Resume / CV : Crusher Plant Manager
V.P. SURESH KUMAR
DIPLOMA MECHANICAL ENGR.
EMPLOYMENT :19+ Years
MODERN CRUSHER INDUSTRIES LLC 2008 Sept – Till date
(Allied Business Corporation LLC)
POSITION : CRUSHER MANAGER – Reporting to CHAIRMAN
DUTIES & RESPONSIBILITIES :
- Invite, study and Selection of Plant and Machinery from different suppliers for setting up a 400TPH plant at Quarry Site Shinas
- Supervise the quarry development and selection of Drilling Blasting Agency
- Prepare access roads to site, construction of Office, plant and accommodation facilities
- Follow up with the administration department for Licenses and permits for operating quarry
- Supervision of installation of plant.
- Operation and running of the company as a department head.
ABDULLAH AL AL KASHRY &PARTNERS CO LLC 2006 Dec – 2008 Sept
POSITION : PLANT MANAGER – Reporting to G.M(OPERATIONS)
DUTIES & RESPONSIBILITIES :
- Production and quality control of products manufactured.
- Preventive and routine maintenance of plant and machinery
- Research and development to increase the quantity and quality of products and reduce the cost of production.
- Personnel and General administration of the crusher plants.
- Preparation of yearly budget, and its implementation.
- Re conditioning of old machineries and design, fabrication and installation of a new production line.
Plant Details : Capacity 5000 tons per day
- Kleemann Reiner Double Toggle Jaw Crusher KSB 800
- Pilot Crushtech VSI Tornado AC10
- Kleemann Reiner Horizontal Impactor SPH 10
- Kleemann Reiner Vibrating Screen VU25 1020
- Kleemann Reiner Chmaber Filter FM -1
- Ibag Cone Crusher FKB – 270.3
- Hazemag Horizontal Impactor APK 40
- Vibran Washing Wheel V.B 5000, V.B 4000
Heavy Equipments Details :
- Dozer Komatsu D155
- Wheel Loader Komatsu 470, 420
- Wheel Loader Caterpillar 966F
- Tipper Truck MAN, Renault, HINO
NASER AL SAYER CRUSHERS 2004 Jun – 2006 December
POSITION : PLANT IN CHARGE – Reporting to the Quarry Manager
DUTIES & RESPONSIBILITIES :
- Plan, Organize and supervise of day to day production activities of crusher plant, wash plant, quarry and heavy equipments.
- Preparation of preventive maintenance schedule and follow up the execution of the same.
- Preparation of maintenance history records of each machines and ensure the maintenance program is as per the manufacturer's recommendation.
- Co ordinate the drilling and blasting activities.
- Purchase in co ordination with the stores and accounts department.
- Organize and manage staff for maximum utilization of plant.
- Develop and implement new methods to improve quality and production.
- Ensure that the budgeted production is achieved.
- Ensure that the plant and machinery has minimal breakdowns.
- Co ordinate efforts of the transport, customers, weigh bridge operation and port storage and shipment.
Plant Details : Capacity 400TPH
- Cedarapids Jaw Crusher JC 3054
- Cedarapids Cone Crusher Rollercone RC54II
- Cedarapids Horizontal Vibrating Screen TSH 6203-32
- Cedarapids Single Stage Vibrating Grizzly VGF5220-15
- Cedarapids Horizontal shaft Impactor 5064
- Caldehusa Horizontal shaft Impactor MFD60
- Rotex electro magnetic pan feeder SFH42
- Belt conveyors from 600mm to 1400mm wide
- Sand washing Plant Powerscreen Trident2
Heavy Equipments Details :
- Dozer Cat D9R – 2 Nos
- Wheel Loader Cat 972G, 966G,988G
- Excavator Cat 375B,345BL,330BL,325B
- Tipper Truck Renault
ALI MOOSA AND SONS CRUSHERS 2002 Feb – 2004 June
POSITION : PLANT ENGINEER – Reporting to the Crusher Manager
DUTIES :
- Organize and supervise of day to day production activities of plant, quarry and heavy equipments.
- Plan and execute maintenance of plant equipments.
- Prepare material requisition in co ordination with stores department.
- Develop and implement new methods to improve quality and production.
- Ensure that the budgeted production is achieved.
- Ensure that the plant and machinery has minimal breakdowns.
Plant Details : Capacity – 300TPH x 3
- Parker Jaw Crushers
- Hazemag Horizontal Shaft Impactors APK 60
- ATLAS 4 deck vibrating Screen (inclined)
- Sand washing Plant Power Screen Trident-1
- Belt conveyors
Heavy Equipments Details :
- Dozer Cat D9R – 2 Nos
- Wheel Loader Cat 966G,
- Wheel Loader Volvo 150, Volvo 180
- Excavator Cat 345BL,330BL,325B
- Excavator Komatsu PC 700
- Tipper Truck Renault, Volvo
MARSMAN CONSTRUCTION EQUIP. LTD 1998 Jan – 2002 Jan : (4 Years)
(Manufacturer of Crushing and Screening Plants)
POSITION : Sr Project Engineer – Reporting to the General Manager
- Erection and commissioning and related fabrication of process plants and crushing and screening plants of different capacity includes primary jaw crushers, secondary impactor, ball mill, vibrating screens, belt conveyors, screw feeder, sand washing unit, chain conveyor ..etc.
