www.abelloncleanenergy.com Abellon CleanEnergy Ltd Ahmedabad, Bhuj : Power Plant Mechanical Site Engineer

+ Ask Question / Post resume
Results 1 to 7 of 7
  1. Post Count Number #1
    Super Moderator
    Join Date
    April 18th, 2008
    Location
    Tuticorin
    Posts
    7,026

    www.abelloncleanenergy.com Abellon CleanEnergy Ltd Ahmedabad, Bhuj : Power Plant Mechanical Site Engineer

    Abellon CleanEnergy Ltd. Ahmedabad, Bhuj : Power Plant Engineer (Mechanical) / Site Engineer (Mechanical)
    Website: http://www.abelloncleanenergy.com
    abelloncleanenergy.com

    Designation: Power Plant Engineer (Mechanical) / Site Engineer (Mechanical)
    Experience: 2 - 6 Years
    Location: Ahmedabad, Bhuj

    Job Description:
    * The incumbent shall be responsible for all the Erection commissioning activities, Fabrication, Piping and other mechanical activities.
    * The incumbent shall look after the entire project and will be responsible for progress of the project as per schedule / plan

    Desired Candidate Profile:
    * B E Mechanical (Must)
    * B E Mechanical + MBA (will be given preference)
    * Should have experience in Erection & Commissioning
    * Should have experience of Fabrication (Industrial)
    * Should have knowledge and experience of Industrial piping
    * Experience of power plant project is preferable

    Company Profile:
    Abellon Clean Energy is an integrated sustainable energy solution company with focus on bio energy-Fuels & power,Solar and Wind. The company is part of a global business group with presence across 76 countries and business in Pharmaceuticals & contract research, Educational and Infrastructure & Realty.

    Keywords: power plant engineer, erection and commissioning, fabrication, piping

    Power Plant Engineer Jobs in India
    Last edited by muthukalee; October 25th, 2011 at 01:27 PM.

  2. Post Count Number #2
    Guest Poster
    Join Date
    August 14th, 2008
    Location
    Your Heart, Delhi
    Posts
    76,213

    Joshi Manish N.
    E-mail ID : joshimanishn85 AT yahoo.com

    Summary of Qualification :
    - Diploma in Mechanical Engineering with 57.08% fromTEB Gandhinagar, during 2009-10
    - Bachelor of Arts with 57% from Hemchandracharya North Gujarat University, Patan, during 2006-07.
    - H.S.C. with 73.17% from S.M.U. Adarsha Vidyalaya , Sipor, from GHSEB, Gandhinagar, during 2003-04.
    - S.S.C. with 74.29% at Sh. K.B.P.Shah Vidyalaya , Madhasana from GSEB Gandhinagar, during 1999-2000

    Computer knowledge :
    Fundamental of Basic
    MS Office with Word, Excel, Access, Power Point, Out look
    Internet & E-mails with Multi Media
    Sap Program
    DTP Designing
    Basic Skills of Hardware.
    AutoCAD

    Current Company : M/S Ratnamani Metals & Tubes Ltd Anjar - Working as a Production Engineer in ERW Plant.

    Experience :
    - Hydrotesting, Chamfering & Tool room Production Engineer. In ERW Plant.
    10th June (2010) to Till Date
    In “Ratnamani Metals & Tubes Ltd.”(Kutch Division)Bhimasar Ta :Anjar.
    A Carbon Steel Plant

    JOB RESPONSIBILITES IN INTOLCAST :
    1. Daily meeting with marketing engineer about new inquiry received & to review drg. & compare the drg standard with the actual company standard.
    2. After preparing model do the weight analysis of the model.
    3. Review all new orders & planning according to the PO requirement proper planning to the production department.
    4. To give the delivery dates to the mkt dept. & complete the orders accordingly.
    5. If not so then do the route cause analysis of it & proper corrective & Preventive action to be taken from the responsible department.
    6. Weekly rejection summary analysis & find the route cause.
    7. To do the regular follow up of the urgent order given by mkt. Dept. & Management & push the material to the next station.
    8. To prepare the daily production report

    JOB RESPONSIBILITIES IN INTOLCAST :
    1. Sound Knowledge of S.A.P. An ERP Program.
    2. To provide all documents related to the production department.
    3. To be ready to do everything as assigned.
    4. I have working as Shift incharge.
    5. Tooling record.

