www.metalandtech.com Metal Tech Constructions Pvt Ltd Pondicherry Chennai : QA/QC Engineers Inspector

+ Ask Question / Post resume
Results 1 to 5 of 5
  1. Post Count Number #1
    Site Admin
    Join Date
    April 17th, 2008
    Location
    Europe
    Posts
    11,588

    www.metalandtech.com Metal Tech Constructions Pvt Ltd Pondicherry Chennai : QA/QC Engineers Inspector

    Metal Tech Constructions Pvt Ltd Pondicherry Chennai : QA/QC Engineers Inspectors
    Website : http://www.metalandtech.com
    metalandtech.com

    Metal Tech provides an environment where human resources are nurtured and developed to achieve organizational goals, while in the process providing adequate scope for individual growth. We pride ourselves when we say… We build careers as strongly as we make our buildings!

    The work environment is based on our corporate values---- straight talking, customer centric, teamwork, diversity and respect, empowerment, employees as core assets and meritocracy. When you choose Metal Tech Constructions Pvt. Ltd., you join an organization that is focused on growth and aims “To be the most successful and admired company in the region”. The company provides an opportunity to work in a multi – cultural environment with some of the best professionals drawn from various industries.

    Position : QA/QC-Senior Engineers/Engineers/Inspectors
    Location : Pondicherry

    Experience : 2 to 6 yrs
    Description :
    Should be a minimum of a diploma holder in mechanical and a graduate in mechanical engineering is desirable. Should have knowledge in reading industrial drawings and able to check/assure quality on the output in all respects. Should have knowledge in welding,fabrication and painting process to ensure the quality and desired specification or met with on all occasions.
    Please send your resume to contact@mntecc.com

    Contact us :
    Corporate Office Address:
    Puducherry (Pondicherry)
    Metal Tech Constructions Pvt.Ltd.,
    4/493, Second Cross Road,
    Kalaivanar Nagar, Dhanvantry Post,
    Gorimedu, Puducherry (Pondicherry) - 605 006,
    India.

    Branch Offices:
    Chennai
    Metal Tech Constructions Pvt.Ltd.,
    No:33, Kossa street,
    Cantonment, Poonamalle,
    Chennai - 600056, India.

    Coimbatore
    Metal Tech Constructions Pvt.Ltd.,
    Site # 3, First Floor, KGS Garden,
    Thottipalayam, Coimbatore - 641 015, India.
    Last edited by muthukalee; October 13th, 2011 at 12:24 PM.

  2. Post Count Number #2
    IJT addict Guest-IJT's Avatar
    Join Date
    October 15th, 2010
    Location
    Looking for Job
    Posts
    20,894

    CURRICULUM-VITAE

    Email :-herjinder_009i AT rediffmail.com HERJINDER SINGH

    CAREER OBJECTIVE
    :-
    - Intend to build a career with leading corporate of hi tech environment with committed & dedicated people, which will help me to explore myself fully realize my potential. Willing to work as key player in challenging & creative environment.

    EDUCATIONAL QUALIFICATION :-
    S. No. Particulars Institution/ Board/ University
    1 Matriculation Suryadev High School Ajmer (Rajasthan)
    2 Intermediate Rajendra Senior Sec. School Ajmer (Rajasthan)

    PROFESSIONAL QUALIFICATION
    :-
    - Successfully passed 2 years ITI certificate in Civil Draughtsman from Director Technical Education Rajasthan, Jodhpur.

    SOFTWARE EXPOSURE
    :-
    - Successfully Complete Auto Cad 2D, 3D &3D Studio Max from NSIC Technical Services Centre, New Delhi.

    WORKING EXPERIENCE
    :-
    - Fresher

    STRENGTH
    :-
    - Positive Attitude
    - Ability to salve Problem
    - Interested in learning new things any time
    - Self - Confident
    - Hard working

    HOBBIES :-
    - Books Reading
    - Listening Music
    - Social Work & Spiritual Healing Practice

    SELF ASSESSMENT
    :-
    - To work hard always with honesty for the best results and to achieve as such as I can and burning desire to succeed and with limit for success.

