www.apotexpharmachem.com Apotex Pharmachem India Pvt Ltd Bangalore : Electrical Technical Project Maintenance

+ Ask Question / Post resume
Results 1 to 5 of 5
  1. Post Count Number #1
    Super Moderator
    Join Date
    April 18th, 2008
    Location
    Tuticorin
    Posts
    7,026

    www.apotexpharmachem.com Apotex Pharmachem India Pvt Ltd Bangalore : Electrical Technical Project Maintenance

    Apotex Pharmachem India Pvt. Ltd., Bangalore : Technical Assistants Electrical
    Website: http://www.apotexpharmachem.com

    Designation: Technical Assistants Electrical
    Experience: 2 - 7 Years
    Location: Bengaluru/Bangalore
    Education:
    UG - Diploma - Mechanical
    PG - Any PG Course - Any Specialization,Post Graduation Not Required
    Industry Type: Pharma/ Biotech/Clinical Research
    Functional Area: Healthcare, Medical, R&D

    Job Description:
    Preventive maintenance and Break down maintenance Sevices, ETP Sevices.

    Desired Candidate Profile:
    ITI Electrical with 6 years of experience or with Diploma in Electrical with 2 to 3 yrs of experience. Pharma (API) Experience

    Company Profile:
    Apotex Pharmachem India Pvt. Ltd. is a wholly owned subsidiary of Apotex Pharmachem Inc. Canada which is a number one generic pharma co. in Canada. The position is for Bangalore location which has an R&D Centre, Manufacturing.

    Address:
    Site No.1 Bommasandra Indl Area, 4th Phase Jigani
    Link Road
    ,, 560001

    Keywords: Project and Maintenance
    Last edited by muthukalee; October 22nd, 2011 at 04:02 PM.

  2. Post Count Number #2
    Guest Poster
    Join Date
    August 14th, 2008
    Location
    Your Heart, Delhi
    Posts
    76,213

    Re: Apotex Pharmachem India Ltd.Bangalore : Electrical Technical Project Maintenance

    i am looking for Head- maintenance position ,my recent Cv attached for your kind consideration.

    J.N.DESAI

  3. Post Count Number #3
    IJT addict Guest-IJT's Avatar
    Join Date
    October 15th, 2010
    Location
    Looking for Job
    Posts
    20,894

    Total experience for 19 years out of which 08 1/2 years in GULF and Nigeria.

    Over 19 years experience in QA/QC, welding, painting/coating and NDT fields in oil and gas industry, petrochemical plants, cross country pipelines, sub sea pipeline, onshore and offshore platforms.
    Have performed various kinds of inspections i.e. Welding, Painting/Coating, visual / dimension check, NDE, hydro test / leak test, N2/Hilum leak test, coating, site erection supervision and expediting of the equipment like pressure vessels, towers, boilers, heat exchangers, steel structures, piping, fired heaters, off-shore jackets / Modules, sub sea pipeline hook up and commissioning.

    PTAS SDN BHD. Brunei
    Sr. Inspector – December 2008 to Continue

    F Assigned for various offshore assignments for Brunei Shell Petroleum, performing Sr. QA/QC Inspection, Welding and Painting/Coating inspection services for offshore projects.

    Projects Involved

    Client: SKSWood SDN BHD, Brunei.
    Project: Contract No. C020359/SCO
    End User: Shell Petroleum Brunei
    Ø Working as Sr. Inspector Welding & Coating Inspector for pipeline laying, testing and commissioning and offshore installation, hook up, modification and Punchlist activity.

    SGS Gulf Ltd. UAE
    QA/QC Inspector (Welding/Painting/Coating) – July 2003 to October 2008

    F Assigned for various TPI assignments for local and international clients, performing QA/QC, Welding and Painting/Coating inspection services for onshore and offshore projects.

