Lanco Infratech Ltd Dhenkanal : Thermal Power Plant, Project Execution

+ Ask Question / Post resume
Results 1 to 15 of 15
  1. Post Count Number #1
    Super Moderator
    Join Date
    April 18th, 2008
    Location
    Tuticorin
    Posts
    7,026

    Lanco Infratech Ltd Dhenkanal : Thermal Power Plant, Project Execution

    Lanco Infratech Ltd. Dhenkanal : COO Super Critical 2640 MW Thermal Project in Orissa
    Website: http://www.lancogroup.com

    Designation: COO Super Critical 2640 MW Thermal Project in Orissa
    Experience: 20 - 30 Years
    Location: Dhenkanal

    Job Description:
    1. Implementing 4X660 MW super critical Thermal Power from concept, development till commissioning and financial closure.
    2. Lead all the project development activities including land acquisition and regulatory clearances etc.
    3. Coordinating with State Government. Liaison with the concerned authorities such as MoEF, MoP, Railways, Airport Authorities, Irrigation & Revenue dept. for obtaining clearances.
    4. Essential quality shall be demonstrable execution skills and leading from the front – Completing the project within the budget and the schedule, assessing capital cost involved and execution with world class standards using project execution & evaluation techniques and models
    5. Prepare estimates and BOQ based on requirements generated during detailed engineering of the project.
    6. Co-coordinating the procurement activities - tendering & bid management, estimations, techno-commercial evaluations, negotiations etc. Identifying vendors on the basis of service, quality, handling negotiation, finalization and awarding of contracts for procurement of different equipment required.
    7. Commercial arrangements for power sale.

    Desired Candidate Profile:
    1. BE Mechanical or Electrical with 20 years+ of experience in managing/leading development of large (>1000MW) coal based thermal power projects in India.
    2. An effective communicator with excellent interpersonal & managerial skills.
    3. Must have handled large teams, team size exceeding 100.
    4. Experience with Government, statutory bodies and other agencies for Labor Land & rehabilitation Water Resources Coal State Utilities.

    Company Profile:
    LANCO is one of the fastest growing business conglomerates in corporate India. The group has diversified into Power, Infrastructure, Realty and Construction & EPC sectors with an asset base of US $550 Million. Groupâs holding company,

    Address:
    Lanco Group
    Lanco Infratech Limited
    Plot No. 229
    Udyog Vihar, Phase 1
    Gurgaon,Haryana,INDIA 122016

    Email Address: anu.gaur@lancogroup.com
    Keywords: Project Development,Project Management, Thermal Power Plant, Project Execution

  2. Post Count Number #2
    Guest Poster
    Join Date
    August 14th, 2008
    Location
    Your Heart, Delhi
    Posts
    76,213

    SAILENDRA NARAYAN SETHI
    Electrical Engineer
    email :saila4u_rinku AT yahoo.co.in
    Objective :
    To pursue a challenging career in your esteemed organization, I would like to make a positive contribution towards Promoting team spirit to meet the objectives and own professional growth.

    Personal skill :
    Can adapt to any Environment and perform to the maximum under any circumstances with Management, Logical and Analytical Abilities. Have passion to learn new things and ability to grasp the subject.
    Work Experience :

    Total Experience : 4+Yrs
    - Presently Working as ELECTRICAL Engineer in MAHAVEER ENERGY &COAL BENIFICATION LTD., Raigarh.-24 mw, 55tph,triveni turbine.
    - Worked as ELECTRICAL Engineer in OEGI site at ARASMETA CAPTIVE POWER COMPANY LTD(LAFARGE)-43MW,90*2 TPH thermax boiler, bhel turbine.
    - . Having 1-YearApprentice Training at CESCO, Bhubaneswar in 33/11KV substation.
    Current Job Responsibilities :
    - Breakdown & Preventive Maintenance of electrical equipments like power transformer, distribution transformer, instrument transformer, all L.T.motors., Switchgear.
    - Breakdown & Preventive Maintenance of 132 KV Switch yard, M.C.C. in M.E.C.B.L.
    - Relay operation & synchronization.
    - Read the Electrical diagram and find the fault in MCC
    - Trouble shooting and Maintenance of E.S.P.
    Nature of Job : Electrical Operation and Maintenance in Thermal power plant.
    Educational qualification :
    - B-Tech in Electrical Engineering under BIJU PATTANAIK UNIVERSITY OF TECHNOLOGY in 2007.
    - 12th under the Council of Higher Secondary Education ( Orissa) in2003.
    - . 10th under the Board of Secondary Education (Orissa) having 73 % marks in2001.
    - M.B.A. in production operation management under UTKAL University under Continue……
    Computer Awareness :
    Have a good practice & knowledge of packages like :
    - INDUSTRIAL AUTOMATION(plc) .

    Special Interest :
    - To work always in a competitive atmosphere and to gain through and extensive practical knowledge to implement in day to day trouble shooting.
    VOCATIONAL TRAINING : Organization: OPTCL, CESCO, Orissa
    Purpose: Transmission & Distribution System

  3. Post Count Number #3
    Guest Poster
    Join Date
    August 14th, 2008
    Location
    Your Heart, Delhi
    Posts
    76,213

