sainik spring works Delhi : Quality Maintenance Manager

+ Ask Question / Post resume
Results 1 to 2 of 2
  1. Post Count Number #1
    Super Moderator
    Join Date
    April 18th, 2008
    Location
    Tuticorin
    Posts
    7,026

    sainik spring works Delhi : Quality Maintenance Manager

    sainik spring works Delhi : Quality manager

    Keywords: Quality & maintainence Manager

    Designation: Quality manager
    Experience: 1 - 3 Years
    Location: Delhi
    Education:
    UG - B.Tech/B.E. - Mechanical
    PG - Post Graduation Not Required
    Industry Type: Auto/Auto Ancillary
    Functional Area: Production, Maintenance, Quality
    Posted Date: 04 Jul 2009
    Job Description
    :
    Handling of quality management system, maintainence, operations.

    Desired Candidate Profile:

    The candidate must be dedicated, focused and adaptive. good know of QUALITY MANAGEMENT SYSTEMS ISO AS WELL AS TS . should be used to working in a very disciplained work culture especially privalent in automobile industry.

    Company Profile:
    We are into manufacturing different trypes of springs used in electronic, automobile industry, etc.
    Ours is a Small scale organisation with very good growth prospects in the near future. We have a very rich value system with strong business ethics.

    Executive Name: sushant bhatia

    Address:
    sainik spring works
    10/63 a kirti nagar indl. area
    NEW DELHI,Delhi,India 110015

    Email Address: sainikspringworks1@hotmail.com

    Telephone: 91-11-9811020698

    Keywords: Quality & maintainence Manager

  2. Post Count Number #2
    IJT addict Guest-IJT's Avatar
    Join Date
    October 15th, 2010
    Location
    Looking for Job
    Posts
    20,894

    Sir,

    It is with great interest that I am forwarding my CV/Resume for your consideration.

    would like to state the following about myself before u go through My CV. I am
    - Mechanical Engineering Graduate
    - Around 30 Years of Experince covering
    a) Intial period in Heavy Fabrication shop as Fabrication/Welding Engineer.(Approx 5 Years)
    b) Inspection Engineer Fabricated Process equipments (3 Years)
    c) Project Management and Construction of Refinery/Petrochemicals, Pipeline almost 20 Years)
    d) Last Job with PDO-Oman as Senior Project/Pipeline Engineer
    e) Currently occupied as Freelance consultant in INdia.
    The attached CV will give rest of the details.
    Thank you for your time and consideration, and do not hesitate to contact me if you have any questions.

    I look forward to speaking with you soon.
    Rgds,
    Prabhakar
    +919449834721

    CV

    NAME : B. C. PRABHAKAR

    Permanent Address 1249, SUBHAGA
    2nd Cross, 20th Main,
    J.P.Nagar 2nd Phase,
    Bangalore-560078.

    .

    E-mail address prabhubc AT gmail.com

    Contact Phone No (India) Landline: +918026494721 (Residence)
    Cell: +919449834721


    EDUCATION : Bachelor of Engineering (Mechanical), Mysore University;
    Year of Graduation 1973.

    TRAINING PDO mandatory HSE training courses
    - HSE Management
    - Project Management and Planning
    - Piping Design in Indian Institute of Technology (IIT), Mumbai
    - CHDS, CSR course (93%)
    - Construction supervisory course
    - Welding and Radiography courses
    - QA, ISO 9001 certification
    - Various in-house computer courses (PDO –Oman)
    - Various HSE courses.

    MEMBERSHIP OF
    PROFESSIONAL : Kuwait Society of Engineers
    BODIES American Welding Society
    American Petroleum Institute

    EXPERIENCE : Has over 30 years experience in oil & gas pipelines and facilities
    SUMMARY in India and overseas covering all areas of in Project Management
    & Construction Mgmt apart from Engineering, Design, Procurement & Construction.

