Project Engineer : Qatar

+ Ask Question / Post resume
Results 1 to 3 of 3
  1. Post Count Number #1
    Site Admin
    Join Date
    April 17th, 2008
    Location
    Europe
    Posts
    11,588

    Project Engineer : Qatar

    globus manpower resources qatar :

    Company Name: globus manpower resources
    Company Location: qatar
    Designation of the vacancy: Project Engineer
    Company E-mail for contact: globusmanpoweresources@gmail.com
    Company Website: globusmanpower.webs,com

    Details of the job:
    Project Engineer (7.nos)
    Range of Basic Salary (Qr. 5,000 to QR.6, 000) + Site Allowance (Offshore Qr.80/ per day or Onshore Qr.40/per day)

    Engineering Graduate in Mechanical / Diploma
    Good command of English written & Spoken

    Experience:
    At least 5 – 7 years experience in the same capacity as project Engineer (mechanical ) within Oil & Gas environment dealing with EPIC

    With on shore & Offshore experience

    looking for c-v's asap.

    regards
    javed
    globusmanpoweresources@gmail.com

    GLOBUS MANPOWER RESOURCES
    MR.JAVED KASAM
    HILL ROAD,BANDRA,
    MUMBAI,INDIA . .
    MOBILE-0091229833524719
    FAX-0091226459763.
    EMAIL-javed.kasam@gmail.com -globusmanpoweresources@gmail.com

  2. Post Count Number #2
    IJT addict Guest-IJT's Avatar
    Join Date
    October 15th, 2010
    Location
    Looking for Job
    Posts
    20,894

    Name : Brajesh Singh
    Email : singhbk11 AT yahoo.in
    Designation / Skillset : Engineer- Project Management
    Graduate Engineer with 4.10 Years exp.in thermal power plant

    Resume :

    CARRIER OBJECTIVE :
    Seeking a challenging job, which would offer more opportunities and help in my Professional Carrier development and at the same time in mutually beneficial to the organization and self.
    JOB EXPERIENCE : 4.10 Years Experience.
    WORKING ORGANIZATION :
    ORGANIZATION : MSP Steel & Power Limited, Raigarh (C.G.).
    DESIGNATION : Sr. Engineer
    DURATION : Since May 2008 to till date.
    COMPANY PROFILE :
    MSP group has a turnover of around 1800 crores with its group companies spreaded over Meghalaya, Orissa, Chattisgarh, Maharastra & West Bengal, involved in the Power plant units and a large scale of steel unit set up to manufacture of sponge iron through rotary kiln, Ferro alloys, Pellet Plant ,SMS & Structural Rolling Mills.
    JOB PROFILE :
    Involved in whole project planning, procurement, erection, & commissioning of all electrical equipments with associates accessories as boiler, STG, Coal handling Plant, Ash handling plant, cooling tower etc. Taking the Techno-Commercial offers from the Vendors, Co-ordination and Techno-Commercial discussion with Parties, Comparison of area, Scope of supply and technical specifications. Equipments Selection & procurement.
    Current Salary : 3.36 Lacs per Annum + Accommodation.
    Expected salary : Negotiable
    FUNCTIONAL SKILLS :
    Project Planning, procurement, erection & commissioning.
    PROJECT MANAGEMENT :
    1X18MW CPP & 1X25MW CPP project under operation & 2X34MW IPP project under construction.
    Steering the overall planning, scheduling and management of modernization & capacity expansion projects, ensuring completion of assignments within time.
    Planning for materials, developing vendors to obtain timely procurement of materials and instruments to
    facilitate smooth production process.
    Detail Engineering initiatives with inputs on all Electrical System- Transformer, Switchgear, Generator set with associated equipments etc. based on GA drawings completed during the basic engineering phase.
    Preparing Detail specifications for all Electrical & Instrumentation system and to fully define project construction requirements.
    Executing Detail Engineering with inputs on Instrument systems for all P & I drawings based on general arrangement drawings completed during the basic engineering phase.
    Follow up with clients, contracts & service agencies for drawings, supplies & execution.
    Man Management :
    Leading, mentoring & monitoring the performance of the team to ensure efficiency in Projects & meeting of individual & group targets.
    Ensuring that teams adhere to all the quality tool & procedures.
    Resolving interpersonal issues & working towards a harmonious work environment.
    PREVIOUS EXPERIENCE :
    ORGANIZATION : Power Tech Engineers, Ghaziabad (U.P.)
    DESIGNATION : Site Engineer
    DURATION : From July 2006 to April 2008.
    SITE : - Ultra tech Cement-Thermal Power Plant Project 4X23MW, Kovaya [Gujarat]
    Job Profile : Handling 220KV substation - Erection of power transformer, Erection of Circuit Breaker, Isolators ( Single & Double Earth Switch ), Current Transformer, Lightening arrestor, Erection of Bus bar (Aluminum tube Pipe & ACSR Conductor) & Erection of all Types of HT & LT Panels (i.e. Switchgears, PCC, MCC), Bus duct ( HT & LT ) , Preparing the Control Cable & Power Cable schedule, Earthing Schedule, etc., Site supervision & Operations audit.
    Professional Qualification :
    Bachelor of Engineering Electrical & Electronics Engg.) from Technocrats Institute of Technology, Bhopal under Rajeev Gandhi Technical University, Madhya Pradesh with 70% (1st division) in 2006.
    Seminar & Training :
    Four weeks summer training at B.H.E.L.,Haridwar (Uttaranchal).
    Two weeks summer training at M.P.Electricity board,Bhopal (M.P.).
    Computer Literacy:
    AutoCad, MS Word, MS Excel, Power Point, Internet, ERP etc.