    Instrument Engineer

    CURRICULUM VITAE

    Name : YASHASHREE MUDULI.
    E-mail : yashashree.muduli AT gmail.com
    Career Objective :
    To contribute my level best no matter for which organization I work.
    Personal Skills :
    A good communication skill, extremely energetic and has the tenacity to handle to pressure and come out of a difficult situation; good leadership qualities; confidence and will power are the key strengths.
    Present Employer :
    Vision sponge and Power Pvt. Ltd
    (Captive Power Plant of capacity 15MW under commissioning)
    Plant Profile : BOILER- 4*10 TPH WHRB (HARI MACHINES)
    40 TPH AFBC (VEESONS)
    15 MW TURBINE (TRIVENI)
    Position : Asst. Manager (C&I Department).
    Experience : From 1st October 2010 to till date.
    Present Job Profile :
    - Dealing with the consultancy about requirement, modification and implementation jobs, finalise the I/O requirement and approval of P&ID digrams.
    - Materials (Instruments with proper data, Equipment with proper specifications) selection to purchase and negotiation with the material provider.
    - Indent of materials and there certification.
    - Supervision of field work (erection and commissioning of all field instruments like control valves, motorized valves, power cylinders, transmitters, pressure switches, all temperature and pressure gauges, vibration sensors , ash handling system and all cable selection and cable tray rooting)
    - Termination schedule preparation for termination at both field and DCS ABB-AC-800M.
    - Erection and commissioning of DCS ABB-AC-800M having more than 1900 I/O S.
    - Troubleshooting of all the problems regarding erection and commissioning from instrumentation prospect.
    - Man power management and job distribution to concern person and looking after their safety.
    - Over all responsible for all control and instrumentation job.
    Previous Employer :
    Adhunik Metaliks Ltd.(Captive Power Plant of capacity 2*17MW and 2*45 MW in project).
    Plant Profile : BOILER- 5*10 TPH WHRB (THERMEX)
    130 TPH CFBC (WOXI)
    2*17 MW TURBINE (HTC)
    Position : Sr. Engineer (E&A Department).
    Experience : From 7th January. 2007 to 30th September 2010.
    Previous Job Profile :
    - Routine maintenance and control room job.
    - Project commissioning job.
    - Calibration, maintenance and checking of transmitters, gauges, switches, pneumatic control valves, MOVs, pneumatic power cylinders.
    - Maintenance of temperature elements, Oxygen Analyzer, Ash Handling System, vibration proximitters, vibration & speed sensors etc.
    - Took part in Project Commissioning job of 2*17MW turbine & 130 tph CFBC boiler and 5*10TPH WHRB boiler.
    - Took part in commissioning of Oxygen Analyzer, Ash Handling System & SIEMENSE S7 400 DCS.
    - Maintenance & trouble shooting of DCS.
    PROFFESSIONAL TRAINING :
    - Industrial training (Vocational training) at NALCO, Damanjodi, Odisha in C&I deptt. In the year 2004.
    - Two month training in Hardware & Networking in C.T.T.C (Bhubaneswar)
    PROFESSIONAL EXPERIENCE

    Control & Instrumentation Engineer
    PROJECT EXPERIENCE :-
    1. Erected & commissioned complete DCS controlled 2*17 MW power plant in ADHUNIK METALIKS LTD (Unit – ROURKELA) and 15 MW CPP at VISION SPONGE AND IRON PVT LTD (MADHUKUNDA). The following activities were carried out during the Project.
    - Erection & commissioning of DCS having more than 2000 I/Os model SIEMENS S7 4OO, DCS ABB-AC-800M , Profi-bus DP, Mod bus and OFC are used as communication protocols.
    - DCS logic modification according to our requirement.
    - Erection & commissioning of field instruments.
    - Planning for daily manpower engagement.
    2. Level transmitter installation in steam drum, dearator, hotwell and cooling tower.
    Pressure transmitter installation in furnace bed, steam drum, dearator, hotwell, turbine HP side and turbine LP side.
    3. Flow transmitter installation from boiler to high pressure header, hp header –turbine, feedwater from dearator to steam drum (orifice and venturi tube).
    4. Installation and commissioning of RTD (PT-100) in turbine and thermocouple (k-type) in boiler area.
    Operation :
    - Knowledge with the power plant operation & their control system.
    - Knowledgeable with seimens-S7 400 (Version-6.1) DCS , DCS ABB-AC-800M.
    - Control operation and Troubleshooting through DCS.
    - Configuring channels and troubleshooting the same.
    - Online forcing of values and monitoring.
    - Program modification at VFD (ABB,TBWOODS,)
    Maintenance :
    - Maintenance of Field Instruments in BOILER (WHRB, AFBC, CFBC) and TURBINE.
    - Troubleshooting in Process Instrument and control loop logics.
    - Installation and Calibration of Electrical actuators. (Auma, Rotork,koso).
    - Calibration & Maintenance of field instruments and preparing schedule for maintenance. (Make : Rose mount, ABB,Yokogawa, Honey well).
    - Familiar with field instruments like Thermocouples, RTD’s, Limit Switch, solenoid valves, flame scanner and their applications.
    - Experience in gauges such as Pressure gauges, Temperature gauge of different types and ranging, pneumatic actuators and pressure switches.
    - Installation of Flow / Level / Pressure/Temperature transmitter and online Calibration using HART communicator.
    - Installation and commissioning of TSI Instrument.
    - Familiarity with following design documentation Block diagrams, Termination diagrams, Schematics, loop diagrams, Functional Logic diagrams, Instrument layouts, P&ID, Cause and effects.
    - Knowledge of Auxiliary system such as Air Compressor-Dryer, ESP, Ash Handling system, Soot blower and their control system troubleshooting.
    - Creating and Issuing of order through SAP and also preparing Shutdown job list.
    - Assist maintenance department in equipment maintenance.
    - Observe overall plant equipment health, and initiate changes to improve plant performance.
    HANDS ON EXPERIENCE :-
    - Working in 2*17 MW Power Plant with SIEMENS (Model : 800xA) DCS and ABB
    (AC- 800M) DCS System.
    - Boiler (WHRB, AFBC, CFBC), 65-70 Kg/cm2 and Turbine (Make : HTC,TRIVENI).
    - Working with SIMENS (Model : SIMATIC S7-300) PLC in Macawber Beekay Ash Handling System and OSM Ash Handling system.
    - Working with Woodward (Model : 505) Digital Governor System.
    - Working with BENTELY NAVADA (MODEL 3500) Vibration System.
    - Working with Transmitters (Make : ABB, YOKOGAWA, ROSEMOUNT, HONYWELL), Control Valves (Make: MIL CONTROLS, FORBSMARSHAL, KOSO, SAMSON).
    PROFESSIONAL PROFILE :
    Bachelor of technology in Electronics and Instrumentation Engineering (B .Tech)
    from Biju Pattnaik Technical University, Orissa with 72% (2002-2006)
    ACADEMIC PROFILE :
    - C.H.S.E: Council of Higher Secondary Education, Orissa passed.
    - H.S.C: High School Certificate Examination , Orissa passed.
    SOFWARE EXPOSURE:
    - C, C++, core JAVA.

    - HARDWARE EXPOSURE:

  4. Post Count Number #4
    Guest Poster
    Join Date
    August 14th, 2008
    Location
    Your Heart, Delhi
    Posts
    76,213

    cv

    “CURRICULUM VITAE”
    ASHOK GUPTA
    E-Mail : ashok.g07 AT rediffmail.com

    ashokjorhat AT gmail.com
    KEY SKILL : Mechanical Engineer having 4 years experience in Iron & Steel Plant.
    : Project, Commissioning and Maintenance of Sinter Plant and Lime plant.

