CV Resume : Site Engineer, HT LT panels Transformer Installation

+ Ask Question / Post resume
Results 1 to 2 of 2
  1. Post Count Number #1
    On probation
    Join Date
    March 7th, 2010
    Location
    raigarh(C.G.)
    Posts
    1

    CV Resume : Site Engineer, HT LT panels Transformer Installation

    CURRICULUM VITAE :
    YASHWANT SHARMA
    Email : yash_sharma13 AT rediffmail.com

    Objective :
    To contribute towards the growth of an organization where I can work through the application of my skills and other significant talents, all the while enhancing and updating my knowledge with the dynamically changing world.

    Professional Qualification :
    Completed B.Tech. (Electronics & Telecommunication) (2004-08) From J.R.N. Rajasthan Vidyapeeth University with Aggregate Percentage 61.63%

    Academic Qualification :
    10th From United Alpha Hr. Secondary School Neemuch M.P. with 62.00%
    12th From United Alpha Hr. Secondary School Neemuch M.P. with 55.33%

    Experience :
    Daga Power System & Engineers pvt.ltd. Jan.2009 to till date.
    Site engineer :
    Responsibility :
    Erection of HT , LT panels & Transformer .(On going project of Jindal Steel And Power Ltd.) Raigarh (C.G.)
    Project Undertaken :
    Project Report : Radar System for the detection and location of reflecting object such as aircraft, ships, spacecraft, vehicles, people and the natural environment.

    Computer Literacy : win98, win XP, MS Office, language C, C++, Computer Communication & Network.

    Co-Curricular Activities :
    - 13 Days Technical Training in M.P. Power Transmission Company L.T.D. in PLCC Indoor and Outdoor Equipments.
    - 20 Days Technical Training in VLSI Design from CRISP Bhopal.

    PERSONAL PROFILE :
    Hobbies Reading News Paper, Watching Cricket &
    Listening Songs .
    Date of Birth December 4 -1984
    Sex Male
    Martial Status Unmarried

    Declaration :
    I hereby declare that all the above written particulars are true to the best of my Knowledge and Belief.

    Date :
    Place :

  2. Post Count Number #2
    On probation
    Join Date
    January 18th, 2012
    Location
    Chennai
    Posts
    1

    Manager Maintenanace

    Krishna Kumar Ramagopalan
    Email : ramg.kkumar AT gmail.com / rkkumar123 AT hotmail.com

    PROFICIENCY FORTE :
    - Maintenance / Trouble Shooting
    - Proactively identifying areas of obstruction /breakdowns and take steps to rectify the equipments abnormalities through application of trouble shooting tools.
    - Develop vendors for procurement of critical spares at low cost with out compromising quality.
    - Developing rugged Preventive maintenance schedules and implementation of the same.
    - Plan & Control of Repair and Maintenance Expenditures of Plant & Machinery.
    - Responsible for Indigestion of the spare parts.
    - Experienced in Industrial Automation (PLC,AC and DC Drives, Servo Control, CNC Machines, Hydraulics and Pneumatics)
    - Preparing Annual Budget for the Entire Manufacturing areas includes Variable cost, Maintenance Cost, and CEP & SREP
    - Project/Other Management
    - Resourceful in managing the spectrum of activities encompassing Over all Maintenance of Plant Machinery and Utilities including Mechanical, Electrical, Civil (In Projects & Maintenance) of Entire plant.
    - Resourceful in managing the spectrum of activities of Production and Maintenance.
    - Trained Internal Auditor in SHE Audit
    - Working exposure in ERP

    CAREER FEATURES :
    Present Employment :
    VRV Asia Pacific Private Limited from August 2011. We are the leading Pressure vessel and Cryogenic vessel manufacturing Process and Gas Industry.
    Key performance Area :
    - Projects and Maintenance In charge Overseeing Overall Maintenance of Plant and Machinery of Mechanical/Utility/ Electrical.
    - Factory Safety activities. Implementing safety rules, conducting safety meetings, Trainings
    - Plan and Implementation of Preventive Maintenance Schedules.

