-
October 14th, 2009, 01:26 PM
Post Count Number #1
www.bluestarindia.com Blue Star Ltd Mumbai : Design Planning, Electrical Projects
Blue Star Ltd Mumbai : Design Planning, Electrical Projects
Website : http://www.bluestarindia.com
bluestarindia.com
Designation Deputy Manager / Manager - Design & Planning, Electrical Projects
Job Description
The candidate shall be reponsible for complete Design & Planning of High / Low voltage Electrical Projects for customer segments like Malls, Multiplexes, Commercial Complexes, Hotels, Hospitals, Ariports, Infrastructure Projects, etc.
Desired Profile
The candidate shall have hands on experience on complete Design & Planning of High / Low voltage Electrical Projects for customer segments like Malls, Multiplexes, Commercial Complexes, Hotels, Hospitals, Ariports, Infrastructure Projects, etc.
Contacts us:
Mumbai
Bandbox House
4th Flr, 254 D
Dr Annie Besant Road
Worli
Mumbai - 400 030
Tel: (91) (22) 66544000
Fax: (91) (22) 66544001
Mumbai
Sahas
414/2 Veer Savarkar Marg
Prabhadevi
Mumbai - 400 025
Tel: (91) (22) 66664000
Fax: (91) (22) 66664001
Chennai
9 Bazullah Road
T Nagar
Chennai - 600 017
Tel: (91) (44) 4344 4000
Fax: (91) (44) 28158015 / 4344 4072
Last edited by muthukalee; October 11th, 2011 at 05:02 PM.
-
May 30th, 2011, 11:14 AM
Post Count Number #2
IJT addict
Name : kaleshwar sahu
Email : saw.kailash3 AT gmail.com
Designation / Skillset : electrical engg trainee
fresher electrical engg job
Resume :
sahu.kaleshwar1 AT gmail.com
CAREER OBJECTIVE
Intend to build a career with industries of hi-tech environment with committed & dedicated people, which will help me to explore myself and realize my potential.
EDUCATION
- B.E (Electrical & Electronics Engineering), from Radharaman Engineering College, Bhopal under Rajiv Gandhi Technical University, Bhopal (2008-11) with First class 70.66% marks upto (7th Semester).
- Diploma in Electrical Engineering, from Government Polytechnic Dhanbad (2004-2007) with 74.05% marks.
- Kendriya Vidyalaya, Chandrapura with First class 66% marks in 12th (C.B.S.E) 2003.
- Kendriya Vidyalaya, Chandrapura, with First class 73% marks in 10th (C.B.S.E) 2001.
(B.E) PROJECT WORK semesters
6th semester
Minor Project work entitled with “P.I.D CONTROLLER”. In this project we have done Speed Regulation of Motor by Proportional-Integral Derivative Controller which is a generic control loop feedback mechanism widely used in Industrial systems.
8th Semester
Major Project work entitled with “Automatic Railway Gate Control System & Energy Efficient Coaches”. Project is designed to avoid Railway accidents happening at unattended Railway gates. This project is also based on making Indian Railway coaches Energy efficient. Their features are that they can generate electricity by help of solar Panels Installed on the top and make use of wind energy to generate electricity.
COMPUTER SKILLS
i. Language : C,C++
ii. MS Tools : MS Word, MS Excel, MS Powerpoint
iii. Operating Systems : unix, windowXP
TRAININGS
- Steel Authority of India Ltd. Bokaro : During the time period of three weeks from 12.07.2010 to 31.07.2010 studied how Stainless Steel is manufactured from their raw materials. In the training module we get the exposure of practical & theoretical idea about Instrumentation & Automation, Electrical reparing shop, Telecommunication, Cold/Hot rolling Mills.
- Chandrapura Thermal Power Station (D.V.C) : In the Industrial training of two weeks from 24.07.2009 to 6.08.2009 studied how Electricity is generated by raw material pulverized coke. We learned the practical and theoretical idea about Boiler section, Turbine section, Bus bar section, generator, transformer, Generation, Transmission, and Distribution of electric Power.
- Hindustan malleable & Forgings Limited , Jalan Nagar Bhuli Dhanbad : During the time period of 1 month from 12.11.2006 to 26.12.2006.I have studied Single / Three phase motors and also learn exposure of practical and theoretical idea about Foundry, Pattern shop, Casting.
