-
August 5th, 2009, 03:48 PM
Post Count Number #1
Falcon services Kazakhstan : Offshore oil & gas piping Engineer
Falcon services Kazakhstan : Senior piping engineer
Website: www.falconservices.in
Keywords: 10 years relevant experience in discipline engineering in an offshore oil and gas project environment., 5 years experience as discipline leader, experience of large multidiscipline project,
Designation: Senior piping engineer
Experience: 8 - 12 Years
Location: Kazakhstan
Education:
UG - Any Graduate - Any Specialization,Graduation Not Required
PG - Any PG Course - Any Specialization,Post Graduation Not Required
Industry Type: Oil and Gas/ Power/Infrastructure/Energy
Functional Area: Other
Posted Date: 04 Aug 2009
Job Description:
A candidate should be BE Mechanical with 10 years relevant experience in discipline engineering in an offshore oil and gas project environment., 5 years experience as discipline leader, experience of large multidiscipline project, experience in 3 D CAD, experience of High Pressure Systems and Sour Service,experience in managing contractors work will be an advantage.
Desired Candidate Profile:
A candidate should be BE Mechanical with 10 years relevant experience in discipline engineering in an offshore oil and gas project environment., 5 years experience as discipline leader, experience of large multidiscipline project, experience in 3 D CAD, experience of High Pressure Systems and Sour Service,experience in managing contractors work will be an advantage.
Company Profile:
With over 25 years of international experience , flexible partner for a wide range of qualified services to the Oil & Gas Industry, Refining, Petrochemical, Chemical, Power and Desalination Plants. Through theirbusiness activities we have been involved in major offshore and onshore projects located in the Emirates, Italy, Kazakhstan, Middle East, North Africa and Russia. In these areas they have worked with many of the major Operators and Contractors including ENI/Agip, ABB, BG, ExxonMobil, Fisia, Foster Wheeler, Infineum, Italimpianti, Saipem, Snamprogetti, Tecnimont, Chevron Texaco, Technip and many others.
Executive Name: Ravi
Address:
Not Mentioned
Email Address: Ravi@falconservices.in
Telephone: 912226670852
Keywords: 10 years relevant experience in discipline engineering in an offshore oil and gas project environment., 5 years experience as discipline leader, experience of large multidiscipline project,
-
May 11th, 2011, 05:56 PM
Post Count Number #2
IJT addict
Siva Chidambaram
-------------------------------------------------------
The submitted value of field named "Email :" is:
-------------------------------------------------------
shiv.chid AT yahoo.in
-------------------------------------------------------
The submitted value of field named "Designation / Name of the Post / Skill Set" is :
-------------------------------------------------------
Engineer
-------------------------------------------------------
The submitted value of field named "Copy Paste Your CV / Resume Here :" is:
-------------------------------------------------------
S SIVA CHIDAMBARAM
Email : shiv.chid AT yahoo.in
Objective :
To establish as a CAD/CAM/CAE Consultant providing complete Engineering solutions in the need based technology era with quick learning capabilities, delivering high Quality services and on-time delivery that fulfills customer expectations.
Synopsis :
- Bachelor Degree in Marine Engineering with 3 years of experience in Ship Design, Modeling & Drafting, Design changes and Standardization of Drawings.
- Executing Marine Services Projects based on the Customer requirement.
- Good Working Knowledge on ISO 9001 :2000, ABS Rules.
- Developing Feature based models from IGES/DXF data.
Professional Experience :
- Aveva Information Technology India Pvt Ltd, Mumbai, India
- Neilsoft Pvt Ltd, Pune, India
Academics :
Course Institution Percentage of Marks % Year
SSLC SRKVG, Ulundurpet 89.27 2001
HSC SRV, Rasipuram 76.33 2003
Bachelor Degree in Marine Engineering BIT, Ranchi 67.47 2009
Computer Skills :
CAD/CAM/CAE/PDM Software’s : Tribon M3-SP6, Aveva Marine-12-SP6, AutoCAD-2009, Bentley view.
Achievements :
- Leading the successful Team towards achieving the company objective and customer aspirations.
- Appreciated by the customers for Training on software’s in a lucid manner.
