-
November 17th, 2009, 01:14 PM
Post Count Number #1
www.jasubhai.com Engineering Pvt Ltd Mumbai : Instrumentation Engineer
Jasubhai Engineering Pvt.Ltd Navi Mumbai : Instrumentation Engineer
Designation: Instrumentation Engineer
Job Description:
Preparation of instrument specification, IO list, Technical Discussion, raising of enquiries for instrumentation.
Preparing Instrument Datasheets; Junction Box Termination Diagram; Process, Pneumatic and Electrical Hook – Ups; Cable and Cable Tray Routing Diagram.
DCS / PLC / MJB Termination Diagram.
•Inspection of the Instruments at the respective factories
before dispatching to the site.
• Overall Supervising and Technical Assistance at the time of calibration.
Desired Candidate Profile:
Computer conversion, Good communication skill, For Female- Married & staying near by vashi
Address:
ABM Steels Pvt Ltd
207-209, Thacker tower
Plot no.86, Sec-17
Vashi Navi Mumbai
MUMBAI,Maharashtra,India 400075
Email Address: hrbombay@jengg.com
Website: http://www.jasubhai.com
Last edited by muthukalee; September 7th, 2011 at 03:52 PM.
-
November 18th, 2010, 03:47 AM
Post Count Number #2
Re: Jasubhai Engineering Ltd Navi Mumbai : Instrumentation Engineer
My name is Smita Dige I am looking for a job. willing to work for good organisation.
SMITA TUKARAM DIGE
E-mail Id : smitadige AT gmail.com
Current Objective
A Graduate who likes to take challenges for testing abilities in difficult situations with hard work and enthusiasm. A very professional and task oriented team player with good interpersonal and communication skills and a broad understanding of industry. To start my Professional Career and be Successful by extending my Academic Knowledge & dedication toward work.
Degree and Date Institute Marks & Achievements
B.E. Instrumentation,
2009-10
Parshvanath College of Engineering, Thane
(Mumbai University) 8thSem - 71.44%
7th Sem - 69.51%
6th Sem- 68.68%
5th Sem- 69.93%
4th Sem - 68.97%
3rd Sem- 66.20%
2nd Sem- 64.28%
1st Sem– 50.66%
Branch topper in 3rd, 4th & 5th sem,
Third topper in 6th sem,
Second topper in 7th sem
Consistently getting distinction (65%+) after 2nd sem
HSC
2005 Dnyanasadhana Junior college, Thane
77.83%
2nd topper in college,
Top 10% in IAPT (Physics Olympiad)
SSC
2003 Shiv Samarth Vidyalaya, Thane
81.60 %
School topper in Sanskrit
Computer Exposure
- Knowledge of Basic Computer fundamentals & MS Office package
- Studied C & C++ programming languages
Personal Information
Date of Birth : 25th Dec 1987
Marital status : Single
Nationality : Indian
Languages known : English, Hindi, Marathi
Interest : Listening to music, surfing Internet
Personal traits : Confident, Active Participant, Responsible & Creative
B.E. Project
“Automatic Production Management And Control Using RFID” at Leela Electronics, Goregaon, Mumbai.
Extra Curricular Activities
- Participated in ”One Day Technical Workshop Of ISA”
- Undergone Training Programme of PLC Basic at Siemens Ltd. Technical Skills Development Centre, Kalwa
Declaration and Signature
I hereby affirm that the information in this document is accurate and true to the best of my knowledge.
Place : Thane, Maharashtra. ( Smita Dige )
-
December 30th, 2010, 11:02 AM
Post Count Number #3
Re: Jasubhai Engineering Ltd Navi Mumbai : Instrumentation Engineer
Dear Madam/Sir,
I came across your job posting on ascent.com for the role of Instrumentation Engineer and would like to apply for it.
Please find attached my profile and resume.
Best Regards,
Sachin
-
June 15th, 2011, 10:41 AM
Post Count Number #4
Resume
RESUME
Vanashri R.Rangari Mob. No. - vrrangari AT yahoo.com
CAREER PROFILE
Objective
Quest to work in a professional atmosphere, which will help me to impart knowledge about the latest technologies in the world of information by virtue of my sincerity and dedication. I intend to contribute positively towards the growth and prosperity of the company.
