    Name : M.S.Rajkumar
    Email : rajahome86 AT yahoo.co.in

    CAREER OBEJECTIVE :
    To apply my skills on challenging assignments, which let me exhibit and nurture my technical acumen and communication skills as an active member of the team and always aspire to fulfill the accomplishment of the organization and self-growth.

    SYNOPSIS :
    - Degree with first class in Bachelor of engineering (Mechanical stream).
    - A result oriented professional with total of 4 Years of rich experience.
    - Confident team player, self-motivated and communicative to achieve exceptional performance.
    - Excellent inter-personal skills & a team player ability to work in multi cultural environment.

    WORK EXPERIENCE :
    APR’07 – Present, Titanium Tantalum Products Limited
    Titanium Tantalum Products Limited, an ISO 9001 : 2008 certified multi product company with an undisputed leadership in the field of exotic metal chemical equipment design, manufacturing, erection/commissioning and services since 1981. TiTaN offers design, manufacturing and refurbishment of heat exchangers, pressure vessels, valves, pipes & fittings, thermo wells, cathodic protection anodes, electrodes for electrochemical and aerospace applications, Electro chlorinators and Turnkey Projects etc.,

    Designation :Material planning engineer.
    Core-Responsibilities :
    - Planning & scheduling of job orders and monitoring (in MS project and SAP).
    - Monthly schedule preparation based on client delivery requirement..
    - Co-ordination with Design, Materials, Production, QC and Vendors to meet the client’s delivery date and Regular follow-up of job orders.
    - Coordinating with Design and sales coordination team to send the documents for client approval and ensuring timely receipt of the same approved documents.
    - Sending Inspection release certificate and packing list to the clients to get dispatch clearance.

    Notable Accomplishments :
    - Successfully completed the major job orders in planned time by expediting effective co-ordination.

    KEY TECHNICAL SKILLS :
    - System Application Product (SAP) – MP (Material planning) and PS (Project structure) modules
    - Hands on experience on the various transaction codes in (PP and PS) module.

    COMPUTER KNOWLEDGE :
    - Design/analysis package : AutoCAD, Pro-E, ANSYS,
    - Professional package : MS-Project, MS-Excel (MS Word and MS Power point)
    - ERP System : SAP ERP 6.0 (Design, MP & PS Module)
    - Operating system : Windows 98/XP, windows Vista.

    ACADEMIC CREDENTIALS :
    - Graduation- Bachelors in Engineering (B.E) in April 2007 From Bharath University, Chennai- Percentage of marks : 70.2 %.
    - SSLC (TN State board) –83% marks, H.S.C Bio maths (TN State board) –72% marks

    EXTRA & CO-CURRICULAR ACTIVITIES :
    - Final Year Project : Title: “Design and analysis of Fixture for Draw Gear Assembly using ANSYS” at ICF – Chennai.
    - Active team member in NSS, CUIC state level placement program and student’s placement canvassing team during college days.

    Place : Chennai Rajkumar.M.S
    Date : 04.06.2011
    Signature/Full Name
    Last edited by mariammal; June 13th, 2011 at 12:43 PM.

  2. Post Count Number #2
    IJT addict Guest-IJT's Avatar
    Join Date
    October 15th, 2010
    Location
    Looking for Job
    Posts
    20,894

    Re: Resume / CV : Planning Engineer

    Planning Engineer

    SARAVANAN.M

    Project Controls Engineer :
    Have four plus years of experience in the area of Planning, Scheduling and Project Engineering and Cost control. Have handled Project control functions for engineering and construction of Petro chemical, Industrial and Construction [EPC] Projects. Have been responsible for the following activities :
    - Preparation of Project Schedules, S-Curves and Man hour Projection Plans
    - Preparation of Work Breakdown Structure (WBS)
    - Preparation of target schedule
    - Preparation of Detailed Lev-4 Schedule Tracking and control of Deliverables as per Target Plan.
    - Preparation of Drawing and document schedule
    - Preparation of weekly and monthly progress report highlighting the areas of concern, milestone achievements, exception reporting etc.
    - Preparation of ISO metric Schedule and comparing with actual
    - Preparation of Engineering Quantity Release, Procurement & Construction key quantity Curve
    - Project schedule monitoring with the help of Early / late schedule, charts, Histograms
    - Preparation Cost Control Budget and Monthly Cost Control Report for the Projects
    - Preparation Monthly Cost Control Report for Executive Committee Meeting
    - Material take off analysis and quantity forecast
    - Establishment of Progress Measurement System by giving weightage to each Level for a detailed schedule on the basis of efforts and cost required in association with Projects group.
    - Preparation of recovery plans for delayed activities.
    - Preparation of periodical Progress Reports and S-curves and comparison with actual
    - Corrective action on areas of concern in a Project
    - Cost Control Analysis
    - Manpower Projection Plan Analysis
    - Procurement progress tracking.
    - Participation in weekly client review meetings.
    - Reviewing constraints with contractors on regular basis.
    - Preparation of invoice for both unit price and lump sum portion of works
    - Preparation of Look A Head Schedules
    - Schedule Updatation

    Software skills :
    Familiar with the use of the following applications
    - Primavera Project Planner,
    - MS Office

    Experience :
    Company : Gulf Spic Contracting Company W.L.L.,
    Kuwait

    PERIOD OF WORK PROJECT CLIENT TYPE OF CONTRACT Designation :
    Mar 2010 to Till date Installation of New Compressors in GC 7,8 & 21 Saipem / AMEC / KOC Demolition, Re routing & Construction Planning Engineer
    Aug 2009 to Feb 2010 Building of New GC 24 SKEC / AMEC / KOC Construction – Structural, Mechanical & Piping Planning Engineer
    March 2009 to July 2009 Replacement of LPCC & HPCC carbamate pumps, condensers in Urea B Plant PIC Construction – Civil, Structural, Mechanical, Piping , E & I

    Planning Engineer :
    TA 2009 – Overhauling of Rotating & Reciprocating Machines PIC Maintenance- Overhauling of Rotary & Reciprocating Machines
    Planning Engineer
    September 2007 to June 2009 Construction Works of EBSM Project at OL2K The Kuwait Styrene Co Construction – Structural, Mechanical, Piping , E & I
    Planning Engineer
    Feb 2007 to March 2008 EPC of Sulphur Unloading Facility at KNPC Flour / Equate EPC – Civil, Structural, Mechanical, Piping , E& I
    Planner
    October 2006 to September 2007 Infrastructure –Mechanical 1 at OL2K Flour / Equate Construction – Structural, Mechanical, Piping , E & I
    Trainee Engineer - Planning

    Education :
    - Secondary School Certificate : T.M.H.N.U.MAT SCHOOL – THENI
    Passed Out with First Class
    - Higher Secondary : T.M.H.N.U.MAT SCHOOL – THENI
    Passed Out with First Class
    - Bachelor of Engineering : Annamalai University, Batch-2006
    - Emphasis : Mechanical Engineering
    - Percentage of Marks :7.94 GPA
    - Maters Degree : Annamalai University, MBA
    Currently doing through Distance Education

    Training :
    - Summer vacation training taken in VKN Boilers Trichy
    - Project done in BHEL – Trichy