    Projects Involved

    Client: J Ray McDermott. Middle East Inc.
    Project: 1. Qatar Gas 3 & 4 Sub-sea Pipeline laying, testing and commissioning - Qatar Gas – Qatar Gas 3 & 4
    2. 16 Jacket & Platform installation and Maintain Potential Facility - Saudi Aramco
    3. Dolphin Energy Platform Project - Dolphin Energy, Doha
    4. 9 Wellhead Platform Project - Oil & Natural Gas Commission (ONGC), India
    5. MSP Jacket and Platform Installation - Oil & Natural Gas Commission (ONGC), India.
    Ø Working as QA/QC Welding / Painting / Coating Inspector for fabrication, offshore installation, Hook up and punch list activity of jackets , platforms, Bridge, tripod and fabrication, laying, pigging and hydro testing, wet lay-up, N2/Hilum leak test & commissioning of sub sea pipeline for J Ray McDermott project at Qatar, Saudi Aramco, India offshore field.

    Client: NPCC, Abu Dhabi
    Project: 1. Extension and Modification of platform at Zakum field - ADMA-OPCO Zakum Field, UAE
    2. Al-Khalij Northern Area Development Project – Qatar Petroleum, Qatar.
    Ø Working as QC / Welding & Painting Inspector for NPCC Offshore projects for ADMA-OPCO Zakum Field Project (Aug. to Dec. 2003) and Al-Khalij Northern Area Development Project for Qatar Petroleum (Feb 29 to May 2004).

    Various other short term assignments:

    Ø Third Party Inspection for Nakheel with M/s. Cansult Ltd for Extension of Berth 21 and installation of crane rails at Jebel Ali, Dubai.
    Ø Welding Engineer for J. Ray McDermott at welding department for their different project like Dolphin Energy, Qatar Petroleum, Rasgas.
    Ø Inspections at Maritime Industrial Services for inspections of CS Epoxy Coated and Lined Pipe work.
    Ø Gulf Eternit Industries for inspections of GRE Pipes and Fittings for OMAN LNG Project and Kuwait from June 6, 2003 to July 31, 2004.
    Ø Third Party Inspection for JGC, BAB Project at Head Line Engineering at Musaffah, Abu Dhabi.
    Ø Client Inspection for Interbeton & Co. L.L.C of Qalhat LNG Project Oman at IMAC yard, Musaffah, Abu Dhabi.
    Ø Client Inspection for MOTOR OIL (HELLAS) of Refinery Expansion 2005 Specs., Corinth Refineres S.A. Greece Project at FBM Hudson Italiana, Jebel Ali Free Zone, Dubai.
    Ø Third Party Inspection (Ceramic Coating) for ABS at Al Bawardy and Grand weld, Jadaf, Dubai.

    Responsibility Involved

    o Monitoring and verification of vendor product and production system.
    o Inspection of vendor supply material at vendor location.
    o Monitoring, witness and Inspection of all construction activity at vendor place.
    o Witness Mechanical testing and other testing at third party laboratory according to client requirement.
    o Witness, Verification of Welding Procedure Specification (WPS) and Qualifying the procedure as per the required Code, Standard and Specification.
    o Approval and Witness welder qualification test in association with the client.
    o Preparation and approval of QA / QC procedures and method statements.
    o Inspection of offshore platforms (Modular type fabrication), Vessel and piping fabrication.
    o Witness hydrostatic testing of pipeline and pigging & hydro testing of sub sea pipeline.
    o Daily welding & painting/Coating inspection activity monitoring as below.

    Larson & Toubro Limited.
    QC & I Engineer – 12.12.02 to 30.06.03

    Projects Involved

    Ø ONGC/EIL, MNW project for fabrication of Offshore Modular platform.
    Ø ONGC/EIL, MNW project for fabrication of Offshore Modular platform Piping.
    Ø ONGC/EIL, MNW project for fabrication of Offshore Modular platform Pressure vessels
    Ø Fabrication of pipes as per API standards

    Responsibility Involved

    o Preparation of Welding Procedure Specification (WPS) and ensuring that only qualified procedures are employed on the work.
    o Witness welder qualification test in association with the client.
    o Planning developing and qualifying new welding procedures for the forth coming job.
    o Preparation of QA/QC procedure and method statements.
    o Inspection of offshore plate form (Modular type fabrication), Vessel and piping fabrication.
    o Monitor sub-contractors work activities for compliance with quality requirement as per QC procedures.
    o Daily welding & painting/Coating inspection activity monitoring as below.