    Particular experience with high pressure duplex stainless steel (Exotic material) flow/pipelines, PE lining, GRE etc. Experience also includes HSE and Quality Management aspects for large oil & Gas projects..

    Jan 2009 onwards : Valdel, Bangalore
    2005-2008 : Freelance Consultant at Bangalore
    1995-2004 : PDO, Oman
    1993-‘94 : AlHassan, Oman
    1991-‘93 : Spectra Technical Consultants, Bangalore
    1982-’90: Kuwait Oil Company, Kuwait National Petroleum Co, PIC, CONCO
    1981-‘82 : Humphreys & Glasgow Consultants, Bombay
    1978-‘80 : Dalal Consultants, Bombay
    1973-‘78 : Manufacturing Companies




    EXPERIENCE :
    DETAILS

    Jan ‘2009 : VALDEL ENGINEERS & CONSTRUCTORS PVT LTD.
    BANGALORE

    HOD, PROJECT MANAGEMENT CONSULTANT – PIPELINES (ENGINEERING AND CONSTRUCTION)

    In charge of the Pipelines department, involved in all aspects right from Prebid enquiry stage to proposal for the new tenders, engineering work of PMC contracts to construction and handover of the project. Also, involved in all aspects related to pipeline management.


    Project: DAROD – JAFARABAD GAS PIPELINE PROJECT
    (24” X 205 Kms)

    Spur lines net work (P001 to P005)

    Client: Gujarat State Petronet Ltd

    Project: 24” X 205 kms, API5LX65, 600# Rating with 8 Sectionalised Valves’s. (PMC Contract)
    Project Details:
    - The sweet processed gas received from various suppliers such as Carirn Gas, Shell Hazira, Petronet etc is intended to be transported by 24 inch dia buried cross country pipeline between Daod & Jafrabad (Gujrat) with river, Road and Canal crossings with one intermediate pig station.
    - GSPL planning to develop a state grid for the supply of natural gas to various potential customers in Gujrat sate. GSPL has already completed 1348 Kms of spur lines(pipelines) and planning to complete 690 kms of spur lines under EPC contract.

    Single point responsibility for the project from Engineering, to construction / commissioning and handover.

    Responsible for the Basic Engineering (Includes the activities such as route survey report, preparation of pipeline design criteria, alignment & crossing drawings, preliminary wall thickness calculation, specification for line pipe, preparation of pipeline job standards, quality assurance plan for vendor, preliminary MTO preparation)

    Procurement of Long lead items, Tender and SOW for the EPC contract, Technical evaluation of EPC contracts, Review of Detail Engineering (By the EPC contractor), Procurement, Bid evaluation(Technical), vendor selection, Site Construction Management, Pre-commissioning, Commissioning, Start up and Handover with all necessary documentation and test packs and Project close out report highlighting learning points.

    Responsible for HSE and quality management.

    Responsible for the HSE programme (preparation of HSE requirements and guide lines) and implementation by the costruction contractor. Particiapation in HSE audits and inspection.
    Review and approve all important design documents and drawings of suppliers/contractors, adherence to contractual engineering specifications and QA/QC plans.
    Review of construction and quality assurance plans of major contractors and other contractors and confirm their compliance to approved codes/standards/specifications etc under the contract.
    Maintain the quality records to demonstrate achievement of the required quality and the effective operation of the quality management system.


    Jan ‘2005 to : SELF EMPLOYED, FREELANCE CONSULTANT
    Dec ‘2007
    Process equipment viz viz: Pressure Vessels, Heat Exchangers etc, Production planning, Quality cortication, Welding and Inspection procedures also involved in the Factory management.
    Involved in Site Construction management, Progress/Monitoring of chemical plants.

    Involved in stage wise inspection/expediting of process equipment.


    June ‘1995 to : PETROLEUM DEVELOPMENT OMAN
    Dec ‘2004 (SHELL OPERATED CO), SULTANATE OF OMAN.