    PRESENT STATUS
    - Presently associated with Uttam Galva Metallics Ltd., Bhugaon, Wardha, Maharastra as “Sr. Engineer” in Maintenance Unit of Sinter Plant Department.
    ORGANIZATIONAL WORK EXPERIENCE : (4 YEARS)
    1 : UTTAM GALVA METALLICS LTD., WARDHA, MAHARASTRA. (Since Oct 2010 to till date)
    Uttam Galva Metallics Ltd. (UGML) formerly as Uttam Steel Ltd., part of the Rs. 2,000 crore Uttam Galva Group, is a India’s largest single site standalone manufacturer-exporter of value added steel products. Now it is tie up with Arcelor-Mittal Group.
    JOB RESPONSIBILITIES :
    - Reporting to Section Head-Mechanical Maintenance (AGM)-Sinter Plant
    - To ensure upkeep of all Mechanical equipments in healthy condition and uninterrupted operation of the plant.
    - Resource planning, job planning for planned and routine maintenance.
    - Execution and attending of Preventive/serious plant breakdowns & shutdown jobs.
    - Responsible for Man, Machine, Material and Safety Management.
    - Scheduling, Planning, & indenting of the required mechanical maintenance Spares and Tools & tackles for maintenance.
    2 : BHUSHAN STEEL LTD., DHENKANAL, ORISSA. (Since April 2007 to September 2010)
    Bhushan Steel Ltd. (Formerly Bhushan Steel and Strips Ltd.) is the steel producer with total turnover of 5500 crores plus. The Plant’s current production capacity is 3.1 Million Tons per Annum. The projected capacity is 7 MTPA in nearby future.
    JOB PROFILE :
    - Working in Bhushan Steel Ltd., as Jr. Manager in 177m² Sinter plant, Project, Commissioning and Maintenance.
    - Team player in successful commissioning of the Sinter plant.
    - Also successfully executed the Lime & Dolomite Plant Project of 400×4 TPD capacity.
    - Coordinated in implementing documentation of ISO : 9001-2008 & 14001: 2004 series for best quality & environmental safety management standers for Mechanical Maintenance Department of Sinter Plant of Bhushan Steel Ltd.
    JOB RESPONSIBILITIES : PROJECT STAGE
    -During project reporting to AVP, Sinter Plant (Project) and Sr. DGM (Structural/Mechanical).
    - Supervision, Fabrication, Erection, Alignment and Quality inspection of mechanical, building and technological structures
    - Supervision, Erection, Alignment, Trial Run and Commissioning of Material Handling equipments (Conveyors), ESP & Bag Filter with Dedusting, Sinter Machine, Crusher, ID Fans, Screening, Proportioning, Mixing etc. of Sinter Plant.
    - Working on utility systems like hydraulic, pneumatic, grease, lubrication which are major part of the project.
    - Study of drawings, planning site fabrication & erection activities & preparing overall target plan for monthly of structural and mechanical equipments with resource planning and procurement of materials from Fabrication Drawings.
    - Preparation and modification of fabrication/equipment drawings supplied by Chinese/consultant according to site requirement as suit to Operation and maintenance team to improve productivity and achieved good result.
    - Also carrying out of Preventive maintenance and necessary activities like cleaning, overhauling, greasing, oiling of equipments before installation during project period.
    - Verification & certifying of Contractor R/A Bill, material reconciliation and managing the problems manpower.
    - Attending Project review meeting for evaluating the planning & progress and prepare balance work report, critical list, Punch Lists, Defect Lists etc.
    - Played a major role in Safety Implementation in Project Execution.
    JOB RESPONSIBILITIES : MAINTENANCE STAGE
    - Reporting to Section Head-Mechanical (Sr. DGM)-Sinter Plant
    - Maintenance of sinter plant equipment like Hammer crushers, Vibratory Screens and Vibrofeeders, All type of conveyor belts, rotary mixers and Dedusting System Including ESP & I.D. Fan & F.D Fan, Sinter M/c and lubrication systems.
    - Execution and attending of Preventive/serious plant breakdowns & shutdown jobs on scheduled time.
    - Preparation of History books, Standard Maintenance Practice (SMP), PM schedules lubrication schedules etc.
    - Modification of Equipment to improve aesthetics, Productivity & ease of maintenance and operation.
    - Scheduling, Planning, & indenting of the required mechanical maintenance Spares and Tools & tackles for maintenance.
    - Co-Ordination with various in-house departments (Design, Purchase, Production Planning & Control, Accounts, Stores); Interface with Workshop for machining & assembly related issues.
    - Looking after safety aspects like : on- job safety training programs and regular inspections to prevent accidents.
    There after continue in the relieving shift with responsibility of plant mechanical maintenance.
    PROFESSIONAL AND ACADEMIC CREDENTIALS :
    Sl. No. Exam Passed Board/University Year of passing % Marks
    1 B.E.(Mechanical) Jorhat Engineering Collage (JEC) (Established by Assam Govt.), Jorhat, (Assam) affiliated to Dibrugarh University, Dibrugarh, Assam.
    2006
    64
    2 Diploma (Mechanical) HRH The Prince of Wales Institute of Engineering and Technology (POWIET) (Govt. Polytechnic), Jorhat, Assam affiliated to State Council For Technical Education(SCTE), Guwahati (Assam)
    2001
    72
    3 Matriculation Sankar Dev Seminary,Jorhat (Assam) affiliated to Board Of secondary Education(SEBA), Assam
    1997
    58
    COMPUTER PROFICINCY AND TECHNICAL EXPOSURE :
    - Operating system-All Windows Environment, MS Office Packages & Internet Applications.
    - Designing & Planning software’s like AutoCAD 2000, Primavera Project Planner.

  5. Post Count Number #5
    Guest Poster
    Join Date
    August 14th, 2008
    Location
    Your Heart, Delhi
    Posts
    76,213