    Mody Technical Consultancy

    Inspector – 10.10.02 to 25.11.02

    Projects Involved

    Ø HL Engineering, Surat company applied for ASME “U” stamp certification.

    Responsibility Involved

    o Preparation of QA Manual and QA Procedure as per the requirements.
    o Planning with Authorized Inspector for Final audit and documentation.
    o Preparation of Welding Procedure Specification (WPS) and ensuring that only qualified procedures are employed on the work.
    o To train the existing Engineer and Supervisor for the requirements and quality related issue.
    o Daily welding & painting/Coating inspection activity monitoring as below.

    o Work for Reliance Industries at Surat for shutdown at Highdrocraker plant as client Inspector.


    Al Turki Enterprises LLC.
    QC Inspector (Welding/Painting) – 15.06.01 to 10.08.02

    Projects Involved

    Ø Fabrication, Modification and installation of Main Pumping Station of PDO, Oman.
    Ø Installation of Flow line at different area of PDO, Oman.

    Responsibility Involved

    o Preparation of Welding Procedure Specification (WPS) and ensuring that only qualified procedures are employed on the work.
    o Witness welder qualification test in association with the client.
    o Witness hydrostatic testing of pipeline.
    o Inspection of welding and fabrication of main station pipeline, flow line and on plot pipeline.
    o Daily welding & painting/Coating inspection activity monitoring as below.

    Julius Burger (Nigeria) Plc.
    Welding Inspector – 25.05.00 to 30.11.00

    Projects Involved

    Ø NLNG PLC at Nigeria for expansion project of LNG plant

    Responsibility Involved

    o Preparation of Welding Procedure Specification and ensuring the qualified procedures are employed on work.
    o Witness welder qualification test.
    o Inspection of fabrication and welding of LNG, LPG & utility tanks, pipeline and LPG jetty.
    o Planning and organisation with inspection and fabrication team.
    o Daily welding inspection activity monitoring as below.

    Gujarat Gas Company Limited (British Gas Plc. UK)
    Senior Executive – 07.01.91 to 24.05.00

    Projects Involved

    Ø Fabrication and installation of Main Gas Receiving Station, Pressure Reduction Station, Industrial Pressure Reduction Station, Pressure Reduction Chamber
    Ø Cross Country Pipeline of 36” dia. To 8” dia. Size
    Ø Pipeline in city area for 24” dia. To 2” dia.
    Ø Plant piping for different industries – 200 nos.

    Responsibility Involved

    o Preparation of Welding Procedure Specification (WPS) and ensuring that only qualified procedures are employed on the work.
    o Witness welder qualification test in association with the client.
    o Monitor sub-contractors work activities for compliance with quality requirement as per QC procedures.
    o Inspection of fabrication and welding of cross country pipeline project, gas receiving station and Pressure reduction station and plant pipeline.
    o Design, Planning, Erection and Commissioning of cross- country, plant pipeline and pressure reduction station.
    o Verification and certification of all activity with third party like DNV
    o Hydro testing and pneumatic testing of pipeline.
    o Preparation and interpretation of isometric drawing of pipeline.
    o Computer - MS office.
    o Internal quality auditor for ISO 9002.
    o Commissioning and maintenance of Gas based Industry and equipment.
    o Shutdown planning, organization & execution of charged pipeline.
    o Planning and organisation of inspection and fabrication team of 50 members.
    o Safety norms:
    o Familiar with work permit system
    o Member of Hazard Management Team (Site co-ordination)
    o Daily welding inspection activity monitoring as below.