Educational Qualification :
Sr.no Istitution/college Board/University %mark MM/Year
1. Govt. Engg. College Of Nagpur University 55.59 12/2008
Chandrapur
2. SSC Nagpur 60.13 03/2000
3. HSC Nagpur 53.17 03/2003
CURRICULUM PROJECT
PROJECT TITLE : Embedded maintenance system
Embedded maintenance system is mainly designed for localization of the fault due to which problem occur in the machine .The basic idea of the project is to take all the test point in the microcontroller by proper interfacing circuitry. The standard range of all test points will be stored in the microcontroller so controller will be programmed in such a way that it will continuously scan test point and compare with the standard value. If any point crosses its upper or lower limit then controller immediately give the indication of that failure. So with very less amount of time the location and the cause of the fault will be known by the maintenance Engineer so that loss of production can be minimized.
TECHNICAL SKILLS
1. COMPUTER : Basics MS-CIT Exam passed with first class.
Packages MS Word & MS PowerPoint.
Operating Systems Windows 2000/XP
2.DIPLOMA : Certified Automation Engineer
PLC,SCADA,DCS, HMI,Panel Designing,
Variable SpeedDrive ,Industrial process
Management)
HONORS AND ACTIVITIES
- Hardworking, sincere.
- Responsible, Creative & Optimistic.
- Good Listener, Equable & Diplomatic.
HOBBIES
- Listening Music & Surfing Internet.
-
June 20th, 2011, 07:04 PM
Post Count Number #5
Instrumentation Engineer
RESUME
Annamalai Muthu
Mail Id : malaicsr81 AT yahoo.com.au
OBJECTIVE
Aiming for a challenging position that will utilize my skills and knowledge that are acquired during my experience and to establish unique identity.
EXPERIENCE SUMMARY : -
Having hands on experience in erection, testing, commissioning, and site supervision (PLC, SCADA, DCS, ESD&HMI) – Thermal Power plant,Gas Oil separation plant , Refinery and Combined Cycle Power Plants.
PLC’s - SIEMENS S7 200&S7 300, AB SLC5/03, Micrologix & RSlogix 5560, GE FANUC (Versamax)
SCADA - WONDERWARE (Package-Intouch 7.0)
DCS - HONEYWELL, YOKOGAWA, ABB,Emerson and
TRICONEX (ESD&Vibration monitoring system) and ABB drive (ACS/150), MHI Diasys(Netmation) Gas turbine control.
WORK EXPERIENCE : -
Instrumentation Engineer (India) – June 2002 to Dec 2003
Instrumentation Engineer (Saudi Arabia) - Nov 2006 to Dec 2008
Commissioning Engineer (Qatar) - March 2009 to March 2010.
Deputy Manager (India) - June 2010 to till date
JOB PROFILE : -
DEPUTY MANAGER(INSTRUMENTATION&CONTROL)- CHEMIN C&I PRIVATE LIMITED-INDIA
We are the Subcontractor for Invensys Process System for carrying out the Erection&Commissioning activities for establishment of 5*800MW Thermal power plant for Coastal Gujarat Power Limited (CGPL), Ultra Mega Power Project.
Activities :-
In the above mentioned project , I am leading a 70 member team comprising of Engineers,Supervisors,Technicians,Fitters and Welders for carrying out panel erections,calibrations,cable laying and terminations,field instruments erection and Impulse lining ,loop checking,hydrotesting,SWAS system erection and tubing,CEMS panel erection and tubing.
COMMISSIONING ENGINEER(INSTRUMENTATION&CONTROL)-
HYUNDAI ENGINEERING&CONSTRUCTION LIMITED-QATAR
worked for the above mentioned concern from March-2009 as a commissioning engineer for the establishment of combined cycle power plant of 2900Mw capacity for Rasgirtas Power Corporation (RGPC).Hyundai is the EPC Sub-contractor for Mitsui corporation .This combined cycle project consists of 8*270MW Gas turbine(Mitsubishi make M701F turbine),* HRSG’s(Doosan Make),8*300MW steam turbine(Mitsubishi make).
Commissioning Activities :
In the above mentioned project, I co-ordinate with MHI technical advisors in carrying out loop check for temperature&pressure elements,flame detectors,gas detectors,density meter , Auxillary interlock test for Lube oil Pumps,control oil pumps,Seal oil pumps,Enclosure ventilation fan,TCA cooler fan,Casing cooling fan,igniter spark test and alarm test for the above mentioned systems.
