-
June 24th, 2009, 11:05 AM
Post Count Number #1
www.evonik-es.in Energy Services India Pvt Ltd Noida : CFD modeling Power Plants boilers ducts
Evonik Energy Services India Pvt Ltd Noida : GENERAL MANAGER - PROCESS
Website: www.evonik-es.in
evonik-es.in
Designation: GENERAL MANAGER - PROCESS
Experience: 10 - 15 Years
Location: Noida
Job Description:
CFD Modelling of Boilers / ducts for Power Plants; Design and Engineering of Power Plants
Desired Candidate Profile:
The Engineer should have at least 10 years experience in operation/design of coal fired power plant and minimum TWO years experience in CFD modeling of boilers / ducts for Power Plants.
Company Profile:
Evonik is Germany's largest IPP and owns and operates about 11,000 MW worldwide. Evonik Energy Services(I)Pvt Ltd,a wholly owned subsidiary of Evonik Industries, Germany engaged in O&M, Engg. and IT Solutions for the Power Sector in India & abroad.
Address: Evonik Energy Services Pvt Ltd
GSEG CC Power Plant
Village Mora, Post Bhatha,
Hazira
Surat,Gujarat,INDIA 394510
Keywords: Design / Engineering, Power Plants, Operation
Last edited by muthukalee; October 12th, 2011 at 12:43 PM.
-
July 17th, 2011, 12:03 AM
Post Count Number #2
Mamta Bajetha
Email : mbajetha AT gmail.com
CAREER OBJECTIVE
I want to work in the renewable energy sector particularly in the Solar and Wind Energy sector with the
focus of making the technologies more economical and efficient.
EDUCATIONAL BACKGROUND
1. Master of Technology - Renewable Energy Engineering and Management (2009 - 2011)
TERI University, New Delhi
SGPA – 83.0%
2. Bachelor of Technology – Electrical Engineering
(1998-2002) GBPUAT Pantnagar, US Nagar, Uttarakhnad
SGPA- 70%
WORK EXPERIENCE
1. Govind Ballabh Pant Engineering College (G.B.P.E.C.),Pauri Garhwal,Uttarakhand
Lecturer (from 17.05.05 to till 24-07-2009) - 4 years
2. Institute of Engineering and Technology (I.E.T.), Lucknow, Uttar Pradesh
Lecturer from (2-06-02 to 30-07-04) – 2 years
SOFTWARE
MATLAB, WaSP, HOMER
WORKSHOP and CONFERENCE ATTENDED
1. One week training on ‘Wind Technology’ in “Suzlon”, Pune from 29th November to 3rd
December 2010.
2. “Energy efficiency and demand side management (DSM) entailed with clean development
management (CDM) benefits” at Dehradun.
3. Renewable Energy and Power Workshop, Solar Energy Centre, Gwalpahari.
4. Workshop on Small hydro energy – AHEC, IIT Roorkee.
5. Solar cooling technologies workshop at TERI, IHC.
6. 3rd Renewable Energy Expo 2009.
7. DIREC 2010, Greater Noida
PAPER PRESENTATION
1. “An overview of small hydro” and “Environment consideration in energy technology” in
national seminar on recent trends in renewable energy and technology (RREST) at, Srinagar,
Pauri Garhwal, ttarakhand.
2. “Short term load forecasting and power control using Artificial neural network” and
“Study on Communication Protocol for the Substation Automation” in RESONANCE
-2002 at H.B.T.I. Kanpur.
TRAINING & PROJECTS
1. Four months major internship in Renewable (Power Division) Mott MacDonald Private Ltd. Noida.
2. Two months minor (summer) internship in “Kargil hydro-electric plant’, BHEL Kargil,
Ladakh.
3. Four weeks training on “Electrical maintenance” in H.A.L Lucknow.
4. Project on “Determination of hysteresis loss in low loss iron core by A.N.N. (artificial neural
network) technique in non-sinusoidal excitation”.
EXTRA CURRICULAR ACTIVITES
1. Editor of college news bulletin.
2. Faculty in-charge of I.S.T.E. (Indian society for technical education) and organized several intra
and inter college technical and literary events.
3. Convener of Students consulting committee (S.C.C.) who works as a link between students and
faculty on several issues.
4. Actively participated & won prizes in various competitions at school & college level.
-
July 18th, 2011, 05:25 PM
Post Count Number #3
post applied for sr engineer -mechanical maintenance-boiler power plant
Tusar kanta parida
E-mail :tkp_18 AT rediffmail.com
CAREER VISION
To learn and contribute in team environment within a progressive organization in which my knowledge and intellectual skill can be best utilized.
ACADEMIC QUALIFICATION
EXAMINATION UNIVERSITY YEAR OF PASSING Division
DIPLOMA IN MECHANICAL ENGG S.C.T.E&V.T,ORISSA 2000 1st
APPRENTISHIP S.C.T.E&V.T,ORISSA 1995 2nd
I.T.I (FITTER) S.C.T.E&V.T,ORISSA 1993 2ND
10TH B.S.E,ORISSA 1991 1ST
WORKING EXPERIENCE :
Organization Capacity Post From - To
ICCL, Choudwar Supervisor 01.03.01 to 06.05.06
Adhunik Metaliks Ltd., Rourkela 2x17 MW Mech. In-Charge 10.05.06 to 20.04.08
SMCPGL, Jsg, Orissa 25+8 MW Foreman 28.04.08 to 2009
KPS (VAL, Jharsuguda) 9X135 MW Sr. Engineer 2009 to Till Date
current ctc- 4.3lakhs per annum
JOB RESPONSIBILITY :
As aSr. Engineer (Mech. Maintenance) looking after the maintenance of
- TG Area- BFP, CEP, CT Fan, CWP& Turbine Area
- Boiler Area- ID, FD, PA Fans, Dosing Pump, Ash Handling Systems
- ASH HANDLING SYSTEM
- DM PLANT
TECHNICAL SKILL
O.S : WINDOWS(98,2000,XP)
Application : MS office .
