September 19th, 2009, 01:46 PM
Post Count Number #1
Tekfen Construction & Installation Co. Saudi Arabia : Piping Engineer TCIC
Tekfen Construction & Installation Co. Saudi Arabia : Piping Engineer (TCIC)
Website: http://www.tekfeninsaat.com.tr
Job Description:
B.E. Mechanical Engineering with 5-7 or Diploma Mechanical Engineering with 10-15 years experience working in the petrochemical industry and having knowledge of erection, pre commissioning and commissioning related works.
Desired Candidate Profile:
Urgently required for one of the turkish based leading organization in sectors like Construction, Petrochemical, Oil & Gas EPC Projects.
Company Profile:
Tekfen Construction and Installation Co., Inc., today a leading organisation in challenging fields of contracting activities but also a studious environmentalist, traces its roots to an engineering consulting company established in 1956. An uncompromising dedication to global quality standards in its business conduct has underscored the company’s consistent growth and stability over five decades.
Email Address: resume@itlservice.net
http://www.tekfeninsaat.com.tr/hr_policy.asp
-
June 23rd, 2011, 02:01 AM
Post Count Number #2
MECHANICAL ESTIMATOR & QS
CURRICULAM VITAE
Email # justinjoseph2007 AT yahoo.com , justin6173 AT gmail.com
Presently I am working in Modern Arab Construction (MAC) AL-Khobar, KSA, from 2nd October 2007 to still date as a Mechanical Estimator & Quantity Surveyor
Having 5 years of experiences in the field of Mechanical works (Including 4 years in Gulf) as a Mechanical Estimator & Quantity Surveyor / Engineer in esteemed organization, Initial pre-tender formalities, Preparation of, bill of quantities and tender pricing, Preparing a cost summary for the entire project this includes the cost of materials, equipments, labor, taxes, insurance and other costs affecting the project, final documentation, submission of bids and also post-tender negotiation and the follow up during the entire period of construction / execution of the project. Related to Power, Oil, Gas & Petrochemical Industrial Projects Etc… Monitoring shop fabrication and field installation, liaison with clients and contractors
Post Applied for : Mechanical Estimator/ Quantity Surveyor / Engineer
DIPLOMA IN MECHANICAL ENGINEERING (3 Years)
(Board of Technical Examinations, Government of Kerala, India, March 2006)
Govt. Polytechnic Collage, Kottayam, Kerala, India
HIGHER SECONDARY EXAMINATION CERTIFICATE
(Board of Higher Secondary Examination, Government of Kerala, India, March 2003)
St. Peters HSS, Kurumpanadom, Kottayam, Kerala, India
SECONDARY SCHOOL LEAVING CERTIFICATE (S.S.L.C)
(Board of General Education, Government of Kerala, India, March 2001)
St. Peters HSS, Kurumpanadom, Kottayam, Kerala, India
Additional Qualifications
- Primavera Project Planner
- Auto CAD 2007 Level – I
- Auto CAD 2007 Level – II
Training & Certification
- Amiantit / Bond strand Training Certificate in Handling & Assembly of Adhesive bonded conical/cylindrical joint, adhesive bonded taper/taper joint, Laminated joint or Butt & wrap joint, Flanged joint for RTR Piping.
- Future Pipe Industry (FIP) Training Certificate in Handling & Assembly of Adhesive bonded conical/cylindrical joint, adhesive bonded taper/taper joint, Laminated joint or Butt & wrap joint, Flanged joint, Rubber seal socket joint for RTR Piping.
