April 16th, 2010, 11:36 AM
Post Count Number #1
Resume CV : CSWIP 3.1 Welding Inspector
Rahath.abid
EDUCATION :
· Completed the CSWIP 3.1 successfully
· Diploma in Automobile Engineering from HINDUSTAN ELECTRONICS ACADEMY,BANGALORE (Karnataka) affiliated to Directorate of technical education in the year 2009 Successfully completed with distinction.
Completed the NDT(ASNT) :
Ø LEVEL-II RADIOGRAPHIC TESTING
Ø LEVEL-II ULTRASONIC TESTING
Ø LEVEL-II DYE PENETRANT TESTING
Ø LEVEL-II MAGNETIC PARTICLE TESTING
Qualification :
From Supreme Excel NDT,Thiruchirappalli Tamilnadu.
· Completed the Higher secondary Education From Christ college,Kannur University.
. Diploma in Autocad (mechanical). From Sree Sankarachaarya Computer Center, Kannur.
July 29th, 2011, 10:29 PM
Post Count Number #2
ABDULLAH KHAN
e-mail : sundus03 AT gmail.com
EDUCATIONAL QUALIFICATION :
Bachelor of Science : 1992
TECHNICAL QUALIFICATION :
THE WELDING INSTITUTE ( TWI) CSWIP 3.1 Welding Inspector
INSTITUTE OF TESTING TECHNOLOGY MUMBAI - INDIA : Level II Certification in the following:
1. Ultrasonic Testing
2. Radiographic Testing
3. Magnetic Particle Testing
4. Liquid Penetrant Testing
HELLENIC SHIPING SERVICES - DUBAI : Level II Certification in the following:
1. Ultrasonic Testing
2. Radiographic Testing
3. Magnetic Particle Testing
4. Liquid Penetrant Testing
OTHER TECHNICAL QUALIFICATION :
AL HOTY STANGER LTD. – K.S.A. : Certification in the following:
1. PMI Operator
2. Ferrite Tester
3. Holiday Tester
OTHER ATTAINMENTS :
1. Brinell Hardness Testing
2. Temperature Measurement of Heater Tubes by Pyrometer
3. Leak Testing
4. Visual Inspection of welds & Materials
5. Cargo Gear Load Test.
PROFESSIONAL EXPERIENCE :
1. YEAR : JANUARY 1993 TO JANUARY 1996
COMPANY : QUALITY ENTERPRISES
POSITION : NDT TECHNICIAN
PLACE : INDIA
2. YEAR : JANUARY 1996 TO AUGUST 2004
COMPANY : AL HOTY STANGER LTD.
POSITION : NDT INSPECTOR
PLACE : KINGDOM OF SAUDI ARABIA
3. YEAR : AUGUST 2004 TO DECEMBER 2005
COMPANY : SGS GULF LTD.
POSITION : NDT INSPECTOR
PLACE : UNITED ARAB EMIRATES
4. YEAR : APRIL 2006 TO JULY 2010
COMPANY : HELLENIC SHIPPING SERVICES
POSITION : SUPERINTENDENT / QC / NDT INSPECTOR
PLACE : UNITED ARAB EMIRATES
5. YEAR : JULY 2010 TO TILL DATE ( FREE LANCE)
COMPANY : CGG VERITAS
POSITION : RIGGING SUPERINTENDENT
PLACE : UNITED ARAB EMIRATES
WORK EXPERIENCE :
SUPERINTENDENT/QA -QC / NDT INSPECTOR :
Present job involved performing Superintendent job for various vessels, Welding inspections , QA-QC Inspections for various projects, Ultrasonic testing (weld testing, lamination check, bonding test, thickness), Magnetic Particle Testing (fluorescent / non fluorescent techniques), Liquid Penetrant Testing (fluorescent / non fluorescent techniques), Radiographic Testing (using Iridium 192 remote operated cameras) involved in the fabrication of pressure vessels, heat exchangers, drums, boiler tubes, spheres, columns, pipelines, heater tubes, shipping barges, and other components as per client’s specification and international acceptance / rejection codes.
