Saudi Consolidated Engineering Company Al-Khobar KSA : Piping / Pipeline Engineer

+ Ask Question / Post resume
Results 1 to 4 of 4
  1. Post Count Number #1
    On probation
    Join Date
    August 7th, 2009
    Location
    Saudi Arabia
    Posts
    1

    Saudi Consolidated Engineering Company Al-Khobar KSA : Piping / Pipeline Engineer

    Are you looking for professional growth opportunities as a full time employee enjoying OUTSTANDING BENEFITS? Do you have 5+ years of professional experience in the Design Engineering? We offer a rare opportunity to work within an organization where individual contribution makes a significant difference.

    Company : Saudi Consolidated Engineering Company

    Job Location : Al-Khobar, Saudi Arabia

    Industry : Design; Consulting; Engineering

    Open Positions:

    1.Sr. Environmental Engineer
    2.Transportation/Traffic Engineer requirements
    3.Structural Engineers
    4.Planning Engineer / Planner
    5.Sr. Telecommunication Engineer
    6.Senior Electrical Designer Engineer
    7.Senior Design Engineer High Voltage
    8.Mechanical Engineer (HVAC)
    9.Piping / Pipeline Engineer
    10.Mechanical Engineer (Static Rotating Equipment)
    11.Mechanical Lead Engineer (Water / Wastewater)
    12.Process Engineer
    13.Instrumentation and Control Section Head
    14.Material Engineers
    15.Construction Manager
    16.Bid Proposal Coordinator
    17.Cost Estimator
    18.Document Controller

    For detailed Job Description and other details please mail us with the above mentioned Job Title in the subject.

    About Company:
    We are a multidisciplinary architectural and engineering Consulting Company. Our services cover a wide range of activities and include: preparation of feasibility studies, preliminary designs, detailed working drawings, technical specifications, bills of quantities, conditions of contracts, analysis of tenders, construction management, supervision of construction, preparation of interim and final payments, control of materials testing, plant utilization and cost control, provisional and final taking over of projects, systems design and integration, designing and building of databases, application design and development, simulation and modeling.

    Please visit us on the web at http://www.khatibalami.com/

    Your interest in our Organization is appreciated and we wish you success in your job search. You’re welcome to share this information with interested colleagues, friends, and relatives.

    Best regards,

    Syed Ibrahim
    0096638946816 ext 219
    Syedibm@scecka.com
    Al Khobar, 31952 K.S.A
    Saudi Consolidated Engineering Company
    Al Khobar, Saudi Arabia
    http://www.khatibalami.com/
    Last edited by syedibm; September 4th, 2010 at 05:48 AM.

  2. Post Count Number #2
    Guest Poster
    Join Date
    August 14th, 2008
    Location
    Your Heart, Delhi
    Posts
    76,213

    Re: Saudi Consolidated Engineering Company Al-Khobar KSA : Piping / Pipeline Engineer

    Sir,
    I am from kerala,with valid passport having 10 yearexperienced aswelder &18 months in DOHA.I am trained in welding from govt.polytechnic,kannur then took advance training in highpressure welding,at ATI,chennai,Govt.ofINDIA,& NCVTTrade certificate in welding.I have passed SSLC,know ENGLISH HINDI&MALAYALAM.I have discontinued my studies to look my family.I am 30,marriednow have a son of5,and ready to join for the job ASAP.
    Thank you,
    Truly yours,
    shyjukrishnan

  3. Post Count Number #3
    Guest Poster
    Join Date
    August 14th, 2008
    Location
    Your Heart, Delhi
    Posts
    76,213

    Re: Saudi Consolidated Engineering Company Al-Khobar KSA : Piping / Pipeline Engineer

    Apsoft Technologies specializes in fiber optic splicing and testing services and provides these services on-site year-round throughout India. Apsoft Technologies is your preferred location for all services related to fiber optics. We have the necessary skills, tools and knowledge to solve all of your fibre optic needs. Some of the services we provide are fiber optic termination, fiber optic splicing, fiber optic testing, fibre optic equipment and fiber optic troubleshooting services.
    All of our services are provided by professional technicians and we use only the very best equipment. Our state of the art test equipment will offer you a variety of specialized fiber optic testing that is required to maintain top quality service. Our technicians have years of experience and will be able to troubleshoot your needs in no time.
    Trust that all of our work is fully tested, accurate and up to date with current industry standards, practices and procedures.
    Fiber Optic Splicing and Termination Services
    Apsoft Technologies provides fusion splicing and mechanical termination services. For fiber optic splicing, we use Fujikura FSM 60S Fusion Splicers, Apsoft Technologies is known for their performance in the fiber optic installation industry, to ensure the lowest splice loss possible. Whether your system splicing requirements are, mechanical or fusion, Apsoft Technologies is ready to perform.
    Contact Us Today
    Technology makes ideas happen and we make your work easier. For more information , please feel free to contact us today.
    Apsoft Technologies
    Call Rakesh Gour : +91 9561669912
    Ajay Gour +91 9370565551
    Sohit Gour + 91 9822237560
    Email : ajay@apsoftindia.com
    Web : www.apsoftindia.com

