-
July 23rd, 2009, 11:39 AM
Post Count Number #1
www.pratibhagroup.com Pratibha Industries Ltd Bhubaneswar, Delhi, Patna : Projects Planning Engineer
Pratibha Industries Ltd. Bhubaneshwar, Delhi, Delhi/NCR, Mumbai, Mumbai Suburbs, Navi Mumbai, Patna : Engineer Projects --Planning
Website: http://www.pratibhagroup.com
Designation: Engineer Projects --Planning
Experience: 8 - 13 Years
Location: Bhubaneshwar, Delhi, Delhi/NCR, Mumbai, Mumbai Suburbs, Navi Mumbai, Patna
Job Description:
- Planning and monitoring construction program to sufficient level of details so that all activities can be easily monitored during project implementation;
- Prepare and update organizational chart.
- Prepare project master construction schedule clearly identifying the critical activities in a presentable and understandable format;
- Prepare construction program to sufficient level of details so that all key construction activities can be easily monitored during project implementation;
- Review and monitor the construction schedule and schedule of key dates prepared by the quantity surveyor to ensure that they are in strict compliance with the construction program and are properly executed;
- Co-ordinate as well as monitor with vendors, suppliers, various labour contractors and subcontractors on necessary resources, material, machinery, equipment, to ensure that the works are carried out in strict accordance with the planned schedule;
- Monitor progress of work, update construction program and prepare recovery program if necessary;
- Document all project related communications and/or instructions between the Company and all external parties in the form of official letters, fax transmittal or memorandum, whichever is appropriate;
Desired Candidate Profile:
Candidate should have 8 to 15 yrs of expereicne in Planning and execution Should have atleast 5 yrs relevant exp in building projects / hospital building projects .
Review all good-for-construction drawings received from Consultant to ensure that they are accurate, clear and free from discrepancies before endorsing for construction.
Evaluate and review all variation orders to ensure they are within limit, correct and properly administered;
Monitoring cash flow projection and S-curve in sufficient details so that the Client’s project cash flow can be effectively executed;
Prepare, Evaluate and review cash flow statement for the project to ensure that it is operating in positive cash flow position;
Co-ordinate and liaise directly with Client, Consultants, Architects and Contractors to ensure smooth and seamless operations;
Company Profile:
PRATIBHA INDUSTRIES LIMITED, a fast growing infrastructure company with expertise in the area of design and construction of complex & integrated water transmission & distribution projects, water treatment plants, elevated & underground reservoirs, mass housing projects, commercial complexes, pre-cast design, road, etc.
Address:
Pratibha Industries Ltd
Shrikant Chambers, Phase-II, 5th,Floor,
Sion-Trombay Road, Near R.K.Studio, Chembur,
Mumbai
MUMBAI,Maharashtra,India 400001
Email Address: hr1@pratibhagroup.com, hr@pratibhagroup.com
Keywords: Planning Engineer
-
August 15th, 2011, 09:01 PM
Post Count Number #2
Please find the attachment of my updated resume for the suitable post.If there is any possible, please do the need.
CURRICULUM VITA
Arvind Kumar Patel Vill-
E-Mail Address : - arvind_99p AT rediffmail.com, arvind.99p AT gmail.com
Mobile : - 09330591731, 09934210311
Qualification : B.E (Civil) from Magadh University at BodhGaya Bihar Passed in November 1997
With First Class
Objective : To achieve in modern construction techniques in professional environment.
Project Taken in Civil Engg :
: A study on pre-cast Vis Cast in situ R.C.C Element in Building Construction and on
Introduction Ferro cement.
Elective in Civil Engg : Ground Water & Hydrology
Computer Knowledge : MS Office -2000 (Word, Excel and PowerPoint etc)
Very good in typing (English)
Profiles : Buildings, Roads, Drainages, & Ready Mix Concrete Plants. Experience : 13 years, 4months
(5) Company Name : ACC Concrete Ltd
- Project : RMC Plant
- Designation : Assistant Manager- Project
- Duration : Aug 2008 to Till Date
(4) Company Name : Shapoorji Pallonji &Co Ltd
- Project : Torrent Pawer Plant (Surat)
- Designation : Deputy Manager (Construction)
- Duration : Feb 2008 to Aug2008
(3) Company Name : Akshay Enterprises (Navi Mumbai)
- Client : Man Construction co ltd
- Project : M.I C.T Town Ship Mundra( Gujarat )
- Designation : Site Engineer
- Duration : Jan 2005 to Sept 2005
- Client : Disciple ship centre Delhi
- Project : T. Sunami 180 Houses Kuttapully ( Tamil Nadu)
- Designation : Sit- In-charge Duration : Oct 2005 to Sep 2006
- Client : Ultra Tech Concrete Limited ( Mumbai)
- Project : : Ready Mix Concrete Sanand Plant No-1 &
- NarodaPlant No-2Ahmedabad (Gujrat)
- Project : Ready Mix Concrete Changodar Ahmadabad Gujarat
- Designation : Project In Charge
Duration : Sept 2006 to Feb 2008
(2) Company Name : Manisha Construction Company (Pune)
- Client : Maharashtra State Road Development
Corporation Ltd. (M.S.R.D.C)
- Consultant : Consulting Enggs. Service (I) Pvt. Ltd.
