-
July 30th, 2009, 01:41 PM
Post Count Number #1
www.universalerectors.com Universal Erectors India : Erection, Welding, Power Plant Engineer
Universal Erectors Anywhere in India : Erection Engineer / Welding Engineer
Website: http://www.universalerectors.com
universalerectors.com
Keywords: Erection engineer, Welding Engineer, Turbine, Generator, Boiler, HRSG, Piping , Erection, Construction, Projects, Thermal power plant, Engineering Construction, Power Plant Engineering, Power Plant Construction
Designation: Erection Engineer / Welding Engineer
Experience: 3 - 6 Years
Location: Anywhere in India
Job Description:
• Reading erection drawings
• Preparation of job sheets to erection and fit up group.
• Day to day erection activities monitoring, supervision, inspection, progress monitoring etc.
Desired Candidate Profile:
• Experience in Erection / Maintenance experience in Boiler / STG/ GTG / Piping / Electrical and C&I
• Qualification : Engineering Graduate / Diploma
Company Profile:
Universal Erectors, an ISO 9001:2000 certified and one of the pioneering Indian companies in the field of construction and maintenance of power plants since 1976.
The company specializes in Erection of Gas Turbine, Steam Turbine, GTG, STG, Heat Recovery Steam Generators, Boilers, their Auxiliaries, Piping, Balance of Plant, all Electrical and I&C equipments, R&M of old Units and Overhauling of Gas turbines & Steam turbines of various capacities.
The company has vast experience in western, northern and southern parts of India as well as in European and Gulf countries.
Email Address: universalerectors@hotmail.com
Keywords: Erection engineer, Welding Engineer, Turbine, Generator, Boiler, HRSG, Piping , Erection, Construction, Projects, Thermal power plant, Engineering Construction, Power Plant Engineering, Power Plant Construction
Last edited by muthukalee; October 21st, 2011 at 05:20 PM.
-
March 3rd, 2010, 09:53 PM
Post Count Number #2
Re: Universal Erectors India : Erection, Welding, Power Plant Engineer
erection of power plant.steam turbine and generator
-
August 13th, 2011, 12:29 PM
Post Count Number #3
QA/QC Engg /6 years exp in erection field
A.Sethuraman
Summary of Skills
Ø Total 6years experience in Quality Control & Quality Assurance.
Ø Always follow these mantras Safety, Quality & Schedule
Ø Have 1 years experience as a QA / QC Engineer in boiler erection activities & piping in 210 MW power plant.
Ø Have 34 years experience as a QA / QC Engineer in boiler erection activities in 90TPH, 110TPH, 120TPH power plant.
Ø Have 2 years experience as a Senior Engineer in Quality Department in power plant activities in 120TPH and 90TPH Traveling Grate Boiler
Ø Prepare IBR related documents (Drum inspection, Hydro test witness light up permission & System wise film, Document hand over) as per IBR regulation & getting approval from the IBR.
Ø Course completed for
o NDT level II (DPT,MPT,RT & UT)
o IWS-Welding Inspector.
o Quality Management System.
Ø Well experience in interpretation and evaluation of root & final DPT & RT
Ø Co-ordination between client, Consultant and contractors.
Career objective
To work with a progressive organization in which I can contribute my technical skills and experience to enhance quality and production for achieving the needs of the organization with the attribute of time, quality and discipline.
1. Work experience
Working as a Senior Engineer in M/s. Avant-Grade Engineers & Consultants (P) Ltd, Gangapur Project.
Period : From June 2009 to June 2010.
Work project : 1x120TPH Travelling Grate Boiler, Karnataka.
Customer : M/S. Vijayanagar Sugar Pvt. Ltd.
Responsibility held : Senior Engineer for Power Plant.
Period : From July 2010 to till date.
Work project : 1x90TPH Travelling Grate Boiler, Karnataka.
Customer : M/S. Jamkhandi Sugar Pvt. Ltd.
Responsibility held : Senior Engineer for Power Plant.
Job profile
M/s. Avant-Grade Engineers & Consultants (P) Ltd has awarded a job by M/S. Vijayanagar sugar Pvt. Ltd. towards Third Party Inspection for 1x120TPH Cogeneration Plant and M/s Jamkhandi Sugars ltd, 1x90 TPH Cogeneration Plant at Jamkhandi, Karnataka state.
