Instrumentation, Piping, Electrical, Static, Rotating equipment design job

+ Ask Question / Post resume
Results 1 to 4 of 4
  1. Post Count Number #1
    Site Admin
    Join Date
    April 17th, 2008
    Location
    Europe
    Posts
    11,588

    Instrumentation, Piping, Electrical, Static, Rotating equipment design job

    HI,
    updated resume if interested.

    • Position for Jr. Sr. profile
    • Salary negotiable open for Right Candidates

    Experience 3 -15 YEARS OF EXPERIENCE

    Please provide few references if available for following Position

    Piping Engineer

    Piping Engineer/Senior Engineers/Lead Engineers - No. 15
    Designer/Senior Designer - No. 10

    Electrical
    Senior Engineers/Lead Engineers – 18
    PDS Designer – No -12

    Instrumentation
    Lead Engineers No.-14
    Senior Designer No. - 6

    Mechanical
    Rotating Engineers No-8
    Static Engineer – No-10
    Package Engineers - No-6

    Chemical
    Process Engineer - 20

    For Quick Response mail or contact

    Contact person: Nikhil Kumar

    email id 1source.hr@gmail.com

    phone no :+ 91 - 9811501453 [India 9:30 AM to 10:00 PM]

  2. Post Count Number #2
    Site Admin
    Join Date
    April 17th, 2008
    Location
    Europe
    Posts
    11,588

    WE HAVE OPENING WITH KOREAN MNC IN EPC OIL & GAS SECTOR.
    For all above positions, candidates must have relevant experience in the oil and gas field.
    Mechanical
    Rotating Engineers - More than 10 year of relevant experience . No-2
    Static Engineer – More than 8 years of relevant experience. No-4


    Piping
    Engineer/Senior Engineers/Lead Engineers – Candidate should have more than 10 years of experience – No. 5
    Designer/Senior Designer - Candidate should have more than 10 years of experience. – No. 8
    Electrical
    Senior Engineers/Lead Engineers – Candidate having experience of 10-15 years - No. -2
    PDS Designer – Experience ranging from 4 to 8 years. – No -2
    Instrumentation
    Lead Engineers – More than 10 year of experience in oil and gas sector . No.-4
    Senior Designer – More than 15 years of relevant experience. – No. - 2



    Civil

    Engineer/Senior Engineers/Lead Engineers – candidate should have more than 10 year of experience in civil and structure. Experience in modular structure and B.S. code will be preferred. - No.- 3
    Engineer – Having minimum 5 year of experience in General Civil work - No. 2

    *Please note that we are also looking for consultants (Retired civil engineers) for civil department

    PHONE 91- 9811501453
    EMAIL 1source.hr@gmail. com

  3. Post Count Number #3
    Guest Poster
    Join Date
    August 14th, 2008
    Location
    Your Heart, Delhi
    Posts
    76,213

    Electronics & Instrumentation Engineer

    Gensen Mathew George

    Profile - A challenging determined graduate (BE) in Electronics and Instrumentation Engineering with good communication skills and ready to work both independently and as a member of a team, utilizing the skills acquired during my course.
    Career Objective - A career in Electronics and Instrumentation engineer position, that provides opportunities for personal and professional development as well as to contribute to the organizations effectiveness in order to take the company to the top position where ever I work
    Qualification : Bachelor of Engineering (B.E)
    Specialization : Electronics and Instrumentation Engineering.
    Computer Skills : Windows 98\2000, Visual Basic,MS Office, Excel, PPT
    Other certified packages : Automation Engineer from Technocrat Automation

    Project done in Embsys Technology
    AMBITION :
    To successfully lead a team of people towards achieving the organization goals with best utilization of the given resources
    Soft Skills :
    - Good Knowledge in 5 PLC’s i)Siemens ii)Delta iii)Ge Fanuc iv) LG
    v) ASEA Brown and Boveri
    and 2 SCADA i) FIX 32 ii) Wonderware Intouch
    - Strong oral and written communication skills.
    - Good listening power, excellent analytical and problem solving skills. Strong players individually if tasks are allocated

    Academic Qualifications :
    Degree / Qualification Year
    BE (E&I) [Sathyabama University, Chennai.] 2009
    Advance Diploma in Process Control Instrumentation & Industrial Automation [SIIT,Thalayolaparambu]
    Plus Two [Marthoma Senior Secondary School,Kozhencherry] 2005
    10th [Marthoma Senior Secondary School,Kozhencherry] 2003
    Certified Automation Engineer [Technocrat Automation] 2010
    Extra curricular activities :
    - Team member for the athletics team of the school.
    - Presented seminars on various Instrumentation subject related topics

  4. Post Count Number #4
    Guest Poster
    Join Date
    August 14th, 2008
    Location
    Your Heart, Delhi
    Posts
    76,213