  3. Post Count Number #3
    Guest Poster
    Join Date
    August 14th, 2008
    Location
    Your Heart, Delhi
    Posts
    76,213

    RESUME B-TECH MECHANICAL ENGINEER WITH 2 YEAR EXP.

    CURRICULAM VITAE
    HARDEEP YADAV
    Mail id : hardeep.me AT gmail.com

    Objective :
    To add value, gain experience and to add to my exposure in the corporate world so that I can build a strong base for my self and take on from there and march towards my goals in making myself a bright and shining career.

    Work Experience :
    I worked in “JAI BHARAT.PVT.LTD”. under contract “RELIANCE POWER”, on ROSA THERMAL POWER PLANT, SAHAJAHAPUR (U.P.) as a Mechanical Engineer . in “ASH Handling Plant” . Since 01 June 2009 to 09 July 2011.
    Company profile :
    It is a flagship company of the Specialist in Pipe line laying , Erection ,Commissioning, Maintenance & Overhauling of Rotating Equipments, H.P. Values and H.T.&,L.T. motors.& ash handling plant.
    Job profile :-
    1 : Having on desk operation and controlling work.
    2 : Planning of man power & machine for achieving as per target assigned.
    3 : Overall responsibility during the shift.
    4 : Setting and trouble shouting of machine & responsible for improving performance.
    5 : Root cause analysis & analysis for reducing Failure.
    6 : Effective work handling to achieve maximum utilization of man power.
    7 : Improvements in material handling, storage and layout changes for effective utilization of space.

    Professional Qualification :
    **Pursuing “post graduation diploma course” within “thermal power plant” from “national power training institute”(NPTI), New Delhi.
    Bachelor of Engineering in Mechanical Engineer from “ganeshi lal agarwal institute of technology and management” , Mathura, Uttar Pradesh with 64 % (2005-2009).

    Academic Qualification :
    S.S.C. from D.A.V.Public School, Unchahar, Raebareli, U.P. in C.B.S.E. Board with 63.90% Year 2005.
    H.S.C. from D.A.V.Public School, Unchahar, Raebareli, U.P. in C.B.S.E. Board with 72.20% Year 2003.

    Projects :
    - Working on Project : Ultra supercritical thermal power plant
    Detail of Summer Training :
    - Project Undertaken :
    1. Study boiler & turbine
    2. Study of coal handling plant
    - Organization National Thermal Power Corporation (NTPC) at Unchahar, Raebareli U.P
    - Duration two months

    Technical Skills :
    Simulation operation training : 660 MW UNIT OF SEL JHARSUGUDA IPP
    Operating Systems : Ms-Dos, Microsoft Windows 98/ XP.
    Languages : C++ Basic
    Design software : BASIC OF AUTO CAD
    Applications (Packages) : MS Office ,MS Excel

    Extra Curricular Activities :
    Member of college cultural committee.
    Organized a Quiz based on C-Language at college level.
    Member of organizing committee of technical festival.
    Active member of college cricket team.

    Strengths :
    - My Confidence and positive attitude
    - Good interpersonal skills
    - Hard Working with Smart Working
    - My adaptive nature

    Awards and Achievements :
    - 1st Prize in science Olympiad (Group). [1999]
    - Merit holder in math’s talent/Olympiad exams at All India level (1st rank in state )
    - Avid participation in debate/elocution/sports/ organize competitions

    Declaration :
    I certify that to the best of my knowledge and belief, this CV correctly describes me, and my qualifications.
    Place :
    HARDEEP YADAV

  4. Post Count Number #4
    Unregistered
    Guest

    RESUME
    Paresh K. Patel
    E-mail :- pareshkumark1705 AT gmail.com

    CAREER OBJECTIVE :
    To work with organization where I can pursue the challenging job with responsibilities and able to enhance my skills.