- 9 months job experience in PCB design and layout (Pyrotech electronics pvt ltd Udaipur Rajasthan)
INDUSTRIAL TOUR
I. In this session we have seen M.P Power Generation Company Limited, Rani Awanti Bai Sagar Hydal Power Station, Barginagar, and Jabalpur on dated 02.04.2011. It start working in 1985, having two units of capacity of 45 MW .There electricity generated is supplied by 132 KV line. It has an auxiliary unit of 7.5 MW which used by discharge water of both two units.
ACADEMICS
- Distinctive performance in second. National science Olympiad.
- Certificate of Hindi/English typewriting with speed of 35/40 per minute.
REFERENCES
1) Anand Mohan 2)S.N PRASAD
Assistant Professor Sub divisional engineer B.S.N.L Chandrapura ,Bokaro
NSHM Business School, Knowledge Campus (Jharkhand) Arrah Shibtala via- Muchipara DURGAPUR – 713212 , Mobile : 9475413589 Mobile: 9431715088
----------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
I hereby declare that the particulars mentioned above are correct to the best of my knowledge and belief.
Date : 21/04/2011
(Kaleshwar Sahu) Place : Bhopal
-------------------------------------------------------
More Information about this submission and submitter :-
___________________________________________________
Submission ID : 4187374
Date & Time : 29th May 2011 2:05 PM (UTC)
IP Address : 117.199.20.254
Browser Info : Mozilla/4.0 (compatible; MSIE 8.0; Windows NT 6.1; Trident/4.0; SLCC2; .NET CLR 2.0.50727; .NET CLR 3.5.30729; .NET CLR 3.0.30729; Media Center PC 6.0; InfoPath.2; Tablet PC 2.0)
Predicted Country : India
-
June 20th, 2011, 05:02 PM
Post Count Number #3
AROUND 15 YEARS EXPERIENCES IN HVAC,ELECTRIC AND MEP PROJECT
-
September 26th, 2011, 12:43 PM
Post Count Number #4
chennai
chennai is very beautiful city.
-
October 10th, 2011, 04:07 AM
Post Count Number #5
project manager
RESUME
DEBIDATTA BISOYI
E-Mail ID : debibisoyi AT gmail.com
debidatta.bisayi AT futuregroup.in
Objective :
To acquire a remarkable and versatile position in industry and to utilize my potential in the attainment of the organizational goals.
Educational Qualification :
B.E (Electrical Engineering) From Berhampur University, Orissa.
MBA appearing 2Nd Semester.
Computer Knowledge : DCA In computer Application
- Diploma in System Management from VJ.INFO.
- Knowledge of Microsoft Office 2000.
- Knowledge of Windows 2000 and Unix operating Systems.
- Knowledge of Programming Languages C,C++.
- Proficiency in Auto CAD 2002
1. Work Experience :
:
From September 2007 to till date, Working in Pantaloon Retail India Ltd. (PRIL) is Future Group Company. Working as an Deputy Manager Project and Safety and Facility east zone.
Job Responsibility.
:
1. PROJECT :
Project Management, technical support, Logistics and coordination (Services Part).
- Prepare the project evaluation.
- Erection and installation of Fire Fighting system,all electrical like starting from H.T to LT,CCTV,HVAC SYSTEM,D.G,PA and Check point etc.
- Independently handling east zone Project only services part.
- Project planning and complete the project with in time frame.
- Vendors finalize by tendering process.
- Daily Correspondence of the entire Project with daily project report and project tracker.
- Make the Schedule of Quantity as per requirement of Single line diagram.
- Preparing the SLD (Single line diagram) and SOQ (Schedule of Quantity) and Finalize the tender of the project.
- Purchase the material as per the SLD.
- Daily progress report of the project reporting to M.D.
- Making the Running Bill of the project and approve the RA Bill of the Project as per SLD, SOQ and TS.
- Site Coordination as per telephonic and site visit.
- INSPECTION & TESTING OF L.T Panel, H.T Panel, Transformer etc.
- Logistics handle zone wise project like drawing submission, approval and all I.E RULES and CBIP guide line etc.
- Successfully completed of 40 nos project in east zone and Bangalore Central II and Indoor Central and total Approximately More then 30 Lakhs sq.ft are
2. Safety and Facility :
- Handel safety and facility 66 Retail store (All BB and PNT with include 3 malls, H.T,Central and Brand Factory)in East Zone.
- Handel total retail area Aprox. 3025985 Sq. ft. safety and facility in east zone.
- Handel more then 400 Technical Staffing and Scheduling of the department and allocation of duties.
- Develop systems and procedures that achieve higher cost efficiency and Customer
satisfaction.
- Facilitate learning and development for all the team members of the department.
- Performance Appraisal/ Management of the staff in the department.