    Snr Instrument Engineer

    CURRICULUM VITAE
    Of
    Mohamed Ibrahim Elabbas
    OBJECTIVE
    I am willing to give total support the organization that I will be in, the 12 years experience in Instrumentation field and capability that I have, in order to achieve organization’s goals and create mutual benefits.
    Email : mohamed.ibrahim AT wnpoc.com.sd
    GRADUATION
    1.Bachelor degree of engineering in electronic engineering (Communication) honor(second class) Sudan University of Science and Technology (2002-2004)
    2.Electronic Engineering Diploma Sudan University of Science and Technology (1993-1995)
    3.Two years vocational training (instrumentation measurement and control) Greater Nile Petroleum Operating Company institute. (1999-2001)
    SUMMARY OF Experiences
    About twelve (12) years of experience in Instrumentation and Control System field
    Main duties and responsibilities are
    - Reviewed project proposals, design drawings, equipment specifications and ensure compliance with international applicable codes, standards and specifications.
    - Preparation of the detail design packages for new plant or modification and upgrades design for existing facilities.
    - Witness, monitor and/or inspect the installation and testing of instrumentation and controls and ensure installation and start-up of control and instrumentation systems as per scope of work.
    - Inspection of field installation and location of instrumentation and control panels, PLCs and SCADA systems.
    - Assure compliance with specifications, drawings and approved submittals.
    - Provide recommendation on all instrumentation and control construction work to assure a functionality and final product.
    - Verify equipment settings, alignment, and testing and instrumentation calibration tests.
    - Monitor contractors' compliance with approved contractor quality control program and submittals.
    - Give recommendations for improvements to standard construction quality control provisions.
    - Work with vendor technical representatives to resolve equipment technical problems.
    - Leads and recommends new continuous improvement solutions for installations or modifications to improve the newly designed facilities and standardization.
    - Support project execution and project proposals, initiate detailed work outline, and make decision as to basic processes, and/or equipment.
    - Aware of Hazardous area Classification.
    - Preparation of Instrument Specifications for Flow, Level, Pressure and Temperature Instruments.
    - Sizing of Control valves, Pressure relief valves and Orifice plates, Venturi, Ultrasonic, and Vortex Flow meters.
    - familiar with relevant international standards related to instrumentation control and safety system like API, ISA, ANSI/ASME, IEC etc.
    WORK EXPERIENCE
    2005-2011 Instrumentation and Electrical Engineer (senior position)
    White Nile Petroleum Operating Company (WNPOC)
    Lead supervision of the installation and commissioning of Fire alarm system for TharJath an Mala camps
    Lead supervision of the rectification of the FWKO interface level Transmitter
    Supervised/Lead the bidding stage of the Batching Feasibility study
    Supervised E/I work activity in WNPOC Batching Feasibility study
    Prepare/Review the instrumentation Guidelines/Procedures/Equipment specification
    Lead the engineering phase of Mala Satellite project
    Complete the installation and commissioning of the DCs (monitoring system) of Mala Satellite project
    Lead TJ/Mala/Jokyan/Thoun filed basic
    Engineering package
    Prepare material requisition, issue tender package Expedite vendor quotation receipt, receiving bids. Analyze, evaluate and study the bids.
    Hold Technical pre-award meeting with the successful suppliers.
    Supervised basic and detail engineering design with regard to electrical and instrument which include preparation of Instruments equipment specification.
    Review and give recommendation on contractors’ design, procedures and drawings related to electrical/ instrument discipline to ensure compliance with project specifications.

    Manage and expedite work related to electrical/ instrument discipline to ensure compliance with project schedule.
    Manage contractor to undertake the project in compliance with all HSE and international safety standards and regulations.
    Team member of Hazop study, project Risk Assessments and projects integrity review.
    Attended equipments tests such as Factory and Site accepted test, Pre-commissioning, commissioning and start-up.
    1999-2005 Instrumentation Technician (Senior position)
    Greater Nile Petroleum Operating Company (GNPOC)
    Six (6) years experience in field Instrumentation and control of Oil & Gas. Job includes corrective and preventive Maintenance, Commissioning, Modification of instrument devices and equipments, control loops, logics as per requirements of production.
    Carried out Calibration work for all instrument measurement sensors
    Carried out all type of rectification work for instrumentation equipments and devices this includes calibration work for pressure, temperature, flow and level measurement in the field processing facility and central processing. Facility (FPF,CPF).
    Familiar with all type of instrumentation calibration equipments (Digital Millimeter, Hart Communicator, pressure and temperature calibrator
    etc….)
    Training/Courses
    Institute course title date
    Meirc Training & Consulting
    Successful Business writing 01 Jan 2008
    Haward technology Advance Valve Technology (Design, Selection, Installation, Sizing, Inspection, Maintenance & Troubleshooting)
    19 Dec 2010
    The McCleland
    Institute Managing Motivation for Performance Improvement
    06 Dec 2010
    International Center
    for Quality
    Advance Supervisory Skills 26 Sep 2010
    ITOL(Institute of raining & Occupational learning) Technical Report writing 10 May 2010
    International Center for Quality Problem Solving & Decision Making 27 Jul 2009
    Aztech Safety Instrumentation and Emergency Shutdown Systems 26 Jul 2009
    Meirc Training & Consulting Negotation Skills 10 Nov 2008
    Egyption Training Consultation & Management Center Advanve Programmable Logic Control -PLC 12 Oct 2008
    Petroleum India International Performance Management System 03 Nov 2007
    Instep Project management 15 Jun 2006
    GLOMACS Advance Process Instrumentation (Process Control & Loop tuning) 20 Nov 2004
    Tri star middle east Programmable Logic Controllers(PLC) 26 Sep 2004
    Glomacse filed instrument and control valve 28 Jun 2004
    metso automation Scada System 14 Nov 2002