    ACADEMICS :
    B.E. (Electrical) S.P.College of Engineering H.N.G.U. Patan July 2009 63.40 %
    H.S.C. (Science) The New Progressive High School G.H.S.E.B. March-2005 47.08 %
    S.S.C. M.S.Patel Adarsh Vidhyalaya G.S.E.B. March-2003 66.86 %

    EXPERIENCE :
    Arpit Institute of Engineering and Technology
    Recently I am working as Lecturer in Electrical Department. Since 9th Feb 2013
    Paschim Gujarat Vij Company Ltd.
    1. I was work as Junior Engineer (Electrical) in PGVCL Jamnagar since 28th March 2011 to 4th Feb 2013.
    2. I know about HT and LT line Erection, Maintenance and Operation.

    Torrent Power Limited. :
    Job Description :
    1. Work with Torrent Power Limited. Ahmadabad in its total capacity 400 MW Thermal Power Plant situated at Sabarmati as an Apprentice since 4th March 2010 to 3rd March 2011.
    2. Operation Training of 2 Month in 400 MW Thermal Power Plants, Operation Training of Boiler, Turbine and Generator
    3. Transmission and Distribution Training of in various departments like EHV (Extra high voltage) Department - 132 KV and 66 KV Transmission, Sub-Station Operation and Maintenance.
    4. Power plant maintenance training to be completed in various electrical departments.

    PERSONAL PROFILE :
    Date Of Birth : 17th May, 1988.
    Gender : Male
    E-mail :Pareshkumark1705 AT gmail.com
    Known Languages :English, Hindi, Gujarati
    Hobbies :Playing Volley-Ball, Reading

    Place :-
    Date : -
    Yours faithfully
    (PATEL PARESH)

  5. Post Count Number #5
    On probation
    Join Date
    June 5th, 2013
    Location
    raipur
    Posts
    1

    Mechanical Engg & PGDC in Thermal Power Plant (NPTI)

    RESUME
    PRADEEP KUMAR DILLIWAR
    Email : pradeep.dilliwar AT gmail.com

    CAREER OBJECTIVE :
    Intend to build a career with leading corporate of hi-tech environment with committed & dedicated people, which will help me to explore myself fully and realize my potential.

    ACADEMIC QUALIFICATIONS :
    EXAM / DEGREE YEAR NAME OF INSTITUTE UNIVERSITY / BOARD PERCENTAGE :
    PGDC IN Thermal Power Plant Engineering 2012-13 NPTI, Neyveli
    Under Power Ministry, Govt. of India Completed in July 2013
    B.E. (MECH) 2011 C.S.I.T. DURG C.S.V.T.U. BHILAI 75.24%
    12th Board 2006 GOVT.H.S.S. ANDA CGBSE RAIPUR 80.0%
    10th Board 2004 GOVT.H.S.S. ANDA CGBSE RAIPUR 84.5%

    PROJECT WORK :
    Study and Analysis of Heat Pipe Apparatus which improve the Heat transfer capacity, by thermo syphon action of porous structure material and having higher heat transfer coefficient.

    INDUSTRIAL TRAINING :
    Company : Bharat Aluminum Company Limited Korba (C.G.)
    Visit Detail : Alumina Plant, Smelter, Sheet Rolling shop, Billet Mill etc.
    Company : Vossloh Beekay Casting Limited Bhilai (C.G.)
    Visit Detail : Mould making, Electric furnace, Foundry shop, Machining, Heat Treatment etc.

    PERSONAL SKILLS :
    ** Comprehensive problem solving abilities.
    ** Ability to deal with people diplomatically.
    ** Willingness to learn, team facilitator and hard worker.

    ACHIEVEMENTS & EXTRA CURRICULAR :
    ** Participate in robotics event Kshitij 2009 organized by IIT Kharagpur .
    ** Participate in training program in the trade Air Conditioning & Refrigeration.
    ** Awarded 3rd prize in state level robotics competition organized by NIT Raipur.

    PERSONAL PROFILE :
    Name : Pradeep Kumar Dilliwar.
    Father’s Name : Mr. Rikhi Ram.
    E-Mail Address : pradeep.dilliwar AT gmail.com
    Date of Birth : 03 Feb. 1989
    Sex : Male
    Marital Status : Single
    Nationality : Indian
    Languages Known : English, Hindi.