Carried out actual back up running test for Lube oil,Control oil and Seal oil systems.Stroke adjustments and null adjustment for E/H servo valve and loop check and adjustments of servo modules .Taking step response for the servo valves using Hioki recorder,stroke adjustments for pneumatic valves.Carrying out GT simulation test and checking out it’s alarms and interlocks.Preparation of reports for these tests and submitting it to the consultant and get it approved.
Co-ordination with NEM systems from Germany for their Divert damper system to carry out loop check for their pressure&position transmitters,Limit switches,alarm and interlock test for their system.
INSTRUMENTATION ENGINEER-AL-OSAIS CONTRACTING CO –DAMMAM – SAUDI ARABIA
Worked as an Instrument Engineer for the above mentioned concern, as contractor for Saudi Aramco in their control system up gradation for their Uthmaniyah Gas Oil separation plant, and electrical system upgradation for their Yanbu refinery.
Activities :
In this project, I looked after the calibration of Instruments, cable laying and termination,loop checking,and co-ordination in
Pre-commissioning and commissioning activities.
INSTRUMENTATION ENGINEER- OCC OFFSHORE OVERSEAS PROJECTS,PVT.,LTD-MUMBAI-INDIA
I joined as a Trainee engineer for this concern, they were the contractors for BHEL (I&C) division .BHEL was the main contractors for Chhattisgarh state electricity board, control system up gradation for their 2*120MW Thermal power plant.
Activities :
I looked after calibration of Instruments, cable laying & termination, Installation and co-ordination in pre-commissioning & commissioning activities.
Academic Qualification
B.E. (Electronics & Instrumentation)
Annamalai University – Chidambaram, TamilNadu, India.
Percentage - Aggregate 75%, Year 2002
Project Done : - Neural Networks ("Character Recognition Using Neural Networks")
M.E.(Micro-Electronics)
Victoria University of technology, Melbourne, Vic, Australia.
Percentage – Aggregate 65%, Year 2006.
Project Done :- Radio Frequency ID using xilinx platform
Software Skills
Computer Language;: - C, C++, Ms Office
-
June 21st, 2011, 01:19 PM
Post Count Number #6
instrument engineer
Bedekar Faisal Abdur Razzauqe
E-mail :faisal_bedekar AT rediffmail.com
Career Objective :
“To use technical & analytical skills to improve overall departmental efficiency, play a vital role for achieving team goals with better communication skills and innovative ideas and a burning desire to enhance and alleviate better understanding and knowledge level of self and subordinates”
Educational Qualification :
o Degree in Instrumentation Engineering - 77.12 %, June – 2006 www.bamu.net
o Diploma in Instrumentation Engineering - 63.56 %, June – 2003 www.dbatechuni.org
o SSC Examination - 76.93 %, June–2000 Mumbai Board.
Professional Experience :
Total Work Experience : 5 years in Chemical & Petrochemical industries;
Name of Company : SAUDI KAYAN PETROCHEMICAL COMPANY, SABIC GROUP
Position Held : Instrument Technician I
Period : 31st May 2008 – till date.
Project : HIGH DENSITY POLY ETHLYNE (HDPE), Jubail, Saudi Arabia
Name of Company : SHARQ EASTERN PETROCHEMICAL COMPANY, SABIC GROUP
Position Held : Instrument Technician (OJT)
Period : October’2008 to March’2009
Project : LOW DENSITY POLY ETHLYNE (LDPE), Jubail, Saudi Arabia
Name of Company : HIKAL LIMITED, KALYANI GROUP www.hikal.com
Position Held : Trainee Officer - Instrumentation
Period : 1st Jan 2008 to 25th May 2008
Project : Dyes, Agro-chemicals, Pharmaceuticals, Mahad, India
Name of Company : Pidilite Industries Ltd, PAREKH GROUP www.pidilite.com
Position Held : Apprentice Engineer Instrumentation
Period : 1st Jan 2008 to 20th May 2008
Project : VAM (Vinyl Acetate Monomer), Fevicol Brand, Mahad, India
Summary of Experience :
- Maintenance Responsibilities :
- Perform day to day onsite maintenance and overhaul activities; like disassembly, inspection, repair, modification of instrumentation and control systems, such as Control valves (Fisher/CCI/FlowServe/Samson/Dembla),transmitters YOKOGAWA/ROSEMOUNT/ FOXBORO/ E/H), switches, Weight Indicator (Metler-Toledo /Elder) and gauges.