Experience Summary :
Aveva Information Technology India PVT LTD, Mumbai
AVEVA is the world's leading engineering IT software provider to the plant, power and Marine industries. Through 40 years of visionary and continual progression, AVEVA has harnessed the power of information technology and transformed entire industries.
Duration : Jan 2010 – Till date Designation: Technical Consultant - Marine
Responsibility :
- Taking care of the support activities on software. Responsible for Hull Module in Tribon and Aveva Marine -12 all over India.
- Tribon is a Naval Architecture program originally developed by Kockum Computer Systems (KCS) for designing commercial and naval vessels. KCS was spun off from Kockums shipyards as an independent company, later renamed Tribon Systems, which was in turn acquired by Aveva in 2004.
- Tribon is actually a family of programs that create and refer to a common set of databases containing the design details of the ship. Together, these databases are used to depict a 3D model of the ship, with embedded information for all of the parts of the design, from ship structural elements to pipe segments to equipment.
- Doing benchmarks, Installation and Training for customers products at customer premises to their satisfaction.
Client : Academy of Maritime Education and Training, Chennai
Component : Aveva Marine -12
Modules Handled : Hull Duration: 20 Days
Responsibility : - Training 14 Naval Architects on Aveva Marine-12 Module
Client : Indian Maritime University - IMU, Vishakapattinam
Components : Tribon – M3
Modules Handled : Initial Design, Hull, Hull Manager and System Manager Duration: 41 Days
Responsibility : - Training Naval Architects on complete module of Tribon M3.
- Succeeded in Converting Maxsurf Ship Surface to IGES, SAT files, importing it in Tribon M3 for Calculating Sea keeping and Resistance using Calc/Hydro.
- Succeeded in Creating the Surface using Patch and Curve Editor for the new sections given, having it as sections.bri.
- A challenging task of creating 3D model for Azimuth Thruster using Surface and Compartment module.
Client : Mazagaon Dock Limited - MDL, Mumbai
Components: Tribon – M3
Modules Handled: Lines Design, Hull Manager, Curved Hull, Plate Nesting Duration: 5 Days
Responsibility: - Training Hull Team on above mentioned modules
- Checking Surface with Lines and Pace
- Complete Setup of a New Project
- Clarified the Curved Hull team on Different ways of Modeling.
ONSITE Training
In programmable Macro language
Busan, korea.
14th Mar 2010 - 25th Mar 2010 - A detailed study of PML practices and standards was done in Korea and implemented the same in India.
- An Internal Training on Programmable Macro Language – PML for AvevaMarine-12 attended by all Hull Managers from Asia pacific.
- Able to create or Edit Macros for Hull based Explorers.
- The Task was to learn and practice Hull data Extraction using PML, Form Handling, Add-ins, Advanced Form (GUI) handling with exercise, net and Usage, Interface with C# and Vitesse.
Major Clients: Larsen & Toubro, Microdata, Neilsoft, Conceptia, Indian Navy, Pipavav Shipyard.
Neilsoft Pvt Ltd, Pune
Neilsoft is a specialist engineering services & solutions company servicing clients across a range of engineering segments helping improve their engineering efficiency, support their global footprint and improve their competitiveness.
Duration: Jul 2007 – Jul 2009 Designation: Design Engineer
Client: INEC, Netherlands Role: Engineer Team Size: 12
International Naval Engineering Consultants - INEC is a well known Marine Surveying and Consulting Company. INEC is designing sea-going and inland waterway vessels of all types.
Project Handled:
G. Cargo Carrier Design project: Design of 14 Blocks Duration: 4 Months
Responsibility: - Study and Estimating the Project
- Preparing the Detailed Project plan
- Complete Hull modeling for four blocks in forward
- Generating the Nesting sketches and Production Dwgs
- Quality control of the projects
- Deliver the complete blocks and drawings to the customer
Client: Ghesa, Seville Role: Engineer Team Size: 3
Ghesa Andalucía - GHENOVA INGENIERÍA is Scientific research and development; scientific and technical consulting and research relating to basic and development engineering in the aeronautical, naval, civilian and industrial field.