- Supervisors Training for Incident & Injury Free work certificate (Seven Hours Training), Class Taken by JMJ Associates
- Confirmed space Training
- H2S Gas Training
IT Skills
- Operating Systems : Windows 2000, Windows XP, Windows vista, Windows 2007
- Environment : Windows, LAN and Internet
- Others : MS Office 2007 / XP. MS word/ Excel
Job Profile
Total 5 years extensive working Experience in Mechanical Estimator & Quantity Surveyor / Field Engineer
4th March 2010 – Still date
Company : Modern Arab Construction Co. Ltd (MAC)
Position : Mechanical Estimator & Quantity Surveyor
Client : Saudi Aramco
Contractor : Japan Gasoline Corporation ( JGC )
Project : Manifa Utilities Storage & Shipping Facilities Project, Saudi Aramco
Project Value : 420 million, Saudi Riyal
8th October 2008 – 3rd March 2010
Company : Modern Arab Construction Co. Ltd (MAC)
Position : Mechanical Estimator & Quantity Surveyor
Project : Working in MAC’s Estimation Department for MAC’s several bidding jobs and Projects of Saudi Aramco, Saudi Electricity Company, Sabic, Royal Commission, Madden Etc…
6th January 2008 – 7th October 2008
Company : Modern Arab Construction Co. Ltd (MAC)
Position : Mechanical Estimator & Quantity Surveyor
Client : Saudi Aramco
Contractor : Snamprogetti, Saudi Arabia Ltd.
Project : Khurais Crude Facilities (KCC), Saudi Aramco
Project Value : 366 million, Saudi Riyal
2nd October 2007 – 5th January 2008
Company : Modern Arab Construction Co. Ltd (MAC)
Position : Mechanical Estimator & Quantity Surveyor
Client : Saudi Aramco
Contractor : MAC’s direct Project in Saudi Aramco
Project : Gas Treatment & Compression Facilities Hawiyah, Saudi Aramco
Project Value : 365 million , Saudi Riyal
Experience in India
7th February 2007 – 20th September 2007
Company : Neo Structo Construction Co. Ltd
Position : Mechanical Field Engineer
Client : Essar Group, India
Contractor : Direct Project
Project : Essar Power Plant Module-6, Surat, Gujarat, India
12th August 2006 – 6th February 2007
Company : Neo Structo Construction Co. Ltd
Position : Mechanical Field Engineer
Client : Reliance Petroleum Ltd, India
Contractor : Heurty Petrochem, France
Project : Reliance Jamnagar Export Refinery Project, Gujarat, India
Nature of Job
- Preparing bill of quantities and tender prices from studying project’s drawings like plan, isometric, key plan, plan & profile, interface plan, spool erection drawings, P&ID, flow diagram drawings and designs
- Studying scope of works, Project specifications and Material specifications
- Preparing daily progress report, weekly progress report, monthly billing, Estimate man hours for work change orders (Additional works), hydro testing diagrams, Pipe spool erection drawings, joints mapping, material requisition.
- Analyzing and compiling data on construction factors, such as labor, materials, special machinery requirements and site location.
- Performing site visits and gathering necessary information such as site accessibility, availability of utility services and reporting to the concerned person.
- Preparing a cost summary for the entire project, this includes the cost of materials, equipments, labor, taxes, insurance and any other costs affecting the project.
- Developing accurate and clear cost estimates based on project data and communicating those estimates with engineers and concerned staff.
- Maintaining a construction cost database for forecasting project costs and ensuring that construction costs are managed as efficiently as possible.
- Performing costs analysis, preparing and analyzing costing for tenders to assist in anticipating project costs.
- Monitoring and storing costs through the use of computers to improve the accuracy of future estimations this is sometimes
- Integrated with the quantity surveying activities
- Conducting feasibility studies to estimate materials, time and labor costs for projects in addition to negotiating and prepare bids for tenders and contracts.
- Prepare value engineering, alternatives and proposals to be submitted to clients.
- Search always for more comprehensive alternatives without sacrificing quality.
- Coordinating with the project staff to schedule costs related to the project and communicate cost estimates with concerned departments.
- Coordinating with planning engineers to schedule project costs, resources and quantities as required
- Sending inquiries and getting quotation for different type of materials, machinery and equipment from local overseas suppliers / manufactures / subcontractors.
- Preparation of quotation comparison table and finalizing the unit price
- Familiar with ASTM, ANSI, ASME, ASNT, API, NFPA, UPC, Saudi Aramco & Sabic Standards and codes
- Review of addendums on scope of work, project specifications, procedures, revisions, Engineering standards and other references applicable to the project.
- Handling refinery, Gas plant, Power plant, Water & Sewage treatment plant, Industrial supporting facilities projects
- Preparation of Bid synopsis
- Coordination with civil, electrical and instrumentation departments to keep accuracy of estimation
- Familiar with QA/QC procedures, activities, standards and codes
About Myself
I am an easy going person with full confidence in my abilities. My flexibility in working as part of a team or as an individual in different and demanding working environments stands out as my specialty.
