Resume CV : Instrumentation control engineer(DESIGN)

+ Ask Question / Post resume
Results 1 to 2 of 2
  1. Post Count Number #1
    On probation
    Join Date
    February 10th, 2010
    Location
    kerala
    Posts
    1

    Resume CV : Instrumentation control engineer(DESIGN)

    JIBIN THARAKAN P T
    E-Mail : jibin019 AT gmail.com , jibintharakan AT gmail.com

    CAREER OBJECTIVE :
    To gain a suitable position in a challenging and rewarding environment that utilizes my education, experience and professional skills.

    PERSONAL INFORMATIONS :
    - Nationality : Indian
    - Sex : Male
    - Marital status : Single
    - Date of Birth : 23rd May 1985
    - Education Level : Graduation

    EDUCATINAL QUALIFICATIONS AND TRAININGS :
    - BTech graduation in Instrumentation.
    - Secondary Education SSLC
    - Higher Secondary Qualification, HSE- Computer Science.
    - Training in Detailed engineering (INTOOLS 8).
    - Training in Automation Engineering.
    - Project Planning and Management using Primavera.
    - H2S/BA Training by QP and KOC.
    - Permit To Work Training By QP.
    - In plant training in Kerala Metals and Minerals Ltd, Kerala.

    SKILL SUMMERY :
    I have experience in design and detailed engineering (preparation of Specification sheets, loop drawings, hookups and BOMs) construction and commissioning of oil and gas projects of reputed clients like Qatar Petroleum and Kuwait Oil Company. By around Four years of my Career I acquired the following skills.

    ENGINEERING :
    - Site Survey.
    - Preparation of instrument schedule.
    - I/O schedule for SCADA, HMI and PLCs.
    - Instrument cable block diagram.
    - Instrument JB schedule.
    - Instrument cable routing.
    - Preparation of loop diagrams.
    - Preparation of hookups and BOMs.
    - Preparation of specification sheets.
    - Area, class and zone classification.
    - Flow, control valve calculations using INTOOLS.
    - Preparation of general and network layouts.

    CONSTRUCTION :
    - Site management including material and manpower.
    - Co ordination with clients and vendors.
    - Site inspections and RFI acceptance.
    - MTO preparation.
    - Method of statement preparation.
    - Installation of instruments, JBs and Panels.
    - Cable routing, laying and installations.
    - Calibration and preventive maintenance of instrument.
    - Installation and Configuration of PLCs, SCADAs and HMI.
    - Installation and configuration of F&G systems.
    - As built preparation.

    PRE-COMMISSIONING AND COMMISSIONING :
    - Cable continuity and insulation test.
    - Loop checking.
    - Pressure test.
    - Functions test.
    - Alarm and trip verification.
    - Cause and effects verification.
    - SAT performance.

    SOFTWARE SKILLS :
    - General
    - MS-Office, Windows and Internet.
    - Design
    - Intergraph Smartplant Instrumentation (INTOOLS 8), Intergraph Smartsketch. AutoCAD.
    - Management
    - Primavera and MS Project.

    EQUIPMENTS AND SYSTEMS :
    - DCS -Honeywell , DeltaV
    - SCADA- Honeywell and Intouch Wonderwere.
    - PLC- Allen Bradley, Siemens
    - Allen Bradley Panelview HMI.
    - F&G- Honeywell and Detronics, and VESDA HSSD.
    - Instruments-Rosemount, Honeywell, Detronics and dragger.
    - Bentley Navada 3000

    FAMILIAR STANDARDS :
    - ISA- the instrumentation, systems and automation society
    - BS- British standards
    - ISO, IEC
    - QP (Qatar Petroleum) and KOC(Kuwait Oil Company)

    ORGANIZATIONS AND PROJECTS WORKED :
    Blackcat Engineering and Construction WLL, Qatar. (From December 2008)
    Client : Qatar Petroleum
    Projects :
    1. EPIC for Corrosion inhabitation facility in well heads and gas lift manifolds.
    2. EPIC for 3 Additional Slots in Gas lift manifold.
    Designation : Instrumentation and Control Engineer
    Department : Engineering and Construction.
    Duties : Construction management, and coordination with the clients and vendors. Design Detailed Engineering for the second project.

