Hyundai Engineering & Construction Co Saudi Arabia : Electrical Procurement Quality Engineer

+ Ask Question / Post resume
Results 1 to 7 of 7
  1. Post Count Number #1
    Super Moderator
    Join Date
    April 18th, 2008
    Location
    Tuticorin
    Posts
    7,026

    Hyundai Engineering & Construction Co Saudi Arabia : Electrical Procurement Quality Engineer

    Hyundai Engineering & Construction Co. LTD Saudi Arabia : Electrical Procurement Quality Engineer –Hyundai
    Website: http://www.dss-hr.com

    Keywords: Electrical Procurement Quality Engineer

    Designation: Electrical Procurement Quality Engineer –Hyundai
    Experience: 7 - 12 Years
    Location: Saudi Arabia
    Compensation:
    Good Salary as per experience, qualification & as per Interview result
    Education:
    UG - B.Tech/B.E. - Electrical, Mechanical,Diploma - Electrical, Mechanical
    PG - Post Graduation Not Required
    Industry Type: Oil and Gas/ Power/Infrastructure/Energy
    Functional Area: Site Engg., Project Management
    Posted Date: 25 Jun 2009

    Job Description:

    Required to work as Elec. Procurement Quality Engineer at the project site in Saudi Arabia. URGENTLY FORWARD DETAILED CV, ACADEMIC, EXP CERTS & PHOTO BY E-MAIL OR COURIER.

    Desired Candidate Profile:

    B.E (Mech/Elect), with min 7 yrs exp in static, Rotating EQ & Vendor Inspection. Gulf exp preferred but not mandatory. Good English & PC. Passport holder. AGE 30 - 45. Willing to join immediately.

    Company Profile:
    Hyundai is known the world over for erection & commissioning of Oil / Gas / Petrochem / Refinery projects. Present site is a very large 'Gas To Liquid' project site in Saudi Arabia.

    Executive Name: Col. Rehni

    Address:
    Dynamic Staffing Services Pvt Ltd
    E-40/7
    Okhla Industrial Area
    Phase ? II
    Delhi,Delhi,INDIA 110020

    Email Address: dss-job5@dss-hr.com, dss-job7@dss-hr.com

    Telephone: 91-11-40410000

    Reference ID:
    Elect Procre Qlity Engr / Hyundai S. Arabia / Rehni

    Keywords: Electrical Procurement Quality Engineer

  2. Post Count Number #2
    On probation
    Join Date
    April 14th, 2009
    Location
    Dubai UAE
    Posts
    1

    Re: Hyundai Engineering & Construction Co Saudi Arabia : Electrical Procurement Quality Engineer

    NAME : Md.Jahangir Alam
    COMPANY : Arabtec Construction L.L.C. Dubai (UAE)
    POSITION : Sr. Draughtsman
    E-MAIL ADDRESS : jahangir_x AT yahoo.com
    mdjahangir80 AT gmail.com

    MOBILE NUMBER : 00971502421248
    NATIONALITY : Indian
    PASSPORT DETAIL : Date of Expiry – 07– 07–2016
    Place of Issue – Muscat (Oman)
    Passport No – F6582333
    TOTAL EXPERIENCE : Total work Experience 8 years (Eight year), 4 years (Four years) in GCC. & 4 years (Four years) in India, in the field of High rise Towers, Airport, Substations, & Residential Buildings with Excellent working knowledge of Structural, Civil, Architectural & MEP Drawing Drafting & Assist to junior Draughtsman
    PROFILE : Organized and Result Oriented Sr. Draughtsman with
    8 Years Experience. Well versed in various Construction activities Excellent Communication and Problem Solving Skill. Familiar with Technical Co-ordination with Engineers & Consultants
    EDUCATION : Diploma in Civil Engineering
    Karnataka University, India – 2001
    10+2 from Bihar Intermediate Education

    Council, Patna, India – 1997
    COMPUTER LITERACY : Auto Cad (Up to Date Version)
    MS Windows (Word, Excel, etc)
    Primavera – P3
    LANGUAGE SPOKEN : English, Arabic, Hindi, Urdu

    EMPLOYMENT Presently working for one of the prestigious project in EXPERIENCE Dubai. Infinity Tower at Dubai Marina 73 story
    Residential tower rotating at 90 degree
    1.) ARABTEC CONSTRUCTION LLC DUBAI UAE (28TH MARCH 2007 TO PRESENT)