    HOBBIES :
    ** Swimming.
    ** Playing Cricket.

    DECLARATION :
    I hereby declare that above information is correct to the best of my knowledge and belief.
    Place :
    Date :
    [ Pradeep Kumar Dilliwar ]

  6. Post Count Number #6
    Unregistered
    Guest

    btech mechanical engineer having 3 yr experience

    LIJU LALU
    E-Mail : laluliju AT gmail.com

    CAREER OBJECTIVE :
    To work in a progressive and challenging environment, which provides ample responsibility for enhancing and using my creative, technical and professional skills towards the fulfillment of my personal goals and also towards the larger goal of the organization I am working for. Seeking a growth-oriented profession in Piping, where I can utilizes my technical background for the benefit of the organization.

    IDEAL NEXT JOB :
    Any position related to my experience and qualification open to all offers anywhere around the Globe.
    Date of availability : APR 2013
    Expected salary : Negotiable
    Total working experience : 3 years
    Overseas experience : 1 years

    WORK EXPERIENCE :
    1. M/s NASSER S AL.HAJRI CORPORATION., SAUDI ARABIA
    Nasser S. Al –Hajri Corporation (NSH) established in 1978, has grown, not only as the largest but also as the safest working industrial contractor in the Middle East. Being a 100% Saudi Company, NSH work with all major international clients and the customer profile includes Saudi Aramco, SABIC & its affiliates , Qatar-Gas, Ras-Gas, ADNOC, Sipchem, Shell, Exxon Mobil, Total, Qatar Petroleum, Oryx-GTL, Dolphin Energy, Tasnee, Chemanol etc.. Recently NSH executed 2 major jobs for SABIC, simultaneously and achieved over 90 Million safe man hours.

    NSH provides meticulous construction and fabrication services to the full spectrum of the industrial and infrastructure work area including, but not limited to, commercial & heavy industrial buildings, oil, gas, refineries, petrochemicals, fertilizer, cement, power, desalination, aluminum , steel, and others.NSH is the first Construction Company to obtain the TUV NORD Certification for Occupational Health and Safety Assessment (OHSAS 18001) followed by NSH also obtaining the ISO 9001 accredited Quality Management System.With all these assets and accomplishments NSH is truly realizing its vision to "BE THE BEST AND MOST TRUSTED AMONG THE INDUSTRY".

    Project : Jubail Export Refinery Project, Saudi Arabia
    The Jubail export refinery project (JERP) is a joint venture consortium between Saudi Aramco and TOTAL S A, France. It is located at Al Jubail -2 in the east coast of Saudi Arabia. Daelim Industrial Co. Ltd., Saudi Arabia was awarded the EPC contract of package 2B which included the construction of sulphur, amine & sour water treatment plants.
    Client : SAUDI ARAMCO TOTAL Refining & Petrochemical Co., Saudi Arabia.
    Designation : QA/QC Piping Inspector Period : 14th Apr 2012 to 19th Apr 2013