    I hereby declare that all the above mentioned details are true to the best of my knowledge and belief.
    Date:
    Place: Raigarh [Brajesh Singh]
    -------------------------------------------------------
    More Information about this submission and submitter:-
    ___________________________________________________
    Submission ID : 4391378
    Date & Time : 20th Jul 2011 7:56 AM (UTC)
    IP Address : 223.191.156.48
    Browser Info : Mozilla/5.0 (Windows; U; Windows NT 5.1; en-US; rv:1.9.2.18) Gecko/20110614 Firefox/3.6.18
    Predicted Country : --

  3. Post Count Number #3
    Guest Poster
    Join Date
    August 14th, 2008
    Location
    Your Heart, Delhi
    Posts
    76,213

    CARRIER OBJECTIVE :
    Seeking a challenging job, which would offer more opportunities and help in my Professional Carrier development and at the same time in mutually beneficial to the organization and self.
    Academic Qualification
    Matriculation :1992 From BISE, Hyderabad.
    Intermediate :1994 From BISE, Hyderabad.
    Bachelor of Arts :2000 From University of Sindh Jamshoro.
    Master of Arts (Sociology) ;2007 From University Of Sindh Jamshoro.
    ProfessionalQualification
    Diploma of Associate Engineer (Mechanical) : Sindh board of Technical Education, Karachi.(1st Division).
    Certifications
    - BP’s 8 Golden Safety Rules Certification in BP Pakistan Exploration and Production.
    - Permit to Work (PTW) Issuer and receiver in BP Pakistan Exploration and Production.
    - TRA Certification in BP Pakistan Exploration and Production.
    - Rigging & Lifting NSL certified from BP Pakistan Exploration and Production.
    - Advance safety Audit (ASA) certified from BP Pakistan Exploration and Production.
    - HITRA- Hazard Identification Task Risk Assessment certified from Bp Pakistan and Maxtrain.
    Summary of Projects Title, Position & Companies
    January-1, 2010 Till to date :
    Presently working with MOODY INTERNATIONAL Pakistan, as a Mechanical Planner / Engineer for services of pipeline/piping execution planning, Inspection, supervision, of facilities and co-related trouble shooting task with Production, Maintenance & Mechanical, for client British petroleum Pakistan.
    January-1, 2007 To December -2009 :
    Worked with MOODY INTERNATIONAL Pakistan, as a Construction Engineer / Inspection for services of pipeline/piping execution planning, supervision, of facilities and co-related trouble shooting task with Production, Maintenance & Mechanical, for client British petroleum Pakistan.
    Site Engineer – March, 2006 To November, 2006
    worked with M/S. Shaukat and Raza (Pvt) Ltd, as a Site Engineer at cross – country pipeline project ALGERIA.
    Project : M/S. Sonal Gaz company Algeria
    Mechanical Engineer - FEB-2005 TILL TO FEB-2006
    Worked with M/S. Teams international .
    Project : M/S. British Petroleum Pakistan Exploration & Production Inc.
    Piping Engineer / Inspector - JAN-2004 to DEC-2004 :
    M/S. Moody International Pakistan (Third Party Inspection,Specialist ISO-00/14000EMS)