- Implement the preventive maintenance plan and upkeep of engineering services.
- Preparing monthly reports and budget reports and tracking.
- Material procurement and management.
- Execute the energy conservation programs monitor HLP consumption on a daily
- basis.
- Playing an important role in implementing of BMS operated HVAC and energy saving.
- Monitoring of Help Desk operation with respect to SLA and report Generation.
- Playing an important role in 6 Sigma project for Energy consumption.
- Preparing of annual operating plan and Execution.
- Coordinating with Vendors, Contractors and liaison authorities.
- Maintain the fire safety system through regular follow up with store fire alarm and
- sprinkler system.
- Ensure that the government regulations for boilers, electrical installation,Fire NOC,Lift and escalator License, D.G Pollution Certificate,and environment etc. are strictly followed.
- Starting to Handing over process to store safety in daily basis.
- Old machine AMC, New vendor finalize etc.
2. Work Experience :
From January 2006 to till date, Working in ICICI-WINFRA (The ICICI – West Bengal Infrastructure Development Corporation Limited (I-WIN) is a joint venture between the ICICI Bank Group and the Government of West Bengal Industrial Corporation Ltd. .)Working as a Sr. officer (Project Department).ICICI WINFRA Is a Project Management consultant in West Bengal and other state.
Job Responsibility :
- Project Management, technical support, Logistics and coordination (electrical).
- Prepare the project evaluation
- Independently handling six to eight nos of Project in West Bengal industrial development corporation.
- Making the project estimate.
- Project planning.
- Preparing the Cash flow of the project.
- Daily Correspondence of the entire Project.
- Make the Schedule of Quantity as per requirement of Single line diagram.
- Preparing the SLD (Single line diagram) and SOQ (Schedule of Quantity) and Finalize the tender of the project.
- Purchase the material as per the SLD.
- Daily progress report of the project reporting to M.D.
- Making the Running Bill of the project and approve the RA Bill of the Project as per SLD, SOQ and TS.
- Site Coordination as per telephonic and site visit.
- INSPECTION & TESTING OF L.T Panel, H.T Panel, Transformer etc.
- Logistics handle zone wise project like drawing submission, approval and all I.E RULES and CBIP guide line etc.
3. Work Experience : From March 2003 to Dec 2006, working in Uttara foods & feeds Pvt Ltd (Venky’s India Ltd.) as a Sr. Electrical Engineer.
Job Responsibility :
- Installation &Commissioning Construction of O&M of Electric Equipment like Panel, Transformer, Switchgear, Board and L.VContral panels etc.
- Testing of Transformer, Cable, switch gear, panel, protection relay & PLC’s.
- Reading of Cable schedule, Control wiring etc.
- Relay panel drawing, Control panel & main distribution panel drawing etc.
- Line diagram, distribution & Substation drawing of 33KV &11KV line or substation. Provenience in AUTOCAD2002.
- Installation, Commissioning & maintenance of D.G set like (650KVA, 450KVA, 250KVA, 125KVA).
- Maintenance of Food processing Plant in electrical division.
- Twenty to thirty nos of skill Labor handling.
- Contractor finalize as per quotation collection, rate negotiation, work order finalize etc.
- Daily reporting to G.M and Project Manager.
- Liaising work as per state wise (drawing approval, application of electric connection etc.).
Professional Trainings : -
First Vocational Training.
At “Hydro Power Plant” Mukhiguda, ORISSA. During this period we had worked in power plant, as well as studied about the Power generation.
Second Vocational Taring.
At power distribution division of “South Co” Berhampur, Orissa. During this period we had trained about the power distribution system and as well as regarding how to protect the power distribution system.
Engineering Proficiency :-
- Electrical Machine.
- Power System.
- Measurement and Instrumentation.
- Electronics and Microprocessor
- Computer Architecture and Troubleshooting
-
February 6th, 2012, 01:26 PM
Post Count Number #6
Project planner (Primavera-06)
RESUME
Name
: KULDEEP MARUTI DOLAS
Educational Qualification : Diploma in Mechanical Egg.
Datta Meghe College of Egg.Navi Mumbai
A.M.I.E. (Mechanical)
Institution of Engineers Kolkata (India)
E-mail ID : kuldeep_dolas AT yahoo.co.in
Details of Academic Career :-
Examination Passed
Name of School/ College
Year of Passing
University/Board
Class Obtained.
A.M.I.E.
(Mechanical)
Govt. Polytechnic 49, Kherwadi, Bandra (east),
Mumbai – 51
Winter - 2001
Examination Institute of Engineers(India) 8 Gokhale Road, Kolkata
Pass
Class.