    POSITION : Sr. Draughtsman
    I) PROJECT : Infinity Tower (6B+GR. & MAZZ. +6 Podiums + 73 Floors)
    Dubai Marina Dubai, UAE
    Contractor : Arabtec Construction LLC
    Client : Cayan Investment & Development
    Consultant : Khatib & Alami

    PERIOD : 15th Dec. 2008 to Present
    II) PROJECT : Dubai Sports City, Multipurpose Stadium S-4
    Dubai, UAE
    Contractor : AMB-JV (Arabtec/Max-Bogl)
    Client : Dubai Sports City
    Consultant : SCHUSTER PECHTOLD

    PERIOD : 1st March 2008 to 14th Dec. 2008

    III) PROJECT : Dubai World Central International Airport
    Air Traffic Control Tower &
    Passenger Terminal Building (Only Structural)
    Dubai, UAE
    Contractor : AMB-JV (Arabtec/Max-Bogl)
    Client : Department of Civil Aviation
    Consultant : adpi/Dar-Al-Handassah

    PERIOD : 28th March 2007 to 29th Feb. 2008

    JOB RESPONSIBILITIES
    FOR ALL PROJECTS
    Review and coordinates All Contract Drawings before
    Execution of work and checking the Discrepancies
    in Drawings for prepare shop drawing

    Preparation of Architectural, Civil, Structural Shop
    Drawing, General arrangement, Detail Drawings
    As per project Requirements & submit for
    Consultant approval
    Co-ordination and discuss with consultant for any
    Technical Clarification & Modification of
    Drawings in all discipline.

    Raised R.F.I. & S.C.R. to Submit Consultant
    for Technical Clarification.

    Co-ordinate & assist to Jr.Draughtsman for prepare
    the Drawings

    Preparation & Submission of as built drawing
    According to actual site measurements.

    Co-ordinate with Project Manager, Technical
    Manager & Construction Manager

    2) MODERN CONTRACTING COMPANY OMAN (4TH NOV. 2004 TO 10TH OCT. 2006)

    POSITION : Technical Coordinator cum Draughtsman

    PROJECT : Mirbat 5-Star Hotel Tourist Resort
    5-Star Hotel, 4 Story Hotel Building, With 250 Rooms &
    24 Suits, Total Area 64000 meters square
    Contractor : Modern Contracting Co.
    Client : Dhofar Tourism S.A.O.G. &
    Golden Tulip Hotel Group
    Consultant : Parsons International LLC.

    JOB RESPONSIBILITIES
    Review and coordinates All Contract Drawings before
    Execution of work and checking the Discrepancies
    in Drawings for prepare shop drawing

    Preparation of Architectural, Civil, Structural Shop
    Drawing, General arrangement, Detail Drawings
    as per project Requirements & submit for
    Consultant approval

    Site visiting for technical guidance and Coordinate
    With site team, to resolve problems.

    Co-ordination and discuss with consultant for
    any Technical Clarification & Modification of
    Drawings in all discipline.

    Preparation & Submission of as built drawing
    According to actual site measurements.

    Co-ordinate with Project Manager, Technical
    Manager & Construction Manager

    3) ARCHOHM CONSULTS PVT LTD NEW DELHI, INDIA (14TH JUNE 2004 TO 23RD AUG. 2006)

    POSITION : Draughtsman cum Site Supervisor

    JOB RESPONSIBILITIES
    Site Visit, Inspection & Supervision
    Preparation of Concept Design drawings with
    Architect.

    Preparation of General Arrangement, Working &
    Detail Drawings Independently
    Coordinates with Contractors
    Coordinates with Clients

    4) HABITATE ARCHITECT PVT. LTD NEW DELHI, INDIA (15TH JULY 2001 TO 30TH AUG. 2006)

    POSITION : Draughtsman cum Site Supervisor
    JOB RESPONSIBILITIES
    Site Visit, Inspection & Supervision

    Preparation of Concept Architectural Design
    Drawings with Architect.