- Project : Improvement /Construction of Baner Road, Pune
Improvement / Construction of Mundhwa Kharadi
Road, Pune
-
- Designation : Site-In -charge
- Duration : 3 Years (Feb- 2002,- Jan-2005)
(1)Company Name : Muscovite Group, Mumbai
- Project Name :(I). Highland Residency (Thane)
(II) Marothan Max, Mulund (W)
Siddachal Phase – V
- Designation : Site Engineer
- Duration : 04Years (Feb-1998, –Jan- 2002)
- Responsibilities :
- Overall in charge of site like work execution, planning, Preparing timing plan schedule for day by day progress, preparing drawings, bills verification, certification,etc.,
- Estimating, Leveling, Drawings.
- Purchasing the construction materials, equipments etc;
- Arriving Data. Preparation of Tender Documents
- Receiving quotation from 3 to 5 companies for purchasing the materials.
- Preparing the Comparison statement for received quotation, selecting the least quotated company for negotiation and finalization.
- Materials follow up and making good relationship between the supplier and management by maintain good rapport to the vendor.
- Checking the standardization of Vendor Company for regular process of supplying the materials etc.
- Preparing the labor wages for weekly payment etc.,
- Preparing Labour payment, Material Payment, vendor payment,
- Preparing Running Account Bill at regular intervals of time to receive the customer or client.
- Current CTC : 5.82 Lac
- Joing Time Required : 30 Days
Declaration:
I hereby declare that above mentioned information are correct to the best of knowledge.
Place: Mumbai
Date:-15.08.2011
Signature
Arvind Ku Patel
-
August 17th, 2011, 03:09 PM
Post Count Number #3
BIRENDRA KUMAR
E-mail ID : brndr_1973 AT yahoo.co.in , birendrak.kumar AT gmail.com
Assignments in Project Planning & Management/ Site & Construction Management/Resource Planning with a high growth oriented organisation.
Professional Summary
- 11 year of experience in Project Planning, Site & Construction Management.
- Presently associated with condor group in dubai.
- Previously associated with DLF LAING ‘O’ Rourkee as Sr. Engineer.
- Strong organisational experience with expertise in multidimensional execution of projects for multiple clients along with optimising resource utilization.
- Adept in planning, executing and spearheading construction projects with a flair for adopting modern construction methodologies.
- Deft in swiftly ramping up projects with competent cross-functional skills and ensuring on time deliverables.
- Well conversant with latest construction Technologies and heavy construction equipments.
- A keen communicator with honed problem solving and analytical abilities.
Core Competencies
Project site Planning & Management
- Anchoring on-site construction activities to ensure completion of project within the time & cost parameters and effective resource utilization to maximize the output.
- Participating in project review meetings for tracking project progress & de-bottlenecking & implementation of QA/QC procedures as per norms and standards.
- Liaising with external agencies, clients & consultants for determining technical specifications, approvals for execution & obtaining on-time clearances.
- Handling relocation of utilities, removal of obstructions, resettlement and rehabilitation activities, issue site instructions, preparation of variation orders.
- Monitoring physical & financial progress, making interim payment certificate, price-adjustment bill, etc.
- Interaction with design deptt for priorities, corrections, construction friendly alterations, incorporation of site constraints, as-built finalisations, etc
Site & Construction Management/Resource Planning
- Supervising all construction activities including providing technical inputs for methodologies of construction & coordination with Site Management.
- Handling team of engineers for various types of job and resolving bottlenecks.
- Setting out of works, preparation of claims and bills, liaising with client etc as well as controlling process of execution of all works during construction to ensure the quality of construction, etc.
- Liaising with local authorities for clearances and approvals.
