April 12th, 2010, 07:03 PM
Post Count Number #1
J. Ray McDermott engineering services pvt Ltd Dubai : OFFSHORE INSTALLATION
OFFSHORE INSTALLATION MANAGER
J. Ray McDermott has immediate openings for experienced and qualified Offshore Installation Managers (OIM). This Senior Management Position undertakes responsibility for the management of the project offshore. The role includes being the primary operational interface onboard with the client, superintendent, engineers and vessel masters in the spread. The OIM shall ensure that operations are completed in accordance with approved programs, procedures and relevant statutory and company policies. Likewise, operations shall be completed in accordance with the necessary contractual and technical specifications.
QUALIFICATIONS
* Preference for former OIMs, Mariners or Construction Superintendents with hookup and commissioning and/or offshore construction.
* Computer literate (proficient with Microsoft Office products).
* At least ten (10) years of substantial related experience is essential, with demonstrable relevant management experience – ideally in a Superintendent type position with international offshore management experience.
* A good overall knowledge of all offshore construction operations supported by a strong foundation in management and leadership capabilities is desired.
* Experience with barge operations and other aspects of subsea construction is a plus.
Interested and available candidates should submit their resume/CV with full details of experience and education qualifications by email to: jraymarinejobs.com. When submitting your resume/CV, please title your email Offshore Installation Manager.
Prospective candidates please respond by quoting the position in the subject line.
Jebel Ali, Dubai, U.A.E.
Middle East Operations
Submit resumes to
jrmrecruiting.middleeast@mcdermott.com
http://www.jraymcdermott.com
-
December 9th, 2010, 06:39 PM
Post Count Number #2
Re: J. Ray McDermott engineering services pvt Ltd Dubai : OFFSHORE INSTALLATION
hi this is malleswararao sangaru
i am applying post for trainee electrical officer
-
January 6th, 2011, 08:52 AM
Post Count Number #3
Re: J. Ray McDermott engineering services pvt Ltd Dubai : OFFSHORE INSTALLATION
Mahesh Kumar Sankaran
maheshkumarsankaran AT gmail.com
A result oriented professional with 24 years experience including 4 years international experience in the
Middle East, mainly handling Environment, Health, and Safety issues in the construction sector. Seeking a
challenging assignment as Safety Engineer/Officer in areas of loss prevention & safety
management in a Firm of repute in the Oil & Gas/ Construction industry.
Profile at a Glance
- Expertise in managing HSE engineering operations in Oil & gas/Construction sector in the Middle East.
- Familiarity with Environment, Health, and Safety norms in construction safety and meeting international standards as well as GCC requirements.
- Actively involved in the documentation processes for ISO 9001 :2008 QMS, ISO 14001:2004 EMS, and OHSAS 18001:2007 Occupational Health & Safety standards.
- Demonstrated capability in performing vital tasks as a member of the Indian Air Force for two decades.
- Expertise in identifying and evaluating hazards and risks, assessing impacts associated with each activity and developing various control techniques and procedures.
- Possess technical expertise in imparting safety training, conducting safety induction, and toolbox talks on various HSE issues.
- Ability to work under pressure in a fast paced, multi cultural environment and achieving goals.
- Possess strong communication, analytical, organizational, & interpersonal skills.
- A team player with an excellent record of team management and leadership.
Competency Profile
- Updating, communicating, and promoting the Company's HSE Management System, Safety Procedures, and Emergency Procedures.
- Conducting HSE awareness training/induction training & Tool Box Talks to Engineers, Supervisors and work force.
- Carrying out risk analysis activities on all Company’s installations/operations; reviewing new projects and assessing modifications to existing facilities with regard to fire safety.
- Ensuring the proper establishment and homogeneous implementation, of HSE policy throughout all sites.
- Conducting HSE audits to ensure adherence to Company's established Safety standards and code of practice; initiation of immediate action for enhanced compliance of HSE performance.