Extensively worked on Vertex Flow Meters (Emerson-8800DF, Yokogawa-DYA050, E/H), Mass Flow Meters (Emerson, E/H), Thermal Mass Flow meters (Fluid Components Intl), Nuclear level Transmitters (Thermo Fisher), Ultrasonic Flow Meters (E/H), Magnetic Flow meters (Yokogawa), Displacer Level Transmitter (Dresser)
- Trouble shooting and Maintenance of Vibration Monitoring Probes in Field & System Software 3500 (BENTLY NEVEDA-3500)
- Responsible for generating failure analysis along with preventive, predictive and breakdown reports for minimizing downtimes by providing quick turnaround responses and efficient solutions.
- Actively and effectively participated in preparation and implementation of preventive, corrective and condition monitoring of instrumentation and control systems to avoid failures.
- To conduct toolbox meeting and allocate work permits as per PTW system for better understanding of task and safety related to work.
- To prepare list of annual spare parts and warehouse standby instruments for making annual budget of the instrumentation department and suggest special tools/test equipment required
- Though designated technician but responsible for handling department like Supervisor.
- Responsible for planning, scheduling of preventive/predictive/shutdown activities for entire plant and resource deployment using modern SAP plant maintenance module.
- Hands on experience and fully conversant with PLC (S7-300 & 400-Siemens, Triconex, RS Logix 5000-AB), Machine Monitoring System (3500-Bentley Nevada), GE Fanuc PLC’s.
- Hands on experience of DCS (CS 3000 YOKOGAWA) and conversant with FOXBORO DCS.
- Construction, Pre-Commissioning, Commissioning & Start-Up Responsibilities :
- Done Pre commissioning, Commissioning and Start-Up of High Density Polyethylene (HDPE), including Loop-Checking, Function Test and Logic Test.
- Lead a team in preparing instrument loop folder test packages for loop checking purposes; including insertion of pertinent documents such as instrument index, piping and instrument diagram, instrument location plan, instrument hook-up details and instrument wiring connection details.
- Monitoring and witness inspection of lab calibration and field calibration for flow, pressure, level, temperature, control valve, pressure switch, temperature switch, pressure gauge and temperature gauge and verify configuration/parameter of various type of instruments through various type of communicator.
- Witness inspection of leak test for the control valve and ON-OFF valve for class V and class VI (TSO) with third party as per project specification and ITP.
- Surveillance and witnessing of inspection of various type of instruments installation such as a flow, pressure, level, temperature, control valve, on-off valve, MOV, pressure switch, temperature switch, pressure and temperature gauges.
- Installation and maintenance of vibration monitors, Probes (BENTLY NEVEDA-3500)
- Prepared Standard Quality Procedures (SQP) for Calibration & Standard Maintenance Procedures (SMP) for Preventive Maintenance & Replacement of various instruments for HDPE Plant.
- Verification of all installed Instruments and incorporation in the Punch list.
- Prepared and finalised commissioning spares and essential spares for 2 Years of operation for Instrument department.
- Review and correction of Data Sheet, PFD, P &ID, Hook Up, Loop/Logic Diagram, Cause & Effect, Logic Narratives, Location Diagram.
- Presenting Daily, weekly and monthly reports to superiors with respect to day today working, project improvement & achieving the targets in key result areas (KRAs).
- Supervising the Construction activities & Manage the Manpower
- Documentation of all drawings from consultant.
- Shutdown Responsibilities :
- Meticulous Planning of Shutdown activities; complete planning of spares, manpower and deployment in a demanding schedule.
- Arranging for PTW (permit to work) in various areas and deployment of manpower and resources along with coordination among various engineering departments.
- To supervise Shutdown activities till final completion and acceptance.
- Work completed report preparation and submission to Supervisor & Superintendent.
- Master Instruments / Calibrators handled so far:
- HART 275 ,375 ,475 (EMERSON)
- Fluke 744
- Druck calibrator(DPI610), Decade box
- TK3 Webulator (Vibration Measurement)
- Current / Voltage Calibrator CA11 (YOKOGAWA)
- Universal Calibrators CAL71, CAL72 (YOKOGAWA)
- Temp. Calibrator (Bath) ETC-600 (NAGMAN) 50 to 600 0C
Training & Certification: In-house
- Completed Training in Control Valve, Flow Measurement, Pressure Measurement, Temperature Measurement, Level Measurement - SAUDI KAYAN PETROCHEMICAL COMPANY.