Also involved in positive material identification (PMI) of materials (material identification & alloy analysis using nuclear analyzer.
MAJOR ASSIGNMENTS :
CGG VERITAS – DUBAI : Worked as a Rigging Superintendent during the modification of vessel BOURBON SUPPORTER in Dubai Dry Dock for their S65 Fleet.
CGG VERITAS – DUBAI : Worked as a Rigging Superintendent during the modification of vessel ADAMS AQUANAUT in Dubai Dry Dock for their S66 Fleet.
Nolis SPA – ALGERIA : Worked as Superintendent during repair of their vessel M.V. AMIROUCHE in Turkey
Multigroup L.L.C. - DUBAI : Worked as a Superintendent during repair of their Barge DOLPHIN in Jadaf
E- Marine - DUBAI : Worked as a Superintendent during fabrication of J-tube in Iran.
M.C. Shipping – CYPRUS : Worked as Superintendent during the renewal of water blast tank, tank top, side shell plates, bottom plate, fore/Aft peak areas, main deck plate, TST area plates, and cargo tanks saddles etc for KEW BRIDGE Cargo Vessel at DUBAI Dry Dock.
Arab Heavy Industries – Ajman / U.A.E. : Worked as QC Inspector for their NRPOD TAPTI EXPANSION PROJECT. The job involved fit up inspection, dimension check and visual inspection of welds during the construction of 42” Protection and Base frame, 36” Protection and Base frame, 42” and 36” Plem Piles, 42” and 36” Chaser Piles, 42” and 36” piping.
Arab Heavy Industries – Ajman / U.A.E. : Worked as QC Inspector for their BLACKFORD DOLPHIN (6000 feet deep water moored drilling & completion semi – submersible rig.) Project. The job involved fit up inspection, dimension check and visual inspection of welds during the construction of Blisters, Main Riser Columns, Auxiliary Columns, Out fittings, & Sea Fasting etc.
Petromin Lubricating oil Refining Company :
- Luberef II Project- YANBU / K.S.A. : Worked as a NDT Inspector for MOBIL / LUBREF during the project. The job involved during this period have included industrial radiography, ultrasonic thickness measurement (using isometric & construction drawing), magnetic & penetrant testing of piping, heat exchangers, drums, towers, boiler tubes, tank- lining, spheres and structural steel welded fabrication through construction, start up and normal plant operation.
Nasser S. Al- Hajri Corporation- YANBU : The job involved Ultrasonic & Radiographic testing T-joints & circumferential welds of tank-lining, during the construction of Yanbu Cement Company
ACBI LTD. – YANBU : The job involved Ultrasonic, Magnetic, Penetrant testing of Re-generator head to shell weld, telephone piece to W.G.Ducting weld, cone to rough cut-riser welds, cyclone hanger nozzle welds, re-generator head lifting lugs welds, catalyst withdrawal nozzle CNX2 weld etc during SAMREF’s 1998 FCCU re-generator turnaround shutdown & modifications.
Consolidated Contracting Co. Ltd.
YANBU : The job involved positive material identification of material (material identification and alloy analysis) using the X-Met 880 alloy analyzer in Ibn Rushed PTA Project.
Metal Services Company – JEDDAH
- Formally Al Joaib- : The job involved radiographic testing of various diameter-piping welds. Penetrant testing of various diameter socket welds, fillet welds of steam tracing line, valve - fitting welds during the Saudi Aramco’s Jeddah Refinery Shutdown.
SCECO - Western Region- Rabigh : The job involved ultrasonic thickness measurement of Economizer’s stubs & tubes, re- heater tubes, water wall tubes. Penetrant testing of spacer welds of unit #4 during the Rabigh Steam Power Plant Shutdown.
FAFCO – Jeddah : The job involved radiographic testing of various diameter-piping welds. Penetrant testing of socket and fillet welds. Ultrasonic thickness measurement of shell plates of all tanks during the Jeddah Refinery‘s tank modification.