Diploma in Mechanical Engineering Shreeram Polytechnic
Navimumbai
Airoli 1997-98 Board of Technical Education Mumbai Second Class
54.33 %
Project Planning management
CADD CENTER
Mumbai
March
2009 P.S sivasamy salai
Mylapore-600004
Chennai First class
OBJECTIVE :-
- Seeking a position in rapidly progressive organization offering a highly competitive environment for a diversified learning and progressive.
SOFTWARE KNOWLEDGE :-
I have knowledge of, Project planning Management, Primavera Project planner Version 6.0 CPM /PERT/ WBS, Microsoft project 2007, Ms-Office-2007 Project planning Management Certification.
Membership : - Integrated management system policy core committee member. Hindustan Dorr-Oliver Limited. (March-2008 to June 2011.)
PRESENT WORKING EXPERIENCE
Thermal Power Projects ,Oil & Gas Refinery,Water treatment Projects.
I am presently working with ION EXCHANGE INDIA LIMITED as Dy. Manager Project planning. My responsibilities are planning scheduling, controlling Recourses, Estimation of cost, Resource leveling, tracking progress, Earn value analysis, Reporting, Methodology Management
& take approval from CEO projects-Davison. & Review for monthly budget for our clients BHEL kalpakam, NTPC Wallur, L& T DB power.600 X2 MW, Reliance Sasan Project, and Jindal India thermal power.
Preparation of barchart in Microsoft project 2007, Primavera-06 version.Preparation of s-curve & submission to CEO project for review & approval & final submission to client.(From 9th May 2011 till date.)
PREVIOUS WORK EXPERIENCE :-
Oil & Gas Refinery turnkey projects. (Duration 3years.)
I have working experience as project assist Planning manager HINDUSTAN DORR -OLIVER LTD (From30th Oct 2009 to May2011.) process of implementing 9 MMTPA refinery at Bhatinda Punjab.(Oil & Gas refinery turnkey Projects.)
Client Name : - HPCL MITTAL ENERGY LIMITED.
GURUGOVIND SINGH REFINERY BHATINDA PANJAB.
Consultant : - ENGINEERS INDIA LIMITED (DELHI) (Govt. of India Enterprises.)
EPC Contractor : - HINDUSTAN DORR OLIVER LTD
Project Name : - Integrated Effluent Treatment plant, DM Plant, Reverse osmosis plant. Turnkey project package.
AREA OF RESPONSIBILITIES :-
- Preparation of weekly activities plan, monthly planning for Project micro-schedule for the RO-DM Plant project, resources leveling & tracking progress, scheduling & report generation.
- Liaise with EDD (Engineering Design Dept.) And preparing & maintaining proper documentation of work done & put up monthly to the CEO projects Dept.
- Responsibilities involve all the mater pertaining to fabrication, installation Erection and expansion of the RO DM plant. EIL (Engineers India Ltd.) (Govt. of India Enterprises)
Oil & Gas Refinery turnkey project
I have worked as project planning engineer for HINDUSTAN DORR -OLIVER LTD.
Client Name : - HINDUSTAN PETROLIUM LIMITED. (MUMBAI REFINARY)
Consultant : - ENGINEERS INDIA LIMITED.
EPC Contractor - HINDUSTAN DORR OLIVER LTD
Project Name : - Effluent Treatment plant, Reverse osmosis plant, RO Plant
ISBL/OSBL PIPING.(From 13thMarch 2008 to 28th Oct 2009).Oil & gas refinery Turnkey project.
I have co-ordinate with Consultant EIL & our client HPCLfor Fuel,lub Refinary Piping as per ASME codes B 31.3, Detail Design Engineering, fabrication Erection of pressure vessel as per API -650 Standard specification.
OVERSEAS EXPERIENCE (GULF EXPERIENCE) :-
Water treatment plant projects in Oil & Gas Refinery sector.(Duration 5 years.)
- I have worked for Modern Gulf Trading & Construction Company Ltd. of their client Ministry of Water and Electricity General Directorate of Water - Eastern Region, P.O. No.53006, and Riyadh. Kingdom of Saudi Arabia. Oil & Gas Refinery project (From 19th Dec.2003 to 25 Jan2008 )
I have worked as project planning Engineer for MOGU (Modern Gulf Trading and Construction Company Pvt. Ltd., which is the main contractor of SAUDI ARAMCO having the following duties and responsibility.
- Preparation of network analysis critical path Method (CPM), program evaluation and review technique (PERT) for sewerage treatment plant.