    RESPONSIBILITES CARRIED OUT :
    ** Responsible in piping project planning, screening of piping project opportunities, route selection, third party and environmental impact studies, feasibility assessments and concept selections, and front-end design.
    ** Review of project specification and P&ID s.
    ** Handling all piping technical queries and investigating all field pipe work related problems, including the drawing of field sketches when necessary.
    ** Coordinating with engineering and construction and liaise with the client on detail engineering requirements.
    ** Develop construction engineering technology in line with company policy and procedures
    ** Elaborates construction feasibility analysis evaluating the available materials & drawings.
    ** Responsible for piping erection operations and pipe support installation in accordance with schedule, procedures, specifications, priorities and availability of construction drawings
    ** Ensure the productivity and quality is maintained by subordinates. Coordinate with other disciplines in site.
    ** Monitoring the daily work activities of sub contractor and updating sub contractor progress reports
    ** Assist design department in solving piping modification and technical problems in the field.
    ** Provide technical answers to engineering queries raised up by the sub-contractor confirming design drawings and standard requirements
    ** Responsible for counter checking by isometric/piping plan for the spools erected in the correct location, orientation, alignment and plumpness.
    ** Carrying out final P&ID check of installed piping systems in the module. Preparation of “as built” drawings.
    ** Preparation of field piping system test packages ,including system limit on P&ID and piping isometrics
    ** Responsible for carrying out mechanical clearance, conducting hydro and pneumatic tests, fulfilling commissioning and pre-commissioning requirements for the project.
    ** Responsible for line checking after hydro test to complete the post punch list prior to sign-off the test packages before signing the completion of piping / mechanical.
    ** Ensure that all the valves, orifices, spectacles, spacers, strainers etc are installed in correct flow direction and orientation
    ** Ensure that hydro test reinstatement is to be done as per procedure. Ensure that all punch list items are resolved; client handover is satisfactorily concluded and that there is no prolongation of project.
    ** To read isometric drawings with MTO & supports and work accordingly. Familiar with International Design code like ASME, ANSI, API

    2. M/s DPC ENGINEERING PROJECTS PVT LTD., INDIA
    DPC engineering PPL is a major contractor of Bharath Heavy Electricals LTD ( BHEL) . DPC was awarded Erection of TG packages including rotary & static equipments and fabrication and erection of Piping.
    Client : BHEL
    Designation : Piping supervisor
    Duration : 4th Feb 2012 to 10th apr 2012
    RESPONSIBILITIES CARRIED OUT :
    ** Supervising the work, Manpower handling and coordinating with client.
    ** Monitoring piping material take off as per Isometric drawing according to project specification and spec.
    ** Attending meeting with clients and to discuss the project requirement and consultancy to resolve technical problems
    ** Execute Hook Up, modification and construction activities.
    ** In ward material calculation according to scope of work and conducting the project material inspection
    ** Support the pre commissioning and commissioning activities like air blowing, steam blowing, chemical cleaning and nitrogen purging etc
    ** Execute Transition bend hook up and Tie in point hook up in process plat area with quality and safety standards
    ** Test package preparation and hydro testing of Hook up lines with process flow identification and Test pressure
    ** Inspection clearance slips of piping spool, project and surplus material.

    3. M/s SHREESABHA ENGINEERING CONSTRUCTION
    Sreesabha is a construction company which provides exclusive production and engineering support
    service, plant maintenance, heavy machinery jobs,erection of pipe lines and fabrication activities.
    Designation : Piping supervisor
    Period : 10th May 2010 to 20th Jan 2012
    RESPONSIBILITIES CARRIED OUT :
    ** Supervising the work.
    ** Prepare the work schedule, planning & execution of the work according to the prepared schedule.
    ** Execution of fabrication at shop and onboard installation of pipe lines as per the approved client drawings.
    ** Execution of fabrication and installation of pipe lines as Site Run according to the P&ID (without drawings).
    ** Ensure the productivity along with quality and safety standards.
    ** Co-ordinate the work with Class and Client representatives.
    ** Conducting daily internal production meeting & representing in Client and meeting.
    ** Preparing work completion and invoice details.

    ACADEMIC DETAILS
    - B.TECH in Mechanical Engineering from kerala University with an aggregate of 58% in the year 2011.
    - H.S.E from Board of higher secondary examinations Kerala with an aggregate of 70% in the year 2006.
    - S.S.L.C. from board of Public Examinations Kerala with 79% in the year 2004.

    TECHNICAL CERTIFICATION :
    1. ASNT NDT Level II in RT, UT, MPT,VT & PT

    PERSONAL DETAILS :
    Nationality : Indian
    Gender : Male
    Social Status : Single
    Date of Birth : 08-12-1988
    Languages Known : English, Hindi, Tamil, and Malayalam.
    Extracurricular Activities : Games, Driving& swimming

    DECLARATION :
    I hereby declare that the above mentioned information is correct up to my knowledge and I bear the responsibility for the correctness of the above-mentioned particulars.
    Place :
    Date : LIJU LALU

