July 2nd, 2009, 02:16 PM
Post Count Number #1
www.thermodyne.in Technologies Pvt Ltd Chennai : Strucad, Boiler design, Structural Engineering
Thermodyne Technologies Pvt.Ltd Chennai : Manager/Structural Engineering (Location - Chennai)
Website: www.thermodyne.in
Designation: Manager/Structural Engineering (Location - Chennai)
Experience: 8 - 10 Years
Location: Chennai
Job Description:
Detailed design of Structures, Bunkers in Boiler/allied heavy engineering. Head of section in design dealing with structures, ductings and layouts.
Desired Candidate Profile:
Familiarity with relevant codes, duct design and boiler layout, knowledge of Strucad or other softwares.
Company Profile:
Thermodyne is a leading Industrial Boiler manufacturer catering to Indian and Export market with 100 crore current turnover with about 200 employees.
Email Address: thermodyne@thermodyne.in
Keywords: structural engineering, boiler, ducting, layouts, strucad, design,
Last edited by muthukalee; October 14th, 2011 at 05:35 PM.
June 20th, 2011, 08:41 PM
Post Count Number #2
RESUME
VIJAYAKUMAR. B
MAIL ID : viji_kumar29 AT yahoo.co.in
CAREER OBJECTIVE
To search an exciting and challenging carrier Healthy environment. Where my education, Experience and Interpersonal Abilities can be fully utilize.
PROFESSIONAL EXPERIENCE
Designation-IV : Draughtsman (For Pressure Part dept.)
Period : Nov 2010 to till date…
Organization : Ansaldo caldaie boilers (India) Pvt Ltd,
(On Contract)
: TRICHY-01
Designation-III : Design Asst. (For Pressure Part dept.)
Period : May 2007 to Mar 2010
Organization : UNI PRODUIRE ENGG (P) LTD.
: TRICHY-20.
Designation-II : Cad Engineer
Period : Sep 2006 to Mar 2007
Organization : JEY-REA TECHNOLOGIES.
: TRICHY-01.
Designation-I : Cad Engineer
Period : Sep 2004 to Aug 2006
Organization : DOUX TECHNOLOGIES (P) LTD.
: TRICHY-01.
NATURE OF WORK :
- Preparation of GENERAL ARRANGEMENT, PRESSURE PART ARRANGEMENT & WATER WALL ARRANGEMENT.
- Preparation of DETAILED DRAWINGS for Water & Steam Circulation System. (For Steam Drum, Drum Internals, Water walls, Headers, Risers, Down Comers, Economisers , Superheaters CBD&IBD Tanks)
- Preparation of IBR WELDINGS for Pipes, Tubes, Shells, Headers & End cover.
- Preparation of PIPING &PIPE ROUTING for Steam and Water line.
- Detailing for AIR & FLUE Gas Ducting.
- Preparation of BILL OF MATERIAL ,SHEET ,TITLEBLOCK with
ATTRIBUTES.
- Preparation of HOT STRUCTURE Details for Top suspension drawings.
- Preparation of Structural Details for GALLERY TOWERS & ROOF TRUSS.
- Preparation of Civil Drawings with Key Plan.
- Preparation of Model and Layout Module drawings.
PROJECT HANDLE :
- DOOSAN BABCOCK ENGINEERING (1X500TPD WHRB)
- BABIA LAS MIANS - PANAMA (1 X 120 MW BOILERS FOR BUCKSTAY ONLY)
- MIND ENGINEERING DESIGN (INDIA) P LTD. (1 X 30 TPH (WHRB)
- LLOYDS STEELS INDUTRIES LTD. (1 X 90 TPH FBC BOILERS)
- ERK ECKROHRKESSEL (GERMANY) (1 X 20 TPH HRSG BOILERS)
- PENSOTTI SADELMI (GERMANY) FOR ROUTING, PIPING & SUPPORT
- NAGAI THERMAL POWER PROJECT (2X150 MW)
TECHNICAL QUALIFICATION
Qualification : Diploma in Mechanical Engineering
Percentage : 62%
Academic year : April 2002
EDUCATIONAL QUALIFICATION
Qualification : S.S.L.C Secondary School Leaving Certificate
Percentage : 72.4%
Academic year : April 1999
TECHNICAL PROFICIENCY
Design software’s : Auto CAD-2007
Pro /E 2001&Wild fire 2.0
Advanced Modeling, Assembly design & Detailing.
UniGraphics-NX2
Advanced Modeling, Assembly design & Detailing.
Operating System -MS Office