    job

    CURRICULUM VITAE
    Manoj kumar Mishra
    Mail-mishra.manoj.m AT gmail.com
    pm-orissa AT gangesintl.com
    Objective Highly self-motivated and goal-oriented professional committed to pursue a long-term career implementation of different telecom projects. I have five years of track record demonstrating strong analytical and management skills, computer proficiency and ability to follow through with projects from inception to completion.
    Qualification :
    - MBA from Gyana bharati institute ,orissa under Sikim Manipal university, securing first division.in the year of 2008.(07 TO 08).
    - B.Tech in Mechanical from MAGHIGHARIANI INSTITUTE OF TECHNOLOGY AND SCIENCE,Under Berahampur university securing 75%)in the year of 2005.
    - )+2 Science passed from Council of higher secondary Education ,orissa in the year 2000(Pattamundai college,kendrapara) securing 62%.
    - HSC PASSED FROM BSE ,ORISSA in the year of 1998(M.N HIGH SCHOOL pattamundai, kendrapara)
    securing 75%
    Work Experience :
    - Over 5 .5years in telecom project line.( Fabrication Erection and Civil work)
    Carrier :
    - Presently working as a Project manger in Ganges Internationale Pvt ltd from 2006.
    Exclusive Experiment
    - Handling Up gradation projects of Infratel and TSP project of Infratel.wttil,ATC,
    - Making the survey of the sites given by the client and suggesting the upgradation requirements as per the SLA of the customer with the sharing operator and our SLA with the customer.
    - Preparation of BOQ and getting it approved from Client
    - Follow up with the clients for PO and billing
    - Procurement of material and movement of material to the sites
    - Upgrading the sites as per the timeline given by client
    - Invoicing the Job executed and supply and getting it certified by the client .
    - Developed the infrastructure and resources for this new task assigned by the company
    - Meeting clients to fetch more services to add up the projects in our kitty.
    - To Develop the vendor Base for the various jobs i.e. Civil , Electrical ,tower etc. in the different states and provide to the project teams
    - To provide the WO in time to the vendors to avoid any delay in work
    - To monitor the delay in different stages of activity and eradicate the delay
    - To look after the all the aspects of TSP , from acquisition to Accceptance .
    To achieve the targets of the customer by making a proper planning .
    - Handling Up gradation projects of Infratel and TSP project of Infratel.wttil,ATC,
    - Making the survey of the sites given by the client and suggesting the upgradation requirements as per the SLA of the customer with the sharing operator and our SLA with the customer.
    - Preparation of BOQ and getting it approved from Client
    - Follow up with the clients for PO and billing
    - Procurement of material and movement of material to the sites
    - Upgrading the sites as per the timeline given by client
    - Invoicing the Job executed and supply and getting it certified by the client .
    - Developed the infrastructure and resources for this new task assigned by the company
    - Meeting clients to fetch more services to add up the projects in our kitty.
    - To Develop the vendor Base for the various jobs i.e. Civil , Electrical ,tower etc. in the different states and provide to the project teams
    - To provide the WO in time to the vendors to avoid any delay in work
    - To monitor the delay in different stages of activity and eradicate the delay
    - To look after the all the aspects of TSP , from acquisition to Accceptance .
    - To achieve the targets of the customer by making a proper planning of activities and materials .
    - To co-ordinate between the SCM and projects to see the proper delivery of materials in order to avoid gaps between Milestones
    - Co-ordination between finance and customer to get the payments in time .
    - To make a proper co-ordination between the Project team and TSP team to ensure proper quality is delivered to the customer
    - To take pro-active steps to ensure that no measure issues turn up as a hindrance in the progress .
    - To ensure all necessary steps to ensure the proper quality is delivered within time line.
    - Looking after Liasoning like Pollution , Municipal , EB liasoning For Airte,wttil.
    - of different vendor and accomplished the Task.
    - Processing Civil, Electrical, BTS Bills by creating POs, Work orders for all the activities.
    - Completed Tower erections and Punch point clearance for the same.
    - Completed Shelter Erections and Punch point clearance for the same
    - Completed DG Installations and Punch point clearance for the same.
    Project Management : -
    - Managed Complete USO Phase as Project Manager(In-charge)
    - Deployment of the Civil contractors, Erection contractors, mobilizing the engineers to the sites.
    - Supervise the civil foundation, Tower works and get certified by the Customer (infratel,WTTIL)
    - Raise the Civil foundation, Tower supply and Transportation bills and get those certified by Customer
    - Prepare the Budgets, sales targets monthly wise for the project.
    - Complete all the works at Customer satisfaction in due time as well as keeping my corporate targets in tact besides all the hurdles
    FAT and Hand back :
    I played an active role in fulfilling the main motto of my company that is handing back the site
    - To visit the sites to collect different punch points at the sites and keeping a track of it.
    - To clear the punch points at the site by contractors and vendors
    - Preparing Visit schedules with INFRATEL after discussing and implement it.
    - To clear the punch points given by INFRATEL
    - To prepare the folders as required by INFRTEL
    - To hand back the sites by hook or crook.
    Electrical : INFRATEL Project
    - To mobilize the Electrical Vendors to the sites
    -
    - To get the electrical works including Internal & External electrical works, DG commissioning, SVS, Fire alarms to be done.
    - Check the sites in point of FAT.
    - Hand back folders of the sites with all sort of punch points clearance.
    - To Look after the EB Liasoning and related activities in co-ordination with vendors.
    Tower : -AIRTEL and Infratel project
    - Erect the Towers according the Drawings.
    - Check the Towers according to the Drawing for AT and FAT.
    - Fabricate the Tower material in case of need.
    - And handed over the Tower with all respect to the Customer with quality check certificates (TPL)
    Present Salary----549,120 per annum( Ctc-45760.00 per month)
    Expected Salary--Negotiable

  6. Post Count Number #6
    Guest Poster
    Join Date
    August 14th, 2008
    Location
    Your Heart, Delhi
    Posts
    76,213