- Reviewing HSE performance of different Project Sites / Activities, reviewing site-specific HSE needs of plants / complexes, preparation & presentation of MIS.
- Investigation of work accidents to establish root cause, suggest remedy, follow-up compliance & generate statistical reports to the higher management and advising management on safety matters.
- Interacting with leading HSE organizations for obtaining specialized support towards skill enhancement, localizing new developments etc. pertaining to HSE.
- Preparing and maintaining of safety related document to demonstrate conformity and compliance, to HSE policy and procedures.
- Conducts safety meeting with sub contractor’s safety officers and promoting safety aspects by conducting safety campaigns.
- Inspecting lifting gears and scaffolding at work site
Career Profile
Wade Adams Contracting LLC, Dubai, UAE
(An ISO 9001 :2008, ISO 14001:2004, & OHSAS 18001:2007 certified MNC firm, engaged in construction and engineering activities since 1976, currently focused in the UAE, Bahrain, Qatar, Oman in GCC and Libya in the MENA region)
HSE Advisor (June 2008 to date)
(Reporting to the Corporate HSE Manager)
Job Profile :
As HSE Advisor and handling the following responsibilities :
- Supervising upkeep of Fire Fighting equipment and monitoring its maintenance through periodic checks.
- Conducting inspection of site with respect to HSE Auditing requirements.
- Continuous monitoring of all activity to avoid non-compliance
- Evaluating/review and preparing risk assessment procedures and job safety analysis (JSA) and Emergency Procedures,
- Advising execution team for existing control measures and preparing joint hazards Identification risk assessment based on the method statements, before commencement of any critical activities.
- Reviewing, studying accident cases, implementing new techniques & necessary procedures to reduce the aggravation of accidents, and ensuring protection of lives and property.
- Providing input and support for the safe conduct of work by contractor personnel during normal maintenance/shutdowns of the company’s operating facilities and associated utility equipment.
- Conducting fire drills and imparting fire lectures to all employees.
- Coordinating with the clients for the implementation of HSE standards and regulation at site.
- Preparing accident / incident, near miss reports, through investigation & analysis and making recommendation for corrective action.
- Identifying opportunities for improvement and liaising with the authorities on HSE issues.
- Monitoring compliance with the applicable laws and regulations and fulfilled adherence to statutory norms providing assurance to the management.
- Providing expertise and knowledge and preparing progress reports for the top management.
- Coordinating the company HSE activities on site and managing the same
- Supervising the periodical HSE audits of site including sub-contractors and monitoring project HSE performance by evaluating HSE statistics.
- Developing the safety culture in the organization and setting personal examples as a Health & safety professional. Ensure all plants, Equipment, Machineries and power tools projects are safe to operate, guarded with appropriate safety devices.
- Ensuring that all employees adhere to safe work norms.
- Developed and delivered HSE training courses to project personnel as required.
- Organizing and attending safety meetings with client and contractors
Contributions :
- Felicitated and awarded the Best Contractor Award from Nakheel while working in Palm Jebel Ali, in appreciation of the on the job performance and in recognition of the exemplary contribution to the project.
- Reduce incident rate every year with extraordinary efforts and dedication.
- Prepared detailed Non-compliance Audit Reports, and suggested corrective action, leading to substantial improvement in HSE performance.
Al Muftah, Qatar
(A pioneer business establishment in the State of Qatar started in 1963, is a conglomerate with diversified business activities and its civil construction division undertaking Engineering, Procurement, Installation and Commissioning (EPIC) contracts of civil construction projects including Mechanical, Electrical and Plumbing (MEP) works)
Safety Officer (February 2008- April 2008)
(Reported to the QP Safety Engineer)
Job Profile :
As Safety Officer worked on the projects NGL-4 Shutdown
- Reports accidents, near misses involving lost man-hours, property damage, and personal injury
- Carried out incident/accident investigation and reported to senior management.