- Successfully completed Training in Control of Bypassing of Safety, Health & Environment Critical Instruments - SAUDI KAYAN PETROCHEMICAL COMPANY.
- Completed Training in WORK PERMIT RECEIVER - SAUDI KAYAN PETROCHEMICAL COMPANY.
Training & Certification: External
- Training By Yokogawa Services, Saudi Arabia
o Certificate course in General Introduction & Instrumentation.
o Certificate course in Yokogawa Instruments Training Course.
o Certificate course in CS-3000 Maintenance Training Course.
o Certificate course in Plant Resource Manager Fundamental Training.
- Training By GE Energy, Saudi Arabia
o Certificate course in Fundamental Of Vibration & Transducers (LEVEL-1) Course.
o Certificate course in 3500 Operation & Maintenance (LEVEL-2) Course.
o Certificate course in System 1 introduction (LEVEL-3) Course by.
- Training By Saudi Basic Industries Corp. (SABIC)
o Certificate course in Reliability Centre Maintenance (RCM) Methodology Facilitation
o Certificate course in Reliability Centre Maintenance (RCM) Methodology Training
- Certificate course in Basic Siemens PLC (S7-300 & S7-400) by PROLIFIC System & Technologies Pvt. Ltd.
- Certificate Course in Allen Bradley PLC by ISCOSA Ind & Maintenance Ltd (Siemens Company) Saudi Arabia
- Certificate course in PLC (GE Fanuc, AB) & SCADA (GE Fanuc, wonder ware)
- Certificate course in Maharashtra State Certificate in Information Technology (MS-CIT)
Achievements:
o Certificate of Achievement for Competency in Field Instrumentation, Controller, Final Control Element, Process Control Technique, Basic Maintenance Routine Inspection of Package PLC’s, Gas Detection Systems, Best Practice Tools & Equipment Application from Jubail Technical Institute, Saudi Arabia.
o Certificate of Appreciation for Preparing Instrument Spare Part for HDPE Plant from Saudi Kayan Petrochemical Company (SABIC)
o Certificate of Appreciation for Successful Commissioning & Start-Up of HDPE Plant from Saudi Kayan Petrochemical Company (SABIC)
Software Skill:
* MS- Office, Programming Languages: C, INTERNET
-
September 12th, 2011, 05:01 PM
Post Count Number #7
Name : MOHAMMAD TAHIR
E-mail Id : syedmd.tahir AT gmail.com
OBJECTIV :
Being a committed team player went to be a part of renowned organization to contribute towards the growth of the organization. Based on my expertise tan to further my personal capability by from the new exposure within the structure of organization
POST APPLIED “INSTRUMENT TECHNICIAN SUPERVISOR”
CAREER HISTORY :
PROJECT CALIBRATION & MAINTENANCE
Having working knowledge of Calibration Pressure Instrument lick Pressure Gauge (Bourdon gauge, Diaphragm gauge) Pressure Transmitter Pressure Switch Pressure Indicator Installation of all Pressure Instrument
Having working knowledge of Calibration Temperature Instrument lick Temperature gauge (Bi metallic Mercury Gas etc.) Temperature sensor lick (RTD & Thermocouple) Temperature Transmitter Temperature Indicator Installation of all Temperature Instrument
Having working knowledge of Calibration Level Transmitter Level Indicator Level radar Transmitter Level Switch Installation all Level Instrument
Having working knowledge of Calibration Flow Transmitter Flow Indicator Installation of all Flow Primary and Secondary Instrument
Having working knowledge of Calibration Control valve Pressure safety valve Global Valve Batter fly valve Gate valve and etc
Having working knowledge of Make of Calibration Report and Calibration Data Sheet and Operate to HART COMMUNICATOR
Having working knowledge of Trouble shooting Calibration of Recorder Indicator Controller and I/P Converter
Good working knowledge of Loop checking Hot/Cold and Commissioning Installation of all. Instrument. I have Solve all Instrument Related Problem. I have knowledge of equipment & piping layout and knowledge of P & ID
WORKING EXPERIENCE :
Company Name Site Date Date
Auto cal solution Pvt Ltd Vasia Thane Maharashtra
Reliance Life center Rabale New Mumbai
05/04/2007 18/02/2008
Sandoz Pharmacy Turbhe New Mumbai 21/5/2008 25/12/2008
SUPER TECH INSTRUMENTATION Pvt.Ltd. Engineers & Contractors Thane Maharashtra Lxmi Industrial pvt ltd Mahad 04/03/2009 14/11/2009
Lansexx Industrial pvt ltd Ankleswar
Gujarat 20/11/2009 25/05/2010
Fresenius Kobi oncology Kalyani West Bengal 02/06/2010 20/10/2010
GACL Dahej
Gujarat
28/10/2010
05/03/2011
Asian PPG sriperambudur Chennai
09/03/2011
12/05/2011
Kansai Nerolac Paints Jainpur Kanpur (Dehat) U.P
20/05/2011
Till Now
EDUCATION QULIFICATION :
- SSC Passing Year 2000
- Diploma In INSTRUMENTATION within Three Year Community Polytechnic College Passing Year 2000 to 2003
- B.com Passing Year 2006
- COMPUTER APPLICATION :
- CCC course Basic computer: Ms Office Ms Excel ,Ms Word.
