-
January 4th, 2010, 07:07 AM
Post Count Number #1
Freelancer
www.dream11.com Gaming Pvt Ltd Mumbai : PR Manager
Dream11 Gaming Pvt Ltd. Mumbai : Manager PR
dream11.com
Website: http://www.dream11.com
Designation: Manager PR
Job Description:
1.Manage PR agency including creating scoops for Media
2.Conceptualizing, Planning and executing events for Media leverage
3. Damage Control in online blogs
4. Doing periodic customer surveys
Desired Candidate Profile:
Candidate with 2 Years of PR Agency Experience + 1.5 Years of Entertainment/ Web Portal experience
Address:
Dream11 Gaming Private Limited
Unit No 7, Basement,
B Wing, Trade World,
Kamala City,
SenapatiBapat Marg,
Lower Parel (West)
Mumbai 400013
Email Address: deepa@plughr.com
Last edited by Guest-IJT; December 1st, 2011 at 01:50 PM.
-
August 17th, 2011, 03:08 PM
Post Count Number #2
IJT addict
Name : K.Pandian
Email : pandian.sanajay AT gmail.com
Designation / Skillset : ASST MANAGER OR MANAGER
Resume :
K. PANDIAN
Professional Experience
Organization Larsen & Toubro Limited, ECC Divison
Designation Assistant Production Manager
Period Jan’05 to Till Date
Present Assignment
- Working as an Assistant production Manager for the construction of LTSB at Chennai
Responsibilities
- Erection of PEB structures to a quantity of 3000 Tone
- Fabrication and Assembly of Ship lift platform around 6000 Tone
- Sand blasting and painting of fabricated structures to the specified standard of SA 2.5 or SSP 10 blasting and Pr0tective coat application of painting
- Preparing the schedule, resource planning and execution of work as per schedule
- Follow-up with the vendor for on time completion of work as per the schedule
- Follow-up with the Engineering and procurement for on time delivery of necessary inputs , drawings and raw materials
- Preparation of weekly and monthly report and submit to the management
- Implementation and monitoring of HSE and Quality plans/ processes or standards of L&T Ltd
- Ensure safe and clean working environment at site and regular EHS inspections.
- Negotiation and finalization of the vendor within the Target budget
- Resource planning and allocation including erection logistics for the timely completion of the works.
- Periodic monitoring of progress, control and take remedial action for critical paths of the project.
- Estimation of materials required as per the look Ahead schedule.
- To maintain records of any extra works undertaken to ensure Company billing covers any additional costs to clients
Previous Assignments
- Assistant Production Manager for the construction of Commercial ship at Hazira manufacturing complex, M/S.LTSB, Hazira, Surat
- Assistant Production Manager for the construction of vessel project (Nuclear submarine) at Vizag, SBC, vishakapatnam.
- Mechanical equipments erection and installation.40 tone of Engine, 20 tone of Gear box.
- Heavy structures of crane pedestal foundation fabrication and erection with 100% UT joints.
- Small and Medium equipment erection and installation.
- Heavy structure of stern ramp erection and installation for 100Tonne.
- Mooring equipment erection and installation.
- Equipment foundation fabrication and installation for structural work with stringent tolerances.
- Small and Medium Fabrication and erection of structures
- Pipe spools fabrication and installation in various system of HP Air system, DG Exhaust system and etc.,
- Installation of rotary and static equipments.
- Titanium pipe fabricated and erection with various dia of pipes in nuclear submarine, one of most important system of HP Air system in Submarine.
- Leak test of union joints with 400 bar in HP air system
- Hydro test of welded joints with 600 bar in HP air system.
- DM water flushing of primary and secondary system
- Preparation of schedule in discussion with the vendor and in line with the target schedule
- Planning of materials and resource arrangement in line with the schedule
- Co-ordinate with the internal and external QC
- Co-ordinate, interact and respond to internal customers and External customers complaints/ feed back and take corrective and preventive action.
- Ensure contractor compliance with regards to statutory/ local authorities rules and regulations.
- Periodic progress evaluation & generating reports with look-ahead schedules
Organization M/s. Adithya Engineering, Vizag
Designation Technical Supervisor
Period April’04 to December’04
Project Construction of Vessel project at ship building centre at Vizag under M/s. L&T ECC
Responsibilities
- Fabrication and Erection of Structural Work.
- Schedule preparation and arrangement of materials and required resources for completion as per the target finalized by customer
Organization M/s. L & T Ltd, ECC Division.
Designation Mechanical Supervisor.
Period October’ 03 to March’04
Project Expansion Project for M/s. Hi- tech Carbon, Sipcot Industrial Estate, Chennai.
Responsibilities
- Fabrication and Erection of light and medium Structural Steel Like Beams, Columns, Roof Truss Pipe Racks and Etc.,
- Resource planning and allocation
Organization M/s. Panna Erectors, Chennai.
Designation Mechanical Supervisor.
Period January’03 to September’03
Project Construction of NHT/CRU & COGENT Plant at Chennai Petroleum Corporation Ltd., Chennai, India. Under M/s. L&T Ltd, ECC division.
Responsibilities
- Fabrication and Erection of Piping and Arrangement of Material & Man Power.
