test (Unit Auxiliaries)
    1. Condensate Extraction Pumps (6 units)
    2. Boiler Feed Pumps (9 units)
    3. Condensate Booster Pumps (5 units)
    4. Closed Circuit circulating water pumps (9 units)
    5. Auxiliaries Closed Circuit Circulating Pumps (9 units)
    6. Gland Steam Exhauster Fan (6 units)
    7. Mot vapor extractor (3 units)
    8. Turning gear oil pumps (3 units)
    9. Auxiliary Oil Motor (3 units)
    10. Turning Gear Motor (3units)
    11. Oil Purifier (3 units)

    8) Position Held : Power Plant Shift In-Charge
    Employer : DAE SUGAR MILLING COMPANY
    Address : Talisay, Negros Occidental, Philippines
    Date : May 30, 1989 to December 10, 1991
    JOB FUNCTION:
    In-charge of the repair, maintenance and operation of 11 units steam boiler, 5 units steam turbine and 2 units’ stationary diesel generators.
    In view thereof, the said equipment’s are specifically explain below, pertaining capacities, rating and manufacturer made:
    A. For Boiler:
    1. Six units saturated steam boilers with capacity of 500 BHp, 3½ inches diameter generating tubes (1,200 pcs.), made by Babcock & Wilcok Company of new York U.S.A. with steam rate of 16,000 lbs/hr. each.
    2. Five units superheat steam boilers with capacity of 700 BHp, 3½ inches diameter generating tubes (2,000 pcs.) made by Babcock & Wilcok Company of new York U.S.A. with steam rate of 20,000 lbs/hr. each.
    B. Steam Turbines:
    1. Four units multiple stage steam turbines with capacity of 700 KW each, non-condensing type made by Allis Chalmers of U.S.A .with rated RPM of 3,600.
    2. One unit single stage steam turbine with capacity of 500 KW, non-condensing type made by Westinghouse of U.S.A. and rated RPM of 4,211.
    C. Diesel Engine:
    1. One unit stationary diesel generator with capacity of 500 KW, 1,800 rated RPM, straight type engine and make by Worthington of U.S.
    2. One unit MWM stationary diesel generator with capacity of 800 KW, 3,600 rate RPM . This support power in factory during off milling season.

    9) Position Held
    : Power Plant Maintenance Foreman
    Employer : RST INT. LTD. (Angola, Africa)
    Address : P.O. Box 389 Angola, West Africa
    Date : September 1, 1988 to April 29, 1989
    JOB FUNCTION: ( Stationary Diesel Engine )
    In-charge of the repair and maintenance of 3-units stationary diesel, stationary engine to support power in Barrio Kafunfo and diamond mine refinery. This units has a capacity of 500 KW each with rated RPM of 3,600.

    10) Position Held : Commissioning Power Plant Operator
    Employer : MITSUBISHI HEAVY INDUSTRIES LTD>
    Address : P.O. Box 14 Nagasaki, Japan
    Date : August 20, 1987 to August 17, 1988
    JOB FUNCTION:
    Operational in-charge of the following equipment and its accessories listed below:
    1. Two units boilers with an operating pressure of 75 bars and steam rate of 400 ton/hr.
    2. Four units chillers compressor, three of which is in operation and one unit is in standby unit. This is to support cooling system in the computer room, switchboard, battery room and switch gear room.
    3. Four units Force Draft Fan with motor capacity of 4megawatts..
    4. Two units multiple stage steam turbine with generator capacity of 625 megawatts each.
    5. Four units condensate pumps with motor capacity of 800 KW each.
    6. Chlorination Plant with 4 electrolytes cell tank. This to prevent seaweed’s growing AT intake area.
    7. Two units desalination plant with capacity of 200 ton/hr. each.
    8. Three units instrument and service air compressor with pres. Capacity of 70 bars.
    9. Three units close circuit water pumps, each has a capacity of 200 gallons per hour.
    10. Cathodic protection plant with 5 units rectifier, this to prevent corrosion AT intake pipes lines area.

    11) Position Held : Turbine Operator
    Employer : KONGSBERG SAUDI Arabia LTD.
    Address : P.O. Box 11144, Jeddah 21453 K.S.A.
    Date : August 31, 1986 to February 26, 1987
    JOB FUNCTION: ( Gas Turbine )
    In-charge of the parts assembly & maintenance of gas turbine, with the capacity 50 megawatts. This turbine is the one which support power in the Royal Air Base in the whole Kingdom, especially in MODA and Radar System.

    12) Position Held : Power Plant Master Mechanic
    Employer : KAFOU CORPORATION
    Address : P.O. Box. 790, ABHA, K.S.A.
    Date : July 31, 1985 to June 16, 1986
    JOB FUNCTION: ( Stationary Diesel Engine x 9units 10MW each Units )
    In-charge of the repair and maintenance of 9 units generator stationary diesel engine, with the capacity of 10 megawatts each. And three units gas turbine with the capacity of 50 megawatts each. The said equipment has respectively Man & Westinghouse in brand to which it is use to support power lighting in the whole South Region of Saudi Arabia.

    13) Position Held : Power Plant Senior Mechanic/Diesel & Turbine
    Employer : DACONGCOGON SUGAR MILLING COMPANY
    Address : Tabugon, Kabankalan, Negros Occidental
    Date : May 23, 1979 to July 30, 1985
    JOB FUNCTION: ( Maint. for the Stationary Diesel Engine & Stm. Turbine )
    In-charge of the repair and maintenance schedule of 3 units stationary diesel engine which has a capacity of 800 kw and two is 500 KW each. Thus unit is to support power during off-milling season operation. And three units steam turbine which has a capacity of 500 kw each two units, and one unit of I mega watts. This unit support power during milling season.