-
September 13th, 2011, 12:33 AM
Post Count Number #8
instrumentation engineer+ diploma in electrical engineering
CURRICULUM VITAE
ANKIT MAHESHWARI
E-mail :ankitmaheshwari273 AT gmail.com
OBJECTIVE
Scale new heights of excellence in professional career by setting imprints of success through highest
level of dedication and determination and this is possible only when I am associated with a progressive
and dynamic organization which can provide me a rewarding career opportunity and strong platform
to exercise my technical , analytical and leadership skills to achieve organizational goals.
TECHNICAL QUALIFICATION
- B. Tech. in ELETRONICS INTRUMENTATION & CONTROL Engineering from GOVT. ENGINEERING COLLEGE, AJMER affiliated to Rajasthan Technical University in 2011.
- DIPLOMA in ELECTRICAL ENGINEERING from GOVT. POLYTECHNIC COLLEGE, AJMER in 2008
EDUCATIONCAL QUALIFICATION
- Sr. Secondary with science & maths from Central Board Secondary Education ,AJMER in 2005
- Secondary from Board of Secondary Education Rajasthan in 2003.
SOFTWARE SKILLS
- PLC & SCADA COURSE
PLC ( Allen breadly)
SCADA (Wonderware)
-
- Operating System : Win 2000, Win XP, Win Vista
- Applications : MS Office, C language
PRACTICAL TRAINING
CAIRN ENERGY INDIA PTY LTD., BADMER (FROM 15 MAY TO 25 JUNE 2010)
NORTHERN WESTERN RAILWAY, AJMER(FROM 21 MAY TO 17 JUNE)
PROJECT
- : PLC BASED TEMPERATURRE AND LEVEL CONTROLLER
In GOVT. ENGG. COLLEGE, AJMER
- ALARM INDICATOR CIRCUIT for 24 days in Polytechnic college, Ajmer
- : DIGITAL SPEEDOMETER for 20 days in Govt .Engg.collegeAjmer
STRENGTH :
I will make effort to win the trust of management by using my qualities. Every time I inspire and creates a positive approach in me.
-
September 19th, 2011, 01:34 PM
Post Count Number #9
instrument engineer
B.DINESH
E-Mail : bdineshbv AT yahoo.co.in
OBJECTIVE
My endeavor is to be an employee in the field of Instrumentation and be associated with dynamic and professionally managed organization where I can apply my skills and abilities for organizational growth and personal development.
FORTE :
- Ability to work autonomously as well as in team.
- Good Communication skills, Analytical & Technical skills.
- Adaptability, flexibility and Hardworking.
CAREER RECORDS : (5.2 years)
5.2 year experience in the Field of instrumentation. Erection, Maintenance & commissioning in Oil and Gas field, plant and building fire and gas system and calibration of field instruments.
Erection & commissioning : 4.2 years
Calibration & Service : 1 Year
PROFESSIONAL QUALIFICATION
B.E. (Bachelor of Engineering) : Electronics & Instrumentation
Awarded By : Anna University, Chennai, India
Period of Completion : April 2006
CAREER SUMMARY
1. CURRENT EMPLOYER : AL-HASSAN Engg. Co.SOAG
August 2009 to till date.