- Monitored human resources management, and controlled environmental violations
- Ensured regular inspection of heavy equipments,
- Continuously monitored all activity to avoid non-compliance.
- Reported on accidents, near misses involving lost man-hours, property damage, and personal injury
- Conducted HSE meetings and onsite inspection.
- Conducted Tool Box meetings on a daily basis with the workforce.
Contributions :
- Achieved highest standard of safety with reduced incident rate
Integral Services Co. WLL, Kuwait
(An ISO 9001 :2008 certified firm providing integrated design, engineering, procurement, construction, and project management services to the oil and gas, petrochemicals, fertilizer, power and desalination industries)
Plant Safety Supervisor (September 2007- January 2008)
(Reported to the Team Leader- Safety Engineering and Team lead)
Job Profile :
As Plant Safety Supervisor worked on the projects for KNPC-FCC-MAFP Shut Down
- Liaised on daily basis with Team Leader in the implementation of the site HSE plan and prepared proposals and plans for HSE activities, meetings, and onsite inspections.
- Conducted daily Tool Box talks with the work force.
- Ensured all procedures in the work permit are adhered including conducting the Gas test & Barricading.
- Ensured completion of all mandatory safety training by required personnel (H2S/BA, PTW, Fire & Safety watches, Security training, etc) and are in possession valid certificates.
- Spearheaded the collection and processing of HSE statistical data.
- Carried out evaluation after job safety analysis performance of sub-contractors.
- Monitored and analyzed accident records for clues to prevent future accident.
- Site Inspections to locate unsafe conditions and practices and ensured immediate implementation of corrective actions to avoid recurrences.
- Monitored and executed routine inspection of tools and equipments, adoption of environmental protection measures, and application of job safety analysis.
- Provided support and advice to all project and worksite personnel on matters related to HSE.
- Participated in accident/incident/and near miss investigations and implementation of corrective actions where required.
- Checked company's compliance with statutory safety regulations.
- Monitored consistently any deviations from statutory standards and norms.
Contributions :
- Appreciated for completing 21 million manhours without any reportable accident.
- Reduced accident rate and achieved company's goal of accident free environment.
- Appreciated for Nil accidents and safe handling of shutdown
Indian Air Force
Sergeant (March 1987- March 2007)
In Charge Fire and Safety Services Bay (2004- 2007)
Aerodrome work Supervisor (1998- 2004)
Job Profile :
- As Aerodrome Assistant/ Aerodrome supervisor possess experience in the field of Air Traffic Services/ Airside at different airbases in Indian Air Force.
- Trained in Aircraft Rescue and firefighting at the airbase.
- Experienced in carrying out Airside inspections with regulatory agencies
- Conducted audits for air safety, environment issues and stores.
- Worked as Air Field works liaison officer, ensuring unrestricted Air Craft operations keeping flight safety in mind.
- Was in-charge of runway/taxi track, apron and building construction/maintenance in two Aerodromes.(1998 to 2007)
Projects Handled
As Site HSE Advisor, Wade Adams Contracting LLC, Dubai, UAE, (June 2008 to date)
Project : Mirdif Buildings Roads & Infrastructure, Duration: January 2010 to Date
Client : Dubai Properties
Consultant : AECOM
Project Value : AED 170 million
Project : Development of Midrif Interchange, Duration: January 2009-December 2009
Client : Roads & Transport Authority
Consultant : Al Burj Engineering Consultants /Africon
Project Value : AED 235 million
Project : Dubai By Pass Phase III & IV, Duration: June 2008- December 2008
Client : Roads & Transport Authority, UAE
Consultant : Wilbur Smith Associates
Project Value : AED 500 million
As Safety Officer, Al Muftah, Qatar (February 2008- April 2008)
Project : worked on the NGL-4 Shutdown project
Client : Qatar petroleum
As Plant Safety Supervisor, Integral Services Co. W.L.L, Kuwait (September 2007- February 2008)
Project : Shut Down Project of HP and FCC_MAFP at Mina Al-Ahmadi Refinery
Client : Kuwait National Petroleum Co., Kuwait
As Plant Safety officer, Integral Services Co. W.L.L, Kuwait (Apr/May 2010)
Project : Shut Down Project of EG 1 EG 2 and ASP at Equate Petro chemicals
Client : Equate, Kuwait
Training
- Attended training module on working in Heat/Heat stress, organized by Abu Dhabi Health Department
- Completed certified course on Safe Rigging & Slinging.