    Joined as Senior Pipeline (Project) Engineer for various onshore inter field pipeline projects, and later (after 1.5 years) taken up the position as CSR (Company site representative) for various pipeline / flowline and other construction facilities.
    Good experience in construction/execution of pipelines and facilities.

    During project Engineering work, involved in Conceptual studies, FEED, design reviews (Route selection, Design calculations-Pipe wall thickness, Buoyancy, Road and Wadi crossings, Expansion, Stability, External and Internal corrosion, On plot piping work, Block Valve stations etc) HAZOP participation, Material selection, Vendor qualification, technical evaluation of bids for bulk items etc.

    Develop Project Implementation strategy. Manage all technical aspects of construction contractor/consultant designs for assigned projects, ensuring compliance in application of appropriate engineering standards codes of practice and specifications in conjunction with the discipline team.

    Preparation of Construction SOW for different type of the design and construction packages to describe contractual terms and condition for the contractor and the activities to be performed by the construction contractors.

    Challenge the specification and add valid input to the existing specification.

    Effective Coordination with design consultants, contractors and inter discipline team.

    Well conversant with Shell DEP and PDO ERD standards.

    As CSR (Company Site Representative):

    - Directly Manage the Contractors executing Pipeline/Facilities projects in the field. Ensure that the work is executed in line with Project Specifications (Technical and Quality) and in full compliance with HSE requirements.

    - Assist in the development of HSE plans covering all phases of assigned projects,

    - Manage HSE plan as per PDO specifications

    - Manage Construction work progress as per the master plan

    - Participate in the preparation of Commissioning procedures by contractors/consultants/vendors.

    - Review Pre/Commissioning plans, procedures, involve in the commissioning work and handover.

    - Completions of the project with Construction close out reports.

    - Maintain the project cost, resolve issues related to the extra claims by the contractor.

    - Upon completion of the project, prepare project close out report, lessons learned and recommendations for the management review

    - Well versed in Pipeline operations / maintenance and integrity aspects.


    July ‘1993 to : AL HASSAN ENGINEERING CO (MAJOR EPC
    Aug ‘1994 CONTRACTOR IN SULTANATE OF OMAN)

    Project Manager for the EPC contract for the construction of ‘SaihRawl Water Disposal Project”.

    Separation of Oil and water from Sair Rawl (North Oman) oil fields.This was the first EPC contract by the client awarded to Alhassan.

    Detail Engineering by TEBODIN

    Service Contract – Construction/Rehalibitation of Flowlines.(north Oman oil fields)

    Responsible for Timely construction from inception to completion.

    Lead a team from Pre-tender stages, review of Basic design,
    Responsible for the detail engineering, procurement, construction, commissioning and handover the projects to client in terms of Planning, execution, turnover, profitability and growth including effective client relationship.

    Ensure that contractors and suppliers fulfil their commitments as per contract and plan.

    Set up and manage the project execution /construction team. Construction / Fabrication planning (MS Project, Primavara), review, corrective actions and commissioning in schedule time & cost.

    Customer satisfaction and resolving customer complaints with focus on prevention.

    Develop and deliver a Project execution plans indicating whole scope of work, the contracting strategy (if require), the timelines for resource requirement/mobilization, engineering, procurement, construction and commissioning of various oil field projects.

    Manage interfaces between all project parties and implement an efficient hand over with the operations teams.

    To set up procedures that will deliver the quality and HSE targets.

    Represent the organization and enhance relationships in dealings with client, consultants and regulatory authorities to ensure all agreements are implemented.

    To get design approvals from client & to clear design clarification on discrepancies, interfaces, mismatches.

    Identify areas of concern & resolve.

    Day to day Liaise with our design (Detail Engineering by TEBODIN), planning, material controller, procurement / purchase, execution / construction team members, HSE advisor, QA/QC, QS, Plant Manager for smooth execution of project and commission the project within stipulated time & cost.

    Prepare site Budget, to review & control the cost and time, so that there should not be any over run.