    Application for power plant construction manager in Orissa

    CURRICULUM VITAE
    E-mail :sarat_patra77 AT rediff.com & sarat_patra77 AT yahoo.com
    SARAT KUMAR PATRA
    POST APPLIED FOR : CONSTRUCTION MANAGER IN LARGE SIZE POWER PLANT / SUPER CRITICAL BOILER
    PROFILE
    - Ability to think analitically and solve specific problems.
    - Have a tenacity to patiently work through an area, for achieving the desired result.
    OBJECTIVE :
    - Seeking a responsible and challenging position that will provide me with an opportunity .
    - To utilize my skills and enable to make a visible and valuable contribution.
    EDUCATIONAL QUALIFICATION :
    MATRIC 1995 B.S.E-ORISSA
    +2Sc 1997 C.H.S.E-ORISSA
    PROFESSIONAL QUALIFICATION :
    B.E-MECHANICAL (1999-2003) passed with 1ST CLASS from –SATYA SAI ENGG COLLEGE-BALASORE under B.P.U.T-ROURKELA
    TRAINING & PROJECT REPORT-
    2nd Yr & 3rd Yr Summer training- from Emmami paper mills Ltd. Balasore & Ispat Alloys Ltd., Balgopalpur ,Balasore for one month respectively.Design project report on manufacturing of Hand Operated Wall Jib Crane from Jessop & Construction Ltd-Kolkata & Seminar report on Steam Boilers.
    COMPUTER KNOWLEDGE : M-S DOS, M-S OFFICE, WINDOWS’98,MS EXCEL,INTERNET & C-LANGUAGE
    EXPERIENCE :- From 8th Nov.-2003 to 10th Nov.2004
    Organisation :-M/s Shree Ganesh Automobiles,Balasore,Orissa
    Employer :-Ashok Leyland Ltd.
    Position :-Trainee Service Engineer
    Salary drawn :- Rs. 9500.00 + Other Allowances
    From 15th Nov.-2004 to 15th Feb.2008
    Organisation :-M/s Pradhan Associates Pvt. Ltd.,Bhubaneswar
    Site :-Emmami Paper mills Ltd. & Orissa Sponge Iron Ltd.
    Project :-W.H.R.B. (52tph)& A.F.B.C.Boilers (85tph&52tph)
    Position :-Project Engineer
    Boiler supplier :-Cethar vessel Ltd.
    Salary drawn :- Rs. 19,000.00 + Other Allowances
    From 15th Feb.2008 to 25thNov.2008
    Organisation :-M/s Cheema Boilers Ltd.,Chandigarh,Mohali
    Project :-Slope Fired Boiler(47tph),4Nos Waste Heat Recovery Boiler
    Site :-India Glycols Ltd. ,Gorakhpur,Uttar Pradesh
    :-Haldia steel Ltd,Durgapur
    Position :-Sr Project Engineer
    Salary drawn :- Rs. 23,600.00 + Other Allowances
    From 25thNov.2008 to till date
    Organisation :-Larsen & Toubro Ltd(ENC POWER DIVISION).,Vadodara,Gujurat
    Project :-238MW(5HRSG AT 95TPH EACH+2nosUTILITY AT 406TPH EACH Boiler) Previous Site:-Indian Oil Corporation
    Panipath Naptha Cracker Project
    Present site :-GMR Power Ltd.,Rajamundry,Andhra Pradesh
    Project :-383MW combine cycle power project (HRSG)
    Position :-Asst Manager
    Salary drawn :-7.5 Lakh CTC per Annum
    RESPONSIBILITY-ERECTION OF PRESSURE PART,PIPING,EQUIPEMENT & COMMISSIONING OF THE SYSTEM IN AFBC,WHRB,SLOP FIRED,HRSG & Gas based Boiler.

  7. Post Count Number #7
    Guest Poster
    Join Date
    August 14th, 2008
    Location
    Your Heart, Delhi
    Posts
    76,213

    job for mechanical engg. in orissa

    PULAK NAYAK
    Engineer -Mechanical
    Email id : pulak.nayak AT rediffmail.com

    CAREER OBJECTIVE :
    Seeking a challenging position in PMC (Design, Engineering& Consultancy) & EPC organization, this enriches my academic potential & paves me a way for my career growth & upliftment in my field.

    PROFESSIONAL EXPERIENCE :
    I have total 7 YEARS Experience. But in Ash handling 6 years’ Experience.
    MACAWBER BEEKAY PVT LTD, NOIDA, INDIA-January 2005 to present
    Working as an Engineer- Mechanical with below responsibilities.

    - Preparing Flow diagram for Mechanical Equipment’s.
    - Preparing Bill of materials for Mechanical Equipment’s.
    - Preparation all General Arrangement Drawings, Layout of pipes, & Manufacturing drawings.
    - Vendor document & procedure review.
    - Detailed engineering.
    PROJECTS UNDERTAKEN :
    Title : COASTAL THERMAL POWER PROJECT 2X 150 MW
    Client : MEENAKSHI ENERGY PVT LTD
    Contractor : THERMAX LTD
    Title : 2X35 MW CPP
    Client : KAMACHI PVT LTD
    Consultant : ENMAS GB POWER SYSTEM PROJECT
    Title : 14.8 MW CO-GENERATION PLANT
    Client : ITC LIMITED
    Consultant : TCE

    Title : 20 MW COAL GENERATION POWER PLANT
    Client : SHRIRAM EPC LTD
    Consultant : AUQATHERM ENERGY PVT LTD
    Title : 3X210 MW FLY ASH HANDLING SYSTEM
    Client : LAFARGC INDIA PVT LTD
    Consultant : HOLTEC CONSULTANT PVT LTD
    ARATI STEEL PLANT , ORISSA, INDIA- : APRIL 2003 to NOVEMBER 2004
    Worked as a supervisor.

    PROFESSIONAL QUALIFICATION
    Completed B.Tech in Mechanical Engineering in 2011 from RAJASTHAN VIDYAPITHA.
    Completed Diploma in Mechanical Engineering From S.C.T.E & V.T, Chhendipada Angul Orissa in 2002.
    Completed One Year Post Diploma in Auto Cad from B.O.S.E. Cuttack, Orissa in Year 2003.

    COMPUTER SKILLS :
    MS Office, Auto-Cad

    DECLARATION
    I hereby declare that the above mentioned information is correct to the best of my knowledge and belief and I bear the responsibility for the correction of these particulars.

    Place : New Delhi
    Date : / /2012 Pulak Nayak

  8. Post Count Number #8
    Guest Poster
    Join Date
    August 14th, 2008
    Location
    Your Heart, Delhi
    Posts
    76,213

    CURRICULAM VITAE

    CURRICULAM VITAE
    Panneerselvam.S
    E-mail-Id :panneer1973 AT gmail.com
    Job Objective :
    - Over 17 years of exposure in Erection & Commissioning, Operation & Maintenance of various electrical equipments, high pressure boilers & turbines auxiliaries and Balance of plant (BOP).