- Successfully completed Junior Warrant Officer Leadership Course conducted by the Indian Air Force
- Completed a certified course on First Aid & Safety, organized by the under secretary occupational Health Ministry UAE.
- Attended workshop to get permit to work level one from Qatar Petroleum (C-3153)
- Undergone a General Course on Air Crash Rescue and Fire Fighting conducted at the Defence Institute of fire Research, New Delhi.
- Participated training course on H2S & SCBA awareness conducted by Ventury Gulf, approved by Qatar Petroleum.
- Approved by Government of India as certified Fire Prevention Officer-NCO Code- 570.10
- Certified as Aerodrome Supervisor, by the Government of India (Issued by Govt. of India, Ministry of Labour letter NO. DGET-5/1/03/VG (01) (NCO) dated 04 June 2003).
Educational Qualifications
- Diploma in Industrial Safety, National Institute of Labour Education and Management. 1st class, (2008).
- NEBOSH, National Examination Board of Occupational Safety and Health, UK, (2007).
- Fire Prevention Officer-Govt of India
- Diploma in Fire and Safety Management, National Institute of Labour Education and Management, 1st class, (2007).
- Diploma in mechanical engineering. Govt of India.
- Bachelors Degree in Arts, Kakatiya University, Warangal, Andhra Pradesh, 2nd. class, (1994).
-
June 8th, 2011, 07:59 PM
Post Count Number #4
RESUME FOR TRAINEE ELECTRICAL OFFICER FOR OFFSHORE
CURRICULAM VITAE
S.RAJA
s.rajakar AT gmail.com
CAREER OBJECTIVE
To have a challenging career in any industry and to associate with an organization which can utilize my skills, ability and knowledge and provide me an opportunity for Professional growth and satisastroy
CAREER OBJECTIVE
B.E., Electrical&electronics Engineering,
Oddaiyappa collage Engineering & tech Theni (Dt), Tamil Nadu,
Anna University, year 2006-2009, Percentage of Marks 55%
Diploma in Electrical&electronics Engineering,
Thagamuthupolytechmic collage Periyakulam, Tamilnadu
Board of Technical Education year 2003-2006, Percentage of Marks 73%
SSLC
T.M.H.N.U Matric Higher Sec School, M.T Patti, Theni, Tamilnadu
Board of Matriculation year 2002-2003, Percentage of Marks 65%
EXTRA QUALIFICATION
- Ship Electrical Engineer Course with R.L Institute of Nautical Sciences,
TVR Nagar, Madurai, Tamilnadu
- Marine Automation & Control System conducted by Honeywell Automation India Ltd
with R.L Institute of Nautical Sciences, TVR Nagar, Madurai, Tamilnadu
- Low Tension Switchgear Course conducted by L&T Switchgear
with R.L Institute of Nautical Sciences, TVR Nagar, Madurai, Tamilnadu
STCW Technical Certifications/Trainings :
Year Course Institute/University/Issuing Authority Certificate No Date of issue Place of Issue
2009 EFA RLINS/DG Shipping EFA/846/2009 23-Dec-2009 Madurai
2009 FPFF RLINS/DG Shipping FPFF/845/2009 19-Dec-2009 Madurai
2009 PSSR RLINS/DG Shipping PSSR/859/2009 26-Dec-2009 Madurai
2009 PST RLINS/DG Shipping PST/857/2009 30-Dec-2009 Madurai