    Preparation of General Arrangement, Working &
    Detail Drawings Independently

    Coordinates with Contractors

    TRAINING PROGRAMS
    SEMINARS AND
    WORKSHOP : Attended many programs on personality
    development like communication skills, effective
    public speaking, Safety management &
    time management, etc.
    Internal Auditor and Trainer for training programme
    Of staff and technicians.
    EXPECTED SALARY : Negotiable
    Availability : One Month

    Mohammad Jahangir Alam

  3. Post Count Number #3
    Guest Poster
    Join Date
    August 14th, 2008
    Location
    Your Heart, Delhi
    Posts
    76,213

    Re: Hyundai Engineering & Construction Co Saudi Arabia : Electrical Procurement Quality Engineer

    i am electrical engineer. i have 7 years exp. 5 years in India and 2 years in KSA.

  4. Post Count Number #4
    moulana
    Guest

    Re: Hyundai Engineering & Construction Co Saudi Arabia : Electrical Procurement Quality Engineer

    Curriculum Vitae
    SHAIK MOULANA SHABUDDIN
    B.E in Mechanical Engineer.
    Curriculam Vitae :
    Site Superintendent Mechanical Engineer & Project Management---Oil, Gas &Power in Simple Cycle and Combined Cycle Power Plants
    Senior Mechanical Engineer-----Oil, Gas & Power in Combined Cycle Power Plants
    Saudi Arabia. India.
    Phone :
    Mobile :
    E-mail :
    Postal
    Address :
    +966-1-2766655 (Ext. 532)
    +966-547600580
    shabuddin AT altoukhi.com shabbushaik AT yahoo.com
    Power Plant Division
    Generation Department,
    Al Toukhi Company for Industry, Trading & Contracting,
    P.O. Box 497, Riyadh–11411, Kingdom of Saudi Arabia. NIL
    +918832439436
    shabbushaik AT yahoo.com
    S/o sk.Jan Saida
    House no :4-340/2, Navabharath nager, Bommuru post,
    Rajahmundry Rural,
    East godavari district,
    Andhra Pradesh, India
    Pin :533126
    PERSONAL INFORMATIONS :

    PROFESSIONAL QUALIFICATION :
    PROFESSIONAL COURSES :
    PROFESSIONAL EXPERIENCE
    INDUSTRY TYPE
    EXPERIENCE
    CLASSIFICATION
    JOB FUNCTION :
    OIL &GAS PIPE CONSTRUCTION&OPERATION ENGINEER
    COMMISSIONING
    ENGINEER
    DESIGN
    ENGINEER
    PROCUREMENT &TENDER ENGINEER
    SUMMARY :



    SOFTWARE
    SKILL :
    LANGUAGES KNOWN :

    Father’s Name : Shaik Jan Saida
    Sex : Male
    Marital Status : Married
    Nationality : Indian
    DOB : 13 July, Nineteen Seventy six
    Passport Details : Passport No.-E8725329.
    Place of Issue - Visakhapatnam, Andhra Pradesh, India
    Eqama No. : 2212316034
    Bachelor of Engineer from Gulbarga university, Karnataka, India.
    - Institution
    - Discipline
    - Academic year
    - Percentage occurred

    : Veerasaiva Vidyavarthaka Engineering College, Bellary.
    : Mechanical Engineering
    :2000
    :65%
    Sl No. Courses Done Name of the Institute Certificate No. Date of Issue
    1 Gas Turbine and Combined Cycle Power Plant Nevyeli, National Power Training Institute)
    Tamilnadu, India. Npti/000656 22 jan.2002
    2 Pipe Welding Inspection Technology Pune, Maharashtra Aws/Cwi/C81P21 26th jan.2008
    Worked in ABB 8C GT & Alstom steam turbine 800mw Combined Cycle Power Plant (India) consists of HRSG (horizontal Gas flow with natural circulation type arrangement)and HP and LP pressure of STG.
    Worked as Asst Site manager ,Mechanical Site Construction Engineer, Design engineer, procurement engineer in :
    GE FRAME 7FA* 4 in 450MW FARAS Power Plant Extension(SEC-EOA),
    GEFRAME 7FA* 4 in 450MW PP8 Power Plant Extension(SEC-COA),
    GE frame 7EA in Tihama Unit 10 &11 in 150MW (SEC-WOA)
    GE Frame 6BRafha Power plant Extension(SEC-EOA) and
    Oil, Gas & combined Cycle Power.
    10 Years of Experience
    7
    1
    1
    1
    Mechanical Engineer with hands on work experience in the Middle East and India. Majority of Experience falls within the Design, Procurement, piping Construction in gas Turbine and Combined Cycle Power Plants.