    Date :
    Place : (HERJINDER SINGH )

  3. Post Count Number #3
    Guest Poster
    Join Date
    August 14th, 2008
    Location
    Your Heart, Delhi
    Posts
    76,213

    MECHANICAL QA/QC ENGG

    RESUME
    Post applied for : MECHANICAL QC ENGINEER.
    MARUTHAVANAN. S
    OBJECTIVE :
    My objective is to enunciate my technical skills with earnestness in a daring environment thereby nurturing my qualities and to elevate the standards for accomplishing the organization’s goal
    EDUCATIONAL QUALIFICATIONS :
    Accademical : Degree in Mechanical Engineering
    From Anna University, Chennai, Tamilnadu, India.
    Professional : : ASNT Level-II in Liquid Penetrant Testing,
    Radiography Testing, Ultrasonic Testing,
    Magnectic Particle Testing,dye penetration testing.,
    : RTFI (radiography testing and flim interpretation)

    PROFESSIONAL EXPERIENCE : 3 +yrs
    1.CONSTRUCTION OF FAST BREEDER NUCLEAR REACTOR (MAIN VESSEL)
    Company : SAKTHI HI-TECH CONST/ LARSEN &TURBO LTD , .
    Designation : QC ENGINEER,
    Name of the Organization : BHAVINI (GOVT OF INDIA ENTERPRISES)
    Location : KALPAKKAM
    Period of Work : NOV 2007 to SEP 2008.

    MY DUTIES AND RESPOSIBILITY
    - Maintaining welding consumables & monitoring the temperature, humidity in the storage room as a daily activities..
    - Maintaining welding rod issuing record .
    - Maintaining and controlling welding rod baking as per the procedure.
    - Material test certificates review
    - Checking & review all the validity & expiry certificate.
    - Checking all the Isometric drawings with respect to P&IDs
    - Checking and preparing As-Built revision drawings of Isometric drawings and P&IDs
    - To check the fit up stage prior and confirm that root gap ,Off set, bevel angle are within acceptable limit then Carried out Fit up inspection as per welding procedures and specifications
    - Carried out PT in bevel and root face area before welding to ensure no defects..
    - Carried out dimensional inspection in every shell to shell circum joint fit up in order to maintain straightness,verticality,roundness before the welding.
    - Handling auto level instrument to maintain up and down alignment of shell during fit up.
    - Witness orientation of main vessel & long seam orientation .
    - Checking and ensure correct batch no,SFA specification and size of the electrode before welding starts..
    - witness the preheating process before the welding
    - ensure the welder using proper PPE during welding ..
    - monitoring current,voltage,beadlength ,time for each electrode in order to maintain the heat input at every sequence of welding as per wps..
    - checking and maintaining interpass temperature during welding
    - Maintain weld data sheet as a record for each electrode as per client
    - Maintain daily fit up &daily weld production report &preparing weld summary
    - Carried out dimensional inspection after the welding to check any distortion during welding ..
    - Compare the dimensional inspection report for before and after welding..then make a report to client daily…
    - Carried out Visual inspection of weld after the welding to ensure to clear the porosity,blow holes,arc strike and spatters…
    - Checking the thickness of material in the welding region of every circumferential and longitudinal joint with respect to base metal..
    - Check the batch certificate and expiry date for developer,penetrant, cleaner prior to use
    - Then carried out DPT test for final welding and make a report to client….
    - 100% RT offering as per line NDT status and film interpretation
    - Tracing the Repair joint and gouging the joint up to correct length and width then find out the defects ,carried out DPT and then take RT in gouging condition…
    - Monitor the work progress and ensure the uniformity and consistency in the application or procedure in conformance of project specification requirements.
    - Check and review test package documents that the data contain herein are accurate and complete prior to perform any test.
    2.CONSTRUCTION OF PLANT PROCESS PIPING & STORAGE TANKS
    Designation : QA/QC INSPECTOR.
    Name of the Organization : UREA GRANULATOR AMMONA ABATMENT PROJECT.
    Location : JUBAIL./SAUDI ARABIA
    Period of Work : NOV 2008 to OCT 2010.( 2 YRS)
    ASME B31.3 PROCESS PIPING-AG
    MY DUTIES AND RESPOSIBILITY
    Prior to fabrication
    - Receiving and inspect the incoming material as per material data sheet and also visually checking the material free from cracks due to transportation.
    - Checking the piping materials as per Codes and Process Standard Specifications
    - Check the welding filler material approval by approved vendor format
    - Go through WPS/PQR and maintain welder performance qualification..
    - Receive all the isometries with IFC stamps from the client…
    - Preparing weld map include spool no,joint numbering for all isometric and issued the copy to production for fabrication ….
    - Checking the transfer of heat nos & traceability
    During fit up
    - Check the material as per piping material specification and also with respect to color coding procedure given by client.
    - Checking the dimensions and orientation of spools as per isometric drawing and site adjustments
    - Carried out the dimensional inspection of shop fabricated spool piece in site prior to fit up..
    - Checking the fit up of pipe –pipe & pipe to fitting with correct orientation with respect to approved iso and P&ID and also cross check the heat nos of pipes & fittings…
    - Checking spool number,joint number,heat no in order to verify the material using against the iso drawing..
    - Checking bevel angle,groove face,root face,and root gap as per approved WPS..
    - Checking plumbness of piping within 0.5 mm…
    - Maintain daily fit up report &preparing weld summary
    - Responsible for making a as built iso drawing if there is any modification
    - Perform inspection on erection and installation of prefabricated line pipes.
    Prior to welding