Project Handled:
Bulk Carriers Design project: Design of 11 Blocks Duration: 3Months (Spain)
4 Months(Pune)
Responsibility: - Study and Estimating the Project
- Preparing the Detailed project plan
- Learning to use Bentley view as a reference Material
- New and fast applications used in Planar hull and curved hull modeling
- Control over four different shipyard standards and their respective blocks
- Control over four different shipyard standards for Nesting
- Assigning the blocks within the Team
- Modeling the blocks with topology maintained, so as to minimize the time in Modifications
- Sequence of modeling 8 Sister Ships.
- Usage of Python applications for Nesting and production info
- Training two more members to help the team in Nesting
- Deliver the complete blocks and Drawings to the customer within specified time limits.
ONSITE Deputation –
Ghesa,
Seville, Spain.
Feb 2008 - May 2008 - The task was to learn hull modeling following client’s Yard standards, convert them to English and continue leading the project in India.
- To Deal with the latest application used in Hull Modeling
- Understanding the Yard standards of four Major shipyards –Odense, Western, Loksa and Baltija
- Involved in developing three blocks, creating production drawings and Nesting sketches.
Client: Cotecmar, Colombia Role: Engineer Team Size: 2
Cotecmar - is a major Naval Engineering consultancy for U.S
Project Handled:
Patrol Vessel Design project: Design of complete ship Duration: 12 Months
Responsibility: - Preparing the Detailed project plan
- Detailed study of the Drawings
- Discussing design doubts and clarifying them within the team
- Assigning the blocks within the Team
- Modeling the blocks with topology maintained, so as to minimize the time in Modifications
- Quality control of the Projects
- Assigned to design the complete ship model in planar hull
- Helped designing the holes as to minimize the work for Outfitting Team
- Helped client formulate their own Yard standards which can be used for their future Projects
- On time delivery of the assigned blocks to the customer.
Extras:
1. Gold Medal for Proficiency in Science and English during SSC Examination
2. Handled two Systems – Fresh Water and Co2, when ship in campus was formulated under DG shipping rules.
3. Worked as an Assistant Engineer handling four Tugs in Chennai Port.
4. Specialized in Oil Tanker, Chemical Tanker, Fire Prevention and Engine room simulator courses.
-------------------------------------------------------
More Information about this submission and submitter:-
___________________________________________________
Submission ID : 4117829
Date & Time : 11th May 2011 8:36 AM (UTC)
IP Address : 210.18.111.195
Browser Info : Mozilla/5.0 (Windows NT 5.1; rv:2.0.1) Gecko/20100101 Firefox/4.0.1
Predicted Country : India
-
November 15th, 2011, 11:52 AM
Post Count Number #3
project piping engineer
DEEPAK SHETTY.
Email : maildeepakshetty AT gmail.com
Career Summary
Handling/monitoring in offshore operation activities of turnkey projects in Mumbai high. Fabrication, erection & installation of pipeline/piping/heavy structural, jacket fabrication in offshore projects at process platforms/unmanned platforms of ONGC.
Present Employer :
Sarku Engineers Project Engineer Dec 2010 to Present
Previous Employers :
Larsen & Toubro Ltd. Project Engineer Feb 2008 to Nov 2010
GAS projects (I) PVT ltd Project Engineer May-2007 to Feb-2008
Larsen & Toubro Ltd. Inplant Trainee 6 Months.
Larsen Toubro Ltd. Inplant Trainee 6 Months.
Education Summary
A SSC : Institution: Navodaya English High School.
Board : Maharashtra State board.
B Diploma in Industrial Mechanical Engineering :
Year of passing : 2007
Marks : 61.44
Institution : Larsen Toubro Institute of Technology.
Board : Maharashtra State board of technical education
C Diploma in Piping Engineering :
Year of passing : 2007
Marks : First class
Institution : ELIXIR institute of piping Engg. Technology.
Board : Mumbai University
I. My latest project Experience
TOTAL EXPERIENCE 5 Years 3 months(4.3YEARS &1 Year of Training.)
STRENGTH :
- Handling monitoring of Lump sum Turnkey EPIC projects in Oil & Gas industry
- Project Co-ordination / Execution-Piping, pipeline and structural
Billing/Quotation pre-engineering & post engineering survey done.
- International codes and standards for piping, pipeline and structural
Dec 10 – Present : 1. Sarku Engineers (Sapura Crest).
TITLE : PROJECT ENGINEER.