    Responsibilities:
    COMBINED POWER PLANT EXPERIENCE IN INDIA FROM 2001 AUGUST TO 2004 SEPTEMBER
    - WORKED FOR ABB FRAME 8C OF 6(no)x 50MW TURBINE AND ALSTOM STEAM TURBINE IN JEGURUPADU 800MW COMBINED CYCLE POWER PROJECT, AP, INDIA.(PHASE1+PHASE2)
    - 2001 to 2005 worked in Mechanical Site engineer, Design & Operations site engineer in 800mw GVK combined cycle power plant.
    Heat recovery steam Generator:
    HRSG (horizontal Gas flow with natural circulation type arrangement),with HP steam outlet 60kg/sec with pressure 56 bar and LP Steam Outlet 14.70 kg/sec with pressure 3.8 bar, hence with Output Power77MW.
    Worked, familiar with following systems:
    - HRSG Start ups, 24” Condenser Cooling water Pipe line system with cooling Tower fans (Paharpur), Cycle make up pumps for maintaining the daerator level.
    - Daerator: Normal Operating Pressure:2.2 to 2.8 Bar. and temperature 160 DEG C., Condensate Extraction Pumps trips at trips at Daerator Level 1800mm and Normal Make up in between 1485-1525mm.
    High Pressure Boiler Feed pumps: which feeds feed water to boiler, Capacity is 122m3/hr and minimum capacity 25m3/hr, Suction/discharge pressure 5/96 bar, Motor Details:500KW/50 Amps/6.6 KV and with minimum flow recirculation valve.
    Start Permissive: Daerator level should be greater than 950mm for start up of HPBFP.
    - Familiar with HP ,LP feed water Control Valve, HP ,LP superheater vent MOV
    LP,HP DRUM Vent Motorised Operated valves, LP Extraction MOV
    Worked familiar with HP START UP BY PASS, HP TURBINE INTEGRAL BYPASS MOV.
    High pressure shut off valve to Turbine MOV.
    Low pressure shut –off valve to Turbine MOV module.
    HP desh CV upstream and Downstream valves.
    Blow down Tank Inlet Isolation valve
    Low pressure boiler Feed pumps: Capacity is 155m3/hr, Minimum capacity 50 m3/hr,Suction/discharge Pressure 5/20 bar. and motor details:132KW/222 Amps
    Diverter Damper System: Hydraulic Tank levels, function and Damper Opening Conditions as per HRSG BOILER protections.
    HP, LP STEAM HEADER CLEAN BLOW OUT.
    STEAM TURBINE GENERATOR :
    If Cold start up turning gear should be in service at least 2hrs.
    If Hot start up HP Inlet Temperature and sealing steam temperature must not be
    Colder than 50 deg.C
    Condenser Cooling water system: which circulates water from condenser to cooling tower through Cooling water Pumps in Auto mode.
    Condenser Tube Cleaning system: cleanse the condenser tubes through Basket Strainer system
    Auxiliary Cooling water system is supplied from Main Cooling water system through Debris filter .Debris Filter consists of Self cleaning Strainer, rotation, flushing pump. Debris filter goes to Backwash on AUTO whenever DP across filter increases to 75mBar.
    Closed Cooling water system for HRSG Damper hydraulic Circuit and SWAS sample coolers.
    Liquid ring Vaccum Pumps: Maintaining Vaccum in Condenser for removal of non-condensible gases.
    Gland steam System: HP, LP Turbines have 2 sets of seals inner and outer,Inner Seals are maintained at high pressure 0.2 bar during Start up by admission pressure by HP steam through Gland steam shut-off valve and 0.3 bar during operation by dump CV.
    Lube oil system: 2x100% AC Driven lube oil pumps and DC lube oil Pumps, which feeds to HP & LP Turbine bearings and reduction gearbox.
    HEAT RECOVERY STEAM GENERATOR HYDRO TEST:
    ENSURANCE OF CPH CIRCUIT FILLING,LP ECONOMIZER CIRCUIT FILLING,HP/LP ECONOMIZER CIRCUIT FILLING,HP/LP SUPERHEATER &EVAPORATOR CIRCUIT FILLING
    Ensurance close of Transmitter and Drum level indicators
    Start the Hydro Test pump with recirculation valve open, Start pressurizing HP drum gradually with an increment of 1.0 bar and observe the pressure at pump discharge and at HP Drum carefully.
    Thoroughly check safety valves for any passing and other valves for any leaks during Pressurization. After HP drum reaches to 80 bar. hold the pressure for 15 minutes,and check for leaks.If pressure is holding ,depressurize hp drum GRADUALLY TO ZERO.
    FAMILIAR WITH FOLLOWING COMBINED CYCLE SYSTEMS:
    - Raw water system, clarified water system and Cooling water system,
    - firewater system, pre-treatment plant, and pre-treatment chlorination,