    Educational Qualification :
    - Diploma in Electrical & Electronics Engineering with an aggregate of 85 %
    Current employer :
    Still now working in DFPS and TDPS joint on 1st june'12 power project commissioning and operation of the electrical and instrumentation.
    - Privies Handling the BTG and BOP Operation, Maintenance and Electrical Maintenance and commissioning activities of 1 X 600 MW- Mettur Thermal Power Plant -M/s. GB Power project & worked as a Deputy Manager (BTG & BOP commissioning) at Mettur
    w Company Profiles :
    w Steam Generators : PULVERIZED FIRED BOILER of M/s. Dong Fang electrical & co make- 1 Nos.
    1*2028 TPH capacity, 192.5 Kg/cm2 press, 541 OC temp.
    w Turbo Generators : 1*600 MW CONDENSED STEAM TURBINE
    M/s. Dong Fang Electrical & Co make–1 Nos.
    (HP,IP,2LP TURBINES)
    22KV,706 MVA Hydrogen cooled rotor & water cooled stator .
    w Control System : DCS M/s. Foxporo.
    w Role and responsibilities :
    w All water and steam lines flushing’s.
    w All type of pumps commissioning and line up
    w Seal oil unit, stator water cooler, EH oil unit commissioning and lineup.
    w Condenser leak test, Vacuum pump commissioning and line up
    w Involved in DC,AC hypo test of Alternator
    w Alternator air leakage test and seal oil commissioning
    w Responsible for Burner start up and Boiler start up and shut down activities.
    w FD fan, ID fan, PA fan, SA fan, Coal mills, CCW, ACW, CEP, CW, Dry ash conveyor, Crusher, Belt conveyor, vibrating screen. Vibrate feeder, Magnet separator, Magnet detector, Wagon tippler commissioning activities through DCS.
    w Shoot blowers operation and commissioning.
    Maintenance :
    - Managing the functions of troubleshooting & preventive/ breakdown maintenance of Machines & Equipment so as to reduce downtime to minimum.
    - Conducting regular inspections to prevent hazard occurrences & adhere to regulatory norms.
    Procurement :
    - Developing a reliable vendor base for procurement of Electrical equipment.
    Previous Employer
    - NOV 2005 to JULY 2011 Worked as an Electrical Senior Engineer with M/s ENMAS O&M SERVICES PVT LTD.,
    - DEC 2004 to NOV 2005 Worked as an Electrical Engineer with M/s Hofincons PVT LTD.,
    - SEP 2001 to DEC 2004.
    Worked as an Electrical Engineer in Larson & Turbo private limited
    Client : M/s IOCL (AOD) DIGBOI
    - OCT 2000 to SEP 2001.
    Worked as an Electrical Engineer in M/s Scoda Export
    Client : M/s Ennore thermal power station, Chennai
    Capacity : 2 X 60 MW
    - NOV 1994 to SEP 2000 Worked as an Electrical Junior Engineer with M/s Chemin consulting Engineers
    Nature of Jobs : Erection and commissioning, trouble shoots rectification for the following equipments
    - Electrical prevent maintenance schedule preparation and work following for schedule.
    - Electrical running trouble shoot attend short time
    - Equipment breakdown - down time decreased.
    - Energy saving system to improve
    - Electrical daily report, energy report and monthly report following
    - Spares and store stock maintained and store auditing co-coordinator
    - Analysis of tripping report following
    - Equipment breakdown analysis of tripping report following
    - Annual shutdown schedule prepare and work implement
    - Transformer's 50MVA, 110/11KV Switchyard, SF6/ACB (Breakers) and ESP Transformer's.
    - Fans : ID, FD, PA Fans, Blowers, Bowel mills, ACC Fans, CHP system, ESP system and CT Fans.
    - All turbine & Boiler auxiliaries :
    - BOP : CHP plant all electrical and instrument, interlock, Dm plant, ASH plant, ESP, ACC & Surface Condenser
    - Drag chain feeders and Pocket feeders.
    - Transformer's 50MVA, 230/11KV,400/11KV 12.5MVA, 33/11KV, SF6/VCB (Breakers)
    - AC and DC drives, DC motor also
    - Aux. Transformer’s 2.85MVA, 11/6.6KV,11000/415V, VCB (Breakers) and ESP.

    Personal Profile :
    Father’s name : G. samikkannu
    Date of birth : 15.06.1973
    Martial status : Married
    Nationality : Indian
    Passport No. : E4411097
    Language : Tamil, English, Hindi & Telugu
    Salary drawn (CTC) : Rs 70,000/- (Rs 8, 40,000 /annum)
    Declaration :
    I do here by declare that above all information are true the best of my knowledge and belief. I am looking forward a positive response from you.
    Thanking you,
    Yours faithfully,
    (S.PANNEERSELVAM)

  9. Post Count Number #9
    Unregistered
    Guest

    Name :SANJAY KUMAR ROUL
    DIST :-JHARSUGUDA.
    E-MAIL :-sanjay_roul AT radiffmail.com

    CARRIER OBJECTIVE :-
    To attain success through hard labour and thus create and image of the company,by leading to market dominance in locality promising to be fully honest and work with complete dedication and discipline for the growth and improvement of the company.

    ACADEMICS :-
    # Diploma in Mechanical engineering from B.D.S.E, Brajrajnagar with 70% in year 2004.
    .#+2 SCIENCE from belpahar college in 1999.
    # 10th from bandhabahal high school with 58% in 1997.
    # Continuing B-TECH from IME (Institution of Mechanical Engineers) since 2011.
    WORK EXPERIENCE :-
    # Worked as a Asst Engg. In powerplant operation of boiler & Turbine, in “Action Ispat & Power (PVT) LTD.”Dist- Jharsuguda for 3 years.
    1. WHRB of 37.5 Tph & 38Tph made by CVL.
    2. AFBC of 80 Tph made by CVL.
    3. TG of 12MW & 25MW of Siemens.
    # Worked as a Asst Engg. In Powerplant operation of boiler, in Shyam Dri Power LTD. Dist- Sambalpur for 1 year.
    1. AFBC of 54 Tph made by CVL.
    2. AFBC of 135 Tph made by VEESONS.
    3. TG of 30mw*2 of HONGHZOU.

    # Presently working as a Jr. Engineer in Powerplant Operation of boiler & turbine, in Hindalco industries Ltd(Adityabirla Group). At- Hirakud since September 2010 to till date.
    1. CFBC of 155 Tph *9 made by Thysen Crupp.
    2. TG of 100mw*3 made by Siemens.
    3. CFBC of 145 Tph made by IGT.
    4. TG of 57mw made by BHEL.

    RESPONSIBILITY :-
    Position held : Main Plant Operation.
    1. Boiler Light up (cold, warm, and hot) and desk control.
    2. Exposure in TG rolling (cold, warm, and hot) and shutdown practices.
    3. Exposure in unit islanding, unit black out, resynchronization, TG protection systems, etc.
    4. Exposure to boiler tube leakage problems ash disposal problems, etc.
    5. Monitoring site activities like Water site, Boiler site, Power House Site, Ash Disposal System, ESP, etc.
    6. Exposure to maintenance activities in Boilers, Turbines, DM Plant as and when required.
    7. Adherence to plant load management, generation target, PLF, etc.
    8. Monitoring plant performance .
    9. Adherence to goal on Quality, Cost, Delivery, Innovation, productivity and safety.
    10. Equipment isolation and normalization as per safety guidelines.
    11. Coordination and follow-up with maintenance departments for rectification of problems .

    # Presently involve in pre comissoning & comissoning activities of u-5 (TG-100MW of siemens & Cold cyclone CFBC Boiler-165tph*2 of Thysenkrup).