LOCATION : Sultanate Of Oman
DESIGNATION : INSTRUMENTATION ENGINEER
PROJECTS HANDLED
Ongoing project :
CLIENT : PETROLEUM DEVELOPMENT OMAN (PDO)
CONTRACTOR : PETROFAC E&C OMAN LLC
LOCATION : KAUTHER GAS PLANT (North Oman)
PROJECT TITLE :
- Kauther Depletion Compression project.
- Shutdown work of existing gas plant.
- Kauther Gas plant New Fire and Gas system (PGDS).
- Access Control System and Public Addressing System.
- Telecommunication works includes data, voice and television works for plant and camp facilities.
- CCTV Camera system in plant and buildings.
Completed projects :
CLIENT : PETROLEUM DEVELOPMENT OMAN (PDO)
LOCATION : QARN ALAM GAS FIELD (North Oman)
PROJECT TITLE :
- Burhan west pipe line project.
- Harmal west pipe line project.
RESPONSIBILITIES
Instrumentation - On site activities :
Working experience in all field Instruments and FF field instruments and calibration of instruments used in the gas well heads and gas plants..
- Pressure, DP and temperature instruments.
- Working with on/off control valves.
- Analyzers, Choke valves, ESD valves and safety relief valves.
- Level and Flow transmitters.
- Fire and Gas system and detectors.
- System cabinets and F&G panels erections.
- Working with Hydraulic panel for valve functioning and ac/dc convertor panel work.
- Fiber optic and telecom panel erection and cables glanding and termination work.
- Instrument tubing work (Pneumatic and Oil).
Instrumentation - Off site activities
- Preparation of drawing control, Scope of work, specification sheet, installation schedule, name plate schedule, list of deliverables, direct charge purchase request & consolidate of project.
- Preparation of Instrument support, cable & conduit schedule /tray layouts.
- Assisting in development of piping & instrumentation diagrams.
- Familiar in PDO and ISA Standards.
- Participation in Technical Meetings with Vendors and Clients/Consultants.
- Preparing redlines and as build drawings.
HSE EXPOSURES
- Permit Applicant in Petroleum Development of Oman (PDO).
- HSE Induction Course from Petroleum Development of Oman (PDO).
- H2S Awareness and Escape safety course in Petroleum Development of Oman (PDO).
- Authorized PDO Gas Tester card holder.
- Job Hazard Analysis from Petroleum Development of Oman (PDO).
- IFR holder in PDO.
2. PREVIOUSE EMPLOYER : United Engineering Projects Company
August/2007 to July/2009.
LOCATION : Oman
DESIGNATION : INSTRUMENTATION SUPERVISOR
United Engineering Projects Company is a leading organization in the field of onshore projects within the Oman and their range of activities include Engineering Procurement, Erection and Commissioning of Refineries, Oil and Gas production facilities, Desalination plants, Petro-Chemical plants, Industrial and Utilities plants etc.
PROJECTS HANDLED
CLIENT : Occidental Petroleum Corporation
LOCATION : Mukhaizna Oil field (Oman)
PROJECT TITLE :
- Early thermal facilities (Steam Producer).
- De bottlenecking (phase 3).
- Central Processing Facilities.
- Mechanical Vapor Compressor.
- Oil production and injection wells.
RESPONSIBILITIES
Instrumentation - Off site activities
- Preparation of drawing control, Scope of work, specification sheet, installation schedule, name plate schedule, list of deliverables, direct charge purchase request & consolidate of project.
- Preparation of Instrument cable & conduit schedule /tray layouts.
- Assisting in development of piping & instrumentation diagrams.
- Familiar in OXY and ISA Standards.
- Participation in Technical Meetings with Vendors and Clients/Consultants.
Instrumentation - On site activities
- Planning and Designing for all Electrical and Instrumentation works.
- Involving in supervising of site activities and preparing erection, installation & Commissioning of Hook up of well head works and in Gathering station works.
- Involved in Erection, Installation, and Preparation for Electrical & Instrumentation works for the Well Pad’s VFC Panels.
- Installation and commissioning of instruments for various wells like Oil production Wells (RDPCP, BEAM pumps) ESP wells, Steam Injection Wells, water supply well, Water disposal Wells.
- Construction scopes the installation of various instruments with associated cables instrument stands and fittings, this to be installed in the designated location as per the relevant drawing.
- Involved in erection, installation and commissioning of Flow Computers, H2S Detectors, Pressure transmitters, Temperature transmitters, Pressure switches, Flow meters, Valves and other instruments connected with the project works.
