-
November 13th, 2009, 12:45 PM
Post Count Number #1
Himachal Pradesh Power Corporation Ltd HPPCL Recruitment : Electrical Environment Engineer
Himachal Pradesh Power Corporation Limited
(A State Government Undertaking)
Himfed Bhawan, Panjri, (Below Old MLA Quarters), Shimla-171005.
Phones: 0177-2633811, 2633808 Fax No.: 0177-2633813
Advertisement No: HPPCL/Appt./10/09
Applications are invited to fill up the following posts in Himachal Pradesh Power Corporation Limited, Shimla:
Post : No of posts : Educational Qualification
Assistant Engineer (Electrical) : 10 : B.Tech/B.E.Electrical
Assistant Engineer(Environment) : 02 : B.Tech/B.E. (Environment Engineering/ Environment Science)
A.O.(R&R) : 01 : BE in Rural Engineering
Pay-Scale :Rs. 7750-14500 (with initial start of Rs.8550/-).
Age : Between 18 to 45 years as on 14th December, 2009 with relaxation to reserved categories as per State Govt. rules..
Allowances:
Bachelor accommodation subject to availability in various Hydro Electric projects of HPPCL. Leased accommodation subject to availability in Shimla (Corporate Office). TA & DA will however be paid when on tour as per entitlement of equivalent post. HRA/ House Lease/ Medical Reimbursement/ Vehicle Allowance will be paid as per company rules for equivalent post in addition to this. Personnels appointed in Kashang HEP except intake site of Kashang HEP, Shongtong- Karcham HEP can get upto 25% and Tidong-II HEP, intake site of Kashang HEP can get upto 50%, of the monthly salary extra as difficult area allowance or as decided by the Corporation/Board of Directors from time to time. No difficult area allowance will be paid on leave or on tour outside the area.
How to apply:
Interested candidates can send their Bio-Data in the prescribed Proforma given on our website ‘hppcl.gov.in’ to
Executive Director (Personnel),
Himachal Pradesh Power Corporation Limited,
Himfed Bhawan, Panjri, (Below Old M.L.A Quarters),
Shimla-17005.
Last date for receipt of applications 14th December, 2009.
Application Fee:
Demand Draft of Rs. 100/- for General Category and Rs. 25/- for Reserved Categories made in favour of Himachal Pradesh Power Corporation Limited payable at any scheduled bank at Shimla.
• Candidates shortlisted on the basis of their applications will be called for test/Interview.
• No TA/DA will be paid to attend the test/interview.
• Candidates expecting their final results may also apply subject to the obtaining of final result and prescribed percentage of marks as on 14th December, 2009
• Candidates who have qualified from recognized institutions/ universities in India will only be considered/eligible.
For more details :
http://www.hppcl.gov.in/Requisition_11_11_09.pdf
-
May 12th, 2011, 08:58 PM
Post Count Number #2
IJT addict
The submitted value of field named "Name :" is:
Mohideen Abdul Kadar
-------------------------------------------------------
The submitted value of field named "Email :" is:
mohideen.hssn AT gmail.com
-------------------------------------------------------
The submitted value of field named "Designation / Name of the Post / Skill Set" is :
Electrical Inspector/QC/QC Inspector/16 years experiencs in Electrical
-------------------------------------------------------
The submitted value of field named "Copy Paste Your CV / Resume Here :" is:
-------------------------------------------------------
Field Experience : 16 Years
Education
Name of the Course Name of the Institution Year of Passing % of Marks
S.S.L.C Govt. High School, Achan Puthur. 1989 78
Higher Secondary Masood Thaikka Higher Secondary School,Kadayanallur. 1991 65
Diploma (Electronics)Radio&TV Mohammed Ismail Poly Technical Institution, Tirunelveli. 1993 82.5
Personal Skills
1. Highly motivated and dependable.
2. Good Team Player and a quick learner.
3. Self starter with passion for excellence.
4. Good analytical and designing skills.
5. Social, optimistic, smart working and being truthful to everyone.
6. Aggressive with dynamic attitude.
7. Hard working, Pressure handling ability
8. Ability to be receptive to feedback on changes or enhancements.
9. Ability to comprehend and clearly understand the problem or delegated work.
10. Good analytical and problem solving skills in the erection site.
11. Ability to approach problems logically.
12. Good knowledge in dealing with Consultants at inspection time.
Computer Qualification :
Name of the Course Name of the Institution Year of Passing % of Marks
Windows 95, M.S Word, Excel, Power Point & Internet Explorer Aptech Coputer Center. Tenkasi Jan’1998 1st Class
Additional Qualification (Safety Courses)
- Proficiency in Elementary First Aid.
- Fire Prevention and Fire Fighting.