2010 OTFC TNMA/DG Shipping OTFC/1033/2010 13-Mar-2010 Thoothukudi
Seamen Relevant Documents :
SI.No Documents Number Date of Issue Date of Expiry Place of Issue
1 Passport H7660295 26-Nov-2009 25-Nov-2019 Madurai
2 CDC MUM182252 28-Jan-2011 27-Jan-2021 Mumbai
3 INDOS NO 10SL1892 28-Jan-2010 Mumbai
-
November 23rd, 2011, 11:00 AM
Post Count Number #5
Senior Structural Engineer
Vijith Vasudevan
vijithkumar.vasudevan AT gmail.com
TECHNICAL SUMMARY
Certifications : Degree in Civil Engineering, May 1999, Pune University
Operating Systems : Windows NT, Windows 2000
Documentation : Office 2000
Engineering Packages : STAAD-Pro, Gtstrudl, ETABS ,SAFE , XSTEEL, SDS/2,Intergraph’s PDS suite covering 3D Modules (Framework Plus ), Bentley’s Micro station , AutoCAD
Total Experience : 12 years
Skill Profile
Over 12 years of total past experience in Structural Analysis, Design, Detailing & Estimation of Grid Station, Substations, Polyester Plant, Ethanol Plant, Chemical Plant, Cement plants, Power plants, Oil & Gas Refinery , Waste Water Treatment Plant & Residential Complexes .
Internal Auditor for ISO 9001 :2008
EXPERIENCE SUMMARY :
Employment in Poyry Energy Ltd ( Dubai ) (From July 2007 – Till Date)
Designation : Senior Civil Design Engineer
Currently Associated with Poyry Energy Limited ( Dubai Branch )
As a Senior Structural Engineer responsible for Design for 400/132/33 kV Grid Station , Waste Water Treatment plant, Power plant & review of EPC contractor’s design and administering “Design and Build” contract as owner’s engineers. Responsible for Progress monitoring , Providing technical support to working engineers/ draftsman , Planning & monitoring the adequacy of recourses for the on going project , interacting with client /authorities for technical matters
Internal Auditor for Poyry Dubai office for ISO 9001 :2008
Employment in Chemtex Global Engineers Pvt. Ltd. (From Oct 04 – June 2007)
Designation : Senior Structural Engineer
Worked as Senior design Engineer With Chemtex Global Engineers
Role & Responsibilities include Analysis, Design, Preparation of Civil & Structural Detail Drawing, Estimation,3D Modeling, Guiding Designers for preparation of Detail Engineering Drawing, Coordination with agencies & site
Employment in Rolta India Ltd. (From Oct 03 – Oct 04)
Designation : Senior Executive – PDA -Stone and Webster Detail Engineering group
Worked as Senior Executive of Stone and Webster Detail Engineering group
Role & Responsibilities include Estimation, Analysis, Design, Preparation of Civil & Structural Detail Engineering Drawing, 3D Modeling ,Guiding Designers for preparation of Detail Engineering Drawing
Employment in Bhagwati Design India Pvt. Ltd. (From September 1999 to October 2003)
Worked as Senior Designer Engineer in Bhagwati design Ltd & was responsible for executing Basic and Detail Design Engineering projects for Cement plants, Power pants, Water Treatment plant & Residential Complex for overseas Project and local Project.