Project : ONGC – 26WPP
EXPERIENCE : Piping discipline – Coordination of engineering deliverable with procurement & engineering consultant , fabrication at yard of piping spools & installation at offshore.
NATURE OF JOB CARRIED OUT :
- Revamping of unmanned platforms, structural fabrication erection relating to jacket, platform’s deck and process platforms structural, deck extension, piping, pipe line, piping hook up.
- Planning for day to day activities of offshore Piping execution, installation, and hook up & Commissioning/pre-commissioning, Co-ordination in North field, south field & heera field at Process Platform in offshore ongoing projects.
ONSHORE JOB RESPONSIBILITY :
- Preparing detailed of scope of work & as built drawings
- Co-ordination with ONGC,
- Preparation of billing of various projects for company.
OFFSHORE JOB RESPONSIBILITY
- Handling Piping and Jacket deck structural execution, fabrication installation, hook up & Commissioning/pre- commissioning
- Structural execution, installation, hook up & Commissioning/pre-commissioning and commissioning.
- Pre-engineering and POST engineering survey of the various Projects.
- Carried out pre construction survey in various project.
- Make and Modify as Built Isometric as per site Modification
Feb. 2008 – 30 Nov10 : 1.Larsen & Toubro Ltd.
TITLE : PROJECT PIPING ENGINEER.
Project : ONGC – Mumbai High South Redevelopment Project -II – Completed (From Sept’08 to March’ 10).
EXPERIENCE : Piping discipline – Coordination of engineering deliverable with procurement & engineering consultant , fabrication at hazira yard of piping spools & installation at offshore.
Job Profile :
1. Worked in MHN project .
2. To understand in detail client’s technical bid documents and technical requirements.
3.Fabrication of piping spools in hazira yard & hook up at offshore.
4.Prepared Material control chart (MCC) for piping modification & ensured proper allocation of the material for MHSRP-II platforms & also ensured close co-ordination with procurement department for timely procurement/supply of material at the site.
5. L&T representative on-board Hal supporter & platform (BHS COMPLEX) for modification of CS & CS-NACE, GRE, DSS pipes. Hook up & successfully handed over.
6Involved in bidding of ONGC projects as B-22, B-193, and MHSRP - II.
7.A part of engineering team for the new well head as well as for modification project.
8 Punch point liquidation, material reconciliation, bill certification and closure of the assigned scope of work.
9 Interaction with Client, vendor, third party and certifying authorities.
9 Execution scheduling, shutdown planning and marshalling of tools, tackles, materials and subcontractor for the prefabrication at the yard and final hook / execution at the site.
10.Coordination for obtaining release notes / milestones for payments.
May07 – Feb08 2. GAS projects (I) PVT ltd
TITLE : PROJECT PIPING ENGINEER.
1.Completed 4 site successfully in Rajasthan project in Auto LPG dispensing sys tem
2.Co-ordination with contractor, clients.
3.Execution co-ordination with fabrication yard and sub-contractor.
4.Handling of client observations and TQ’s.
5.To establish a synergic work flow relation with all the departments in order to accomplish the common objective and conflict management.
Challenges and Issue Resolved
1. Done job on debugging
2. Closing the critical issue at the right time
3. Done a pretty team work for time bound activities
4. Done a pretty team work for time bound activities
My Training Experience
Roles and Responsibilities
Underwent Six months in plant Training at Larsen Toubro Ltd.
Department : Heavy engg. Division in scheduling department.
Underwent Six months in plant Training at Larsen Toubro Ltd.
Department : Coal Gasifier Power Plant DESIGN DEPARTMENT .
Job responsibilities :
Work on Heat treatment requisition, Surface treatment requisition.
Work on Bill of Material. Work on Material Specification
My Final Year Project
Roles and Responsibilities
Title : DIPLOMA PROJECT: Electric heated split type furnace.
My Latest Training Acquired
Design analysis on Offshore structure.
Proficiency on MS OFFICE 07.
Basics of GRE pipe.
Communication skills.
My Computer knowledge
Roles and Responsibilities
1 PRO E PDMS,Auto Cad : 2 D drawings.
2 MS Office.
-
November 16th, 2011, 04:40 PM
Post Count Number #4