-
July 29th, 2011, 10:23 PM
Post Count Number #3
Resume
GOVIND YADAV
E – Mail : gayakhit AT yahoo.com,gayakhit AT live.com
Respected Sir / Madam,
Here is my resume which I here by present for your kind consideration. In the light of the fact that every company needs employees whose minds are
Totally obsessed with the commitment of their jobs. Commitments that do not let them rest till the desired result with outmost dexterity and efficiency in set time-limit. I would consider it as a privilege if you would kindly see what I have to offer.
Whatever job or work I do. I am fully devoted to the work in hand with an eye on achieving the best of the result to be following the given guidelines and if necessary employing my own independent ways and means if such deviation leads to the desired result.
Now the same spirit of enthusiasm that brought success for me in my limited circle of academic and extra curricular activities and for a while in commercial field also. Always being in readiness to learn and be trained for greater efficiency.
I can say I am good communicator with the spirit of teamwork which is naturally inclined to maintain good relations with my colleagues, senior and management.
I believe in delivering 100% service to my employer everyday, day after day. I firmly believe that you will surely find me of great use to your company if you go through my resume and CALL me for an interview to know more about me and be sure of what I have claimed to be for myself.
CAREER OBJECTIVES :
A highly motivated and result driven professional with a proven record of achievement, Utilizing excellent business skills to contribute and make a positive difference to the organization; Ability to adapt well and perform in demanding work environment. Seeking a challenging position as...
PROFESSIONAL EXPERIENCE :
(2010 - 2011) - (Till Date) Computer Operator, Costumer Relation
Printing, and Manage Office Work.
Company name :
Al Jihad Office Services
Work :
- Computer Operating
- Designing
- Manage the Bill of Customer
- Give Advise about our Company.
- Making Bill.
- Maintaining Customer Relationship Rapport.
- Handling Customer Grievances &Problems solving.
( 2009 – 2010 ) - Graphic Designer (Computer Operator)
Company name : Om Murugan Digital
Media Company, Print Production.
Work :
- Handle the Customer,
- Different Type of Media Production.
- Which Types of Material We use that better of our Company.
( 2008- 2009 ) - Office D.T.P. Operator, Office Assistant
Company name : (Vijay Graphics)
Work :
- Handle Office Work
- Data Entry,
- Bill Payment.
( 2007 – 2008 ) - Bolt Operator (Computer )
Company Name :
Master Capital Services Limited
Work :
- Computer Operator
- Data Entry
- Daily Shit
- Give Knowledge about Stock.
- Office Assistant
- All Office Secretarial Work.
EDUCATION :
( Bachelor of Arts ) : Gorakhpur University – ( India )
Bachelors degree/Higher Education
B. A. ( Graduate in Art. )
(H. S. C.) : Uttar Pradesh Board – ( India )
Higher Secondary Certification
(S. S. C. ) : P.N.M.I.C. Uttar Pradesh Board (India )
Secondary School Certification (Science)
OTHER QUALIFICATION
- Diploma in Computer Basic Programming & Computer Application.
- Diploma in Desktop Publishing
- Diploma in Eng.Spec.&Per. Development.
SKILL SETS
Operating Systems : Windows 98, Windows NT 4.0, Unix.
Databases : Microsoft Access2000.
Graphics : Photo Shop, Corel Draw, Illustrator. Page Maker,
- Job Location
UAE, India, Australia, Canada, France, UK, USA, Bahrain, Oman, Kuwait, Singapore.
- Job Category
Customer Service Executive, Junior Management position, Junior Sales Executive, Office Assistant, Computer Operating. And Office Senior Assistant.
- Employment Status
- Full time, comfortable working in shifts.