Ø Contract review to understand the quality requirements and scope of Inspections.
Ø Foundation Clearance inspection
Ø Welding Inspection in all activities (surveillance checks before ,during and after welding )
Ø Alignment Inspection of, Drum, Headers, Panel, structure column, ducts, Fans, Stroker, Tank, ESP & Pumps.
Ø Evaluation of Welder Performance Qualification Test as per ASME Sec IX
Ø Review applicable code of practice
Ø Line Checking by using PID and GA
Ø Raw material mill test certificates are verified and confirmed to the code requirements
Ø Welding /NDT consumables and other consumables test certificates are reviewed
Ø Goods inwards inspections(Dimensional stability , mechanical properties )
Ø Sub-assembly and final dimensional inspection to the approved drawing
Ø Ensure that all NDT specified are carried out and the reports are reviewed
Ø Monitor PWHT operation, review charts and reports.
Ø Ensure hardness after PWHT to confirm the adequacy of PWHT and ensure RT & MT if specified.
2. Work experience
Worked as a QC Engineer in M/s. CETHAR Vessels Limited, Bhuj Project.
Period : From Feb 2009 to June 2009
Work project : 1x120TPH, FBC Boiler, Gujarat.
Customer : M/S. Solaris Chem Limited.
Responsibility held : QC Engineer for Boiler Erection Activities
Job profile
M/s. CETHAR Vessels limited has awarded a job by M/S. Solaris Chem Limited towards Erection of Boilers for 1x120TPH FBC Boiler at Bhuj, Gujarat.
Ø Contract review to understand the quality requirements and scope of Inspections.
Ø Welding Inspection in all activities (surveillance checks before ,during and after welding )
Ø Alignment Inspection of Drum, Headers, Panel, structure column, ducts, Fans, Tank, ESP & Pumps.
Ø Evaluation of Welder Performance Qualification Test as per ASME Sec IX
Ø Line Checking by using PID and GA
Ø Raw material mill test certificates are verified and confirmed to the code requirements
Ø Welding /NDT consumables and other consumables test certificates are reviewed
Ø Goods inwards inspections(Dimensional stability , mechanical properties )
Ø Sub-assembly and final dimensional inspection to the approved drawing
Ø Ensure that all NDT specified are carried out and the reports are reviewed
Ø Monitor PWHT operation, review charts and reports.
Ø Ensure hardness after PWHT to confirm the adequacy of PWHT and ensure RT & MT if specified.
Ø Raising Non – Conformance Report on Product
3. Work experience
Worked as a QC Engineer in M/s. CETHAR Vessels Limited, Gandhidham Project.
Period : From April 2008 to Jan 2009
Work project : 2x90TPH, FBC Boiler, Gujarat.
Customer : M/S. Rei Agro Limited.
Responsibility held : QC Engineer for Boiler Erection Activities
Job profile
M/s. CETHAR Vessels limited has awarded a job by M/S. Rei Agro Limited towards Erection of Boilers for 2x90TPH FBC Boiler at Gandhidham, Gujarat.
Ø Contract review to understand the quality requirements and scope of Inspections.
Ø Welding Inspection in all activities (surveillance checks before ,during and after welding )
Ø Alignment Inspection of Drum, Headers, Panel, structure column, ducts, Fans, Tank, ESP & Pumps.
Ø Evaluation of Welder Performance Qualification Test as per ASME Sec IX
Ø Line Checking by using PID and GA
Ø Raw material mill test certificates are verified and confirmed to the code requirements
Ø Welding /NDT consumables and other consumables test certificates are reviewed
Ø Goods inwards inspections(Dimensional stability , mechanical properties )
Ø Sub-assembly and final dimensional inspection to the approved drawing
Ø Ensure that all NDT specified are carried out and the reports are reviewed
Ø Monitor PWHT operation, review charts and reports.
Ø Ensure hardness after PWHT to confirm the adequacy of PWHT and ensure RT & MT if specified.
Ø Raising Non – Conformance Report on Product
4. Work experience
Worked as a QC Engineer in M/s. CETHAR Vessels Limited, Bharuch Project.
Period : From Nov 2007 to March 2008
Work project : Waste Heat Recovery Boiler, Gujarat.