- Personal Safety and Social Responsibility at HABSHAN GASCO, OGD II, Abu-Dhabi, U.A.E
I. Professional Experience : (May 2005 to until Now)
Organization : THERMO LLC
Designation : QA/QC Inspector (Electrical)
Period : May’ 2005 – Oct’ 2010
Reporting To : Manager
Job Responsibilities :
1. Check the Drawings, specifications and materials before installation.
2. To check the Installation of electrical works as per approved drawing.
3. To rise the inspection request to consultant.
4. Coordinate with consultant and Main Contractor.
5. Supervisor of technical support team responsible for the coordination of technical issues involving the installation works at site.
6. Responsible for field support.
Project Details :
Sl.No Designation Proj. Name Proj. Details
1 QA/QC Inspector Electrical JBR, Jumairah, Dubai 2B+GF+3M+28F+ Roof
2 QA/QC Inspector Electrical Dubai International Airport, Terminal-3, Dubai Concourse – 3 + Car Park
3 Training Officer (MEP & Safety) +PPE Store Incharge Thermo Home Training Center, PPE Store, Dubai Thermo LLC, HRD, Dubai.
II. Professional Experience : (Dec’2002 to May 2005)
Organization : Ras Engineering
Designation : QA/QC Inspector (Electrical)
Period : Dec’ 2002 – May 2005
Reporting To : Manager
Job Responsibilities :
1. Check the Drawings, specifications and materials before installation.
2. To check the Installation of electrical works as per approved drawing.
3. To rise the inspection request to consultant.
4. Coordinate with consultant and Main Contractor.
5. Supervisor of technical support team responsible for the coordination of technical issues involving the installation works at site.
6. Responsible for field support.
7. Arrange the manpower as per work.
8. Monthly billing as per work progress.
9. Quantity surveying and ordering materials.
Project Details :
Sl.No Designation Proj. Name Proj. Details
1 QA/QC Electrical Inspector Sheik Hamdan Palace, Lisaili, Dubai Palace(GF+2F+Roof)
Majlees(1B+GF+Roof)
Kitchen + Labour accommodation
2 QA/QC Electrical Inspector Garden Apartments, Jebel Ali Garden, Dubai. 2B+GF+M+8F+2Roof X 8 Building
III. Professional Experience :(From Nov’1994 to April’2002)
Organization : ETA
Designation : Supervisor (Electrical)
Period : Nov’ 1994 – Apr’ 2002
Reporting To : Engineer
Project Details :
Sl.No Designation Proj. Name Proj. Details
1 MEP Supervisor ADCO Accommodation Building, Ruwais, Abu-Dhbai GF+M+2F+Roof (25 Villas)
2 MEP Supervisor OGD-II Expansion, Habsan Gas Plant, Abu-Dhabi OGD-II Expennsion
3 Electrical Supervisor ADNOC Accommodation and Recreation Buliding, Asap, Abu-Dhabi GF(23 Studio)X7 Villas +Recreation centre+Office(GF+2F+Roof)
4 Electrical Supervisor Etisalat Building, Al-Ain 1B+G+M+7+ Roof
5 Electrical Foreman Al-Muhairy Residence & Commercial Building, Khalidiya, Abu-Dhabi. 2B+G+2M+18+Roof (3 Towers)
6 Electrical Charge Hand Al-Owise Building, Eelctra Road, Abu-Dhabi. 1B+G+18+2 Roof
7 Electrical Technician Sheik Khalifa Building, Salam Street, Abu-Dhabi. 2B+G+M+19+Roof
Email Address Mohideen.hssn AT gmail.com
Driving :
Holding U.A.E Light Vehicle valid Driving License.
Declaration :
I hereby declare that the above-furnished details are true to the best of my knowledge and I hope an early interview with you.
Yours faithfully,
(Mohideen Abdul Kadar)
-------------------------------------------------------
More Information about this submission and submitter :-
___________________________________________________
Submission ID : 4108110
Date & Time : 9th May 2011 5:09 AM (UTC)
IP Address : 112.110.10.244
Browser Info : Mozilla/4.0 (compatible; MSIE 6.0; Windows NT 5.1; SV1; FunWebProducts; GTB6.6; InfoPath.2)
Predicted Country : --
-
July 11th, 2011, 12:39 PM
Post Count Number #3
c,v
CURRICULUM VITAE
PAWNESH KUMAR
Objective :
I want to be the best in my field where I will work. I plan to build a long term career with progressive and professionally managed organization in a challenging competitive and rewarding environment. I have equipped myself conceptually toward my goal.
Qualification;
10th from H.P.B.S.E. Dharamshala with 73%
12th from H.P.B.S.E. Dharamshala with 65%
Professional Qualification
B.Tech in Mechanical Engg. from PTU Jalandhar with 68%
Industrial Training Experience
1 Two months industrial training at T.C. Spinners Pvt. Ltd. Punjab
2 Six months industrial training at NHPC Stage - III, Dharwala,Distt. Chamba(H.P)