- Helping in design and Manufacturing of equipment according to site conditions , familiar with tool room processes like turning, milling, drilling, gas cutting, electric arc welding, shearing, bending, shot blasting, painting..etc.
- Fabrication and erection of structural and piping equipments like steel structures, storage bins, storage tanks, hopper, belt conveyor structure, and industrial buildings, water lines, process lines..etc
MS AL SUWAIDI EST. 1995 Oct – 1997 Nov : (2Years)
Kingdom of Saudi Arabia
POSITION : SHIFT FOREMAN – Reporting to the SHIFT ENGINEER
(Worked in Petrokemya, IBN ZAHR, Samref, Yanbu Refinery)
- Maintenance of equipment related to oil refinery and petrochemical plant
SUNIL CONSTRUCTION 1989 Aug – 1995 Oct : (6Years)
POSITION : SITE IN CHARGE – Reporting to the AREA MANAGER
(Worked in National Aluminum Co. Ltd.,Smelter Plant)
- Operation and maintenance of equipments related to carbon plant, aluminum smelter plant, captive power plant like vibro-compacting unit, anode paste mixer, bucket elevator, ball mill, hammer crusher, magnetic separator, screw feeder, rotary feeder, bag filter unit, hydraulic lifting table, tilting device, roler conveyor, belt conveyors, cooling tunnels, overhead chain conveyor, cranes, hoist, pumps, valves, compressors, gear boxes, fans, heater, boilers, diesel engines, dryer, turbine, pipelines..etc
Qualification :
Diploma in Mechanical Engineering 1985-1988
( Placed in First Class with Distinction ) ( Carmel Polytechnic, Alleppey )
Certification :
Certificate awarded by state board of technical education, Kerala State. Completed the course in Carmel Polytechnic, Alleppey I 1988. The main subjects includes production processes, I C Engines, refrigeration and air conditioning, productivity and quality control, estimating costing and tool design, engineering drawing and industrial managements etc.
Auto CAD R14 :
Familiar with design drawings of machineries and structures like jaw crushers, impact crushers, vibrating screens, Vibro feeders, belt conveyors, steel structure, pipe lines..
Other Information :
Age and Date of Birth 38 Years. 30 May 1970
Place of Birth Muhamma, Kerala
Nationality Indian
Marital Status Married
Physical Standards 159 cm, 60 kgs
Driving License UAE, Oman, India
Languages Know English, Hindi, Malayalam, Arabic
V.P. Suresh kumar
-
June 18th, 2011, 12:17 PM
Post Count Number #2
MY RESME
RESUME :
RAMESHKANNAN K
E-mail : krkannan007 AT yahoo.in
CARRIER OBJECTIVE :
- Seeking a position to utilize my skills and abilities in the organization that offers professional growth while being resourceful, innovative and flexible.
ACADEMIC PROFILE :
Course Year of Passing Institution Board/University Percentage of Marks :
DME 2007 Mohamed Sathak Polytechnic College, Kilakarai Anna University 64
SSLC 2004 Syed Ammal Higher Sec.School, Ramanathapuram State Board 63
TECHNICAL SKILLS :
- Two Wheeler Mechanism (23.12.05 to 23.03.06)
- Refrigeration & Air Conditioning (21.06.06 to 20.09.06)
- Advanced CNC Programming & Operation (01.11.06 to 29.11.06)
- Auto Cad
EXPERIENCE PROJECT IN DIPLOMA :
- TITLE : Material and Dimension Analyzing Machine
TEAM : 06 Members
CONCLUSION : This project was designed and fabricated keeping in mind that the whole world is being converted to computerized and automated manufacturing. In this project, we tried to eliminate the problems of the machine and improved factors for industrial development.
- Accuracy
- Less Scrap
- Reduced lead time
- Labor cost
- Reduced material handling
- Quality of inspection is high
- Improved mass production
MC based material and dimension analyzing machine has been designed, fabricated & tested as an attempt to getting the required object. This offers greater flexibility and adaptability.
IMPLANT TRAINING :
- UNDERGONE In-Plant Training in Tamilnadu State Transport Corporation (Kumbakonam) Limited.
WORK EXPERIENCE :
- Working as Crusher Plant & Batching Plant maintenance Engineer (Mechanical), Bridge using material of beam production engineer worked(civil) in RNS Infrastructure Ltd from May – 2007 to September – 2010.
1. Plant Erection details
2. Material fabrication supervising
3. All Maintenance work
-
January 2nd, 2013, 04:48 AM
Post Count Number #3
plant operator.....A.O.C.p