-
June 29th, 2008, 07:18 PM
Post Count Number #1
www.technipindia.com Technip India Ltd Chennai TPIL : PDS Piping Design Lead
Technip India Limited : TPIL : Chennai
http://www.technipindia.com
Company profile:
TPIL has started its operation in 1998 with a humble beginning with a work force of 70 people and executed projects of less than 100,000 man-hours. Now the company has grown multi fold with a turnover of 1150 million INR with a workforce of around 800 people. The Company is executing projects of 350,000 man-hours size and capable of handling more than 1,000,000 man-hours per annum.
Position: Lead Piping designer
Responsibilities / Missions:
Key responsibilities include:
** Perform CAD 3D piping and equipment modelling on PDS system for studies and layout purposes.
** Prepare plotplans, general arrangement drawings and pipe support drawings on micro station system.
Profile:
** Possess a ITI/ Diploma/Bachelor degree in Engineering
** Minimum of 10 years of working experience in a similar function
** Must be able to speak and write the following languages: English (mandatory)
** PC-knowledge: MS Office and PDS
** Pro-active co-operating, able to communicate direct and open and flexible
email : career@technipindia.com
Fresh Candidates: freshers@technipindia.com
You can also submit your resume here:
http://www.technipindia.com/career_resume.html
Technip India Limited
'MAC House', 4, Sardar Patel Road
Guindy, Chennai - 600 032
India
Last edited by Guest-IJT; May 16th, 2011 at 11:34 AM.
-
June 8th, 2011, 10:42 AM
Post Count Number #2
Resume - pradeep kumar
PRADEEP KUMAR. K
E-mail : kuruvelikaran AT yahoo.com ,
OBJECTIVE :
Obtain a challenging and growth oriented career in a highly motivated environment involving job satisfaction, good career and opportunity to learn and upgrade. Loyal towards work and profession forever and use of my skill and knowledge to the best of my abilities.
EMPLOYMENT RECORD :
Presently working with M/s. ESP (Asia) Pvt. Ltd., Mumbai at its Reliance project at Jamnagar, Gujarat as Asst. Officer (A/c and Admn.) from November 2006 till date.
- Reports to administrative Manager for administrative tasks as directed by management & client.
- Assist Financial Manager for daily cash flow.
- Preparing & disbursement of labour wages/staff salary and maintaining all statutory requirements.
- Preparing Petty Cash book and maintain proper records.
- Inform and advice employees to comply with procedural adherence for execution.
- Supervise office administration, vehicle movement etc,.
- Ensure events, process and all relevant documents comply with company procedures, policies, regulations & standards.
- Coordinate with Depts., consultants & clients to receive/submit regular reports and forms.
- Arrange, coordinate meetings as required.
Employer : M/s. Vijay Tanks & Vessels Ltd., Baroda (An ISO 9001-2000
certified co.)
Position held : Asst. Officer (Accts./Admn.)
Period of employment : January 2003 to September 2006
Employer : M/s. Bridge & Roof Co. (India) Ltd., Chennai (Govt. of India
Enterprises)
Position held : Asst. Store keeper.
Period of employment : August 2001 to December 2002
- Preparing & maintaining all books of records related to materials.
- Assist Purchase Manager.
Employer : M/s. Rediffusion-DY&R, New Delhi
Position held : Secretary to Director (Public Relations)
Period of employment : July 1996 to November 1998
Employer : M/s. Eddy Current Controls (India) Ltd, New Delhi
Position held : Office Assistant
Period of employment : July 1994 to June 1996
EDUCATIONAL QUALIFICATIONS :
- Bcom. from Calicut university, Kerala in 1992
- Pre-Degree Course from Calicut university, Kerala in 1989
- SSC from Board of Public Examinations, Kerala 1987
Working knowledge in : MS Excel, Word & Internet Operations
-
August 23rd, 2011, 11:25 AM
Post Count Number #3
G.PRAVEEN KUMAR
Email :
praveenk_mec AT yahoo.com
Career Objective
- To become an excellent Design and Development Engineer with core competence in advanced technologies in the field of Mechanical Engineering.