-
August 5th, 2011, 11:14 PM
Post Count Number #4
PIPING ENGINEER
Waquar Ahmad
Piping & Mechanical Engineer (Construction & PMC)
Email : waquar2007 AT gmail.com
SKILLS :
Site Representative for Construction, PMC/ Piping and Hydro testing & Mechanical works as Supervisor. Experience in LNG Project, Refinery/ fertilizer, hydrogen gas Project etc. Piping Fabrication, Erection & Hydro testing, Line check up to commissioning stage /Computer Operations (Microsoft Word, Excel, Power point)
Special Skills : Teamwork, Attention to detail, Achievement Orientation, Communication, Influencing and Accuracy to records.
WORK STYLE : Comfortable working in a wide range of environments--ranging from quiet individual time to one-on-one, small groups, large groups and conventions. I enjoy problem solving, especially when it involves leading a group of people or as a team member to resolve cost or project specification issues. I am at my best when I can help solve hard real world issues in the plant and construction areas by using contacts with thoughtful leaders inside and outside the company and innovative new technology.
I enjoy meeting and working with a wide variety of people from around the world and from all walks of life—helping them to grow, overcome major obstacle, achieve their dreams, and tackle meaningful challenges and develop self-reliance. I love to coach, getting my greatest satisfaction from seeing people achieve something they do not think was possible while learning to believe in them
Period Organization Position
Project Client Location
21st March, 2009 till date OSMAK Engineering & contracting LLC. Piping Engineer Cairn Energy India LTD. Cairn Energy India LTD. Barmer (India)
14th Sep, 2007 till 20th Feb, 2009
CCIC (UAE) Piping Supervisor NGL-3 Project Ruwais SAIPEM/GASCO Ruwais (Abu-Dhabi)
01st Jan, 2007 till 13th Sep, 2007
CCC (Oman)
Supervisor (Piping )
IPMF (Refinery) PDO Muscat (Oman)
02nd Jan, 2004 till 31st Dec, 2006
CCC (Oman) Supervisor (Piping & Mechanical) Oman/India Fertilizer Project. Omifco Sur (Oman)
Experience in Onshore Oil and Gas Projects
A career in Oil & Gas Industry related to ,NGL Projects/Refineries/Fertilizers ,Propane Dehydrogenation, Desalination projects, encompassing varied engineering practices to include site representative, and construction supervision, Progress reporting, planning, and Conversant with a selection of requirements of Supervisor aspect of major oil & gas project.
Familiar with major Piping fabrication erection installation, line checking Hydro test package preparation for the construction projects, at Project managing level with an aptitude for inter personal and communicative skills “Collectively” a part of decision making process.
Managing Project site construction department of piping & mechanical for the company in tune with the requirements of the client, incorporating operating considerations, cost in relation to performance, specifications and warranties. Well versed with Construction activities like, Spread Mobilization, Gas Turbine & Boiler, Compressor, Exchanger, Column, Vessel Skirt, Piping fabrication and erection including Line checking, Jetty loading arm, LNG store tank steel structure and air-conditioning firefighting System piping fabrication & erection inspection., line checking, test package preparation, Hydro testing ,Punch list item, Box –up & Mechanical Completion, pre – com & Commissioning Stages.
Track recording in the commencement and completion of Major Multi Discipline Projects at an international level. Managing all project resources, including personnel from different ethnic and cultural background with varying technical abilities. Identify problems in advance, dissect them into their components, produce practical preventive solutions and monitor their implementation.
Negotiate, profitably manage and technically control multi discipline projects. Awareness of contractual obligations of all parties within a contract period and operate them to company’s benefit.
Professional Experience (Total 07 Years)
21st March, 2009 to till date
Piping Engineer
Cairn Energy India Ltd.
Mangala Processing Terminal Barmer Rajasthan (India)
Job Responsibilities :
- Responsible for spool fabrication/erection/Line Checking and hydro testing, line checking test package wise within boundary limits and also maintain activities in the existing facilities to ensure the activities are executed as per the work Scope and in adherence to the HSE standards.
- To maintain primary contact and a good working relationship with sub-contractors site representatives. To be fully familiar with the sub-contractors methods of construction, Programming and procedures and to resolve any apparent conflicts, to ensure that all Sub-contractor employed within his area of responsibility are fully aware of their Obligation and responsibilities.
- To ensure before any variation work is carried out by a sub-contractor that an authorised instruction is given by the management.
