Resume CV : ELECTRICAL QA/QC INSPECTOR

+ Ask Question / Post resume
Results 1 to 2 of 2
  1. Post Count Number #1
    Guest Poster
    Join Date
    August 14th, 2008
    Location
    Your Heart, Delhi
    Posts
    76,213

    Resume CV : ELECTRICAL QA/QC INSPECTOR

    Resume :
    Raja
    Email : v.raja54 AT yahoo.com

    CAREER OBJECTIVE :
    Having 6 years of Experience as QA/QC Electrical Inspector as well as Electrical Supervisor in Petrochemical Plant Project and Refinery Projects. Familiar with Inspection procedures and other applicable code standards and maintenance.

    TECHNICAL QUALIFICATION :
    Exam Passed : DEEE In April - 2002
    Computer Proficiency : MS-EXCEL, WORD, POWER POINT.

    EXPERIENCE IN SAUDI ARABIA : (4 years)
    - Organization : NASSER S AL-HAJRI CORPORATION ,
    Designation : QA/QC ELECTRICAL INSPECTOR,
    Project : METHANOL CHEMICAL PROJECT,AL JUBAIL,
    Contractor : LARSON AND TUBRO LTD,
    Duration : Sep 2007 to Feb 2008

    - Organization : NASSER S AL-HAJRI CORPORATION
    Designation : QA/QC ELECTRICAL INSPECTOR
    Project : SAUDI KAYAN PHENOLICS PROJECT,AL JUBAIL
    Contractor : TECNICAS REUNIDAS GULF
    Duration : Mar 2008 to Sep 2009

    - Organization : NASSER S AL- HAJRI CORPORATION
    Designation : QA/QC ELECTRICAL INSPECTOR
    Project : NCP NORTH PLOT PROJECT, AL JUBAIL
    Contractor : JGC ENGINEERING COMPANY LTD
    Duration : Dec 2009 to Untill

    DUTIES AND RESPONSIBILITIES :
    - Conducting Surveillance for Construction Activities and Site Inspection for the following Electrical Activities :
    - Preparation of Inspection and Test Plan, Construction Quality Procedure and Method of Statement
    - Preparation and Submittal for RFI.
    - Review and Inspection of all Electrical Material, prior to Installation.
    - Daily monitoring the Construction Activities.
    - Responsible for the over-all implementation of Quality Control related electrical works accordance with project specifications and Engineering Standards.
    - Verify the equipment and devices used in the project meets the required specifications per project requirements, Standard and tested in accordance with the procedures.
    - Monitor the Underground installations; check the required burial depth and spacing requirements to adjacent installations, prior to backfilling
    - Testing of cable meggaring and HI – POT test.
    - Inspection of Electrical Equipment function test and Illumination level testing of lighting system.
    - Inspection of electrical installation Panels Monitoring control panel wiring, Termination, cable routing & cable tray installation.
    - Verify all required inspection report and test records are systematically generated and compiled according to the approved QC Procedures.
    - Coordinate with Client representatives regarding the implementation and quality of works.
    - Inspection of Switch Gear Panel installation, Cable Termination and Bus bar torque.
    - Installation of control panel marshalling panels and termination continuity and Meggar test .
    - Insulation Resistance and Winding Resistance Testing of LV, MV motors.
    - Inspection of Ground Rod and Grounding cable, as per Engineering Specification.
    - Preparation of Electrical Inspection Reports
    - QA/QC Inspection witness for cathodic protection system Underground pipe lines and Metal Tanks. Installation of Permanent Anodes, Temporary Mg Anodes, LIDA Anode, Galvanic Anodes, Test station ,AJB,NJB,MJB ASB and Positive Negative cable laying, and Termination, Installation and termination of Transformer rectifier, Witness of HMWPE Cable Holiday Test and CP system Pre-Commissioning Activities.
    - Inspection of Heat Tracing panel Installation, PT, RTD Junction Box Installation and Heat tracing cable laying and meggaring.
    - Witness for Pre-commissioning of motor Solo Run activities.
    - Prepare the Motor Solo Run test Package.
    - Witness of Motor Solo Run Test
    - Provide sufficient feed back to QA/QC Manager on the day to day quality issues.
    - To supervise and carry out effective implementation of work schedule to clear punch list.

    EXPERIENCES IN INDIA :
    O Organization : ABBAN POWER PLANT
    Designation : ELECTRICAL SUPERVISOR,
    Duration : Aug-2004 to Nov-2006
    o Organization : PYRAMID CONSTRUCTION
    Designation : Electrical SUPERVISOR
    Period : Jul-2003 to Jun-2004

    Works carried out for the Electrical Erection & Maintenance works as follows :
    - Electrical cable tray installation.
    - LV, MV Cable installation.
    - LV, MV and HV switchgear installation.
    - Motor Control Center (MCC) installation
    - Single phase and three phase wiring and Interior & Exterior lighting fixture installation
    - Maintenance of HV & MV Distribution Transformers, like visual checking of transformer oil level, oil temperature, winding temperature & breather silica gel. If any abnormalities, rectify that.
    - Testing the transformer oil Di electric strength by BDV test, if lesser value oil filtration will be carried out.
    - Preventive maintenance of panel boards, ACB, VCB, Oil circuit breakers & motors will be carried out with planned schedule.
    - Trouble shooting for the motors, Alternators, DC generators, Rectifiers, welding transformers, Battery banks, UPS system & lighting circuits..
    - Operation of Diesel Generator sets and Parallel operation (Synchronizing) of alternators also done.
    - Measuring of grounding values of the Earth pits with schedule and record the readings in the concerned register log. Applying petroleum jelly over the contact surface of the earth plate.

    Declaration :
    I hereby declare that the information's furnished above are true and correct to the best of my knowledge and belief.

    Yours Faithfully
    V.RAJA
    Last edited by Guest-IJT; June 13th, 2011 at 01:22 PM.

  2. Post Count Number #2
    Guest Poster
    Join Date
    August 14th, 2008
    Location
    Your Heart, Delhi
    Posts
    76,213

    Electrical Supervisor.

    Application for the post of electrical supervisor.