    - potable water chlorination, Effluent treatment plant, oily water separation system, heating Ventilation Air Conditioning system.
    FAMILIAR WITH CIVIL:
    Construction of Dyke walls, Gas turbine foundation and supporting system lean concrete and Concrete foundations
    Duct Bank, sleepers, Pipe trenches, pipe racks and switchgear Building.
    Fencing, Concrete Pavments and Roads
    Crane Installation on Gantry Structure.
    Power house Building.
    FAMILIAR WITH ELECTRICAL:
    Transformer installation 110MVA,13.8kv Medium voltage
    Generator Circuit BreakerABB,SIEMENS
    220kv Switchgear
    MV &LV switchgear panels ABB,SIEMENS,SCHNEIDER (installation)
    PIPING DESIGN,CONSTRUCTION & PROCUREMENT FOR FARAS OPEN CYCLE POWERPLANT AND OTHER VARIOUS POWER PLANTS IN SAUDI ARABIA FROM DECEMBER 2004 TO TILL DATE:
    Design Experience:
    Review of Design Basis Report for Piping Drawings
    Approvals of Fuel Gas and BOP piping Layout Drawings, Equipment Lay out and Isometric drawings
    Review all vendor documentation to assure the Compliance with design and Technical requirements.
    Material ordering as Per Material Take-off., follow-up and Site Co-ordination
    INSTALLATION OF GAS TURBINE AND STEAM TURBINE:
    1.Installation of anchor Bolts for GAS TURBINE FOUNDATION as per GE or ABB manufacturer Drawings
    2.Grouting Generator and Turbine centre line support Blocks Pockets as per exhaust stack and cenre line axis., Clearance Gap Check for concreting the foundation
    3. Installation, testing and Commissioning of Gas Turbine Generator and other Supporting systems
    fuel oil Treatment system(Alfa laval, West falia), fuel filter skids,
    Air compressor system,(atlas copco, ingersoll)
    Cooling water system
    Air intake system (Donaldson)
    Exhaust stack (Bachmann, American Air Filter, Braden)
    Fin Fan cooler
    Fuel Oil Tank Erection
    Construction Experience as Asst Site Manager(in charge) in:
    NATURAL FUEL GAS SYSTEM
    - 24” Main Fuel gas API 5L GRADE X-52 Header pipeline Tapping point with Existing ARAMCO Natural Gas header for the New 600MWPower plant
    - 24” Main Fuel Gas ASTM A106 GRADE B Header Pipeline from Inlet Valve Skid to Gas turbine including all equipment connection through Emergency valve Shut down Station, Inlet Filter Separator, Scrubber, Metering Streams ,Fuel gas compression plant with special pipe Supports, Absolute separator, oil bath heater, Scrubber upto GT End connection.
    - Gas condensate collecting tank interconnection piping, Flare system etc..,
    - Pipe cleaning, Pneumatic Pressure test, Hydro test for all Fuel gas Piping.
    - Post Weld Heat Treatment for Fuel Gas Piping Welds (pipe Work, header, Flange Joint) by Electric resistance Method in form of ceramic Heater Pads.
    - PWHT Range as per ANSI b31.3 not exceeding 177 deg c/hr, hold at 610 c/hr for one per inch of thickness, Cool to 315 deg.c at a rate not exceeding 200 Deg c/hr, final hardness check.
    - All Fuel Gas pipe welding with Shielded Metal Arc welding process (SMAW).
    - Atlas Copco centrifugal Fuel Gas Compressors without put of 40 bar, erection execution, oil bath heater Commissioning
    COOLING WATER SYSTEM FOR ALL 4 GAS TURBINE UNITS:
    - Fabrication, Installation OF 14’’ ASTM A 106 GRADE B Supply and Return header
    Piping from pump skid to lube oil heat exchanger, hydrogen coolers, LCI Cooler, Fin
    Fan Cooler, Fuel gas compressors.
    - Demineralised water piping makeup connections to Expansion tank, Chemical Dosing
    piping, drain piping connection to Waste water system.
    - Cooling water flushing spool connections at all heat Exchangers.
    - X-RAY, cleaning of pipe, Repair Weld after NDT Test.
    - Cleaning, Hydro test of Pipe Lines.
    - Cooling water Chemical flushing Passivation procedure with NALCO before
    normalisation, Start up of GT.
    - All Cooling water pipe welding is Shielded metal Arc Welding Process(SMAW).
    LUBE OIL PIPING SYSTEM FOR ALL 4 GAS TURBINE UNITS:
    - 4’’, 6’’ STAINLESS STEELTP 312 TP 304L Lube oil piping Connection to Bearings, Bearing Headers in Turbine, Generator Compartment, interconnection piping, Hydraulic, seal oil piping, valve connections, Auxiliary, Emergency oil pump discharge piping inside GAS TURBINE.