    PERSONAL PROFILE :-
    Name : Sanjay Kumar Roul.
    Father’s Name : Mr. Srinibash Roul.
    Sex : Male.
    Date of Birth : 6th sept 1982.
    Marital status : Married.
    Language proficiency : English, Hindi, and Oriya.
    Nationality : Indian. .
    HOBBIES :- : Listening to music, Reading Books.
    STRENGTHS :- : Hard working, punctuality.

    DECLARATION :-
    If view above , I request you to give me an opportunity to serve your esteemed organization in the capacity mention above for which act of kindness, I shall remain thankfull you.
    .
    Thanking you sir

    YOURS FAITHFULLY
    ( Sanjay Kumar Roul.)

  10. Post Count Number #10
    Unregistered
    Guest

    POWER PROJECT ENGINEER

    CURRICULUM VITAE
    Mohit Swain
    E-mail : mohitnpt1988 AT gmail.com
    mohitnpt AT gmail.com

    CARIEER OBJECTIVE :
    To learn and function effectively in an organization and be able to deliver to the bottom-line. To constantly upgrade my knowledge and skills and make a difference in whatever I do.

    EDUCATIONAL QUALIFICATION :
    B-Tech in Mechanical Engineering in 2010 with 70.60% at KIIT University BBSR (Odisha).
    Diploma in Mechanical Engineering in 2006 with 64.82% at S.C.T.E & V.T Odisha.
    Matriculation in 2003 with 53.03% at B.S.E Odisha.

    PROFESSIONAL EXPERIENCE :
    Working as a Engineer in M/s. EDAC Engineering Ltd (formerly SPIC JEL Engineering and Construction Limited), Tuticorin Projects.
    Duration : June 2012– Till Date
    Project : 2x600MW Mutiara Thermal Power Projects.
    Customer : Coastal Energen Private Limited.
    Consultant : Harbin Power Engineering Company Limited.
    Job Profile :
    Involve in erection and finishing jobs of pressure parts.

    Working as a Engineer in M/s. EDAC Engineering Ltd (formerly SPIC JEL Engineering and Construction Limited), Angul Projects.
    Duration : June 2010 – June 2012
    Project : 6x135MW Captive Power Plant, Angul, Orissa.
    Customer : Jindal Steel and Power LTD.
    Consultant : M/S. Shangai Electrical Company Ltd.
    Job Profile :
    Involve in fabrication and erection of Cyclone, Structure and pressure parts of cfbc boiler.

    Work profile :
    - Responsible for erection, alignment and fabrication activity of “Boiler and Piping”.
    - Make an erection scheme for major erection work.
    - Plan the daily activities in line with the master schedule.
    - Collect the required materials for specific job.
    - Utilizing the manpower and maintaining the standard production.
    - To Ensuring the erection Procedure & Precaution for Material such as Alloy Steel (P91, P22, P12, etc.), Stainless Steel & Carbon Steel.
    - Supervising the jobs/quality of jobs and preparation of packages for testing.
    - Reporting the jobs to planning and QA/QC departments and preparation of daily reports.
    - Testing of lines according to project specifications.
    - Direct supervision of above works done by the sub contractors.
    - Monitoring the day to day work progress and regular reviews with concerned sub agencies.
    - All the required quality checks and proper documentation for all such records.
    - Arrange the necessary tools and tackles to smooth execution of job.
    - Pressure tests (Either Pneumatic or Hydro) as per testing schedule.
    - Ensure that the work is carried out as per standards, drawings, maintaining quality & safety.
    - Interaction with client and consultant.
    - Verification of work permit prepared by the sub contractors and obtaining its final approval of the client’s safety officers.

    SUMMER TRAINING :
    - 30 days of vocational training at Rourkela Steel Plant on Steel making Shop.
    - 30 days of CATIA V5 R16 training at KIIT university.

    SOFTWARE PROFICIENCY :
    - Operating System : MS-Office, Windows 98/XP
    - Designing Packages : Auto CAD

    RESPONSIBILITIES & ACHIEVEMENTS :
    - I got the best safety performance of during the year 2012-2013 at EDAC Engineering Ltd.(2x600 MW CEPL Tuticorin Tamilnadu )
    - Boiler pressure parts Erection & Fabrication, alignment, material handling (with proper schedule).
    - Planning for erection for the month, direct involvement in site activities, analysis of day to day progress done by sub-contractor, to attain the review progress meeting with the customer, material feeding and manpower handling for the project.
    - Hydro-Test of Unit#1 (Chinese Boiler) at 2x600 MW, Mutiara Thermal power plant, Tuticorin (T.N).
    - Drum lifting & hydro test of Unit#5 (China Boiler) at 6X135MW , Jindal Captive Thermal power plant, Angul (Odisha)

    PERSONAL INFORMATION :
    Date of Birth : 20TH .MAY.1988
    Gender : Male
    Father name : Mr. Sanatan Swain
    Mother name : Mrs. Bijayalaxmi Samal
    Mother tongue : Odia
    Nationality : Indian
    Marital Status : Unmarried
    Languages Known : English, Hindi, Oriya.

    DECLARATION :
    I hereby declare that all the information regarding my education and achievements is true with original documents with me .In case of any sort of discrepancy ( if the text is not modified by unfair means),I am liable to be penalized .
    Place : Tuticorin.
    Date :
    Mohit Swain.

  11. Post Count Number #11
    Unregistered
    Guest

    Water Treatment Plant

    Respected Sir,

    Sir my Self Subash Rout as a CHEMIST in WATER TREATMENT plant of GMR KAMALINGA Energy 4x350 M.W Thermal power plant in ODISHA,ANGUL.I have 8.1 year’s experience in power plant jobs.
    I hereby came to know that you are calling B.Sc. candidate(M.Sc. -Chemistry Continue from Karnataka University) in your esteemed organization. I would like to put forward my candidature for the above post.

    Sir, I am keenly interested to work under your kind jurisdiction. I assure you that if I am given a chance I will put up my full efforts to satisfy superiors with hard work. I will try my best and enhance good will and reputation of your reputed organization.

    Here with enclosing my resume for your kind perusal.
    Thanking you in anticipation of your positive reply.

    Thanks & Regards,
    Subash Rout
    Mob-09776559747.07894450366
    E Mail : subashrout147 AT yahoo.in
    Subashr4 AT gmail.com
    subash.rout AT gmrgroup.in

  12. Post Count Number #12
    Unregistered
    Guest

    B.tech in mechanical engineering having more than one year experience in power plant operation erection and fabrication work.

    Sir/Madam,
    I am a HARIOM GUPTA completed B.TECH in MECHANICAL ENGINEERING having 1 Years of experience in the field of Power plant Fabrication , Erection & operation maintenance work as a Site engineer.