- Always strives for the excellence in all aspects of life.
Academic Qualification :
- First class Graduate in Mechanical Engineering.
Academic Profile :
2005 -2009
Mechanical Engineering with 74% from MAILAM Engineering College, Mailam, Villupuram (Dt). Under Anna University.
2004 - 2005
Passed 12th with 76% from BMTM Higher Secondary School,Pondicherry.
2002 - 2003
Passed 10th with 88% from Wesley Higher Secondary School,Pondicherry.
Software skills :
- Auto CAD 2008
- PDMS 11.5(Design,Spooler,Isodraft)
- CAESAR- II (5.20)
- SAP in pipework application.
- Pro- E 2.0
Current Experience :
- Completed Graduate Apprenticeship Training in BHEL-PIPING CENTRE, CHENNAI From August - 2010 to August – 2011.
Nature of work :
- Design of power plant piping.
Job profile :
- Pipe sizing and Material selection as per ASME standard
- Conversion of layout drawing to Isometric drawing
- Preparation of IBR calculation and documents for getting statuatory approval
- Preparation of Bill of material
- Pipe routing in layout by using PDMS
- Preparation of isometric drawing in PDMS
- Exposure in SAP in piping application.
- Preparation of Erection Welding Schedule(EWS)
Project handled in BHEL
CUSTOMERS
- BINA THERMAL POWER PROJECT,MADHYAPRADESH (2x250MW)
- BONGAIGAON THERMAL POWER PROJECT,ASSAM (3x250MW)
Experience :
- EYE PHOTONIX INDIA (PVT) LTD, Vadamangalam, Puducherry.
- Design Engineer Trainee - Sep 2009 to July 2010.
Responsibilities Design :
- Detailing 2D manufacturing drawing using Auto CAD 2009
- Modelling plastic components using Pro-E 2.0
-
September 6th, 2011, 09:01 PM
Post Count Number #4
resume
M.MONIKANTAN
E-Mail : mani_nandhan AT yahoo.co.in
Seeking assignment in Electrical field particularly in Design, Development & Consultancy, which will utilize my education and professional skills and offer me an advancement opportunity.
PROFESSIONAL SNAPSHOT :
- A dynamic professional of total 7+ years of experience in Electrical Design & Consultancy for various Industries like Paper & Pulp, Power Plants ,132/11kV & 132/33kV substation,etc.
- An out-of-the-box thinker with excellent leadership skills and demonstrated abilities to meet deadlines & work under pressures.
AREAS OF EXPOSURE/EXPERTISE :
- Preparation of HT & LT Single Line Diagram.
- Preparation of Equipment, Layouts-plan & section
- Preparation of Civil Detailing Layouts( floor opening, insert plate, wall opening & joinery details)
- Preparation of Plinth & Trench Layouts.
- Preparation of Transformer Foundation, Layouts.
- Preparation of Panel Busduct & Transformer Busduct, Layouts.
- Preparation of Equipment Earthing & Buried Earthing Grid Layouts.
- Preparation of Lighting & Small power Layouts.
- Preparation of Lightning Protection Layouts.
- Preparation of Cable Tray Layouts.
- Preparation of Cable Route Layouts.
- Preparation of Beam sleeve details.
- Preparation of Insert plate & Support details.
- Site coordination with clients.
ORGANIZATIONAL DETAILS :
July 16-2007 Still Working with ETA-Emirates Trading Agency in Dubai & Abu Dhabi.
Power Project divison. as Electrical Designer.
The Company is doing Electrical Contracting company is doing 132/11kV & 132/33kV substation.
June ’05 – July 09-2007 with Excel Consulting Engineers Pvt. Ltd. as Electrical Designer.