    - All Lube oil Pipe Welding with Gas Tungsten Arc Welding Process (GTAW).
    - Cleaning, Hydro test with 1.5 times the design pressure.
    INSTRUMENT AIR AND SERVICE AIR PIPING FOR BOP AND POWER ISLAND:
    - 4’’, 2’’, 1’’ GALVANIZE PIPE A53 GRADE B ERW.
    - Tapping point PIPING Connection with Existing Faras Power Plant.
    - Compressor House piping (8 bar) includes compressor outlet piping, Dryer receiving interconnection piping.
    - Header, distribution piping with Isolation valves to all Consumer connections.
    - Cleaning, Hydro test as per SEC Standards.
    - All piping with Threading SCREWED Ends, with Jute, loctite as bonding material.
    - Pipe Air Blowing, Hydro test as per SEC standards.
    FIRE FIGHTING SYSTEM:
    - A106 GRADE B Cement lined+Galvanize External Piping
    - Complete mechanical fire fighting system, complete ring header for new power plant expansion
    - Fire Water pump house with hydropnuematic Tank with Hydrant and spray header connection with interconnection NRV.
    - 8 BAR HVW AND MVW SPRAY SYSTEM
    - Hydrant pump, Spray pump, Diesel engine Driven pump, jockey pump, air compressor with HP TANK PIPING.
    - New Fire Hydrant piping interconnection with existing Headers, Foam Tank, Skid piping.
    - Worked with Fire Fighting suppliers are CHEMTRON, SAUDI PAN GULF, GROUP4 NESMA, AL BILAD, FIRE FREEZE.
    - Process used for this piping is Root Pass with 6013 and 7018 electrode with hot pass and capping pass.
    DEMENERALISED WATER, WATER WASH SYSTEM:
    - A312 TP304 L Schedule 40 used for demineralised water.
    - Zamil Stainless steel tanks are used for Demineralised Water Tanks.
    - Demineralised Water Piping from DM plant to DM storage Tanks.
    - DM water make up to all Consumer Connections to water bath heater, Hydrogen Generation area, Cooling Water modules.
    - Water Wash pump discharge piping to GT COMPRESSOR OFFLINE,ONLINE CONNECTIONS
    - Cleaning, Hydro test with 1.5 times of Design Pressure.
    NITROGEN PURGE SYSTEM AND LP CO2 FIRE FIGHTING SYSTEM
    - Nitrogen Gas piping to all Fuel Gas consumer Connections Pressure Reducing Station, Water Bath heater, Scrubber, metering section and other related equipment,
    4”2”LP CO2 GALVANIZE SEAMLESS SCH 80 WITH CLASS 3000 FITTINGS
    USED IN THIS SYSTEM
    - Piping from nitrogen generator to GT Accessory module, Generator module, with Isolation Valve.
    - Soap leak Test, Hydro test as per SEC Standards.
    Experience in Saudi Arabia as Construction piping Engineer, piping design engineer, Procurement engineer, and project coordinator:
    - PIPING DESIGN REVIEWS WITH CLIENT (SEC) AND CONSULTANT (POYRY, L&T), FINALISING GENERAL ARRNAGEMENT, ISOMETRIC DRAWINGS FOR PIPING.
    - PROJECT COORDINATOR FOR FARAS POWER PLANT HANDLING SHIPPINGS OF SUPPLIER DANGEROUS GOODS, DIRECT DELIVERY GOODS AND OTHER EQUIPMENT.
    - WORKED FOR RAFHA EXPANSION 60 MW OF GE FRAME 6B in 2004(SEC-EOA) WORKED FOR ARAR EXPANSION 150 MW OF GE FRAME 7E in 2005(SEC-EOA) WORKED FOR TIHAMA UNIT 10,11,OF 150MW GE FRAME 7EA in 2007(SEC-SOA).
    - WORKED FOR TIHAMA UNIT 10&11EXPANSION 150 MW OF GE FRAME 6B
    - WORKED FOR RIYADH PP8 EXTENSION 600 MWGE FRAME 7FA in 2008(SEC-COA).
    - WORKING FOR FARAS EXTENSION 600MW in 2008(SEC-EOA).
    In saudi Arabia i handled GE FRAME 7FA TURBINE power plant co-coordinating with all site engineers, sub-contractors and following with
    American safety Procedures in scaffolding, Risk Plan Procedures
    Quality control procedures in piping, heavy structure construction
    familiar with Single cycle and combined cycle supporting systems.
    control of Construction budgeting, procurement follow up, site construction Plan,allotment/Distribution of work to Engineers.
    Distribution/follow up of Commissioning Team to finalise the Tasks.
    Timely Completion of Project with following up with Grass root of Technicians, oreman, supervisors, site engineers, subcontractors, Equipment suppliers
    in Civil, mechanical, Electrical, Instrumentation and commissioning
    Monitoring of all Site activities in civil , mechanical, electrical and analyzing the percentage of work/day and advising/finalization that job to be completed in next day.