  7. Post Count Number #7
    Unregistered
    Guest

    CURRICULAM VITAE
    GIRISH KUMAR SONI
    E-mail id : girishgsoni1 AT rediffmail.com, girishgsoni1 AT Yahoo.com

    Summary of work experience :
    18 years of experience in MECHANICAL Construction field with different industrial construction, supervision and modularization works and prepared work schedule plans, methodology for critical works, procedures and job safety analysis of works, Bill preparation & checking. Supervised works of GRE & PE pipeline erections in Oil & Gas field.
    Planned, supervised and executed enormous works like On & Off plot piping & its support, structural, static and rotary equipment, painting, hot & cold insulation, fireproofing, testing, commissioning in Petrochemical refinery and Oil & Gas, plants. Also attended for petrochemical refinery and oil & Gas plant shutdown works Also attended for petrochemical refinery and oil & Gas plant shutdown works.
    As an Assistant Manager in REAL, I was handling the project of 2.5 lac ID piping fabrication and erection, 900MT of structural and equipments erection independently at site, currently working in Arabian Industries Project LLC as Sr. Construction Engineer (Mech)/Site-In charge.

    Professional Skills :
    Experience and proven ability to manage the projects individually, estimations of projects, leading and coordinating engineering/technical teams.

    Objective : Seeking a career that provide mental challenges considerable responsibilities and offer opportunity for profession development while making relevant contribution and innovation in an enabling work environment.

    Qualifications :
    B.E. (Production) Collage of Engineering Technology Jalgaon North Maharashtra University passed in
    First Class with Distinction in the year-1996.
    Diploma in Rail transport Economics and Management from IRT, New Delhi in the year-2001.
    Certificate course of Piping Design from IIT, Mumbai in the year-2000.

    Technical Skills : Microsoft Excel, Word, Power point, MCSE, MS project, CAESAR-II-Statics
    Details of Experience :
    12thSept-09 to 20th May-2013 :Arabian Industries Project LLC, Sr.Construction Engineer(Mech)
    Client : Petroleum Development of Oman (PDO)

    Project executed :
    Nimr-A Bulk header replacement 18”GRE & Roto/ PE lining spools installed and commissioned.
    RTQGhanuq-ARJEF Gross Header 8”GRE & Roto/ PE lining spools & Skids installed & commissioned.
    Thmd-Ald-Maurid–header-replacement 8”GRE& Roto/PE lining spools & skids installed and commissioned.
    Qaharir-Shipping pump replacement project Shipping Pumps and piping installed & commissioned.
    Stage-(I -IV)-Chemical Injection Skid EPC program SS piping & Skids installed & commissioned.
    Replacement piping of on plot tank (T-4817/18) 24”-CS Pipe spools installed and Tie-in joints during Shutdown. DWD-(Phase-I to V)-Deep Water Disposal 24’’CS piping installed and Tie-in joint with existing SRV.
    Polymer Injectivity test project 12” Roto/ PE lining spools, bladder tanks, skid installed & Commissioned.