The Company is doing Electrical consulting jobs for industries like Paper & Pulpmill, & Steel, etc.
May’04 - March’05 with RS WINTECH Pvt.Ltd. Kavalkinaru, Kanyakumari Dist.
The Company is doing Electrical Wind Power Station maintenance.
MAJOR PROJECTS HANDLED IN ETA (Emirates trading agency-power project Divison in Dubai & Abudhabi)
Client : Dubai Electricity & Water Authority
1.132/11kV –Sheikh Zayed Road Tower Substation.
2.132/11kV – Dubai Silicon Oasis Substation.
3.132/11kV – Bohairah Substation.
4.132/11kV – Dhiyafa Substation.
5.132/11kV – Khabessi Substation.
6.132/11kV – Telecommunication Substation.
7.132/11kV – Lost city Substation.
8. 132/11kV – Qaryat Jumeirah Substation.
9. 132/22kV – Ghantoot Substation.
10. 132/22kV- Raha-b Substation.
11.132/22kV.Al Hayl Substation.
12.220/33kV-Ghanthoot Substation.
13.132/22kV-Al Falah Substation.
14.132/11kV-E25 Substation.
- Preparation of Equipment Layouts, Civil Detailing Layouts( floor opening, wall opening & joinery details) Earthing Layouts, Lighting Layouts, Lightning Protection Layout, Cable Tray Layouts, Cable route Layouts, Beam sleeve Layouts, Plinth & Trench Layouts & Site coordination.
MAJOR PROJECTS HANDLED IN EXCEL CONSULTING ENGINEERS : -
1. SIRPUR PAPER MILL, Khagaznagar – New Pulp Mill, Paper Machine Project (Done through SPB-PC, Chennai)
- Preparation of HT & LT Single Line Diagram, Equipment Layouts, Civil Detailing Layouts( floor opening, insert plate, wall opening & joinery details) Earthing Layouts, Lighting Layouts, Lightning Protection Layout, Cable Tray Layouts, Busduct Layouts, Transformer Foundation Layouts & Site coordination erection & commissioning
2. 132kV switchyard expansion –Kuntan WWT and Debottleneck project(Done through Siemens, Malaysia)
- Preparation Equipment Layouts, Civil Detailing Layouts( floor opening, insert plate, wall opening & joinery details) Earthing Layouts, Lighting Layouts, Lightning Protection Layout, Cable Tray Layouts, Busduct Layouts, Transformer Foundation Layouts
3. ANDHRA PRADESH PULP MILL – New pulp mill Project-Rajamundry (Done through SPB-PC, Chennai)
- Preparation of HT & LT Single Line Diagram, Equipment Layouts, Civil Detailing Layouts( floor opening, insert plate, wall opening & joinery details) Earthing Layouts, Lighting Layouts, Lightning Protection Layout, Cable Tray Layouts, Busduct Layouts, Transformer Foundation Layouts & Site coordination erection & commissioning
4. ITC-LIMITED PAPER BOARDS & SPECIALITY PAPER DIVISION –ITC-PINNACLE- (New pulp mill
Project-Bhdrachalam(Done through SPB-PC, Chennai)
- Preparation of HT & LT Single Line Diagram, Equipment Layouts, Civil Detailing Layouts( floor opening, insert plate, wall opening & joinery details) Earthing Layouts, Lighting Layouts, Lightning Protection Layout, Cable Tray Layouts, Busduct Layouts, Transformer Foundation Layouts & Site coordination erection & commissioning
5. ITC-LIMITED PAPER BOARDS & SPECIALITY PAPER DIVISION –PM#6- (New Paper mill Project-
Bhdrachalam(Done through SPB-PC, Chennai)
- Preparation of HT & LT Single Line Diagram, Equipment Layouts, Civil Detailing Layouts( floor opening, insert plate, wall opening & joinery details) Earthing Layouts, Lighting Layouts, Lightning Protection Layout, Cable Tray Layouts, Busduct Layouts, Transformer Foundation Layouts & Site coordination erection & commissioning
OTHER PROJECTS HANDLED IN EXCEL CONSULTING ENGINEERS : -
1. Vendor drawing review of Transformers, Busduct, Motors, Lift Layout, Lighting Layout, Cable tray Layout, HT & LT switchgears for ITC-PSPD, Bhadrachalam - New Pulp mill Project (Done through SPB-PC, Chennai).