    KREMENCO, Kuwait. (April 2007 –May 2008)
    Client : Kuwait Oil Company
    Project :
    1. Maintenance of Crude storage and export facilities (COCC).
    2. Maintenance support for the construction of tank farms and control rooms, including Tank Controls, F&Gs, Gas Detectors.
    Designation : Instrumentation Engineer.
    Department : Maintenance Management.
    Duties : Maintenance planning, scheduling and management.

    SMEC Automation, Kerala, India. (August 2006 –April 2007)
    Client : Local Clients
    Projects :
    1. Fire and Smoke detectors integration.
    2. Fire and safety systems including fire pumps.
    Designation : Instrumentation and Control Engineer.
    Department : Engineering.
    Duties : site survey, material selections, design and preparation of the detailed engineering documents.

    ADDITIONAL INFORMATION :
    Ability to understand the diagrams and drawings
    Graduation certificates were authorized by UAE and Kuwait embassies.
    Ready to relocate anywhere.
    Planning to study HAZOP and SIL.

    DECLARATION :
    Dear sir,
    I hereby declare that all the information above is true to the best of my knowledge and belief.

    Thank you
    Yours truly
    JIBIN THARAKAN P T

  2. Post Count Number #2
    Guest Poster
    Join Date
    August 14th, 2008
    Location
    Your Heart, Delhi
    Posts
    76,213

    Avadhesh Kumar Verma
    E-Mail : finacle.avdesh AT gmail.com , avd4u AT yahoo.co.in

    JOB OBJECTIVE :
    I want to be a pioneer in an esteemed organization, where I can put my skills & competency, which I gained with experiences and knowledge, which can help me and organization to rise and get a pinnacle of success.

    SYNOPSIS :
    >Gained exposure to quality control of site activities and certification of Pipeline as per specification and code requirements. The scope also covers the inspection, checking, certification review of materials as per the Standards in the tender and National/International standards.
    >Gained exposure to on site activity of erection and commissioning for electrical and instrumentation work.
    >Qualified Bachelor of Technology (Electronics & Instrumentation) from Bhagwant Institute of Technology.
    >Conduct the on site audit as per the PNGRB Guideline for various cross country pipelines.
    >A quick learner with the ability to work under pressure and meet deadlines.
    >Possess strong inter personal skills, good reasoning & analytical skills.

    WORK EXPERIENCE : 05 years
    1) Currently with VELOSI CERTIFICATION SERVICES (I) PVT LTD as Inspection Engineer (E & I)- (Dec,10 –till now)
    The VELOSI Group, founded in 1982, provides Asset Integrity, Health, Safety and Environment (HSE), Quality Assurance, Quality Control and Engineering services to a number of leading national and multinational oil and gas companies, including BP, Shell, Exxon Mobil, ADNOC, PETRONAS, PetroBras, ONGC, and Chevron. The Velosi Group operates globally through five regional headquarters in the USA, the UK, Malaysia, South Africa, and the UAE and has 63 offices in 36 countries worlwide.

    Project 1) :Mundra Bhatinda Pipeline Project
    Client : HMEL
    Responsibilites :
    1) Inspection of instrument, LV and HV cable laying, glanding and termination and testing activities.
    2) Inspection of installation of switchgear, UPS, transformer and ring main unit pre commissioning and commissioning activities.
    3) Inspection of instrument installations, calibration, tubing, pre-commissioning activities etc.
    4) Inspection of installation of F&G PLC, SCADA, CCTV access control system and hard ware and associated cabling and all other Field Instruments activities etc.
    5) Inspection of fibre optic cable laying, splicing and termination activities
    6) Familiar to various Electrical & Instrument inspection activities related to DCS, ESD, MMS, PLC & SCADA, MCC, SWGR, PCC, System, Hard ware installation and associated cabling and all other Field Instruments such as Foundation Field bus, Smart Transmitters, instrument Calibration, installation, Cable Gland and terminations, Loop Checking & Pre-Commissioning Activities.
    7) Issue of work completion report after onsite measurement/survey and assessing the reports submitted by sub contractor on daily / weekly / accomplishment basis.

    2) Worked with SGS (INDIA) PVT LTD
    Inspection Engineer : (Sep 07 – Nov 10)
    Founded in 1950, SGS India employs more than 1500 highly motivated, multi-disciplined professionals and utilizes some of the most sophisticated communication network. With years of local experience and a vast network of offices and laboratories, SGS India offers high level expertise in the testing, verification and inspection of products from a wide range of industries.