Role & Responsibilities : Project Estimation, Creation of Design Norm & Plan Of Work, Identifying Earthquake Zone & Wind Speed as per plant location, Generating Load data from Customer Input, Identifying soil strata & founding depth as per soil report, Generating G.A as per Customer Input, Co-ordination with Mechanical & Electrical Team for design Input, Sizing of Structural Members For Analysis, Generating Staad /GtStrudl Model For Analysis, Generating Load for Staad Input, Performing Analysis for Load Combinations as per Codal Provisions, Sizing & Designing Structural Members from final Analysis, Designing the Structure For Worst Load from Analysis Output ,Designing Of Turbine & Equipment Foundation ,Generating Drawing As per Design on AutoCAD, Final Checking of Drawing , Manpower planning for successful timely completion of project, Co-ordination & technical support to site Team
Employment in Shishir Kulkarni & Associates Ltd. (From June 1997 to December 1999)
Worked as Design Engineer for SKA Ltd. & was responsible for executing Detail Design Engineering Projects for Residential & Commercial Projects
Role & Responsibilities : Creation of Design Norm & Plan Of Work, Identifying Earthquake Zone & Wind Speed as per plant location, Generating Load data from Customer Input, Identifying soil strata & founding depth as per soil report, Generating G.A as per Customer Input, Co-ordination with Mechanical & Electrical Team for design Input, Sizing of Structural Members For Analysis, Generating Staad /GtStrudl Model For Analysis, Generating Load for Staad Input, Performing Analysis for Load Combinations as per Codal Provisions, Sizing & Designing Structural Members from final Analysis, Designing the Structure For Worst Load from Analysis Output ,Designing Of Turbine & Equipment Foundation ,Generating Drawing As per Design on AutoCAD, Final Checking of Drawing , Co-ordination & technical support to site Team
WORK HISTORY
Project # 1. Gulf JP Co Ltd has been granted by the Thai government Small Power Producers (SPP)
licenses for a total of 7 new power plants, each of around 110 MWe, using natural gas as a fuel.
Client : Gulf JP Co Ltd
Project Description : 110 Mwe Power Plants
Role & Responsibilities
- Analysis & Design of Pipe Rack, Equipment Foundation, & Shed
- Generating Load for Staad Input
- Performing Analysis for Load Combinations as per Codal Provisions.
- Sizing & Designing Structural Members from final Analysis
- Designing the Structure For Worst Load from Analysis Output
- Generating Drawing As per Design on AutoCAD
- Final Checking of Drawing
WORK HISTORY
Project # 1. 400/220/33 kV Grid Station for Toshiba corporation at ICAD ( Abu Dhabi ) UAE
Client : Abu Dhabi Transmission & Dispatch Company ( TRANSCO )
Project Description : 400 kV GIS Building , 500MVA Transformer , Control Room Building , 33 kV Switchgear Building , 220 kV GIS Building , Fire pump room , Cable trench
Role & Responsibilities
- Review of design input drawings
- Interacting with Client on behalf of Toshiba
- Creation of Design Norm & Plan Of Work
- Generating Load data from Client Input
- Identifying soil strata & founding depth as per soil report
- Generating G.A / Architectural drawing as per Customer Input
- Sizing of Structural Members For Analysis
- Generating Staad Model For Analysis
- Generating Load for Staad Input
- Performing Analysis for Load Combinations as per Codal Provisions.
- Sizing & Designing Structural Members from final Analysis
- Designing the Structure For Worst Load from Analysis Output
- Designing Of Turbine & Equipment Foundation
- Generating Drawing As per Design on AutoCAD
- Final Checking of Drawing
- Manpower planning for successful timely completion of project
- Coordination with Client & Abu Dhabi Municipality for approval of drawings & calculation
Project # 2. New 400/132 kV Grid Station for Toshiba corporation at Bahia ( Abu Dhabi ) UAE
Client : Abu Dhabi Transmission & Dispatch Company ( TRANSCO )
Project Description : 400 kV GIS Building , 500MVA Transformer , Control Room Building , 33 kV Switchgear Building , 132 kV GIS Building , Fire pump room , Cable trench
Role & Responsibilities
- Review of design input drawings
- Interacting with Client on behalf of Toshiba
- Creation of Design Norm & Plan Of Work
- Generating Load data from Client Input
- Identifying soil strata & founding depth as per soil report
- Generating G.A / Architectural drawing as per Customer Input
- Sizing of Structural Members For Analysis
- Generating Staad Model For Analysis
- Generating Load for Staad Input
- Performing Analysis for Load Combinations as per Codal Provisions.