    - Check and verify the certificates of baking oven,welding machine,portable ovens,portable voltmeter& ammeter..
    - Conducting welder qualification test.
    - Check the welder identy card of the welder.
    - Check and ensure the welder using proper PPE or not..
    During welding
    - Maintaining interpass temperature during welding.
    - Checking voltage,current,beadlength to maintain heat input
    - Carried out final visual welding inspection to check weld profile and surface appearance..
    - Maintain daily weld production report &preparing weld summary
    - Carried out NDT –PT to check the quality of the weld surface…
    - Preparing NDT status for offering RT for the piping joint..
    - Keep the record of RT Status
    - Interpretation the RT film
    - Making Welder Performance record.
    - Checking the installation of in line valves with proper tag no to ensure the installation meets specific requirement
    - Checking the installation of flange with correct rating with proper alignment
    - Check the Orifice flange joint to be internally flush girnding .
    - Checking the verification &nstallation inspection of the gasket with proper rating.
    - Checking the bolt properly tighthening as per the procedure to prevent the leakage..
    - Checking all the pipe support installed as per isometric drawing & as per pipe support standard …
    - Preparing QC internal punchlist prior to hydrotest and making A and B punch items..
    - Inspect the cleared A punch items and release the line loop for hydrotest..
    - Prepare the hydrotest test package as per the loop given by the client and submitted the package to client for line release for performing hydrotest.
    - Arranging the loop with validity pressure gauge,test pump and Perform hydrotest with correct line pressure ..
    - Prepare reinstatement to ensure all equipment is install back after the testing..
    Pipe rack line

    Read out the general arrangement drawings ,isometric& P& ID for pipe rack
    Checking the existing pipe line on the pipe rack for our new pipe line route to ensure that there is no abstraction.
    Preparing as built GAD,& ISO drawing if there is any re-routing..
    Checking the dimensional inspection with respect to the existing pipe line.
    Check the fit up as per wps
    Check the welding as per welding parameter & final visual inspection..
    Preparing NDT status for offering RT for the piping joint..
    Keep the record of RT Status
    Interpretation the RT film
    Checking all the pipe support installed as per isometric drawing as per pipe support standard
    After line complete conduct line checking inspection throughout the line & make a punchlist A&B
    Conducting hydrotest as per the approved procedure..
    Witness the PMI for ss pipes..
    TIE IN

