Resume : DEE, Electrical Maintenance & Projects

+ Ask Question / Post resume
Results 1 to 6 of 6
  1. Post Count Number #1
    On probation
    Join Date
    October 24th, 2009
    Location
    No.162/B, 8th Cross, ITI Layout, JP Nagar, 1st Phase, Bangalore - 560078
    Posts
    1

    Resume : DEE, Electrical Maintenance & Projects

    T.V. RAVISHANKARA BHATTA

    No.162/B, Sudhindra, 8th Cross,
    ITI Layout, J P Nagar, 1st Phase,
    Bangalore– 560 078,
    Karnataka, India.

    Cell phone: 9901195406.
    E-mail: 1) tvrsbhatt@gmail.com
    2) tilakerbhatta@yahoo.in

    Qualification: Diploma in Electrical Engineering
    Total Work Experience: 28 years
    Present Location: Bangalore
    Date of birth: 18th July 1959.
    Age: 50 years

    Training:
    01. Allen Bradley slc 500 training (Basic, Programming and Trouble shooting etc.).
    02. Siemens PLC training.
    03. ISO Internal Auditor’s training.
    04. Instruments testing and calibration training.
    05. Hydraulic systems training.
    06. Total Quality Management system training.
    07. National Safety council training.
    08. Diesel Generator (Operation and maintenance).

    My strength: Capable to build an efficient team, build an efficient system for any kind of operation and capable to understand any kind of systems and can handle any sort of responsibilities. I am very much confident to state this based on my previous record of work experience furnished below in brief. People certify me as a good, very efficient and sincere at work.

    Present job profile:Running an own business.
    Period from: April 2009 to present
    Reason for changing: Poor response for business.

    Resent job profile:

    01. Company name: M/s. Alufit (India) Pvt. Ltd, Bangalore.
    Designation: Maintenance Manager
    Functional area: Projects of a new installation.
    Period from: July 2007 to Present.
    Responsibility: Responsible for Projects planning, installation and
    Commissioning, reporting to COO.

    Previous job profiles:

    02. Company: M/s. Ashok Iron Works Limited, Belagaum, Krnataka.
    Designation: Manager – Projects.
    Functional area: Projects.
    Period: from December 2006 to July 2007.
    Responsibility: Responsible for Project department of plant III. Machine
    installation and commissioning, Machine development and up gradation with automation for production requirements. Reporting to Sr. General Manager (Pant in-charge).

    03. Company: M/s. Alumeco India Extrusion Limited. Hyderabad, Andraprash.
    Designation: Manager - Maintenance.
    Functional area: Maintenance and Projects.
    Period: From July 2006 to December 2006.
    Responsibility: Responsible for the entire maintenance and project department activities like, Break down analysis, corrective and preventive actions, Spares identification, planning, procurement and control. Identifying the need of development, machine up gradation, modification, new machine procurement, installation and commissioning. I am leading a team of total 28 workmen and 11 engineers (both Electrical and Mechanical). Reporting to the Plant manager.

    04. Company: M/s Bhoruka Aluminium Limited, Mysore.
    Designation: Deputy Manager - Maintenance.
    Functional area: Maintenance and projects.
    Period : From September 1990 to June 2005.
    Responsibility: Responsible for the entire maintenance and project department activities like, Break down analysis, corrective and preventive actions, Spares identification, planning, procurement and control. Identifying the need of development, machine up gradation, modification, new machine procurement, estimation, costing, installation and commissioning. Identifying the need of workmen and engineers training etc. Leading a team of total 15 workmen and 6 engineers. Involvement in man power planning and new recruitment. I am responsible for energy and fuel Management, energy and fuel conservation. Reporting to General Manager – Production.

    05. Company: M/s Shimoga Steels Limited, Mysore.
    Designation: Electrical Engineer.
    Functional area: Maintenance and projects.
    Period: from March 1981 to September 1990.
    Responsibility: During period from 1981 to 1984 I was responsible for the shift break down maintenance of steel melting shop. During the period from 1984 to 1990 I was responsible for the entire steel melting plant maintenance and projects (both Electrical and Mechanical) activities like, Break down analysis, corrective and preventive actions, Spares identification, planning and control. Identifying the need of development, machine up gradation, modification, involvement in new machine procurement (estimation, costing, installation and commissioning). Reporting to the works manager – Operation.