- Sizing & Designing Structural Members from final Analysis
- Designing the Structure For Worst Load from Analysis Output
- Designing Of Turbine & Equipment Foundation
- Generating Drawing As per Design on AutoCAD
- Final Checking of Drawing
- Manpower planning for successful timely completion of project
- Coordination with Client & Abu Dhabi Municipality for approval of drawings & calculation
Project # 3. 132 /22 kV Sub Station at Yas Island ( Abu Dhabi ) UAE
Client : Abu Dhabi Transmission & Dispatch Company ( TRANSCO )
Project Description : 132 kV sub station Building
Role & Responsibilities
- Generating G.A as per Customer Input
- Sizing of Structural Members For Analysis
- Generating Staad Model For Analysis
- Generating Load for Staad Input
- Performing Analysis for Load Combinations as per Codal Provisions.
- Sizing & Designing Structural Members from final Analysis
- Designing the Structure For Worst Load from Analysis Output
- Generating Drawing As per Design on AutoCAD
- Final Checking of Drawing
Project # 4. 132 /11 kV Sub Station at Sports city ( Dubai ) UAE
Client : Dubai Electricity and water supply Authority
Project Description : 132 kV sub station Building
Role & Responsibilities
- Review of Calculation
- Review of design drawing
- Review of Shop drawing
Project # 5. RELIANCE NG3 REVAMP PROJECT
HAZIRA, SURAT- GUJARAT.
Client : Reliance Industries Ltd
Project Description : Poy Spinning Building, Automated Product Handling Shed , Compressor Shed , H.T Substation , Inter connecting Pipe Rack , TEG Cleaning Building , Compressor House
Role & Responsibilities
- Creation of Design Norm & Plan Of Work
- Identifying Earthquake Zone & Wind Speed as per plant location
- Generating Load data from Customer Input
- Identifying soil strata & founding depth as per soil report
- Generating G.A as per Customer Input
- Co-ordination with Mechanical & Electrical Team for design Input
- Sizing of Structural Members For Analysis
- Generating Staad /GtStrudl Model For Analysis
- Generating Load for Staad Input
- Performing Analysis for Load Combinations as per Codal Provisions.
- Sizing & Designing Structural Members from final Analysis
- Designing the Structure For Worst Load from Analysis Output
- Designing Of Turbine & Equipment Foundation
- Generating Drawing As per Design on AutoCAD
- Final Checking of Drawing
- Manpower planning for successful timely completion of project
- Co-ordination & technical support to site Team
Project # 6. 500 TPD CP, 3 X 150 TPD NGSSS STAPLE LINES
FOR BOMBAY DYEING & MFG. CO. LTD. – DMT DIVISION
Client: BOMBAY DYEING & MFG. CO. LTD. – DMT DIVISION
Project Description: CP Building , Substation , PSF Building , Compressor Shed , H.T Substation , Inter connecting Pipe Rack , TEG Cleaning Building , Compressor House
Role & Responsibilities
-
- Creation of Design Norm & Plan Of Work
- Identifying Earthquake Zone & Wind Speed as per plant location
- Generating Load data from Customer Input
- Identifying soil strata & founding depth as per soil report
- Generating G.A as per Customer Input
- Co-ordination with Mechanical & Electrical Team for design Input
- Sizing of Structural Members For Analysis
- Generating Staad /GtStrudl Model For Analysis
- Generating Load for Staad Input
- Performing Analysis for Load Combinations as per Codal Provisions.
- Sizing & Designing Structural Members from final Analysis
- Designing the Structure For Worst Load from Analysis Output
- Designing Of Turbine & Equipment Foundation
- Generating Drawing As per Design on AutoCAD
- Final Checking of Drawing
- Manpower planning for successful timely completion of project
- Co-ordination & technical support to site Team
Project # 7. Analysis & Design of Power Plant Project for Ambuja Cement
(Turbine Building, Boiler House, Compressor House, Esp. Building, Conveyer)
Client: Ambuja Cement, India
Project Description: Power Plant For Grinding Unit at Ambuja Cement (Himachal), India.