    Won HSE Leadership Award 2010, Worley Parsons Arabian Industries (JV) Page 1of 4
    Responsibilities :
    Supervise and guide Construction Support Group (Supervisors, Foremen and Technicians) with technical expertise for implementation of in plant modifications according to approved drawings and industry standard construction techniques and methods.
    Supervising daily construction activities of project contractors and providing construction progress reports.
    Supervising the discipline construction and commissioning activities in the interior safe manner within budget, on time and in accordance with applicable company procedures and technical specification.
    Carries out the direct ordering and reservation from stock of all materials for the modifications, ensures materials comply with company standards and are correct specification for the dut
    Co-ordination with. Safety department for JSAs, Risk Assessment and procedure for critical lifting job and for any special requirement/training for shutdown works and critical works.
    Review and reservation of all materials required for construction phase of in-house modifications, in addition to Management of regular consumables required.
    Co-ordination with operation and maintenance team and vendors for commissioning and handover of the projects.
    Conducting myself weekly HSE meeting and explain latest LTI notification and safety working method to our teams.
    Installation, alignment and commissioning of static and rotary equipments.
    Coordination with QC department for preparation of procedure qualification record (PQR), welding procedure specification (WPS), welding qualification test (WQT) & inspection test plan (ITP) and follow with client for approvals. Recommend corrective actions and rectification methods for any deficiencies or NCR.
    Ensure adherence to Plant Permit-To-Work system.
    Carries out pre-commissioning checks on the completed work to ensure that construction is to the approved design.
    Liaises regularly with discipline construction engineers and senior construction engineer to address inter-disciplinary requirements and any overlap for the modifications.
    Resolving any technical construction related issues arising during installation phase of projects and modifications Promote HSE awareness and best industry practices amongst construction support group and carrying out relevant plant safety audits. Encourage safety tool box talks and near miss reporting.
    Supervision during GRE pipe lines installation carried by CPI & FPI.
    Coordinating pre-commissioning and commissioning activities following completion of construction phase, and providing notice of final completion certificate.
    Carrying out site surveys and construction feasibility studies in support of Engineering and design activities.
    Delivery of As-Built mark-up documentation for in-house modifications and verification of final contracted project documentation Preparation of method statements, procedures and Risk Assessment for project execution works.
    Ensuring pre-commissioning activates such as Air blowing, torque tightening, mech clearance, hydro test, pneumatic test, service test, Box-up, leak test and nitrogen purging.
    Scheduling & monitoring shutdown activities such as Isolation, draining, spading, purging, cold cutting, Tie-ins welding, NDT acceptance, Hydro testing & de-spading.
    Review marked-up as built drawings of the completed job before hand over to company; highlight any deviation from the original design.
    Sign the test pack after completion of individual jobs making sure that the job has been done according to PDO standard & regulation, side is cleared before job close out.

    25th Sept-02 to 30thJune-09 Reliance Engineering Associate Pvt. Ltd, Jamnagar, India worked post of Assistant Manager
    Project executed :
    Crude-I and Crude-II plant shut down works Attended Pre-shutdown, shut down and post shutdown works.
    Construction of new Crude-III & IV and FCC plantsCS, AS& SS piping erection with associated equipments.
    Construction of new PRU-II & III plants 36,”24,”18” CS, AS and SS piping erection with associated equipments.
    Responsibilities :
    Experience with various areas during RPL new refinery construction and RIL old refinery refurbishing.
    Allocating the specific works to contractors and reviewing their progress. Page2 of 4
    Reconciliation of materials and consumble items and billing checkup of contractors as a team member
    Supervising construction activities PRSD & SD successfully completed in REAL, hand over loop file, preparation of test package for UG/AG piping’s.
    Dealing with material take offs, constraint calculation & constraint resolving
    Billing in SAP-415 server like JMS (Job measurement sheet) creation.
    Assist in planning & monitoring of the work progress through the planning section of the pre & post shutdown & new construction activities.
    Preparing the “look ahead schedule’’ presenting daily progress reports to the Sr. construction manager and advising him for future targets, activities and all matter related to the projects.
    Execution of PRE -SD job related to piping, hookup of fabricated spools with existing Facilities during shutdown.
    Final alignment, leveling & commissioning of pumps, exchangers etc.
    Execution supervision and construction management of FCO.
    Emphasis upon proper utilization of resources & optimizing max productivity of the project.
    Supervising for installation of equipments, variable& constant spring hangers, pipe supports structural works.
    Knowledge ok work permits safe work practice & experience in carrying out job in running plants.
    Coordinate with QA/QC department regarding qualification of welders & proper execution the project.
    Prepared RFI (Ready for inspection), NCR (Non conformance report) and FMR (Field material Request).
    Liaise with the design department concerning the preparation of AS-built drawing, modification of ISO as per FCN.
    Coordinate with the safety department regarding the preparation of procedure for health & safety environment and safety of worker, conduct seminars and training of all personnel involved in the project.
    Supervising for works of hot insulation, cold insulation, wrapping coating & fire proofing works.
    Liaise with the Planning Department and Quantity Surveyor regarding changes in schedules and designs that affects the milestone of the project to prepare variation orders.