  2. Post Count Number #2
    Guest Poster
    Join Date
    August 14th, 2008
    Location
    Your Heart, Delhi
    Posts
    76,213

    Resume : DEE, Electrical Maintenance & Projects

    Pinto Wilson

    Permanent Address: Current Address:

    Cheruvathoor House, Sri Sathya Sai Complex, Appolo Street, Hoodi Circle,
    Chelakottukara, White Field,
    Kuriachira P.O, Bangalore-560048
    Thrissur- 680006, Kerala.
    Contact no: +91-8123380115, +91-9037960327 Email: Pintowilson034 AT gmail.com
    ______________________________________________________________________________

    CAREER OBJECTIVE:

    To Discharge the entrusted functions effectively and to improve myself to be an asset for the organization through the application of my management and technical skills.

    EDUCATIONAL QUALIFICATION:

    - Completed B.TECH in Electrical and Electronics Engineering (2005-2009) 61.3 % aggregate from Nehru College Of Engineering And Research Centre, (Calicut University) Thrissur, Kerala.

    - Passed Higher Secondary Education From St Joseph H.S.S, Thrissur With 74% aggregate.

    - Passed S.S.L.C from St Joseph H.S.S Thrissur with 74% aggregate.

    PROJECT WORK :

    - Main Project: BOILER AUTOMATION USING PLC:

    Description: Programmable Logic Controller is a microprocessor used for automation of industrial purposes. Temperature and pressure are the main considerations of boiler performance. PLC can be used for controlling these parameters. In this project, ZEN programmable logic module is used. Temperature and pressure sensors are used for monitoring the input parameters. Output of the sensors are fed to the PLC in digital form. Based on the program stored in the memory, PLC checks the status of each individual input, performs the necessary logic and sets each of the parameters to the desired status..


    TECHNICAL QUALIFICATION:

    - Certified Automation Engineer Course conducted by M/s. Prolific Systems & Technologies Pvt. Ltd, Bangalore,which Includes:

    - PLC’s - Allen Bradley (Micrologix, SLC 500 Series)
    - Siemens (S7-200 & S7-300)
    - GE Fanuc (Versamax)
    - SCADA - Wonder ware In touch , Win CC
    - Drives - ABB Drives (ACS 150)
    - DCS - ABB AC 800 F
    - Instrumentation

    TECHNICAL SKILLS:
    - Diploma in Computer Programming And Software Applications From All India Technical Education Society.

    SOFTWARE PROFICIENCY:
    - Languages: C.
    - Operating Systems : Windows 07, XP, 2000, 98.
    - Others: Microsoft Office.

    ACHIEVEMENTS:

    - Received certification in Essay writing competition at college level.
    - Secured 2nd place in Extempore competition at college level.
    - Participated in college for single and group dance and received applauds.

    PERSONAL SKILLS:

    Positive thinking, hardworking, easily adaptable, self motivated, good coordinating capability, Ability to learn and apply quickly and effectively.

    EXTRA CURRICULAR:

    - Member of school and college cricket team.
    - Member of Event Management Committee in South zone Inter Collegiate Cultural Fest ‘BLOOM’.

    PERSONAL PROFILE:

    Name Of Fathr : C.P Wilson
    Name Of Mother : Nainy Wilson
    Date of Birth : 23-04-1987
    Hobbies : Listening Music, Playing Cricket, Traveling.
    Languages Known : English, Hindi and Malayalam

    PASSPORT DETAILS:

    Passport No: H5379079
    Place of issue: Cochin
    Date of issue: 16/10/2009
    Date of expiry: 15/10/2019


    Declaration:
    I hereby declare that the above-mentioned information is correct up to my knowledge and I bear the responsibility for the correctness of the above-mentioned particulars.