    Maintain records of any extra works undertaken to ensure company-billing covers any additional costs to clients.

    Participate in regular meetings (in-house & with clients) to identify problems/review/corrective actions to over come problems, target dates and ensure timely project construction and completion within estimated time and cost with no LTI.

    Approval of progress, Billing, Materials and collection of outstanding.

    Supervise work teams for effective delivery of daily objectives including the control of work hours, overtime and incentive schemes to improve efficiency. Daily in-house meeting for next day’s activities.

    Implement HSE plan and procedure at different stages of construction.
    Participation in HSE audits, Site inspections(Camp, work site, Vehicle etc), tool box talks, performance incentives
    Project completed with ‘ZERO’ LTI.

    Submission of As Built & Test pack to client at the end of the project for approval.

    Project closing, obtaining Final Acceptance Certificate & Business Development.

    Tendering, vendor selection and ordering of materials. Controlling for timely delivery of materials.

    Office administration with adequate insurance of assets and inventory.

    Project handover and contract closure

    Jan ‘1991 to : SPECTRA TECHNICAL SERVICES, BANGALORE, INDIA.
    May ‘1993
    Freelance consultancy in Project/construction management in refinery units, also quality assurance/inspection of process equipments.

    Dec ‘1982 to : KUWAIT OIL CO.
    Oct ‘1990
    (Experience in Kuwait)

    As Mechanical field engineer for the construction of ‘Wafra Gas Project’ and 44 Kms pipeline.

    PETROCHEMICALS INDUSTRY CO (PIC)
    As Mechanical Engineer/Senior inspection engineer in the construction of ‘Salt and Chlorine Project’.

    BRAUN TRANSWORLD CORPORATION (BTC)
    Field Mechanical Engineer/Inspection Engineer in the construction of ‘Mina Abdullah Refinery’.

    AL SHUWAIR GROUP OF CO (MAJOR CONSTRUCTION CO)
    Project Manager for the construction of Fire water line, Oil storage tanks and Shutdown jobs.
    Key Responisbilities: Fully accountable for delivery of project within budget and schedule. Responsible for managing all day-to-day aspects of the Contract.

    - Fully accountable and responsible for HSE performance. Responsible for delivery of the HSE plan and ensuring risks are identified and controlled and working with Subcontractors.
    - Promote project goals regarding HSE, Quality, Budget and Schedule and provide assurance that is followed.
    - Ensure that the necessary site supervisory staff is employed / engaged when required, and their duties and objectives clearly defined. Determine the organisation structure required to carry out the work including manpower planning.
    - Determine the organisational structure required to execute the work and regularly review the resource requirements. Provide leadership, guidance and direction to team.
    - Ensure key interfaces are managed and develop effective interfaces between client, consultants and third party agencies.
    - Effective interface during Pre-commissioning.
    - Successful commission and handover.


    Aug ‘1981 to : HUMPHREYS AND GLASGOW CONSULTANTS PVT
    Dec ‘1982 LTD, MUMBAI

    (Experience in India)

    Various brown field chemical, petrochemical plants

    Aug ‘1978 to : DALAL CONSULTANTS AND ENGINEERS PVT LTD
    July ‘1980 MUMBAI

    Various brown field chemical, petrochemical plants

    Mar ‘1975 to KANARA ENGINEERING CO PVT LTD, MUMBAI
    Aug ‘1978
    Mechanical Engineer, Fully responsible for the production, planning, inspection and Chemical process equipment viz., pressure vessels, heat exchangers, reaction kettles, dished ends, which are manufactured under stringent quality control/inspection of third party - surveyors - Lloyd’s Bureau veritas, Engineers India Ltd. FCI, etc.


    Dec ‘1973 to GUJARAT MACHINERY MANUFACTURERS LTD
    Feb ‘1975 - BOMBAY.

    Assistant Engineer, Planning and execution of fabrication equipment and assembly of machineries.