2. Cable Tray Bill of material, Earthing Bill of material, Lighting & Lightining Protection PT-PEC-TECH-INDONESIA
ACADEMIC CREDENTIALS :
- D.E.E.E (Electrical & Electronics) from, Kanya Kumari Dist. 2004 (1st Class).
- B.TECH-Electrical) to till date.
IT SKILLS :
- Conversant with AutoCAD 2000 $ 2004 $ 2006, 2007,2008, Briscad, MS Excel, Word, Power Point, Adobe Photoshop 6.0 & Access.
-
April 23rd, 2013, 05:06 PM
Post Count Number #5
RESUME
Objective :-
To be in a company where I can put in my best efforts for the development of company and to simultaneously learn the latest technologies, which benefits both company and me.
Total Years of Experience :-
3+ Years of working experience in the field of Piping/Mechanical Draughtsman. In Offshore & Onshore Oil and gas/Petrochemicals and Process Piping.
Working Experience : -
I. Name of the Organization - M/s Greeva Software Solutions (Deputed to L&T IES)
Place of Work - Chennai
Department - Piping
Designation - DRAUGHTSMAN
Period - From APRIL 2012 to till date
II. Name of the Organization - SPIC - SMO
Place of Work - Chennai
Department - Piping
Designation - DRAUGHTSMAN
Period - From MARCH 2010 to MARCH 2012
Projects Handled : -
Client : COROMANDEL FERTILIZER LIMITED
Project : AS-BUILT DRAWING IN AMMONIA PIPE LINE
Client : KUWAIT OIL COMPANY LIMITED
Project : PIPING AS-BUILT IN BOOSTER STATION, BS-150
Client : KUWAIT OIL COMPANY LIMITED
Project : PIPING AS-BUILT IN GATHERING CENTER, GC-02
Client : STERLITE INDUSTRIES INDIA LIMITED,
Project : FUGITIVE GAS VENTILATION SYSTEM
Client : PROCTER & GAMBLE (P&G)
Project :
- BLOCK BUSTER
- NECTAR 3
- MANDIDEEP
- GLYCEROL HANDLING SYSTEM – VIETNAM
- DO SUPPLY SYSTEM (DIESEL OIL)
- NaOH (SODIUM HYDROXIDE)
- DESERT ROSE
- Cool DI Supply to GSS Skid (Offshore 3D)
Responsibility :
- Equipment Layouts
- Piping Layouts
- Piping Isometric Drawings.
- As-Built Drawing
- Bill of Material
- Skid Piping Modeling in AutoCAD 3D
Education Qualification :-
COURSE INSTITUTE YEAR OF PASSING PERCENTAGE :
Draughtsman (Mechanical) Govt. Industrial Training Institute, North Chennai-21 July-2009 88%
SSLC St. Peter’s Hr. Sec. School Chennai-13. March-2007 62%
D.M.E
(Mechanical) IGNOU Completed 5th Semester
Computer Exposure :-
Design Software : AUTOCAD 2002-2013, AUTOCAD 3D,
PDS ,
MS - Office,
Hardware & Network.
Personal Information :-
Name - P.KARTHIKEYAN
Father’s Name - M.PARTHASARATHI
Date of Birth - 10.07.1991
Age - 21
Gender - Male
Marital status - Single
Nationality - Indian
Languages Known - Tamil, English
Declaration :
I hereby declare that information given above are true and correct to the best of my knowledge and belief.
Place : Chennai Signature
Date :
(P.KARTHIKEYAN)