    MS-Word, MS-Excel.
    English, Urdu, Hindi, Telugu, Kannada, Arabic.(speaking)

  5. Post Count Number #5
    Guest Poster
    Join Date
    August 14th, 2008
    Location
    Your Heart, Delhi
    Posts
    76,213

    Re: Hyundai Engineering & Construction Co Saudi Arabia : Electrical Procurement Quality Engineer

    sir,
    I am lijo,I working last is HHI qatar- gtl project,,my designation is team leader mechanical errection &instalisation team.my duty is equipment errection and alligement.now i need a good job -mechanical division inside,can u help me,sir?

  6. Post Count Number #6
    Guest Poster
    Join Date
    August 14th, 2008
    Location
    Your Heart, Delhi
    Posts
    76,213

    civil engineer

    CURRICULAM VITAE

    SURESH A. NAIR
    E mail sureshappukuttan AT sify.com ,sureshappukuttan AT gmail.com
    Qualification : B.E. (CIVIL) - 1982 from REC Surat (NIT)
    Professional Experience : 25 years
    April 2010 to Till date TRIDEM PORT AND POWER PLANT
    Working as G.M ( civil) for 750MW Thermal power plant and Port construction at Nagapattinam. Interacting with soil investigation agencies, power plant consultants and port consultants. Review of DPR for power plant and coal berth for Port construction. Interacting with environmental consultants and assisting in land acquisition works
    June 2007 to Till March 2010 MANTECH CONSULTANTS-CHENNAI
    Consultancy for Minjur 100 MLD Reverse osmosis desalination plant . Monitoring progress & quality for sea-water pump house, water retaining structures,equipment foundations, RO building structural works,Roads
    January 2006 to May 2007 FICHTNER CONSULTANTS
    Project management consultancy for CPCL 5.8 MGD Desalination plant. Supervision, quality control for all the civil and structural works for sea water intake pipe jetty,water treatment plant, Reverse osmosis plant
    February 2002 to October 2005
    Name of the project
    Responsibilities as owners
    Engineer :
    ELECTROWATT CONSULTANTS [OMAN]
    CIVIL ENGINEER (Resident engineer)
    200 MW SALALAH POWER STATION, DESALINATION PLANT FOR MINISTRY OF ELECTRICITY AND WATER
    Planning ,supervision & quantity survey of all civil and structural activities of heavy equipment foundations, substations including control and switchgear buildings, switchyard, pump house, workshop and roads in accordance with quality action plan & latest B.S. Codes. Approval of bought out items and enforcement of safety standards
    March 98 to Jan 2002 : MANTECH CONSULTANTS
    CHIEF ENGINEER ( CIVIL)
    Duration : April 1999 to January 2002
    Name of the project : 330 MW PPN Power Company - CCPP
    Responsibilities as Owner’s
    Engineer : Planning, supervision of all civil & structural activities of the project in accordance with quality action plan & latest IS codes such as the Soil Investigation, Surveying, Piling, Pile Testing, T.G. Building, GTG & STG Foundation, HRSG, Chimney, Naphtha storage Tank, Switchyard, Non-Plant Buildings like Administrative Building, Housing Colony, Approval for bought out items. Enforcement of Safety Standards.