    Place: Bangalore (Pinto Wilson)
    Date:

  3. Post Count Number #3
    Guest Poster
    Join Date
    August 14th, 2008
    Location
    Your Heart, Delhi
    Posts
    76,213

    Name : MANIKANDAN.A
    E-mail : manikandan207 AT gmail.com
    Objective
    Seeking for a position of Electrical Engineer and want to work with a progressive and forward thinking company where I can apply my skills.
    Education
    - BE (Electrical & Electronics Engineering)
    - Annamalai University, Chidambaram.
    - Percentage : 71 %
    - Year : 2009 pass out.
    Higher education
    - PG-Diploma, 1 year.
    - Electrical Safety and Safety Management.
    Field of Interest
    - Electrical Machines.
    - Power Electronics.
    - Transmission and Distribution.
    Area of Interest
    - Electrical Maintenance.
    - Site Project Management.
    - Erection, Testing & Quality Control.
    Strength
    - Willingness to work in a team.
    - Hard Working.
    - Self Confidence.
    Experience
    1. Total Experience : 2 Years.
    2. Electrical Engineer Trainee : 1 Year, Coimbatore.
    3. Electrical Maintenance Engineer : 6 months, Pudhucherry.
    4. Electrical Site Engineer : 6 months, Chennai.

    CURRENT EMPLOYER :
    Current Employer : MALAR ELECTRICALS PRIVATE LIMITED., Chennai.
    Designation : Electrical Site Engineer.
    Current Industry : (XS REAL Project) Erection, Installation & Testing.
    Experience : Six months (Jan 2011 to till date)
    - Experience in Preparation of Electrical engineering & construction Drawings.
    - Experience in residential/commercial building (LT/HT) electrical power distribution system erection, testing & commissioning.
    - Experience to prepare various types of layouts like substation layout, cable routing layout, residential lighting & earthings layout etc.,
    - Experience in operation & maintenance knowledge of transformer, DG set, Motors, panel board erection, capacitor banks, telephone system.
    - Guidance of preparing as fitted drawing due to the changes as per the site condition for the following light, circuit, ups, power points, cable tray layout & earthings layout.
    - Power system design performing Electrical design calculations.
    - Electrical distribution panel Installation & cable termination Industrial, official & house wiring, all earth electrode work.
    - Erection, Installation, commissioning of HT&LT equipments, all type cable laying & testing.
    - Erection of Earth electrodes & Earthing of various electrical equipments.
    1.PREVIOUS EMPLOYER :
    Company : Swathi Organics and Specialities private limited., Pudhucherry.
    Designation : Electrical Maintenance Engineer.
    Experience : Six months (July2010 to dec2010)

    - Experience in Steam Boiler operation & maintenance.
    - Chiller plant erection and maintenance.
    - Cooling tower erection work.
    - Erection of transformers 500 KVA.
    - Erection of DG sets 250 KVA.
    - Erection of 22kv Double pole structure.
    - Installation, commissioning of HT&LT equipments, all type cable laying & testing.
    - power system design performing Electrical design calculations,
    - Preparation of all Electrical engineering & construction Drawings.
    - Electrical distribution panel Installation & cable termination industrial, official & house wiring, all earth electrode work.
    2.PREVIOUS EMPLOYER :
    Company : Electricals & Controls Corporation.
    Designation : Electrical Engineer Trainee. (14/6/2009 to 25/6/2010)
    Location : (LARSEN & TOUBRO New plant) at Coimbatore.
    WORK PROFILE : Substation Works:
    - Erection , testing & operation knowledge of substations like, (CR 7.5MVA, VR 110Kv / 33Kv)(33Kv/11Kv)(11Kv/440v)
    - Power transformer & Distribution transformer erection works.
    Cable Works :
    - L.T & H.T cables laying and proper end gland (1.5 Sq.mm to 400 Sq.mm).
    - L.T cables and H.T cables proper end termination works up to 400Sq.mm.
    - L.T cables and H.T cables jointing and testing work up to 400Sq.mm.
    Panel Board Works :
    - Panel board designing and assembling work.
    - MV Panel board Erection & commissioning.
    - Panel board position & bus bar coupling works.
    - Erection of LDB, LSSB, PSB & designing works.
    Motor & Generator Works :
    - Erection, Commissioning and winding checking knowledge up to350KW squirrel cage induction HT motors make BHEL and KIRLOSKER. And up to 200 KW LT motors make ABB.
    - Motor & Starters operation (DOL, Star Delta) connection upto200HP.
    - 125KvA, 200KvA, 1010KvA Generator operation& maintenance knowledge.
    - Heavy load cranes (25 ton to 80 ton) incoming and maintenance works.
    Circuit Breakers:
    - Operation and maintenance Knowledge of different types MCB,OCB,VCB & ACB breakers Erection, Commissioning and Checking Knowledge, Make ABB, SIEMENS.
    Wiring Works:

    - Experience in Residential & Commercial building circuit designing layout.
    - Erection of HPSV lamps, LPSV lamps, Fluorescent, Halogen lamps, Mercury vapor lamps...etc.,

    DEGREE
    COLLEGE/SCHOOL
    YEAR OF
    PASSING
    PERCENTAGE
    B.E - EEE Annamalai University, Chidambaram. 2009 71%
    H.S.C Govt.Hr.Sec.School, Sithalampattu. 2005 81%
    S.S.L.C Govt.Hr.Sec.School, Sithalampattu. 2003 83%
    Academic Records:
    Current Professional Details:
    Total Experience: 2 Year(s)
    Current Annual Salary: 1 Lac(s) 40 Thousand(s)
    Current Industry: Electricals / Switchgears / Erection & Testing.
    Functional Area: Site Engineering / Project Management/ Maintenance Engineering
    Role: Electrical Engineer
    Engineering Project:

    - Selective Harmonic Elimination in a Single Phase Inverter using SPWM Techniques Field in Power Electronics.

  4. Post Count Number #4
    Guest Poster
    Join Date
    August 14th, 2008
    Location
    Your Heart, Delhi
    Posts
    76,213

    MR.RAMAKRISHNAN.R
    E-mail : ramkrishnan1310 AT gmail.com
    EXECUTIVE SUMMARY
    To achieve dynamic and challenging career in the field of Electrical engineering and to work efficiently, where I can continuously learn and prove my abilities as a part of team.

    TECHNICAL QUALIFICATION
    Diploma in Electrical and electronics Engg.,

    - Other Tools : MS Office, Photo shop
    - ‘C’ License Holder
    ACADAMIC PROFILE
    - Diplomo in Electrical and Electronics –IRT polytechnic college,Orappam- post,
    Krishnagiri –TK,Dharmapuri –Dt With 54%(1995-1998)
    - SSLC – Central higher secondary school,A.Nagore,Pollachi with 77%(1994-1995)
    WORK EXPERIENCE
    1. Currently working in RIMA TRANSFORMERS & CONDUCTORS (P) LTD,Bangalore.As a senior service Engineer from APRIL 2010 to Till .
    Service Attended :
    1.5 MVA TO 35 MVA Power Transformers.
    0.630 MVA to 3.15 MVA Distribution Transformers.
    2. Suguna Groups, Bangalore as an Executive engineer from Mar-2007 TO Apri2010

    TASK INVOLVED
    *Servicing of CFL (compact Flour cent Lamp) lights.(SUGGESSTION AWARD )
    *Implement of Infra Red wave use to poultry Bio security Disinfect spray motor ON & off control.
    * Implement of Electronic timer to poultry field for Automatically LIGHTING Switch on & Off to various Time.
    * Cost control work done on HT Line work carry time.(Company Budget is Rs 29,75,000.00.But I have done the work AT Rs19,65,000.00)
    *Diesel cost controlled due to rectifying of Break down in OLTC .(ie. 14,000.00 Litrs to just 4,000.00 Ltrs)
    - Maintenance of all equipments which are related to chiller plant, AHU & Incubators.
    - Maintenance of DG sets(15kva-625kva Cummins ltd)
    - Maintenance of Transformer ,VCB&H.T. yards (1000kva)
    - Preparation of Equipment note for machinery and equipments.
    - Preparation & Maintain the stock materials in ERP.
    - Maintenance of boiler plant & Rendering plant.
    - Co-ordinate with electricity officials for inspection, documentation & other issues.
    - Commissioning and maintaining of 40KLD Effluent Treatment plant in site.
    3. Southern cots spinners pvt ltd,Coimbatore

    Responsibilities :

    - Maintaining & arresting Break downs in control panels.
    - Break down attending in PLC (ALLEN BREADLY)
    - Cross checking in auto level controller.
    - Co-ordinate with erected of long frame with PLC commands &Pneumatic control.
    - Maintaining of 185kva CATTER PILLER DG set.
    - Maintaining of power factor.