Role & Responsibilities
- Creation of Design Norm & Plan Of Work
- Identifying Earthquake Zone & Wind Speed as per plant location
- Generating Load data from Customer Input
- Identifying soil strata & founding depth as per soil report
- Generating G.A as per Customer Input
- Co-ordination with Mechanical & Electrical Team for design Input
- Sizing of Structural Members For Analysis
- Generating Staad /GtStrudl Model For Analysis
- Generating Load for Staad Input
- Performing Analysis for Load Combinations as per Codal Provisions.
- Sizing & Designing Structural Members from final Analysis
- Designing the Structure For Worst Load from Analysis Output
- Designing Of Turbine & Equipment Foundation
- Generating Drawing As per Design on AutoCAD
- Final Checking of Drawing
- Manpower planning for successful timely completion of project
- Co-ordination & technical support to site Team
Project #8. Analysis & Design Of Power Plant For Raymond’s Denim Unit
( 30 Mw Power Plant , Turbine Building , Boiler House , Chimney Foundation )
Client’s Name Raymond Textile Ltd. Mumbai, India
Role & Responsibilities - Preparation of Design Specification
- Identifying Earthquake Zone & Wind Speed as per plant location
- Generating Load data from Customer Input
- Identifying soil strata & founding depth as per soil report
- Generating G.A as per customer input
- Generating Staad /GtStrudl Model For Analysis
- Generating Load for Staad Input
- Performing Analysis for Load Combinations as per Codal Provisions.
- Sizing & Designing the Structure For Worst Load from Analysis Output
- Generating Drawing As per Design on AutoCAD
- Final Checking of Drawing
- Co-ordination with site Team
Project #9. Analysis & Design of Preheated Building for ACC Cement
Client’s Name A.C.C Cement (Punjab), India.
Project Description This was a project for Analysis & Design Of Preheater Building fo Existing cement plant , Total height of building 150m , R.C.C structure
Role & Responsibilities - Studying Input Diagrams, Preparation of G.A, Preparation of Design Specifications as per codal provision and Plant Location Systems. Sizing of structural member, Generating load data for analysis
- Performing Staad model for analysis , Identifying Load Combination as per codal provision
- Designing of Foundation & Structural member
- Generating Drawing for Structural Member on AutoCAD
- Final Checking of generated Drawing
Project #10. Analysis & Design of Clinker Silo Roof
Client’s Name A.C.C Cement (Punjab), India.
Project Description This was a project for Analysis & Design Of Clinker Silo Roof for Clinker storage tank 66m dia
Role & Responsibilities - Studying Input Diagrams, Preparation of G.A, Preparation of Design Specifications as per codal provision and Plant Location Systems. Sizing of structural member, Generating load data for analysis
- Performing Staad model for analysis , Identifying Load Combination as per codal provision
- Designing of Foundation & Structural member
- Generating Drawing for Structural Member on AutoCAD
- Final Checking of generated Drawing
Project #11. PDS 3D Modeling
Client’s Name Indian Oil Corporation Ltd. Vadodara (Petrochemical Refinery)
Role & Responsibilities - 3D Modeling of Hydro-Cracker Unit, Including Furnace Building, Cracking Column, Pipe Rack, Equipment Foundation as per as built data
- MTO Report Customization
- Envelope Generation for Clash Detection
- Structural section customization.
Project #12. PDS 3D Modeling
Client’s Name Bharat Heavy Electrical Ltd. (500 MW Power Plant)
Role & Responsibilities - Project Set Up & FWP Model Creation
- Customization of User defined Section Table Section
- 3D Modeling of Boiler Building, Mill Structure, ESP Structure
- PML Application
- MTO Report Customization
- Envelope Generation for Clash Detection
- Structural section customization.