- Preparation of PTW for the daily routine projects works.
- Material Handling for the specified projects and coordinate with team members.
- Perform Testing, trouble shooting, loop checking and calibrating of various Instruments like pressure transmitters, pressure switch, and temperature transmitters using HART communicator.
- Check and confirm P&ID and loop drawing to PLC configuration, instruments on the field and its termination in PLC cabinet and local panel as well as in the junction Box.
Electrical Works - On site activities
- Involved in Erection, Installation, Electrical Switch-Gear panels (33kv, 11kv, 415V) Works for Substations.
- Construction scopes the installation of various electrical Distribution boards, panels, RMUs etc...
- Electrical cable erection and testing for both HV, LV and control cables along with panels.
- Testing experience with Transformer, Auto Re-closer and Switch gear panels.
HSE EXPOSURES
- Permit to Work Applicant from OXY.
- HSE Induction Course from Occidental Mukhaizna LLC, Oman.
- H2S Awareness and Escape safety course.
- Job Hazard Analysis from OXY
3. PREVIOUS EMPLOYER: Nagman Instruments and Electronics Pvt. Ltd.,
8/2006 TO 8/2007
LOCATION : Chennai
DESIGNATION : CALIBRATION & SERVICE ENGINEER
Nagman Instruments and Electronics Pvt. Ltd., is a NABL accredited calibration laboratory for Electro-technical, Mechanical & Thermal parameters and it has under taken many annual maintenance/calibration contracts
RESPONSIBILITIES
- Involved in the Testing & Calibration of various process
Instruments.
- Calibration of RTD and Thermocouple.
- Calibration of Pressure Switches and Pressure Gauges.
-
September 19th, 2011, 08:09 PM
Post Count Number #10
BE Instrumentation
RESUME
Mr. PRAVIN KRISHNAT KAMBLE
Email : kamblepravink AT gmail.com/er.pravin86 AT rediffmail.com
Objective :
To seek a challenging position and to dedicate my service to reputed organization to expose my talents and skills.
Educational Qualitation :
1. Graduation :
Course : B.E. Instrumentation Engineering.
College : Government college of Engg. Jalgaon.
Exam passed Month&
Year Mark obtained Maximum marks Percentage Grade
B.E. 2010-11 1028 1500 68.53 First class with Dist.
2. Diploma :
Specialization : Instrumentation Engineering.
College : Government Polytechnic, Karad.
Exam passed Month&
Year Mark obtained Maximum marks Percentage Grade
Final Year 2007-08 819 1300 63.00 First class
Project :
Final year project in degree :
Title : PLC based water treatment plant.
Industrial Exposure :
Completed 15 days in plant training at “Rashtriya Chemical and Fertilisers, Chembur” in the steam generation plant.
Computer Skills :
Basic knowledge of computer, C language, MATLAB, Lab VIEW.
Basic of PLC, SCADA.
Extra Curricular Activities :
- Participated in Handwriting completion.
- Participated in Engg. Annual Gathering.
- Participated sports activity in college.
Cricket, Kho-Kho.
Hobbies :
Sketch poster, playing cricket, & News paper reading.
-
October 10th, 2011, 12:07 PM
Post Count Number #11
Resume.
RAFIK KHAN
Email Id :rafik.khan89 AT gmail.com
OBJECTIVES :-
To utilize my knowledge and skills in creation of innovative work, in your esteemed organization by putting hard work with dedication and sincerity under your guidance and company standards in order to achieve the results.
EDUCATIONAL QUALIFICATION :-
SSC (10th) Passed from Maharashtra State Board.
Diploma IN INSTRUMENTATION Engineering from Bharati Vidyapeeth College of engineering (Maharashtra).
Total Experience : 01 years 5 Months
PROFESSIONAL QUALIFICATION :
Handling work related HVAC.
WORK HISTORY :.
1. Worked in Fabz Fabricom Pvt. Ltd. in (MUMBAI) as a Site Engineer.
Location :- Santacruz (MUM)
Duration;- 2010-2011
TECHNICAL SKILLS :
Package : MS-Office, (Ms. Word, Ms Excel, Ms PowerPoint).
Language : C Programming
Operating Systems : Windows 98/200
STRENGTHS :-
- Good public speaking and compeering skills
- Can effectively communicate with team members.
- Very fast learner.
- Commitment towards work assigned.
- Desire to learn and update with the new technologies.
- Can work in various environments.