    Midest pipeline product

    Site Engineer – 01.10.90 to 31.01.91

    Projects Involved

    Ø ONGC/EIL 18” dia. River crossing pipeline at Mahi river, Baroda.

    Responsibility Involved

    o Witness welder qualification test in association with client.
    o Comply daily welding report, verifying weld production reports and ensure compliance to NDT requirements.
    o Review NDT reports. (Review Radiography and Ultrasonic examination)
    o Inspection for welding, Coating and Garneting.
    o Inspection and planning for 18” dia. River crossing pipeline laying.
    o Witness for Hydro Testing.

    Vijay Fire Protection System Ltd.
    Site Engineer – 01.01.90 to 30.09.90

    Projects Involved

    Ø Installation of Fire Hydrant system for new plant at IPCL, Baroda

    Responsibility Involved


    o Witness welder qualification test in association with client.
    o Comply daily welding report, verifying weld production reports and ensure compliance to NDT requirements.
    o Review NDT reports. (Review Radiography )
    o Inspection for pipeline laying and commissioning for Fire Hydrant System.
    o TAC approval

    Shah Enterprise
    Supervisor – 01.07.89 to 31.12.89

    Projects Involved

    Ø Fabrication, Installation of tank and piping
    Ø Erection and alignment of all equipments for new plant at CPIL Baroda

    Responsibility Involved


    o Plan and conduct welder qualification test.
    o Equipment direction and alignment.
    o Planning and supervision for underground and plant pipeline.
    o Fabrication and erection of tanks.

    Oil and Natural Gas Commission:
    Driller – 01.07.88 to 30.06.89

    Projects Involved

    Ø Drilling for Geophysical Party

    Responsibility Involved


    o Operation and maintenance of Short Hole Rigs.

    Daily Welding & Painting inspection activity Involved


    o Conduct Welder qualification test.
    o Planning developing and qualifying new welding procedures for the forth coming job.
    o Training and qualifying welders in various processes.
    o Maintaining records of all welders and ensure their qualifications continuity.
    o Continuously monitoring the performance of welders.
    o Monitoring welding consumables, materials and welding parameters are used for the work, are in compliance with specified requirements.
    o Monitor the storage and handling of welding consumables.
    o Ensuring the welding parameters are as per approved procedures and welding machines are calibrated.
    o Training and qualifying welders in various processes.
    o Maintaining records of all welders and ensure their qualifications continuity.
    o Continuously monitoring the performance of welders.
    o Monitoring and verification of daily welding reports verify weld production report and ensure compliance to NDT requirements.
    o Review of RT films, NDT reports.
    o Ensures that painting material, which are used for work are in compliance with specified requirements.
    o Visual inspection of surface preparation and painting work.
    o Monitor the storage and handling of painting materials.
    o Ensures adherence to quality specification in respect to blasting, painting and coating operations.
    o Ensures that proper records of work carried out are maintained.
    o Compile and maintain pertinent records of inspection and testing till for retention period contractually agreed.
    o Conduct audit / verify the corrective and preventive action whenever it requested.
    o Liaise with the area engineers in case of non-conformance and monitor that corrective actions are taken.
    o Notified the non-conformance identify during inspection and recommending corrective measures to site supervisor.
    o Monitor sub-contractors work activities for compliance with quality requirement as per QC procedures.

  4. Post Count Number #4
    Guest Poster
    Join Date
    August 14th, 2008
    Location
    Your Heart, Delhi
    Posts
    76,213