    Perform tie -in within short time in a plant area as per tie- in procedure

    API 650 AMMONIA STORAGE TANK
    Acceptance of the tanks foundation clearance from civil
    Materials & filler metal approval
    Follow ITP ,Prepare WPS
    Joint numbering in the drawing
    Inspection of plate size ,marking and cutting
    Inspect the Blast cleaning & painting of undemeath
    bottom plate.
    Inspection of plate layout ,overlap and fit ups.
    Inspect and follow the welding sequence.
    Inspect the Baking of electrodes / Interpass cleaning.
    Conducting Vacuum box test for the bottom plate welding
    Inspection of Shell course alignments and fit up of vertical
    and circumferential joints.
    Inspection of Shell diameter, circularity, perpendicularity,
    straightedge before welding.
    carried out visual welding inspection of vertical &circumferential joints and carried out DPT Test..

    Inspect the Visual & Back chip check.
    Radiography marking for random radiography only.
    Inspect the location size & alignment of nozzles and others openings
    Inspect the fit up & welding of R.F pads and conducting air test for R.F pads.
    Inspect Shell to bottom I/S welding root run visual and conducting
    oil test.
    Inspect the Shell to bottom O/S welding visual & LPI for
    toe cracks.
    Carried out inspection of stairways welding ,cleats welding for insulation
    Conducting hydrotest as per the procedure
    ACADEMIC RECORD :
    Completed Bachelors of Engineering in the stream of Mechanical Engineering in A.V.C. College of Engineering, Mayladuthurai.
    Title of the
    Degree College/University Year of
    Passing % Secured
    B.E (mech) A.V.C. College of Engineering
    (Anna University) 2007 69
    H.S.C.C Guru gnana sambandar mission matric hr sec school 2003 75
    S.S.L.C Guru gnana sambandar mission matric hr sec school 2000 78

  4. Post Count Number #4
    Guest Poster
    Join Date
    August 14th, 2008
    Location
    Your Heart, Delhi
    Posts
    76,213

    CURRICULUM VITAE
    Muthuraj.T
    Email :muthu_tharma AT yahoo.co.in
    Qualification Summary
    - 4.1 Years of fabrication, Welding Inspection Experience in India Worked as QC inspector and Monitoring Welding activities, Piping/NDT, Mechanical activities, Material Inspection, and related documentation.
    EDUCATIONAL QUALIFICATION

    Qualification College/School Year of Passing Percentage of Mark
    B.E.MechanicalEngineering Oxford Engineering college
    Trichy 2008 69%
    D.M.E Sowdambika poly technic
    Aruppukottai 2004
    72%
    S.S.L.C Govt Hr Sec School
    M.Reddiapatti 1999
    67%
    ADDITIONAL QUALIFICATION
    - Having Certified ASNT Level – II in Non destructive testing as per standard
    ASNT–TC–1A
    - Ultrasonic testing (UT)
    - Radiography testing (RT)
    - Magnetic particle testing (MPT)
    - Dye penetrant testing (DPT)
    COMPUTER PROFICIENCY
    - Packages : AUTOCAD 2007,Pro-E .CNC Program
    WORK EXPERIENCE
    CONSOLIDATED CONSTRUCTION CONSORTIUM LTD.
    Position : QA/QC Engg
    Client : NAGARJUNA OIL CORPORATION LIMITED
    Site : NOCL, A-14 DHU (cuddalore)
    Duration : January 2011 to Till Date
    Position : QA/QC Engg
    Client : AIRPORTS AUTHORITY OF INDIA.(Chennai)
    Site : CHENNAI AIRPORT EXTENSION PROJECT
    Duration : July 2008 to December 2010
    Lakshmi Machine Works Limited, Textile Machinery

    Division Unit II, kaniyur, coimbatore. (ONE YEAR)
    Duration : July 2004 to April 2005
    Position : QA/QC Engg