Career Highlights
Sincejan-09 CONDOR GROUP as Project engineer
MARINA STAR TOWER 4B+pool+G+24+HC+ROOF PLOT NO 5K (392-495_5K)
CLIENT UKCIG (uk capital investment group)
CONSULTANT DIMENSION ENGINEERING CONSULTANT
PROJECT COST 170 million (AED)
LOCATION DUBAI MARINA
The project handling
Project :Main Package 184 3B+G+6 Typical Floors building on Plot 373- 430 at Al Barsha- 1
Consultant Lacasa Architechs & Engineering Consultant
Client Deyaar Developers
Pmc Skelmore Trident
Project cost 75million
Project : yahsat satelite ground station at abudhabi
Client ALDAR
PMC Clarkebond Engineering consultant
Consultant Alturath engineer consultant
Project cost 268 million
june 07-dec 08 DLF LAING ‘O’ Rourkee as Sr. Engineer
The project handled
Title : Magnolias at DLF Phase-5 Sec-54 Gurgaon
Client : DLF
Mar’06- May’07 Ahluwalia Contracts (India) Ltd., as Sr. Engineer
The project handled
Title : The MGF vilas, DLF, Phase –II, Akashneem Marg, Sec-25 Gurgaon (Haryana) Housing project.
Client : MGF –EMAAR
Dec’03- Feb’06 profile constuction as Project Incharge
The project handled
Title : Educational institute building of IAMR Duhai (Meerut RoadGaziabad, having total area of
25000 sq.ft. each floor.
Title : P.W.D Rohoru Dist. Shimla B. pharmacy College Constructions Work Quarters, G.H.B.H. Auditorium
Aug’00- Sept’03 Fecon Construction Ranchi (Jharkhand) as Asst. Engineer
The project handled
Title : Residential Building at deepa toil cantt. Ranchi involving 52 duplex and G+2 Commercial Complex
Academic Highlights
B.E. (Civil) from Mangalore University.
-
June 10th, 2013, 06:04 PM
Post Count Number #4
CURRICULUM VITAE
Ritu Rani
Email ID : ritudeshwal12 AT gmail.com
OBJECTIVE :
To obtain a position in the corporate world where my skills, abilities and talent could be used in right direction and up to full potential, leading to my professional growth, thereby the growth of organization.
AREAS OF SPECIALIZATION :
Generation of Electric Power, Control System, Transmission and distribution, Power System and Circuit Analysis.
ACADEMIC DISTINCTIONS :
EXAMINATIONS UNIVERSITY YEAR PERCENTAGE
M.Tech IV Sem Rajasthan Technical University 2013 Pursuing
M.Tech III Sem Rajasthan Technical University 2012 67.40%
M.Tech II Sem Rajasthan Technical University 2012 61.00%
M.Tech I Sem Rajasthan Technical University 2011 50.33%
B.Tech VIII Sem Rajasthan Technical University 2010 74.90%
B.Tech VII Sem Rajasthan Technical University 2010 65.60%
B.Tech VI Sem Rajasthan Technical University 2009 61.60%
B.Tech V Sem Rajasthan Technical University 2008 69.50%
B.Tech IV Sem Rajasthan Technical University 2008 64.00%
B.Tech III Sem Rajasthan Technical University 2007 63.60%
B.E. I year Rajasthan Technical University 2007 61.00%
XII CBSE 2006 62.60%
X CBSE 2004 74.60%
EXPERIENCE :-
2 years and 5 months teaching Experience (Power System, Circuit Analysis, Control System and Electrical measuring Instruments ) at Jodhpur National University.
TRAINING DETAILS AND PROJECT :
TRAINING :-
Organization : “ABB drives and Schneider Electric PLC and SCADA at “TYCON AUTOMATION” at Noida .
PROJECT :-
Work on Minor project of “Intelligent Train Engine based on digital circuits”.
Work on Major project of “GPS based vehicle tracking system”.
SEMINAR :-
“Non-linear control method for SSSC to improve Power System Stability ”.
ADDITIONAL SKILLS :
Computing Operating system –Windows 9x/2000/XP.
Programming Turbo C.
AUTOCAD
MAT Technique, MS. Office
LanguageEnglish, Hindi.
ACHIEVEMENTS :
Member of organizing committee of Annual Function-“RESONANCE” in our college.
Participated in group dance, drama at both college and school level.
Participated in Volley Ball competition at both college and school level.
OTHER ACTIVITY :
Participation in summer camp of Personality Development Programmed.
Attended the National Level Conference on Emerging Trends in ITImpact on Industry and Education.
SKILL SET AND STRENGTH :
Thorough keenness and urge to learn the upcoming technologies to continuously refine myself.
Key skills include quick understanding and swift grasping power.
Always filled with confidence but at the same time determined and dedicated towards my goals.
PERSONAL DETAIL :
Father’s Name : MEER SINGH DESHWAL
Mother’s Name : KAMLESH DESHWAL
Date of Birth : 12-07-1988
Gender :
Marital Status : Single
Nationality : Indian
I hereby declare that the information furnished above is true to the best of my knowledge.
RITU RANI
Date : Monday, June 10, 2013
Place-Jodhpur