    I will be much pleased to work in a globally competitive environment
    On challenging assignments that shall yield that twin benefits of the job
    Satisfaction and a steady- paced professional growth.
    I hereby enclose a copy of my resume for your kind perusal.
    Expecting favorable reply
    Thanking you
    (HARIOM GUPTA)
    E-mail : hariom.gupta438 AT gmail.com

    RESUME
    HARIOM GUPTA,
    Gmail :-hariom.gupta438 AT gmail.com

    I Associated with JKM THERMO client GEA COOLING TOWERS TECHNOLOGIES PVT. Ltd. At 225MW combined cycle gas based power plant as a SITE ENGINEER’ (From July 2012 to till Date)

    Job Profile :
    ** Daily line inspection such as pipe rack, sleeper pipe line fit-up welding final inspection.
    ** Heavy structural columns beam bracings fabrication fit-up, welding inspection as per drawing,
    ** Package preparation and inspection carried out with client.
    ** Pre-commissioning activities internal cleaning, box-up, bolt tightening, final inspection.
    ** Review & witness the welder qualifications and testing
    ** Heavy pressure vessels, heavy columns DPT, UT. RT, inspection, preparing report and documents Witness.
    ** Preparing non conformance reports
    ** Making punch list with client and closing punch list
    ** Customer relationship,

    PROJECT HANDLED :
    ** Power plant operation and maintenance (6.5MW Captive power plant).
    Triveni turbines Ltd. O&M site client GIS
    34TPH AFBC Boiler make THARMAX
    6.5MW Bleed cum Condensing cum Extraction turbine
    20m3 R.O Capacity
    Working pressure -65kg/cm2
    Turbine bleed pressue-2.2kg/cm2

    ** Sheet metal forming (Duration 6 weeks).
    Training place SUPRAPHA INDUSTRIES Ltd. Client TATA MOTORS.

    ** Al alloy handling, total quality control (4 weeks).
    Training place HINDUSTAN AERONAUTICS Ltd


    Job Profile :
    ** Individually having the responsibility to undertake, monitor, inspect, and control the activity of mechanical erection, fabrication, pre – assembling and alignment
    ** Study of drawing, technical specification and design details.
    ** Responsible for requirement of resources like material, manpower, consumables, equipment according to the project
    ** Monitoring and checking the bills by means of the Quantity approved for the scope.
    ** Co-ordinate and offered for inspection as per Client QAP,NDT stages like PT.MPT,RT,UT also offered and witnessed the client
    ** Bill of materials prepared as per drawing.
    ** Coordinate with Clients, third party representatives.
    ** Report to our management and get feedback from site all activities.

    PROFESSIONAL QUALIFICATIONS :
    B.TECH in Mechanical Engineering from M.M UNIVERSITY MULLANA, AMBALA in JUNE 2012 with 69%.

    ADDITIONAL QUALIFICATIONS :
    ** Knowledge in Catia.

    OPREATING SYSTEM :
    ** Windows XP, Windows 7,
    ** MS Office

    PERSONAL INFORMATION :
    Date of Birth : 10.10.1989
    Nationality : Indian
    Marital Status : Unmarried
    Languages Known : English, Hindi

    DECLARATION :
    I hereby declare that the written above particulars are true to the best of my knowledge and belief.
    Date :
    Place :
    (HARIOM GUPTA)

  13. Post Count Number #13
    Unregistered
    Guest

    my resume

    CURRICULUM VITAE
    AJAY KUMAR BEHERA
    Email : - kumajay_behera AT rediffmail.com

    OBJECTIVE :
    Interested in working as a team leader involved in challenging project in a well managed company, where I can exercise my knowledge and learn more and more by working with others and of course Sincerely and co-operatively .

    WORK EXPERIENCES :
    SPICER INDIA LTD (31stJuly, 2007 to 4th June 2010)
    It is a member of ANAND GROUP of companies and collaborated with DANA-U.S.A and a manufacture of Drive Shafts for TATAMOTORS, FORD, GENERAL MOTORS,ASIA MOTOR, ASHOK LEYLAND, V.F.J, EICHER ,Certified by the TS-16949,Ford Q1,OHSAS_18001,AND ISO_14001.

    NEELACHAL ISPAT NIGAM LTD (2nd Feb, 2012 to Till Date.)
    Working with Operation and Maintenance Department in power plant section.
    It produces 62.5 MW power.

    JOB PROFILE :
    PRODUCTION & MAINTAINANCE DEPT

    My responsibilities are :
    Daily production targets
    TPM activity
    Member of 5’s activities
    Member of APS activities
    Daily Manpower Planning.
    Participation in new Development.
    Rejection & Rework Annalysis.
    Minimizing M/c Breakdown.

    TECHNICAL QUALIFICATION :
    High school from B.S.E Board (Orissa) in the year 2004 with 58 %
    Diploma in Mechanical Engineering from S.C.T.E. &V.T (Orissa) in the year 2007 with 59.78%.
    One year course in PDTDM at CENTRAL TOOL ROOM & TRAINING CENTRE,BBSR.

    SKILS :
    1. Problem solving.
    2. Idea about reduce m/c breakdown.
    3. Productivity improvement
    4. Pump Maintenance & Compressor Maintenance.
    5. Lathe.

    TRAINING ATTENDED :
    Safety
    APS work shop training
    5’s training
    7qc tools
    TPM
    FMEA
    Kanban
    Employee Involvement.

    ACHIVEMENTS :
    Idea award best idea for reducing cycle time.
    Best Engg. Award in the month of March 2008.
    100% Attendance in one year Training.

    EXTRA CURRICULAR ACTIVITIES :
    MS-WORD,EXCEL,POWERPOINT.
    AUTOCAD2009,PRO-E,UNIGRAPHICS,CATIA.

    PERSONAL PROFILE :
    Name : Ajay Kumar Behera.
    Father : Debarchan Behera.
    Date of Birth : 05th July1989
    Nationality : Indian.
    Religion : Hindu.
    Gender : Male.
    Language Known : Hindi, Oriya & English.

    DECLARATION :
    I do here by declare that all the information’s above are true to the best of my knowledge and belief.
    Place : Jajpur Road
    Date : 27/09/2013
    Ajay Kumar Behera
    Yours Sincerely

  14. Post Count Number #14
    Unregistered
    Guest

    Diploma in mechanical engineering jobs required.

  15. Post Count Number #15
    Unregistered
    Guest

    Safety engg.

    My name is Trilochan Bej. If you have any vacancy in your company please let me know.