- Prepare daily activity and maintain close monitoring with sub-contractor and Construction team ensure that all relevant documentation P&ID, ISO Drawing will be provided in put the work scope and planning of the activity and prepare material Requisition.
- To ensure that all project / Company HSE goals are achieved and where possible exceeded that all construction personnel on the project aware of implement safe working practices procedures and all provided with safe working environments. Deliver a high standard construction capability on the project ensuring a consistent and efficient approach is implemented at all times.
- Management and support of construction personnel maintain and deliver the Construction function within budget and where applicable implement cost saving Initiatives. ROW Survey for the laying of CRUD OIL PIPELINE with the Client and finalization of the route/ Supervision the welding & wrapping and coating, Holiday inspection and lowering of the pipeline section
- Ensure work is done according to Safety standard, with the needed quality, on schedule and budget. Lead development and implementation of an Incident and Injury free culture at site for both Client and Contractor personnel, ensure development and implementation of contractor and Sub-contractor safety plan, emergency response plan, security plan and incident/accident investigation processes.
- Supervise the work and develop contractor employees with particular emphasis on mentoring junior employees.
- Onshore major capital project construction management experiences on large oil and gas pipeline project specification.
- To identify, analyze and solve problems (site safety, technical, construction quality control, schedule)
- Strong Construction background and fluent in English speaking and sound communication skill.
- Establish effective project communication channel between contractor and Client and operation demonstration.
14th Sep, 2007 till 20th Feb, 2009
Piping Supervisor
Consolidated Contractor International Company (CCIC)
NGLExpansion project Phase-3, Ruwais Abu-Dhabi (UAE)
Ruwais NGL 3rd trains project (Abu-Dhabi gas industries Ltd “Gasco), The scope of work involved construction of a grass roots Gas plant including NGL Fractionation, Propane Refrigeration, Molecular sieves, DEO gas treating, LPG gas treating, Sulphur recovery plant, Offsite- LPG propane storage,/ LPG Butane storage/ Pentane plus storage/BOG refrigeration unit, utilities ((Steam & BFW), Flare, Deaerator packages, Chemical injection packages, Condensate polishing packages, etc and the cost of construction is 287milion $. The piping fabrication & erection weight involved is 32000 tons approximately and equipment erection weight is 24000 tons approximately and steel structure 14000 tons including heavy civil and tanks.
Job Responsibilities :
- Supervised : Erection of spools/piping and supports as per piping Isometric &piping general arrangement/ Standard/ Special piping support drawings.
- Progress and progress report controlling and reporting to section Engineer
- Raising technical queries for any fouling/miss matching etc.
- Provide assistance to piping Supervisor/Foreman’s for critical erection and following with them for productivity.
- Experience with pressure piping integrity management program.
- Understand EPC work processes, and experience on large projects.
- Expertise in developing and updating project specification and standards, Design supervision and construction support.
- Broad scope knowledge of engineering designs and understanding of industry codes, registry requirements and standards and construction methods.
- Ability to work well in a team environment.
- Strong oral and written communication skills.
- Excellent analytical and problem solving skills.
- Ability to self- starts and follows through tasks.
- Ensure that all engineering is carried out to the highest standard and meets the client’s requirements.
- Preparation of equipment layouts, piping GADs and piping erection and fabrication isometrics.
- Fabrication and erection of piping of various classes and grade materials. Review and witness Stage Inspections
- Preparation of checklist/ balance work to be done for piping systems/loops with conformity to General Arrangement Drawings, P&ID’s, Isometric drawings and support std. etc.
- Develop and maintain engineering standards and specifications related to piping &valves. Participate in the development of project workflows and in-house libraries.
- Work with other engineering discipline on developing piping deliverables, including plot plans, equipment layouts, etc.
- Manage the project piping group and co-ordinate the work to ensure that piping deliverables are developed on time and according to schedule.
- Review designs against provincial and federal requirements, project standards, specifications, design criteria, and basic engineering principles.
01st Jan, 2007 till 13th Sep, 2007
Supervisor (Piping)
Consolidated Contractor Company (CCC)
Isomerization & revamping of Oman Refinery (IPMF)
Isomerization & revamp of Oman Refinery Company along with construction of a new penex Facilities in Muscat (Sultanate of Oman). Contract Value is $ 84 million & Job type is Engineering /procurement & Construction (EPC).