Customer : M/S. Birla Century Textiles Ltd.
Responsibility held : QC Engineer for Boiler Erection Activities
Job profile
M/s. CETHAR Vessels limited has awarded a job by M/S. Birla Century Textiles Ltd towards Erection of Boilers for Waste Heat Recovery Boiler at Bharuch, Gujarat.
Ø Welding Inspection in all activities (surveillance checks before ,during and after welding )
Ø Alignment Inspection of Drum, Headers, structure column, ducts, Fans & Tank.
Ø Evaluation of Welder Performance Qualification Test as per ASME Sec IX
Ø Line Checking by using PID and GA
Ø Welding /NDT consumables and other consumables test certificates are reviewed
Ø Goods inwards inspections(Dimensional stability , mechanical properties )
Ø Sub-assembly and final dimensional inspection to the approved drawing
Ø Ensure that all NDT specified are carried out and the reports are reviewed
Ø Monitor PWHT operation, review charts and reports.
Ø Raising Non – Conformance Report on Product
5. Work experience
Worked as a QC Engineer in M/s. CETHAR Vessels Limited, Bharuch Project.
Period : From Dec 2006 to Oct 2007
Work project : 2x120TPH, FBC Boiler, Gujarat.
Customer : M/S. Meghmani fine chem. Ltd.
Responsibility held : QC Engineer for Boiler Erection Activities
Job profile
M/s. CETHAR Vessels limited has awarded a job by M/S. Meghmani fine chem. Ltd towards Erection of Boilers for 2x120TPH at Bharuch, Gujarat.
Ø Contract review to understand the quality requirements and scope of Inspections.
Ø Welding Inspection in all activities (surveillance checks before ,during and after welding )
Ø Alignment Inspection of Turbine, Drum, Headers, Panel, structure column, ducts, Fans, Tank, ESP & Pumps.
Ø Evaluation of Welder Performance Qualification Test as per ASME Sec IX
Ø Line Checking by using PID and GA
Ø Raw material mill test certificates are verified and confirmed to the code requirements
Ø Welding /NDT consumables and other consumables test certificates are reviewed
Ø Goods inwards inspections(Dimensional stability , mechanical properties )
Ø Sub-assembly and final dimensional inspection to the approved drawing
Ø Ensure that all NDT specified are carried out and the reports are reviewed
Ø Monitor PWHT operation, review charts and reports.
Ø Ensure hardness after PWHT to confirm the adequacy of PWHT and ensure RT & MT if specified.
Ø Raising Non – Conformance Report on Product
6. Work experience
Worked as a QC Engineer in M/s. CETHAR Vessels Limited, Tirchy
Period : From June 2006 to Nov 2006
Responsibility held : QC Engineer for Boiler Pressure Parts Fabrication
Job profile
Ø Knowledge in SMAW, SAW,GMAW & GTAW welding methods
Ø Welding inspection (surveillance checks before ,during and after welding )
Ø Preheat treatment & Post weld Heat treatment
Ø Preparation of protocol records
Ø Interpretation and Evaluation of Root & Final DPT
Ø Line Checking by using PID and GA
Ø Preparation of Reports for Fit up, Welding, DPT and RT.
Ø Inspection of Equipments, Tools & tackles and consumables at Fab Shop
Ø Welding /NDT consumables and other consumables test certificates
Ø Goods inwards inspections(Dimensional stability , mechanical properties )
Ø Sub-assembly and final dimensional inspection to the approved drawing
Ø Ensure that all NDT specified are carried out and the reports
Ø Monitor PWHT operation.
Ø Ensure hardness after PWHT to confirm the adequacy of PWHT and ensure RT & MT if specified.
7. Work experience
Worked as a QC Engineer in M/s. Dowel Erectors (p) limited, Uttar Pradesh Project.
Period : From June 2005 to June 2006
Work project : 1x210MW NTPC Project, Uttar Pradesh
Customer : M/S. NTPC.
Client : M/S. BHEL.
Responsibility held : QC Engineer for Boiler Erection activities & Piping.
Job profile
M/s. Dowel Erectors (p) limited has awarded a job by M/S. BHEL towards Erection of Boilers for 1x210MW Captive Power Plant at Raibearli, Uttar Pradesh state.