    Since November 2009 Conares Metal Supply Ltd., Dubai Manager (Electrical) Manufactures of ERW Steel Pipe
    (An ISO 9001 : 2000, accredited company with annual company turnover of 2.5 Million USD per Annum)
    Key Performance Areas :
    - Projects and Maintenance In charge Overseeing Overall Maintenance of Plant and Machinery of Mechanical/Utility/ Electrical /Instrumentation Maintenance.
    - Leading the teams consist of Junior Engineer and Work Associates/Learners
    - Plan and Implementation of Preventive Maintenance Schedules.
    - Initiation and Implementation of Energy conservation activities.
    Significant Accomplishments
    - Involved in the Installation and commissioning of Steel Tube Mill. Project cost worth US $435000.
    - 4” Mill sizing section was relocated to install Seam Annealing Machine for ASTM, API Grade Pipes. Total cabling, Termination and commissioning were carried out in-house.
    - Project- Steel Pipe online Annealing Machine cost worth US $ 120000
    - Project- Hot dipped ERW Steel Pipe Galvanizing plant cost worth US $ 100000
    Equipments Handled :
    - Siemens S7 300 PLC, Siemens Simoreg DC Drives, Micromaster 400 & 440, Parker make DC Drive, EOT Cranes, Kaeser Screw Compressor, High Frequency Induction Solid State Welder GH Induction and Phamitech China Make, Solid State Seam Annealing machine GH Induction make, Siemens Servo drive, Nusco Servo Drive.
    - Roll Form Machine, Cut to Length Machine.

    Since Septemebr ‘07 Axles India Limited Dy. Manager (Electrical.)
    A Unit of TVS Group of Companies manufactures Axles for Heavy and Commercial vehicle (A ISO 9001 : 2000, ISO14001 accredited company)
    Key Performance Areas :
    - Projects and Maintenance In charge Overseeing Overall Maintenance of Plant and Machinery and Utilities including Mechanical, Electrical and Civil Maintenance.
    - Leading the teams consist of Executive/Junior Engineer and Workmen (Total work force of 15) apart from Contractor’s Manpower.
    - Plan and Implementation of Preventive and Predictive Maintenance Schedules
    - Annual Budgeting and resource planning for Maintenance, Plans of critical spares, plant availability and Utilization
    - Conducting Root Cause Analysis of Breakdowns, review down time reports, initiate remedial action, build a knowledge base & take necessary steps to avoid recurrence, Preparing MTTR MTBF Analysis.
    - Monitoring health of Equipment, plan and prepare spares for plant and machinery and ensure minimum downtime.
    - Create and Maintenance Asset Registers, Maintenance Instructions.
    - Tracking Equipment history and costs to reduce Maintenance Expenses.
    - Initiating efforts for conservation of Energy.
    - Preparation of proposals on Capital Expenditure Proposal/ Special Revenue Expenditure Proposals for New Equipments or Existing Equipments revamping in terms Capacity Enhancement, Modernisation and New Projects.
    Significant Accomplishments :
    - Projects Executed worth of 10 Billions Equipment in terms of Capacity enhancement, process improvement, productivity improvement, modernisation, Quality Improvement
    - Worked with Cross functional teams for a) Cost reduction b) power Consumption reduction
    Equipments Handled :
    - CNC based machinery VMC, HMC, Horizontal Lathe, Vertical Lathe with FANUC Operating platform, Okuma Horizontal Machining centre, SPM, EOT Crane Hoist and Atlas Copco Screw Compressors.

    From May’2006 to September 2007, Tube Products of India, Mohali. Manager Maintenance
    A Unit of Tube Investments of India, Murugappa Group The Company manufactures Electric Resistance Welded Tubes & Cold Drawn Tubes for the Automobile and General industry
    (A ISO 9001 : 2000, ISO14001 accredited company with annual company turnover of Rupees 100 crores, annual unit turnover of Rupees 1750 Crores and group turnover of Rupees 15000 Crores)
    Key Performance Areas :
    - Leading the team consists of Executive/Junior Engineer and Workmen (Total work force of 15) apart from Contractor’s Manpower.
    - Plan and Implementation of Preventive and Predictive Maintenance Schedules
    - Annual Budgeting and resource planning for Maintenance, Plans of critical spares, plant availability and Utilization
    - Conducting Root Cause Analysis of Breakdowns, review down time reports, initiate remedial action, build a knowledge base & take necessary steps to avoid recurrence, Preparing MTTR MTBF Analysis.
    - Create and Maintenance Asset Registers, Maintenance Instructions.
    - Tracking Equipment history and costs to reduce Maintenance Expenses.
    - Initiating efforts for conservation of Energy.
    - Preparation of proposals on Capital Expenditure Proposal, Special Revenue Expenditure Proposals for New Equipments or Existing Equipments revamping in terms Capacity Enhancement, Modernisation and New Projects.
    Significant Accomplishments :
    - Erection and Commissioning of CR and HR Coil Slitting Machine.
    - Installed Automatic Power factor correction 1000 KVAR Panel after conducting Energy Audit.
    Equipments Handled :
    - 22 KV Substations, High Frequency Induction Welders.
    - SSD make AC and DC Drives, SSD Servo Drive. Siemens Micro Master AC Drive. Allen Bradley AC Drive. Siemens S7 300 PLC, Allen Bradley PLC SLC,Micro Logix 1500,1200 with RS Logix 500 platform, Modicon PLC and GE-Fanuc PLC.
    - Compressors, Aqua Therm water Heaters, Oil fired and Electrical resistance Annealing Furnaces with capacity of 2 Tonne per Hour.
    - Draw Benches, EOT Cranes. Non destructive Testing Machines.
    - Hydraulic and Pneumatic control.
    - 1010 KVA, 600 KVA DG Sets.

