Resume/CV : Process Plant Maintenance Engineer
E mail Address : debashischatterjee2000 AT gmail.com
Debashis Chatterjee
Title : Electrical Engineer with rich experience of over Fifteen years in the field of Process plant maintenance and Projects.
Objective :
Electrical Engineer with vast hands on, supervisory and managerial experience is looking for a suitable change
Key skills :
Electrical distribution, LT substation, Electrical control system, PLC, Instrumentation, Plant Automation, Pneumatic control system, BMS, Variable Voltage Variable Frequency Drives, DC Converter Drives (Thyrister drives), Centrifugal, Reciprocating and Screw pumps, Centrifugal separators, Decanters, Gearboxes, Plant Utility like Boiler, Chiller, Air Compressor, DG, Water treatment Plant, Non conventional centralized air conditioning plant (Vapor absorption Chiller) etc.
Professional Qualification :
Diploma in Electrical Engineering.
Present Employer : BATA India Limited
Previous Employers : Queens Park Estate Pvt. Limited (Construction arm of Mani Group) Kalyani Yeast (Microbiology Arm Of Mani Group)
India Foils Limited (Starlite Group of Industries)
Professional Experience :
Employer : BATA India Limited (Batanagar Factory, W.B.).
Last designation : Manager Maintenance
From : February 2006
To : Till Date.
Responsibility :
1. Responsible for all Maintenance Activities for Process plant (Leather Shoe producing factory)
2. Responsible for all utility (Power, DGs, Steam, Air, Water etc.) operations and maintenance.
3. Responsible for initiation, planning and execution of all engineering projects and investments for the plant.
4. Responsible for all reorganization and plant beautifications.
5. Responsible for controlling maintenance expenditure.
6. Responsible for controlling energy expenditure.
Achievements :
1. Reduction of maintenance cost by 25% through unification of spare parts, Import substitution, consumable control etc.
2. Reduction of energy cost by 30% through production shift scheduling, Installation of energy efficient air compressors and capacity optimization, usage Low cost fuel, installation of energy efficient luminaries etc.
3. Successful planning and implementation of projects like video surveillance system, Smart card automatic attendance system, Standardization of different shop floors etc.
Employer : Queens Park Estate Pvt. Ltd.
Last designation : Asst. Manager Electrical (Project)
From : July 2005
To : February 2006
Responsibility : In charge of Electrical Installations in the construction Projects.
Job Profile :
1. Responsible for every electrical and HVAC installation related to different construction projects like shopping Mall, Multiplexes, IT Park and Housing Complexes Etc.
2. Evaluation of Project reports send by the Electrical and HVAC consultants and communication with them for further modifications or rectification of the same.
3. Preparation of BOQ.
4. Technical evaluation of the material to be used.
5. Negotiation with the vendors along with the purchase department.
6. Practicality evaluation of the cost saving methods suggested by the consultants like Thermal storage, Energy recovery wheels etc.,
Employer : Kalyani Yeast
Last designation : Asst. Manager (Maintenance)
From : May 2002
To : June 2005
Responsibility : In Charge of Maintenance Department.
Job Profile :
1. Responsible for over all performance of Maintenance Department.
2. Heading a team of highly skilled maintenance supervisors.
3. Preparation of Preventive Maintenance Schedule and proper implementation of the same.
4. Responsible for the day-to-day breakdown maintenance.
5. Responsible for handling equipments like Centrifugal separators, Gearboxes, Pumps, Cooling Towers, Decanters, Packing conveyers etc.
6. Responsible for meeting new parties, technical and commercial evaluation of quotation received and playing active roll for vendor selection for new projects.
7. Spare parts management and store inventory control.
8. Responsible for new projects and plant modifications.
9. Organizing and rendering training for the juniors and fellow workers on the above activity.
Achievements :
1. Successful completion of project of installation of L&T (Yaskaba) make VVVF drive for one 250 kW Root Blower.
2. Successful completion of plant automation project for dried yeast plant with M/s Tata Honeywell make BMS control system.
3. Introduction and implementation of Preventive Maintenance schedule along with software to achieve better performance.
4. Conversion of coal fired Boiler to a Duel fired boiler.
5. Successful utilization of Biogas generated from ETP plant as a fuel of the Boiler.
6. Introduction of periodic Energy audit system with installation of energy meters at different key consumption centers.
Employer : India Foils Limited
Last designation : Jr. Executive
From : March 1994
To : April 2002
Responsibility : Shift In Charge
Job Profile :
1. Responsible for day-to-day maintenance activity as Shift in charge.
2. Responsible for proper follow up of preventive maintenance schedule.
3. Responsible for breakdown maintenance of equipments like Transformer, LT substation, LT distribution system, AC/DC converters, PLC controlled drives, Forklift trucks, EOT cranes, PF controllers, Two high and Four high rolling mills, Embossing machine, Lamination and Printing machine and all other electrical control and power equipments.