    19thAug-99 to18thSept-02 –Bonace Engineering Pvt.Ltd. Mumbai, India worked post of Project Engineer Mechaical
    Client : Mahanagar Gas Ltd
    Project executed :
    Pipe Natural Gas project HD, MD and LD Poly ethylene pipe lines erection & commissioned.
    Responsibilities :
    Coordination for mobilization of M &E, Delivery of job materials, Finalization and mobilization of sub contractors.
    Preparation of method statement, procedures & Risk assessment for project execution works
    Coordination the plumbing work of multi storied residential commercial complex in Mumbai.
    Co-ordination with procurement department for follow-up of project materials.
    Estimation, planning, execution of complete mechanical activities for the project works.
    Assisting during the commissioning phase of the project
    Extending full dedicated support to site team for smooth execution of projects.
    Interface with client and provide confidence in project performance & survey customer satisfaction. Initiate timely corrective & preventive actions on customer complaints & NCR.
    Taking the ownership of the project to complete within time and budget with HSE and quality compliance.
    Resolving technical and work related issues by discussing with client and raising the work variation over the SOW.

    13thAug-98 to12thAug-99 M/s Reliance Industries Ltd, Jamnagar, India worked post of Project Engineer Mechanical
    Project executed :
    Construction of new Aromatic plant Galiane-III UG/AG piping erection& commissioned with associated equipments.
    Responsibilities :
    Develop and maintain a detailed schedule and project execution plan.
    Finalize subcontract in liaison with Procurement Manager to meet schedule & budget.
    Coordinate with Engineering contractor, department heads for approval and delivery of various documents as per schedule & certify Contractors bills.
    Review material taking and chase-up procurement engineer for speedy delivery.
    Coordination for the shutdown activities, tie-ins, hookups and commissioning Page3 of 4
    Liaise with QA/QC & HSE dept and ensure the quality and HSE requirements for the project are complied at every stage of project execution.

    21thJuly-96 to10thAug-98 M/S Man Industries India Ltd, Pithampur (M.P), worked post of Site Engineer-piping
    Client : Bridge stone
    Project executed :
    Construction of new pp plant CS & SS piping erection with associated equipments
    Unit shutdown of HP flare line 24”pipe spools installed & taken Tie-In-joint during partial shutdown Responsibilities :
    Providing mech assistance& supports for the installation, alignment & commissioning of equipments (Static/Rotary)
    Verify the materials specifications against drawings and piping line class.
    Performing visual inspection of fit up & maintain project safety & Quality .
    Co-ordination and monitor progress of fabrication, erection as per P&ID, Isometric drawings and update field modification on for As-built drawings.
    Weld map marking (Before releasing the isometric drawing to the site for construction.
    Ensuring pre-commissioning activates such as Air blowing, torque tightening, mech clearance, hydro test, pneumatic test, service test, Box-up, leak test and nitrogen purging.
    Site visit and applying work permits.
    Co-ordination with various disciplines Mech, Civil, Electrical, Instrument, operation and maintenance team.
    Review & Check of fabricated spools, pipe supports fabrication as per detail drawings.

    12thDec-95 to 15thJuly-96 M/s Kusum Industries Pvt. Ltd, Pithampur worked post of Field piping Engineer
    Client : Bharat Petroleum Ltd
    Project executed :
    Utility and potable water piping replacement work CS Piping erection with associated equipments & commissioned.
    Responsibilities :
    Planning work in close interaction with the Operation and maintenance team.
    To assist in pre-commissioning activities.
    Follow up pipe spool prefabrication, erection and painting as per schedule.
    Execution supervision and construction management of FCO.
    Timely completion of works as per schedule.
    Material co-ordination and planning the daily site activities with available resources.

    Personal Details :
    Date of birth : 30th June 1968
    Nationality : Indian
    Marital status : Married
    Languages know : English, Hindi, and Gujarati, Marathi, Arabic.
    Passport no : H1291460 valid up to 2018

    Personnel Attributes :
    1) Able to identify analyze and solve problem.
    2) Able to communicate very well both in oral and writing.
    3) Able to work out supervision and accept responsibilities.
    4) Capability to train, supervise and organize.
    Expected salary : Negotiable

    Date :
    Girish Kumar Soni