    Since November’2004 to May 2006 SMPC Steel Ind. India Pvt Ltd., Plant Manager.
    A Unit of SMPC Corporation Bhd, Malaysia. The Company manufactures Steel Furniture’s for Office (An ISO 9001 : 2000, accredited company
    Significant Accomplishments :
    - Taken care of entire Project. Erection and Commissioning of Sumikura Japan make Slitter, IOWA Cut to Length Machine, AMADA make Automatic Blanks shearing Machine.
    - Planning and Execution of Production
    - Man Power Handling.
    - Operation and Maintenance of Equipment.
    Equipments Handled :
    - Erection of 22 KV Substation, Transformers, Vacuum Circuit Breakers, AC and DC Drives, Fuji make AC Drives, Mitsubishi PLC
    - Compressors, EOT Cranes. Hydraulic and Pneumatic control

    Since July’2002 to November 2004 SMPC Sdn Bhd Malaysia, Engineer Electrical.
    A Unit of SMPC Corporation Bhd, Malaysia.The Company manufactures Steel Furntiures,Steel Service center, Precision Tube Manufacturing and Blue Waxed strapping Manufacturing (An ISO 9001 : 2000, accredited company )
    Key Performance Areas :
    - Plan and Implementation of Preventive and Predictive Maintenance Schedules
    - Conducting Root Cause Analysis of Breakdowns, review down time reports, initiate remedial action, build a knowledge base & take necessary steps to avoid recurrence.
    - Create and Maintenance Asset Registers, Maintenance Instructions.
    - Tracking Equipment history and costs to reduce Maintenance Expenses.
    - Initiating efforts for conservation of Energy.
    Equipments Handled :
    - 22 KV Substation, AC and DC Drives, Fuji make AC Drives, Mitsubishi PLC
    - Compressors, EOT Cranes. Hydraulic and Pneumatic control
    - Blue Waxed Strapping Machine
    - CNC Turret Punch, NC Controlled Machine, Spot welding Machines
    - Power coating equipments.
    - High Frequency Induction Welders.
    Significant Accomplishments :
    - Control Panel was made in house for Tube Mill Pay off reel
    - Modified the oscillation movement of Power coating line.

    Since February’2001 to June 2002 Apollo Steel Tubes Mauritius, Engineer Electrical .
    The Company manufactures ERW Black and GI Steel Pipes.
    Equipments Handled :
    - 22 KV Substation, AC and DC Drives,
    - Compressors, EOT Cranes. Hydraulic and Pneumatic control
    - High Frequency Induction Welders.
    Significant Accomplishments :
    - Modified Contact type Induction welding to Coil type welder.
    - Installed 10 Ton Hoist crab, Total cabling and wiring was made in house.

    Since November ‘94 to January 2001 Lloyds Metals and Engineers Ltd., Senior Engineer Electrical .
    A Unit of Lloyds Group of companies, engaged in Manufacturing ERW Steel Tube (An ISO 9001 : 2000, accredited company).
    Equipments Handled :
    - 22 KV Substation, AC and DC Drives,
    - Compressors, EOT Cranes. Hydraulic and Pneumatic control
    - High Frequency Induction Welders, Seam Annealing Machines
    Significant Accomplishments :
    - Erection and commissioning of 2000 KVA Transformer, Indoor 22 KV Substation
    - Erection and commissioning of Slitting machine, Tube Mill and Seam Annealing Machine
    - Developed indigenous spare for High Frequency Induction welder.
    - Reduced the Breakdown time of equipment form 5% to 2% by means of analysing the fault and prevention method.

    Since March ‘88 to October 1994 Zenith Limited, Assistant Engineer Electrical .
    A Unit of Yash Birla Group of companies, engaged in Manufacturing ERW Steel Tube, an ISO 9001 : 2000, accredited company).
    Equipments Handled :
    - 22 KV Substation, AC and DC Drives,
    - Compressors, EOT Cranes. Hydraulic and Pneumatic control
    - High Frequency Induction Welders, Seam Annealing Machines

    Competencies & Skills :
    - Planning/Problem Solving/Conflict Resolution/Communication
    - Decision Making/Inter-Personnel Relationships
    - Negotiation skills

    ACADEMIC QUALIFICATION :
    Degree : Diploma In Electrical and Electronics Engg.
    Class Obtained : First Class (64%)
    University : State Board of Technical Education (T.N)
    College : Central Polytechnic Chennai

    Computer Knowledge : Working knowledge in MS Office