Job Responsibilities :.
- Close coordinate between Subcontractor and fabrication shop for material movement
- Cost estimation for the addition SI WORKS and prepare the final report and report to the project Manager and Construction Manager.
- Visual inspection of Fireproofing at existing Structure and report submit to the client
- Preparation of Initial Scope for the Construction activities for Module 1 and 2 of the Project in liaison with the engineering team in managing. Office.
- In a Second stage, to manage a team of professional staff to supervise the construction and pre-commissioning activities of the construction contractor site.
- All the site regarding all project sub-contractor aspect regarding site and construction, Safety, Security, Environment, Schedule , Quality control, cost etc,
- To check that Sub-contractors compile and maintain updated construction documents, procedures, plans and pertinent information related to site work.
- To check the preparation, issue and implementation by Sub-contractor of construction Engineering documents including detailed procedure , method statement, drawing, calculation notes, list of construction Equipment, list personnel, planning , back-up by the Sub-contractor procedure.
- To control the work performed by the Sub- contractor and check its progress
- Coordinate and organize the daily /weekly/monthly meeting at site, to manage site contractual matter and potential interface issue with the MLNG staff and Piping Contractor.
- To ensure that contractor HSE practices are acceptable and that adequate measures and procedures are being implemented by everyone concerned.
- To define early mobilization security, environment and sustainable development issues.
- To check the availability and fitness of Construction equipment and to check the personnel mobilization and demobilization.
02nd Jan, 2004 till 31st Dec, 2006
Supervisor (Mechanical & Piping)
Consolidated Contractor Company (CCC)
Oman/India Fertilizer Project Oman (Omifco) Sur-Oman
Oman India Fertilizer (OIF) Project in sur (Sultanate of Oman), the scope of work involved construction of a grass roots fertilizer complex including, Ammonia plant –2 trains 1750 tons/day each, Urea plant-2 trains 2530 tons/day each, All related utilities / Offsite including seawater intake, Material handling systems (Conveyors, reclimers, etc) and the Client was Oman-India fertilizer company and Contract Value was US$ 165
Job Responsibilities :.
- Responsible for all Piping fabrication and Erection Hydro testing and line checking test package preparation and inspection with the Client.
- Monitor the all inspection and QA/QC Documentation & submit to the client for approvals/ and review the P&ID drawing for the boundary marking.
- Construction activities such as installation of Thermal vapour compression units and associate the piping and structure steel platform grating.
- Preparation of MTO from ISO Drawing and finalization of the final list and expediting the procurement/ Preparation of Hydro test package with demarcation P&ID drawing and ISO Drawing & attend the shutdown meeting with client and Subcontractor.
- Preparation of 26 No TIE-IN, Steam line, Seawater, Nitrogen line, Demin water line, with existing line Including materials preparation marked in the Drawing P&ID and ISO Drawing GA Drawing and submit to the Client for final approval for Engineering Department and LNG Operation Department.
- Prepare the oil and Gas related Scope in the managing, scope of work including execution of all activities Civil, Piping Fabrication, Electrical, Mechanical and Erection work etc.. Up to commissioning stage.
- Plan, direct, coordinate, and budget usually through subordinate supervisory personnel for activities concerned with the construction of plant and maintenance of structure, facilities and systems. Participate in the conceptual with the construction development of a construction project and oversee its organization, schedule and implementation essential tasks and responsibilities.
- Confer with supervisory personnel, owners, contractors, and design professional to discuss and resolve the matter such as work procedure, complaints, and construction problem. Determine and implement quality control programs, and directly supervise the worker. Evaluate construction methods and determine cost-effectiveness of plan.
- Inspect and review project to monitor compliance of administrative staff, worker and client representing the owner or developer.
- Investigate damage, accident or delay at construction site, to ensure that project proper procedure is being carried out. Obtain all necessary permits and licenses.
- Prepare and submit the estimates and progress and cost tracking report to construction Manager and project Manager
- Prepare the daily report and submit to the Project Manager and Client daily basic.
- Study the job specification to determine appropriate construction methods take action to deal with the result of delay , bad weather or emergencies at construction site Qualification & Responsibilities :