Saudi Bin- Laden Group – Jeddah : The job involved Magnetic Particle testing of fillet & butt welds webs & flanges for their PP9 Project in Riyadh.
Saudi Bin- Laden Group- PCM Div.- Rabigh : The job involved radiographic testing of 6” dia. Convection tubes during the upgrade of convection section tubes of (F34) 5300 F-02 debutanizer Reboiler at Rabigh Saudi Aramco Refinery Shutdown.
Al – Hamm am Company – Yanbu : The job involved radiographic testing of 6” & 8” diameter piping welds. Penetrant testing of various diameter fillet welds during their fire fighting and Safety facilities upgrade project at Yanbu Bulk Plant.
Ali H. Al-Ghamdi Est. - Yanbu : The job involved radiographic testing of 4” dai. Piping welds. Holiday detection test of the same line (under ground piping area) during the construction of new H2 line from Samref to Safra Plant.
Arabian International Company – Jeddah : The job involved ultrasonic testing of beam to wall plate welds during the construction of Borj Jewar Project in Makkah.
Saudi Bin- Laden Group- PCM Div.- Yanbu : The job involved radiographic testing of 12” dai. Welds. Holiday testing of same line (under ground piping area) during the NIGC to IBN RUSHD pipeline Project.
Mace Saudi Arabia Ltd. – Yanbu : The job involved radiographic testing of 12” dai. Welds during the Saudi Aramco’s pipeline rehabilitation project from SWCC to Yanbu Refinery.
Saudi Bin- Laden Group- PCM Div.- Yanbu : The job involved radiographic testing of various dai. Meter piping welds. PT & MT of various dai. Meter fillet & socket welds during the construction of Luberef II Expansion (Tar & Extract) Project.
Al – Shamrani Industrial Group - Makkah The job involved radiographic testing of various dai. Meter piping welds (4” to 18”) during the construction of Mina Slaughter House Project.
FAFCO – Yanbu : The job involved radiographic testing of various diameter-piping welds during their process fire heaters safety upgrade project at Yanbu Aramco Refinery.
SST – Jeddah : The job involved radiographic testing of 1.25” diameter piping welds of super heater re-heater tubes of boiler during replacement of new tubes at SWCC.
Saudi Bin- Laden Group- PCM Div.- Rabigh : The job involved radiographic testing of super heater & water wall tubes Boiler no. 153 at Rabigh Aramco Refinery.
CCC – Haradh : Radiographic testing of various diameter piping welds during the construction of Haradh Gas Project.
ABV Rock Group – Buriadah : The job involved RT, UT, PT, MT, LT & Pneumatic testing of suction pits bottom frame, suction pits wall plates & top frame, drainage pipe, ribs splice joints floor embedded steel plates, etc. during the construction of SSSP SITE 3 project.
Quality Enterprises: MUMBAI
Worked as an NDT Technician
January’ 93 to January’ 96
Certified Level II in UT, MT, PT, worked in Petrochemical, offshore, hydroelectric & other major project.
MAJOR ASSINGMENTS :
: UT, MT, and PT of shutdown jobs at RCF – Alibagh, IPCL Nagothan, BPCL / HPCL Refineries, Union Carbide – Chembur
: UT & MT of Horton Spheres at GSFC – Baroda, Indian oil refinery – Baroda, BPCL – Baroda & HPCL – Mumbai
: MT of radial gate chain links and pins at hydroelectric project Koynadum
: UT Thickness measurement of ships in mid stream
: MT of TKY joint of platforms and jacket at Megaton Dock Ltd., Inspection of Rigs, Spud cans to leg joints at ONGC, Sager Samrat Sager Uday etc.
: Lamination checking of plates, MT & PT of crankshaft, bolts, crane hooks (chain blocks), bars, propellers, boilers shells and valve at RCF, Zenith Chemical, Zuari Agro etc.