  4. Post Count Number #4
    Guest Poster
    Join Date
    August 14th, 2008
    Location
    Your Heart, Delhi
    Posts
    76,213

    Cv of satish DME for project engneer

    RESUME
    Satish kumar
    (Diploma Mechanical)
    Email :jaiswal.satish.satish AT gmail.com

    Job Objective
    To work in a challenging and creative environment and effectively contribute towards the goals of the organization.
    Assets
    - Good Listener and Quick Learner with Strong Interpersonal and Analytical Skills.
    - Manage Time efficiently and effectively through scheduling and prioritizing.
    - Enjoy working in a multi-cultural, fast paced and simulating environment.
    Academic Credential
    - Passed Diploma in Mechanical Engineering, From Rajasthan University Udaipur in July 2010
    - Passed I.T.I (N.C.V.T)in trade FITTER From Govt.ITI Mirzapur U.P.in July2006
    - Passed H.S.C. from U.P. Board Allahabad 2000
    - Passed S.S.C. from U.P.Board, in 1997
    Experience
    Current status : since August 2010 to till date
    Working as a Project engineer with classic Infrastructure project
    Clint :dhoshion ltd.
    At Site : India bulls power plant Amravati
    Department. GRP pipe line project
    Designation : project Engineer
    Period : august 2010 to till date
    Responsibility
    - carrying out monitoring over all WSS Projects
    - First setting up fully projects in given time frame and cost parameters.
    - Break up full projects in monthly target and prepare Sub-contractor/vendor plan.
    - Monitoring of the project with respect to client approved bar chart and highlighting critical activities
    - intervention from seniors and management.
    - Planning of all equipments erecting, commissioning and complete projects as per tender completion plan.
    - Prepare monthly target sheet as per tender projects completion time .
    - Check weekly progress report for completion of work of sub contractor as per monthly target.
    - Control work progress rate as per planning with maintain quality.
    - anchoring on site erection & commissioning activities.
    - Carrying out finally inspection given all parameters as per tender drawing pipe Excavation laying,
    jointing, testing and water treatment plant and other civil and mechanical works.
    - Carrying out the final inspection of erecting commissioning parts according to layout and drawing.
    - Managing activities from core stage to commissioning stage.
    - Handling project activities involving working out various requirements with respect to M/C, Equipment & manpower.
    - Finalizing the specification of material & establishing quality and quantity for inventory control &
    reducing wastage.
    - Preparations of monthly running bill and maintain proper Lessoning with client.
    - Coordination for inspection, dispatch, invoicing and collection of dues and no dues as per the
    commercial terms and conditions of the contract
    - Weekly reporting to Regional manager by photographic, telephonic interaction and email
    communication.
    Last Project Contents Details :

    1.HINDUSTAN ZINC LIMITED,Pipe line Dariba & intake well Debari-Dariba & Gosunda Dam to DSC
    54 km & 600mm Grp pipe line project
    As per tender GRP pipe Laying,jointing,& Hydrotesting work under my scope.

    2.India bulls power project Amravati
    - GRP pipe line 38km.&1200mm laying, lamination jointing &Hydro testing from morshi dam to india bulls power plant.
    1. Earlier Experience since -May. 2008 to July2010
    - Worked as a Shift Engineer (Mechanical)Of Hydrogen Gas plant with VAAMAN
    ENGINEERS(INDIA) LIMITED” Mumbai.
    “VAAMAN ENGINEERS (INDIA) LIMITED” Mumbai.
    At Site : “STERLITE TECHNOLOGIES LIMITED”(Vedanta group company)
    Aurangabad.
    Department : Hydrogen Plant.
    Designation : Operation and Maintenance Engineer
    Period : May 2008 to July2010

    Responsibility
    - To Operate Hydrogen & Oxygen Gas Plant Smoothly.
    - Monitoring of deviation of operating parameters & performance of equipments.
    - Based on the performance of equipment suggesting improvement projects for power conservation & performance.
    - Planning of Preventive maintenance & Break down maintenance.
    - Maintain Inventory of Compressor Spares & Procurement of Emergency & Mechanical Spares.
    - To ensure that the TPM activities are carried out as per the plan in coordination with management.
    - Making Daily Generation report, Monthly Performance Report & PV Report.
    - To Handle Manpower.
    - Reporting To Manager
    Exposure
    - Having knowledge about DM and RO plants.
    - Plate Heat Exchanger (Closed Loop System)
    - Hydrogen & Oxygen gas Purification System
    - Liquid Seal
    - Cooling Tower
    - Gas Holder
    - Mist Eliminator
    - Dryers
    - Transformer 6.6Kv / 440V
    - Rectifier 225V DC , 5250Amp DC
    2.Earlier Experience since – April 2007 to May. 2008
    - Duravalve India pvt. Ltd (Varroc Group)
    Aurangabad (M.H.)
    Department : Q.C.
    Designation : As Technicians
    Period : April 2007 to May 2008
    Computer Skill Set
    - M.S.C.I.T
    Academic Project Undertaken
    - Project Title : “Working Model of Steam Power Plant”.
    Description : This project shows how we can reduce the heat energy & reduce the fuel consumption.

    I hereby declare that the above written particulars are true to the best of my
    knowledge and belief.
    Place : Satish kumar
    date