November 23rd, 2009, 12:38 AM
Post Count Number #1
Job for Instrumentation EPC contractor, with leave rotation [Query]
Hi,
Do you see any possibility to get the placement PREFERABLY with leave rotation in any company /EPC contractor/consultant in India/abroad? I am Canadian Citizen ,Working in oil and gas field with Instrumentation background and flexible to relocation or rotational assignment on personal ground.
Kindly refer my profile on LinkedIn http://ca.linkedin.com/in/vishnujadhav29
OR My resume is available on http://www.rigzone.com/jobs/resume.asp?r_id=47336
I am answerable on vish236@live.ca
Thanks & best regards.
Vishnu Jadhav
-
August 5th, 2011, 01:23 AM
Post Count Number #2
CURRICULUM VITAE :
Email ID : durga.bujji AT yahoo.co.in
TOTAL YEARS OF EXPERIENCE : 10.
INDUSTRIAL EXPERIENCE : Petrochemicals, Gas, Pharmaceutical,
Power plant & Paper mill
GULF EXPERIENCE : 4 Years.
TECHNICAL QUALIFICATION : DIPLOMA in {Electronics and Communication and Engg}
Industrial training certificate :{Instrumentation}
JOB RESPONSIBILITIES/WORK EXPERIENCE :
Erection,Testing,Calibration,LoopChecking,Troubleshooting,Commissioning and Maintenance of Electronics Instruments, Microprocessor based Process control instruments, Pneumatic Instruments and Hydraulic Equipments.
NATURAL GAS DISTRIBUTION SYSTEM SKILLS :
- Inspection of Natural gas distribution underground pipe lines network and metering system with SCADA.
- Metering system {skids upstream and downstream} trouble shooting, maintenance, Instruments Installation, Termination, Calibration, loop Checking and Commissioning.
- Solar system trouble shooting and maintenance.
- Inspection of cathodic protection systems.
- Metering system{skids upstream and downsteam} breakdown or shutdown in maintenance.
- Total network of Metering system Controlling and measuring for SCADA {ElsterInstromet}
- Communication trouble shooting {RS-232 and 485} with F.O.C { Fibre optic cable}
- Natural gas flow measuring for Ultrasonic flow meter, Turbine flow meter installation, trouble shooting, Calibration and maintenance.
Synopsis of Instrumentation& Control Inspector Experience
- Familiar with NEC, ISA, IEEE, PIP, NEMA and API Standards and Codes.
- Day to day site surveillance visit to monitor ongoing activities.
- Carrying out review of documents.
- Carrying out inspection activities as per RFI (Request for inspection) received from Contractor.
- Familiar with Hook–up drawings, data sheet, P&ID and Instrument logic diagrams.
To be included under the present experience of inspections.
- Inspection of loop checking, function test, interlocks and sequence test.
- Visual Inspection for instruments to check for calibration ranges, model, make, dimensions, body material, tag numbers etc…. as per Approved data sheet. .
- Inspection of installation and leak/pressure testing of Air piping/tubing and impulse hook up.
- Inspection of testing MV/LV, Control and instrument cables, continuity testing and insulation resistance (megger).
- Visual Inspection of Cable Trays, Embedded Conduits, duct bank ,exposed conduits, control panels, Junction Box, local stations, Marshalling Cabinets, instruments, Pneumatic Tubing, Impulse Lines and process hook-up, m.o.v, Cathodic protection system.
- Inspection of Calibration, Loop Checking, Pre-commissioning and Commissioning of Conventional and Foundation Field bus Instruments.
- Site Acceptance Test, loop checks, Dry & Wet Function Test, commissioning and start-up of all Electrical and Instrumentation control systems.
- Visual Inspection and verification of Electrical/Instrumentation Material as per Construction package.
- Hands on experience with DCS systems, Safeguarding, Fire & Gas System, Condition Performance & Monitoring System.
- Inspection and testing of all underground, Earthling Net Work for motors, Switchgears, Sub-Stations.
- Inspection of installation Subgrade earthing, secondary earthing, potential gradient mat and Lightning system.
- Inspection of installation & testing of Battery bank & Battery charging System for Sub-station control Buildings.
Technical skills :
- Working Experience in P.L.C and SCADA {Schneider, Seimens and Allen bradelly
ELSTER Instromet} and D.C.S {C200 Honeywell}, ESD and fire & gas.
- Pannel Wiring, Control Loop checking and Trouble shooting.
- Instruments installation, termination, Calibration of Electronics Equipments.
- Erection and Commissioning of projects.
- Pneumatic, Hydraulic Equipments Servicing and Maintenance
- Laboratory PH meters, Online PH meters, Conductivity meters, Data loggers.
- Control valves Calibrations and overhauling& servicing.
- ON/OFF Valves, Cylinders, Solenoid valves, PS,TS,FS,DPS,LS switches Maintenance.
- All types of Gauges Calibration and maintenance.
- R.T.D and thermocouples Sensors Calibration.
- Tray driers And Clean room validation.
- Air compressors maintenance.
- Handling of HART (375) Communicator and ABB 691 HT.
- Installation, Calibration and trouble shooting of temperature, DP, Flow, Vacuum, Pressure and Level.
- Contacting & non contacting type<PID controllers tuning,
- Familiar with instruments from Rosemount, More, Endress Hauser, Honeywell, Yokogowa, ABB, Forbs marshal, Samson, Moore, fisher,Siemens,Hitrol,UE,
Experience :
- From July 2010
Working on secondment as instrumentation construction supervisor/Inspector in Ministry of Electricity and Water , KUWAIT through KHARAFI NATIONAL
- NOV.2009 to June 2010
Worked as instrumentation Asst.Engineer in A.P.P.M. INDIA
- 26 April 2008 To Oct 2009
Worked as instrumentation supervisor in EAST GAS CO Ltd. Saudi Arabia
- March 2008 To April 2008
Worked as Instrumentation supervisor in WARAQ CO Ltd. Saudi Arabia
- Nov 2006 To Jan 2008
Worked as Instrumentation Sr.Tech in C.P.M Ltd. UAE
- June 2003 To Nov 2006
Worked as Instrumentation Tech in Polmon Instruments Pvt. Ltd
- Oct 2001 To June 2003
Worked as Instrumentation Tech in Hindustan petroleum{H.P.C.L} VIZAG {Manmadha Rao Engineering}
Responsibilities :
- Erection, Execution and Commissioning of projects.
- Installation of Data Acquisition systems
- Installation of Automation projects.
- Operation and Maintenance of Process Instruments
- Calibration of Process Instruments
- Control Panel designing and wiring
- Trouble shooting of Process Instruments
- Maintenance of PLC and DCS & SCADA based projects
- Maintenance of calibration records
- Annual maintenance contract
Projects executed for major clients :
- RH & Temperature project in symed labs. Hyderabad.
- Tray drier automation in DR REDDY’S LABORATERS LTD UNIT-4. Hyderabad.
- Data acquisition system in DR REDDY’S LABORATERS LTD UNIT-4. Hyderabad.
- Wi-Fi automation in BIOLOGICAL E. LTD. Hyderabad.
- Low pressure alarm system in MATRIX LABORATERS LTD UNIT-8, Vizag..
- Clean rooms D.P project in SRINI PHARMACEUTICIALS , Hyderabad.
-
October 29th, 2011, 12:25 AM
Post Count Number #3
instrumentation/engineer with 5 yrs experience in the oil and gas projects
instrumentation engineer with 5 years of experience in oil and gas projects