    4.PROJECT HANDLED

    Project Title :Galfs Agro Food Industries India Pvt ltd,
    Rama pattanam,Pollachi
    Duration of Project : 1 year(Jun2005-July2006)

    Responsibilities :

    - Involved in the creation of design.
    - Erection of Transformer(750kva)
    - Design &Erecting L.T panel boards with automatic control systems.
    - Co-ordinate with electrical Inspection for getting CEIG approval.


    2. I have worked in 22kv/110kv Sub Station, Kongal Nagaram,Pollachi. Maintenance Engineer from July2004 to Apr2005. This company is an ISO 9000-2001 certified company.

    3. Maintaining of 250kw Wind Turbine Generator(48Nos) from Feb2003 to Aug2004 in
    Tamilnadu petro product ltd, Kamanayakkan palayam, Palladam
    Responsibilities :

    - Attending the Break Downs.
    - Carry out Maintenance Electrical / Mechanical.
    - Maintaining of 3MW & 9MW yard.
    - Preparing bill of materials.
    - Coordinating with workshop.
    - Giving Maintenance instructions for operators.
    - Maintaining of power factor.

  5. Post Count Number #5
    Guest Poster
    Join Date
    August 14th, 2008
    Location
    Your Heart, Delhi
    Posts
    76,213

    BHARAT RESUME

    Curriculum Vitae
    SAKARIYA BHARAT R.

    Email :-
    bharat_sakariya AT rediffmail.com

    - Objective
    - Looking for challenging opportunity in Automation industry to contribute to the organization growth and also to move ahead my career by exploring my skills and abilities.
    - Professional Experience 5 years + 8 months)
    Recent Company :-
    - Company Name : - RELIANCE IND. LTD. (Bhupendra & Brothers), Jamnagar.
    - Job duration : - From March-2008 To Still Date.
    - Job Designation : - Electrical Maintenance engineer in Pipe fabrication shop (PFS).
    - Job profile :-
    ( MAINTENANCE )
    - Maintaining of CNC Machines (FICEP MAKE) For Pipe Cutting M/C.
    - Maintaining of CNC Machines (COJAFEX MAKE) For Pipe Cutting M/C.
    - Maintaining of CHOCKSAW cutting machine.
    - Maintaining SAW M/C.
    - Maintaining EOT Cranes. (FITOP MAKE)
    - Maintaining Welding Machine (MEMCO Make–Mig / Tig, FRONIUS) Plazma M/C.
    - Maintaining of LT Motor & Pumps & Gear Assembly.
    - Installation & Commissioning of all Equipment.
    -
    ( CONSTRUCTION
    - All Types of Lighting & Illumination Cable Recording Preventive Maintenance for all the Equipment’s in the Fab Shop according to the Schedule. Laying, Testing &Termination Work.
    - Laying Of HT/LT Cables Including HT&LT jointing, Fab. &Erect. Of Different types of Cable tray.
    - Power & Clean Earthing of Electrical (Transformer, Motor, Grid etc.)& Instrument system.
    - Familiar with types of safe work permit system in process area (Refinery).
    - Installation of New FICEP Make CNC Drilling & Sawing M/C.
    - Erection & New EOT Fabrication work.
    - Erection of 80 tone EOT crane in Essar Steel Hazeera Surat.
    First Company :-
    - Company Name : - M/s Silicon Electrical Rajkot
    - Job duration : - From Dec-2005 To Feb-2008.
    - Job Designation : - Electrical Testing Engineer
    - Job profile :-
    - Testing submersible pumps as per ISI check list.
    - Handle manpower.
    ISI Documental work
    - Educational Qualification
    - D.E. (Electrical), Oct 2004, Technical Education Board, Gandhinagar, Gujarat.
    -
    Examination Year Of Passing Board/ University Percentage
    Diploma In Electrical Dec, 2005 T.E.B,Gandhinagar 65.71%
    S. S. C.
    March, 2001 G. S. E. B. 79.86 %

  6. Post Count Number #6
    Guest Poster
    Join Date
    August 14th, 2008
    Location
    Your Heart, Delhi
    Posts
    76,213

    I want to copy the resume. Please help me.