    August 1996 to February 1998 FICHTNER CONSULTING ENGINEER (I) PVT.LTD
    Name of the post DEPUTY CHIEF ENGINEER
    Duration August 1996 to February 1998
    Name of the Project : 2x23 MW CAPTIVE POWER PLANT FOR LARSEN AND TOUBRO CEMENT PLANT AT AWARPUR
    Responsibilities as Owner’s : Engineer Planning, supervision, & Billing of all Civil &Structural Works in accordance with latest Codes for 2x23MW captive power plant.
    Works Consists of the following
    1. T.G. Building
    2. G.T. Foundation
    3. Cooling Tower
    4. Boiler foundation
    5. Switchyard
    6. Control room
    April 1985 to August 1996 : DEVELOPMENT CONSULTANTS LTD. CALCUTTA
    Name of the post : ASST RESIDENT ENGINEER, RESIDENT ENGINEER
    Duration : April 1985 to February 1992
    Project worked : 720 MW CPP of NALCO at Angul ( Orissa )
    Responsibilities as Owner’s : Engineer Planning, supervision, & Billing for all the Civil & structural works
    1. 120 MW x 6 TG Foundation
    2. Cooling Towers
    3. Cooling Water Pump House
    4. Ash Disposal System
    5. Chimney
    6. Switchgear Room
    7. Intake Structures
    8. Ash Pond
    9. Coal handling Towers
    Duration : March 1992 to August 1996
    Project worked 2 x 235 MW Atomic Power Plant of NPC at Kaiga.
    Responsibilities as Consultants Engineer Quality Control of all the Civil works & field Engineering services in liason with design office for the following structures.
    1. T.G. Building
    2. STG Foundation
    3. D.G. Buildings
    4. Spent fuel storage building
    5. Reactors
    6. Reactor Auxiliary Building
    7. Switchgear room
    8. Service Building
    9. Control Room
    10. Cooling water intake structure
    11. Cooling Water Pump house
    12. Fire water Pump house
    13. Safety related Pump House
    14. Chimney
    August’1983 to March 1985
    FACT ENGINEERING & DESIGN ORGANISATION
    Name of Post SENIOR CONSTRUCTION ENGINEER
    Project worked : 2 x 1350 MTPD Ammonia Plant for KRIBHCO at Surat
    Responsibilities as Owner’s : Engineer Planning, Execution & Billing of all Civil works connected with Ammonia Plant
    1. Compressor House
    2. Various Equipment Foundation
    3. Switchyard Control Room
    4. Roads
    April 1982 to August 1983 : ANIL CONSTRUCTION COMPANY, SURAT
    Name of the post : SITE ENGINEER
    Project worked: Housing Project

  7. Post Count Number #7
    Guest Poster
    Join Date
    August 14th, 2008
    Location
    Your Heart, Delhi
    Posts
    76,213

    Inquiry

    Dear Sir/ Madam,
    May I ask for a short background of HHIA's 150 MW Tihama Power Projects in the 3 places at Easter Province of Saudi Arabia- This is to have a better understanding of your up coming projects.
    Please send your prompt response to my email address at yac_768 AT yahoo.com .
    Thank you,