    Project 1) : Sujalam Suflam Pariyojna
    Client : NWRWS, Gujrat
    Responsibilites :
    1) To carry out factory inspection and project site inspection.
    2) To ensure proper execution of the project as per design and QAP.
    3) To carry out various type tests and routine tests of HT and LT panels, motors, transformers, switchgears, relays, valves etc.
    4) To execute erection, testing, pre- commissioning, commissioning of project.
    5) Preparation of Monthly project status reports.

    Project 2) IOCL Refinery,Panipat.
    Client : Indian Oil Corporation Ltd
    Responsibilites :
    1) FAT of DCS & PLC control panels for different HRSG and UB systems at Honeywell Automation, Pune.
    2) Loop checking for all control systems as per approved I/O assignments.

    Project 3) City Gas Pipe Line Project
    Client : Sabarmati Gas Ltd
    Responsibilites :
    1) Working with the project team to ensure that the projects are planned executed and implemented as per the schedule with minimum deviation starting from approval of engineering drawings to the commissioning of the projects.
    2) Worked with the project team to ensure uninterrupted functioning of gas pipeline on day to day basis by ensuring effective & efficient compliances of all maintenance & nomination schedules & also to facilitate smooth operation & adhere to highest standard of HSE norms and practices.
    3) Worked with group project team to study all the avenues of pipeline construction activities in City Gas Distribution System to increase capacity and safety .
    4) Assisted in the project Deptt. To prepare manual of Schedule of Procedures (SOP) as per standard practices and procedures to carry out the construction activities in an organized way.

    Key Performance Areas :
    >Carry out Inspection/ Field Assignment.
    >Review of data sheet, drawing, inspection report as per built drawing to be carried out.
    >Inspection of various panels, motors, transformers, switchgears, relays, gas skids, valves etc. as per QAP & Technical Specifications and contractual requirements of the client.
    >Detailed knowledge of specification of API, ASME, OSID & other codes for the execution of City gas distribution.
    >Well versed with the controlling of industrial processes by PLC and SCADA system.
    >Conduct the on site energy audit as per the GERC Guideline for various plant in Gujarat.

    3) Worked with NSN for VODAFONE project
    Project : Nokia-Vodafone Project(Western U P Circle)
    Designation : Project Engineer.
    Duration : 12 month (Aug 2006 to July 2007)
    Key Performance Areas :
    >Responsible for Commissioning and Integration of NOKIA BTS.
    >Implementation of GPRS, EDGE and other Location Based Services in the Network.
    >Providing support for Acceptance Testing of NOKIA BTS sites.
    >Resolving customer based queries with instant solutions.
    >Responsible for rollout activity for given territory.
    >To provide support O&M engineer for Nokia BTS.
    >Maintenance of running NOKIA (ULTRA SITE) BTS, FIU, RRI, thereby ensuring smoother
    operation of cell site.
    >Timely troubleshooting of BTS and Transmission Equipments
    >Making Cross-Connections for New sites, Link shifting,Traffic shifting
    >Integration of running NOKIA Flexi BTS thereby ensuring smoother operation of Cell site and Alarm Testing.
    >Analyzing various system performance, traffic reports and statistics identifying issues
    according to the operational requirements of the system and suggest proactive measures.
    >Gained perfection in site master(vswr meter)-antiristu & bird.

    INDUSTRIAL TRAINING :
    Title : PLC Programming & Application
    Organisation : Centre For Research And Industrial Staff Performance, Bhopal.
    Duration : 3 days

    Training Particulars :
    >Program, troubleshoot and communicate on Siemens SIMATIC MANAGER,Allen Bradely, Modicon.
    >PLC wiring ,Source & Sink Concept.
    >RTD, Thermocouple, Load Sensor, Level Detectors, Flowmeter, Temperature Controller, Capacitive & Inductive proximity switches.
    >Making Ladder Diagram for different types of logics

    IT CREDENTIALS :
    Programming Language : C
    Working Environment : Windows (XP, 98, 2000), Ms-Word, Powerpoint, Ms-Excel
    Engineering Software : SIMATIC (CKT Design)

    ACADEMIA :
    Bachelor of Technology (Electronics & Instrumentation) from UP Technical University with 61.62% marks - (2002-2006).
    10+2 from U.P Board - (1998-1999).
    10th from U.P Board - (1996-1997).