- Check, evaluates and review the quantity estimate and detailed cost analysis for approval of Deputy project manager.
- Installation, Testing & Commissioning. of reverse osmosis plant 10,000 cum capacity.
- I have worked for M/S RMC READIMIX INDIA PVT. LTD. (From 26th Dec 2002 to 6th Dec2003).
- I have worked as a project planning Engineer for M/S SAF YEAST COMPANY PVT. LTD. MIDC Chiplun (From Dec. 2001 to 21st Dec. 2002).
Pharmaceutical turnkey projects.(Duration 3 years.)
- Worked as a Mechanical consultant for M/S. MIDTOWN PROJECT & CONSULTANT LTD. for project engineering, planning, Detail- Designing & management & Co-ordination of all mechanical systems for their clients M/s Blue Cross Lab. Ltd ,M/s.Glenmerk Pharmaceuticals Ltd(From Jan. 99 Till Completion of pharmaceutical Turnkey Project).
During my appointment as mechanical consultant Engineer I had project-co-coordinator. Installation erection commissioning of Air Handling Unit, Reciprocating chiller, and chilled water pump
1. Installation Erection commissioning of 600 kg/hr steam boiler.
2. Installation Erection commissioning of water cooled air compressor.
Food processing projects
TRAINING PERIOD :-
I have working experience in CADBURY INDIA PVT LTD. ISO 9002 CERTIFIED COMPANY as Maintenance Engineer in (Operation &Maintenance Department) for the period of one year.
-
February 7th, 2012, 10:24 AM
Post Count Number #7
RESUME
SHANTANU KULKARNI
Email : skulkarni111 AT yahoo.com
-----------------------------------------------------------------------------------------------------------
--------------------------------
Objective :
Self-motivated Mechanical Engineer graduate looking for a challenging position to
learn and effectively contribute to the growth of the organization.
Educational Qualifications :
1. B.E. (Mechanical Engineering),First Class, Mumbai University, May 2011
2. Diploma in Mechanical Engineering, First Class, Maharashtra State Board
of Technical Education, May 2007
3. SSC, Mumbai board, First Class, March 2004
Computer skills :
1. Operating System : Windows 2000/XP/Vista/Windows 7
2. Packages : Microsoft Office 2003/2007, Autocad, Catia,
ANSYS,3DVia,Agile(PLM Software).
Project management skills :
1. Course in Project Planning & management (concepts)
2. Course in Microsoft project.
3. Course in Primavera(P6).
Courses done from CADD centre Andheri,Mumbai.(Registered Education providers
of PMI.)
Academic projects :
1. Compact Thresher, Final Year Diploma Project, May 2007
a. Design and fabrication of a compact but efficient thresher affordable to
common farmers
b. Selected for and appraised at state level project exhibition “DIPEX” held
at Jalgaon.
2. Design and stress analysis of pedestal for centrifugal fan using ANSYS
10.
a. Project involved design and stress analysis of CI pedestal supporting
industrial fans.
b. Project done at Kilburn Engineering Ltd using Finite Element Analysis
software ANSYS.
c. Solid modeling done on CATIA/SOLIDWORKS. Weight of impeller and
shaft assembly, vibrations due to unbalance of main shaft has been taken into
consideration while doing stress analysis.
Work experience : (July 2011-NOV 2011)
I was working with PackSys Global(India)Pvt.Ltd. as Trainee Engineer in Technical
documentation.
Job Responsibilities :
1. Generating and verifying Bill of materials.
2. Preparing exploded views of various assemblies and sub-assemblies for
different projects using 3DVia Composer.
3. Preparing Illustrations for Operating manuals for various projects using
3DVia Composer.
4. Preparing Operating manuals on Adobe FrameMaker for various projects.
5. Maintaining and updating contents and machine documentation on server.
6. Uploading and releasing machine documentation on Agile(PLM
Software).
Strengths :
1. Effective communication skills
2. Ability to work in small and large teams
3. Fast Learner
4. Hard working
Extra Curricular Activities :
1. Volunteered in different Cultural and Technical Programs organized in my
college.
2. Member of Indian Society of Heating, Refrigerating and Air Conditioning
Engineers.
3. Participated in Mahindra Auto Quotient 2010.
4. Won 2nd Prize in Inter Collegiate Technical Quiz
5. Certificate of Honor for participating in Techno Fest 2007.
6. Worked as an Event Coordinator in the Inter Collegiate Robotics event.
I hereby declare that all the above mentioned information is true and correct to the
best of my knowledge.
Shantanu S. Kulkarni.