Organization M/s. Prasanna Engineering Corporation & M/s. Babu Engineering Corporation, Neyveli, India
Designation Supervisor.
Period February’93 to June’98
Project Maintenance of Process steam plant, Boilers, Boiler feed pumps and attending urea reactor works and erection of Air blaster/ Boiler bunkers
Responsibilities
- Maintenance supervisor for high pressure boilers including pressure parts and non pressure parts/ rotating equipments and shut down works of urea reactor and urea plant.
- Planning and arranging the resources and allocation of jobs on day to day basis to complete the maintenance and shut down works as per the customer requirement.
- Interaction with customer on day to day basis
- Preparation of invoices and on time payment realizations.
Organization M/s. Lloyd Insulation India Ltd, Neyveli
Designation Supervisor.
Period May’92 to December’92
Project Construction of 210 MW Thermal Power Plant at TS-II, Neyveli
Responsibilities
- Supervisor for the application of Thermal Insulation in Boilers and Pipe Lines, Acoustic Insulation for ID & FD fans and Sheet Metal Fabrication
Organization M/s. Kay Aea Engineering Contractor, Neyveli
Designation Supervisor.
Period October’91 to April’92
Project Construction of 210 MW Thermal Power Plant at TS-II, Neyveli
Responsibilities
- Supervisor for the Erection and alignment of 20 Tones of Overhead Cranes, Erection and Laying of underground Pipe Lines, Lift Structures, General Construction Work and Erection of Feed Pump Valves
Organization M/s. K P Chandran Contractor, Neyveli
Designation Supervisor.
Period June’90 to Aug’91
Project Maintenance work at Briquette and Carbonize (B&C) plant at Neyveli
Responsibilities
- Maintaining of Press machines, used for shaping and Hardening of Lignite powder into Brick shapes. The Maintenance work Lignite powder into Brick shapes. The Maintenance work involves shaft Alignment and Changing White metal bearings
Professional Exposures
- Pro/E in CAD Software : Doux System Pondicherry Aug 02
- Diploma in Computer Studies : Aptech Computer education, Neyveli 1996
- AutoCAD R13 : Micro world Computer centre, Neyveli 1995
- AutoCAD 2000 : CSC Computer Center, Neyveli 2002
- CNC Program : NTTF, Bangalore 2002
Education
1998 – 2001 B.E.Mechanical (part time) from Annamalai University
1987 --1990 Diploma in Mechanical Engineering
K Pandian
-------------------------------------------------------
More Information about this submission and submitter :-
___________________________________________________
Submission ID : 4456568
Date & Time : 8th Aug 2011 4:02 AM (UTC)
IP Address : 115.241.68.91
Browser Info : Mozilla/5.0 (Windows NT 6.1) AppleWebKit/535.1 (KHTML, like Gecko) Chrome/13.0.782.107 Safari/535.1
Predicted Country ;: India
-
January 22nd, 2012, 09:51 PM
Post Count Number #3
job
CURRICULAM VITAE
Kuldeep Kumar Gupta
E-mail- kuldeepgupta.1187 AT gmail.com
--------------------------------------------------------------------------------------------------------
CAREER OBJECTIVE
Art is my passion; I am seeking a company to catapult my abilities and knowledge to be among the most prominent animators in the market. I desire a conductive and competitive working environment where I can meet other professionals, learn from them and contribute an idea too.
EDUCATIONAL QUALIFICATION
1. Completed 3d Animation course in 2010 From "Maya Academy of Advance Cinematic (MAAC)".
2. Graduation passsed in 2009 from Delhi University.
3. Intermediate passed in 2006 from C.B.S.E Board .
4. High School passed in 2003 from C.B.S.E Board .
WORKING EXPERIENCES
1. Worked at E Biz.com Pvt. Ltd for one year.
2. Worked at "Zdepth Studio" as a 3d Modeling artist and Texturing artist for one year.
3.Worked at " Dream Design Display" as a 3d Modeling artist for eight months.
4.Worked at "Shivani Films "as a 3d Modeling artist and Texturing artist for four months.
PROJECTS WORK
1. Gaming Project etc as a modeling and Texturing artist
2 Mars Project.
3. Giza Project
4. Taj Mahal Project
5. Engine Project
6. Amarapali Group of Interior Exterior Project.
7. Digestive System Project
8. Wastage management Project
9. IC Motor Project
10. Earth Volcano Project
11. Computer Hardware Project.
SPECIAL ACHIEVEMENTS
Participated in 24fps International Animation Awards Competition 2010 in the category of "3D Shot Film Team".
Movie Name :- "THE HUNT" .
I am the topper of my institute.
ADVANCED DETAILING SCUPLTING SOFTWARE
Z-Brush and Mudbox
SPECIALIZATION
Modeling (Texturing also)
SOFTWARE KNOWN :
Mudbox, Z-brush, Photoshop, 3Ds Max, Maya, Premiere, After effects, Fusion
SKILLS :
1. Modeling,Texturing and Lighting using MAYA.
2. Compositing in After effects.
3. Basic knowledge of 3D Max.
4. Vedio and audio Editing in premiere.