    RESPONSIBILITIES
    - Responsible for material handling including equipments and tools.
    - Represent our company in management and technical meeting in project assigned.
    - Responsible for preparing all drawings for customers’ approval prior to material requisition, fabrication and installation.
    - Responsible for manpower distribution and work programming.
    - Monitoring daily workloads and activities.
    - Updating project reports on work accomplishments / percentage based on project completion. Conduct site survey prior to hauling of equipments, materials, tools prior to work.
    - Responsible of fabrication of piping works per codes and specification.
    - Studying drawing and accessing work to the workers.
    - Arranging raw materials for the day to day process.
    - Arrange work schedule and manpower distribution.
    - Study of isometric drawing, general arrangement drawing. Generation of areas of concern and suggesting remedial action.
    - Planning for the man – power needed and resources required for completion of the job within the given schedule and effectively.
    - Fabrication, erection, execution of major piping like alloy steel, carbon steel, stainless steel for different sizes and schedule and structural support.
    - To perform the job at the site with safety and take all the necessary precautions needed for the execution of the job.
    - Resolving the field problems and liaison with client and supervision of the mechanical crew.
    - Qualify and certify Welding Procedure Specifications (WPS), Procedure Qualification Records (PQR) and Welder Performance Qualification (WPQ) as per different American Society of Mechanical Engineers (ASME) and American Welding Society (AWS) codes.
    - Checking pipe Fit up, Checking bevel angle
    - Knowledge of Isometric Drawing
    - Facilitate welder’s training needs and qualifications.
    - Qualify welders and procedures in the use of arc welding e.g. GTAW, SMAW,FCAW GMAW and SAW using ASME Sec-9, AWS D1.1
    - Developing, implementing new processes and techniques to facilitate quality and production of welding.
    - Record results of qualifications, inspections and statutory documentation, as required
    - Allocate projects to welders, according to skills and qualifications.
    - Formulate and maintain records of welding personnel and procedures
    - Continuous improvement in welding processes and quality
    - Inspection, monitoring and maintaining welding quality on the job.
    - Resolve problems in GTAW, SMAW, FCAW GMAW and SAW processes.

  5. Post Count Number #5
    Guest Poster
    Join Date
    August 14th, 2008
    Location
    Your Heart, Delhi
    Posts
    76,213

    resume for mechanical engg.

    Anurag Kumar
    e-mail : anuragshuklas88 AT gmail.com
    Objective
    I am seeking a position within the Mechanical Engineering department and want to utilize my skills and abilities in the Industry that offers opportunities for professional growth along with the organization while being resourceful

    Professional Qualification
    B.E (Mechanical) From St. Joseph engineering college in 2011.(VTU),Vamanjoor,
    Mangalore, Karnataka.
    Academic Qualification
    10+2 from St. Joseph Sr. Sec school in 2006.(CBSE),Samastipur, Bihar.
    10th from Holy Mission Sr. Sec School in 2004.(CBSE), Samastipur, Bihar.
    Skills
    Good understanding of practical evidences and its drawing, Sketching and good
    Command in Ansys, AutoCAD, catia and MS office and also interested in different
    Presentations.
    Experience
    Quality control in Safe Towers (P) LTD. Partapur Meerut Since July 2011 and still
    Working with 15000 per month.

    PROJECT
    STRESS ANALYSIS TEST SETUP FOR SMALL APPLICATION AT THE JUNCTION OF TWO SIMILAR OR DISSIMILAR METALS OR NON METALS USING DIFFERENT KIND OF WELDINGS OR ADHESIVES.
    Personal Skills
    Effective and Efficient working ability.
    Ability to lead and build interpersonal relations.
    Effective team working ability.
    Believe to be self-confidence and self-consistence
    Corresponding Address
    C/O Mahendra Chandra Kasana
    Delhi Road,
    Partapur, Meerut.
    250002

    DECLARATION :
    I Anurag Kumar, hereby declare that the above-mentioned information is correct to the best of my knowledge and I bear the responsibility for the correctness of the above mentioned particulars.

    Date : ANURAG KUMAR