    Project : M/S. PAK-ARAB PIPELINE COMPANY LIMITED, Oil pipeline project, 26-dia, 780 km long, cross-country pipeline.
    General Inspector, MAY- 2002 TO AUG - 2003
    M/S. Moody International Pakistan (Third Party Inspection,Specialist ISO-00/14000EMS)
    Project : M/S.Pak-Arab Pipeline Company (white oil pipeline project , 26”-dia, 780-km long cross country pipeline.)
    Responsibilities I
    - Execution planning and monitoring / supervision, for different projects to ensure for timely completion within completion date also to ensure quality standards in accordance with ASME, API & ANSI Codes API-1104.API-650,653.
    - Supervision of various activities from Mobilization to ROW preparation, Stringing, Production Welding, Lowering, HS Sleeve installation, Hydrostatic Testing, Pigging, Shutdown, Commissioning Punch list killing.
    - Fabrication of piping, Installation of skids supervision and preparation of lifting plan.
    - Preparation cast of project on T&M (Tool and manpower) and WUR (Work unit rate of per activity and items). Preparation of project history issuance of field instructions regarding project issues to the executers. As built drawings verification & material reconciliation reports.
    - Predation of catch-up plan to recover the delays .Verification of bill of and Bill of Quantities.
    - Progress up dates on daily in job planning sheet etc.
    - Review of TRA (Task Risk Assessments) Checklist of equipments, implements of HSE policy of client and internationals standards.
    - Right of way (cleaning of R.O.W and safe working rout for heavy equipments and other traveling purposes)
    - Production Welding (right position for production welding and for safe lowering)
    Field coating sleeve (preparation of surface through grit blasting/sand blasting/through power brush).
    - Lowering (lowering of sections into the trench by safe working methods through equipments)
    Tie-in (buried sections tie-ins procedures to avoid any tension and stress) Back filling (layer by layer as per trench conditions to avoid any damage to coating)
    - Punch listing (preparation of punch listing at every stage of construction and before commissioning and after commissioning for the successful completion of project)
    - Hydro Testing ( arrangement of hydro testing installation of calibrated devices and installation of recorder and also 24 hours monitoring system for the successful completion of hydro test )
    - Crossings of canal, black top road & high ways roads through HDD – Horizontal directional drilling and open ditch as per specification.
    - Thrust Boring (arrangement of specific equipment and trench designing for safe working)
    - Commissioning (arrangement of equipments/manpower and develop of procedures)
    - Preparation of as built drawings.
    - Check the as-built drawing with material reconciliation reports.
    - Check the material in accordance with standers & codes.
    - Prepare of progress reports.
    - Review of drawing & specification.
    - Maintain dispatch record.
    - Supervision of fabrication & erection activities.
    Muhammad Hussain Mallah
    E-mail : hussain_mallah AT yahoo.com