Ø Foundation Clearance inspection and getting signed from all relevant parties
Ø Welding Inspection (Pressure parts & Piping)
Ø Alignment of Drum, Headers, Panel, structure column, ducts, Fans, ESP, Hangers, Pumps etc.
Ø Evaluation of welder performance Qualification test as per ASME Sec IX
Ø Preparation of protocol records
Ø RT Film interpretation & Final DPT
Ø Line Checking by using PID and GA
Ø Compiling of as built documentation
Ø Preparation of Reports like Fit up, Welding, DPT, RT, etc.
Ø Monitoring the corrective usage of Electrodes
Ø Maintaining documents like Electrode records, SR, DPT, RT & Specifications.
Ø Preparing System wise check list
Ø Welding /NDT consumables and other consumables test certificates are reviewed
Ø Sub-assembly and final dimensional inspection to the approved drawing
Ø Welding inspection .(surveillance checks before ,during and after welding )
Ø Ensure that all NDT specified are carried out and the reports are reviewed
Educational Qualification
™ Graduation (B.E Mechanical) from Arulmigu Kalasaligam Engineering College, Srivilliputhur, Tamilnadu
™ Diploma in Mechanical from Karur Polytechnic, Karur, Tamilnadu.
™ 12th – P.K.N Higher Secondary School, Tirumangalam, Madurai, Tamilnadu.
™ 10th – P.K.N Higher Secondary School, Tirumangalam, Madurai, Tamilnadu.
Other Qualifications
1. NDT Level-II in
Ø DPT (Dye Penetrant Test)
Ø MPT (Magnetic particle test)
Ø RT (Radiographic Test)
Ø UT (Ultrasonic Test) as per ASNT standard
2. IWS-Welding Inspector-Member No.: A-01965
3. Quality Management System(ISO9001-ISO14001)
Software Skills
™ Hands in experience in MS OFFICE.
™ Hands in experience in AUTO CAD & Pro-e.
-
May 4th, 2012, 10:52 PM
Post Count Number #4
site engineer
RESUME
Post Site engineer (Erection Mechanical)
Devendra Singh
E-Mail ID DevendraSingh_1980 yahoo.co.in
Academic Education Profile :-
Intermediate from U.P.Board
Matriculation from U.P.Board
Professional Qualifications :-
Diploma in Mechanical Engineering(3 year)
I.T.I Machanic Machine Tool Fitter(2Year)
Experience :-
- Worked in M/n O.P.T Corporates wings pvt ltd in Nov2006 to dec2007 at Panipat Thermal Power Plant,panipat Harayana
-
- Worked in M/n Jai Prakesh Associates Ltd in Dec2007 To June2008 at Sri Salam Turnnel A.M.R Project ,Hyderabad(AP)
-
- Rama Institute of Engg & Technology in june 2008 to April2010 at kanpur
- Worked in M/n Trimurti Engg Pvt Ltd April2010 to oct2010
-
- New India engineering Work Gujrat at Nov 2010 to till date
-
-
Job Profile :-
Erection 5 MW Back Pressure steam turbine Rauzagoan suger mill [Triveni Engg]
Erection 17.5 MW Condensation steam turbine Birla group Rajasthan [T.D.P.S]
Erection 1275 kw Back Pressure steam turbine latur Maharathra
Erection 9 &12 MW Condensation steam turbine,Parali Maharatha [Triveni Engg]
Erection 3 MW Condensation steam turbine,Ahmedabad Gujrat [Triveni Engg]
Erection coil type non IBR water tube boiler D.S.M.Suger mill babrala
Hot water generater amw005 ,01,01,03,04,05
Thermopac tpcm 01,02
RXA Steam boiler 01,02,03,04,05,06
- Pheumatic&hydulic work,cement plant,ash handling work cello,bulk loading system
- pipeline, chimney duct LP.HP heater oil cooler,condenser recovery system,
-
- GA&Foundation drawing,primary&secondary duct drawing refractory drawing,p&I Drawing
-
- water treatement plant ,mechanical plant maintenance ,process plant maintenance, tunnel project
devendra singh
-
November 6th, 2016, 08:59 PM
Post Count Number #5
Quality Control Job
I am a retired mechanical engineer. I am having experience in inspection job in boiler fabrication industry and knowledge in inspection of header, panel, element, separator, storage tank, required suitable job.