    resume with 1 yr exp

    RAGHAVENDRAN D.B
    raghavendrandb AT gmail.com
    B.E. Instrumentation and Control Engineering
    CAREER OBJECTIVE
    To pursue a challenging career where my connoisseur creativity, sheer dedication and smart work reaches its pinnacle of success.
    WORKING EXPERIENCE
    ONE YEAR experience (01/07/2010 to 30/06/2011) as Graduate Engineering Apprenticeship Trainee in the discipline of Instrumentation at MADRAS FERTILIZERS LIMITED (A Government of India Undertaking), Post Box No.2,Manali, Chennai – 600 068 and the following has been gained :
    Knowledge on International Standards, Installation, Troubleshooting, Calibration, Loop Checking and Maintenance of Field Instruments
    - Pressure Transmitter : Rosemount, Honeywell, Foxboro(SMART)
    - Pressure Switch : Switzer, Barks Dale.
    - Trip Amplifiers & Barriers : P & F (Pepper + Fuchs), MTL 2
    - Flow Transmitter : Rosemount, Honeywell (DP Type)
    - Special Type Flow Meter : Magnetic Flow Meter(Krohne, Admac)
    Turbine Flow Meter (BOPP & Renther)
    - Level Transmitter : Rosemount, Taylor(DP Type)
    - Analysis Instruments : Polymetron, Endress Hauser, Yokogawa(pH, Conductivity)
    - Recording Instruments : Yokogawa
    - Programmable Indicators : MCIH, ACCSYS
    - Solenoidal Valve : Rotex, Mercury, Bells.
    Final Control Elements
    - On-Off Valve : Saundors, Valtek, Valflo
    - Control Valves : Fisher, MIL, IL
    Accessories
    - I/P Converters : Fisher, Moore, Forbes Marshall, Bells, Shreyas.
    - Volume Booster : Fairchild
    - Positioners : Fisher, Moore, MIL.

    PLC & DCS
    - PLC (Siemens, FSC)
    - DCS of Honeywell(TDC 3000)
    - Gain Tuning
    - Transmitter(SMART) zero correction from DCS
    - Group Formation
    - Group Formation in History Module
    - Downloading and Uploading from Transmitter
    - Picture Editing
    EDUCATIONAL QUALIFICATIONS
    COURSE NAME OF THE INSTITUTION BOARD/UNIVRSITY YEAR OF COMPLETION PERCENTAGE
    Bachelor of Instrumentation and Control Engineering Saranathan College of Engineering, Panjapur, Tiruchy –620 012. Anna University, Chennai
    2010


    70.35
    Higher Secondary Course ( HSC) Campion Anglo -Indian Higher Secondary School, Tiruchy – 620 001 Tamil Nadu State Board 2006 70.08
    High School Education(ASLC) Campion Anglo -Indian Higher Secondary School, Tiruchy – 620 001 Anglo –Indian 2004 71.60
    PROJECTS UNDERTAKEN
    S.NO. PROJECT TYPE TITLE AIM
    1. Mini Moisture Control To control the moisture content in the agricultural fields
    2. Final Year Eye Blink Sensor and Alcohol Sensor Based Vehicle Safety System To prevent fatal accidents which occur due to drunken drive and where drivers go asleep while driving.

    CERTIFICATE RECEIVED
    - Received an “A certificate” at 5(TN) Naval Unit NCC, Cuddalore.
    IN-PLANT TRAINING
    - Underwent an In Plant Training for one week at “ BHARAT SANCHAR NIGAM LIMITED ” ( A Government of India Enterprise ) , Trichy Telecom District and had established Broad Band Internet connection for 10 houses.
    CO-CURRICULAR ACTIVITIES
    - Attended an All India Seminar on “CURRENT TRENDS IN INDUSTRIAL AUTOMATION” at National Institute of Technology (NIT), Tiruchy which was conducted by the Institution of Engineers (India), Tiruchirappalli Local Centre.
    - Attended a one day workshop on “REAL TIME EMBEDDED SYSTEMS” at R.M.K. Engineering College, Chennai.
    AREAS OF INTEREST
    - Transducers and Sensors
    - Solid and Fluid Mechanics
    - Industrial Instrumentation
    - Power Plant Instrumentation
    LANGUAGES KNOWN
    - TAMIL and ENGLISH – to read, to write and to speak
    - MARATHI – to speak

  5. Post Count Number #5
    Guest Poster
    Join Date
    August 14th, 2008
    Location
    Your Heart, Delhi
    Posts
    76,213

    Job required

    Please give me one job