4. Controlling and supervision of all breakdown and preventive maintenance activity for the plant utility like Steam boiler, Non IBR type Thermic fluid boiler, Air compressors, Chiller Plant, DG sets etc.
5. Implement and maintain ISO 9000 and 14000 norms.
6. Additional responsibility of monitoring inventory of high moving items in Engineering store and raise P.R. for them.
7. Technical evaluation of received quotation from different vendors during procurement of materials in coordination with Purchase department.
Achievements :
1. Active participation, as a member of core team, in reducing store inventory by 20%.
2. Active participation, as a member of core team, in reducing energy cost by 10% through implementation of different energy saving measures.
3. Design control system of an electrically operated, relay driven, fire alarm system for the plant and successful installation of the same in coordination with project department.
Personal details :
Date of Birth : 10th July 1972
Marital Status : Married
Educational Qualification :
Name of the Examination Board / University Year of Passing Percentage of marks obtained :
Madhyamik (10th) Examination W.B. Board of Secondary Education 1988 64.3%
Higher Secondary (10+2) Examination W.B. Council of Higher Secondary Education. 1990 52.7%
Diploma in Electrical Engineering. State Council for Technical Education W.B. Govt. 1993 75%
Place :Kolkata
Date :
DEBASHIS CHATTERJEE
June 1st, 2011, 11:09 PM
Post Count Number #2
RESUME OF B.TECH(ELECTRICAL)
CURRICULAM VITAE :
KOUSIK MITRA
e-mail- amikousik1989 AT gmail.com
CAREER OBJECTIVE :
To take up any sort of challenging job commensurate with my ability and knowledge to perform it successfully I would be more than eager to shoulder responsibilities, which would broaden my knowledge and scope for future development. I am able to work on own initiative or as a team and can deal with any duties competently.
ACADEMIC QUALIFICATION :
COURSE : B.TECH.
COLLEGE : DREAM INSTITUTE OF TECHNOLOGY
UNIVERSITY : WEST BENGAL UNIVERSITY OF TECHNOLOGY
DISCIPLINE : ELECTRICAL ENGINEERING
DURATION : 2007-2011
ACADEMIC RECORD :
YEAR 1ST
YEAR 2ND
YEAR 3RD
YEAR 4TH
YEAR PERCENTAGE(%)
MARKS OBTAINED(YGPA) 7.91 7.29 7.85 PERSUING 77
TOTAL MARKS 10 10 10 10 100 YEAR PERCENTAGE(%)
COURSE : HIGHER SECONDARY EXAMINATION
BOARD : WBCHSE
DURATION : 2005-2007
ACHIEVMENT : 1ST Division
MARKS OBTAINED (IN %) : 81.00 MARKS (PHY.+CHM.+MATH.): 85.3%
COURSE : MADHYAMIK EXAMINATION
BOARD : WBBSE
YEAR : 2005
ACHIEVMENT : 1ST Division
MARKS OBTAINED(IN %) : 76.37
INDUSTRIAL TRAINING DETAILS :
I have completed my industrial training under “EASTERN RAILWAY” at “SEALDAH DIVISION” from 1ST AUGUST 2010 to 18th AUGUST 2010.
I visited the section of “POWER HOUSE”,“COACHING(T.L. & A.C.)”, “RAJDHANI SECTION”,“NKG.(CARSHED)” of “EASTERN RAILWAY” during that traning period.
COLLEGE PROJECT :
PROJECT TITLE : A Project on DESIGNING OF A TRANSFORMER.
PROJECT GUIDE : DR. DIPANKAR SRKAR.
DURATION : SEPTEMBER 2010 TO APRIL 2011.
COMPUTER EXPOSURE :
MS-DOS, WINDOWS-XP, MS-OFFICE-2003 (WORD, EXCEL, POWER POINT), INTERNET & E-MAIL, PAINT, PHOTOSHOP.
ORIENTED LANGUAGE : C.
SKILLS :
Effective Bengali ,Hindi & English Communication skills.
HOBBIES :
Out door games: Football, cricket, badminton. In door games: carom, pc games.