PERSONAL SKILLS :
Good team worker.
Adaptable & analytic.
Self confident, committed & hard working.
Decisive , flexible & also initiative.
-
July 22nd, 2011, 10:23 AM
Post Count Number #4
Job Application: sravanthi B.Tech(EEE) 76.10% NPTI TRAINED
CURRICULUM VITAE
U. Sravanthi
E-mail : usravanti AT yahoo.com
CAREER OBJECTIVE
To seek a challenging and performance oriented career which demands the best of my professional ability in terms of competent Technical, Soft and Analytical skills and helps me in fulfilling my dreams.
EDUCATIONAL QUALIFICATION
[November, 2010 – May, 2011]
- Completed Post Graduate Engineer Trainee (PGET) in OPERATION & MAINTENANCE OF ELECTRICAL POWER TRANSMISSION & DISTRIBUTION SYSTEM from NATIONAL POWER TRAINING INSTITUTE, Nagpur, Western Region, Maharashtra.
[July, 2008 - October, 2008]
- Training under the INFOSYS campus connect program at Jyothishmathi Institute of Technology and Sciences (JNTU, HYD), Karimnagar (Dist.), Andhra Pradesh
[July, 2006 - May, 2010]
- Completed Bachelor of Technology (B.Tech) in Electrical and Electronics Engineering from Jyothishmathi Institute of Technology and Sciences (JNTU, HYD), Karimnagar (Dist.), Andhra Pradesh.
- Aggregate : 76.10%
[June, 2004 – April 2006]
- Completed Intermediate with 90.8% from Holy Trinity Junior College for Girls, Board of Intermediate Education, Karimnagar (Dist.), Andhra Pradesh.
[March, 2003 – March, 2004]
- Completed 10th std (State Board) with 81.67% from Chanakya High School, Kothi-Rampur, Karimnagar (Dist.), Andhra Pradesh.
SKILL SET
- Computer Skills : MS Office Package
- language : C and Data Structures
EXTRA-CURRICULAR ACTIVITIES
- Participated in two days National Seminar on “ELECTRICITY REGULATION, POLICY & COMMERCIAL ISSUES”, Organized by NATIONAL POWER TRAINING INSTITUTE (Western Region) at Hotel Tuli Imperial, Nagpur, Maharashtra on 24-25 February 2011
- Training under the INFOSYS campus connect program at Jyothishmathi Institute of Technology and Sciences (JNTU, HYD), Karimnagar (Dist.), Andhra Pradesh
- Participated & Won in the Essay writing competition of peerless general finance & investment company ltd on the Eve of 71st FOUNDATION DAY CELEBRATION on 25-10-2002
VISITED POWER PLANTS
- SHALIVAHANA (MSW) GREEN ENERGY LTD at Karimnagar in Andhra Pradesh
- KHAPERKHEDA thermal power station at Nagpur in Maharashtra
- KORADI thermal power station at Nagpur in Maharashtra
- WARDHA substation at Wardha in Maharashtra
- ASIAN ELECTRICALS manufacture & repair of power and distribution transformers at Nagpur in Maharashtra.
- Power System Training Institute (PSTI) at NPTI Bangalore in Karnataka
- Hot Line Training Centre (HLTC) at NPTI Bangalore in Karnataka
PROJECTS
MAIN PROJECT
- Title : SYNCHRONOUS FRAME BASED CONTROLLER
IMPLEMENTATION FOR ACTIVE POWER FILTER.
- Duration : 3 months
- Organization : Vector Institute
- Software Used : MATLAB
- Developed in : IV Year (2nd Semester).
MINI PROJECT
- Title : POWER UTILITY MAXIMIZATION FOR MULTIPLE – SUPPLY SYSTEMS.
- Duration : 1 month
- Organization : Orbit Technologies
- Developed in : III Year (2nd Semester).
PERSONAL SKILLS
- Good reasoning and analytical skills.
- Effective planning.
- Optimistic.
- Enthusiastic in team work.
- Keen to learn new technologies.
Declaration :
I hereby declare that the above-mentioned details are true to the best of my knowledge
Place:
Date: SRAVANTHI UPPU
-
September 27th, 2011, 03:44 PM
Post Count Number #5
cv_nptinagpur_ post diploma in power plant engg
CURRICULUM VATIE
CHANDAN KUMAR YADAV
E-mail :
Chandanyadav_1989 AT rediffmail.com
Assets :-
1.Dynamic and effective team member
2.Effective communication and analytical skills
3.Highly motivated for creative and innovative work
Permanent address :
Qtr no :-M-3/7 Birla colony
Singrauli (M.P.)
OBJECTIVE
Intend to build a carrier with leading corporate in hi-tech environment with committed and dedicated people, which will help me to explore my self fully and realize my potential . I am desperate to work as a key player in challenging and creative environment .
SKILLS & ABILITY
- Ability to work in team and create a collaborative work. environment
- take ownership and responsibility of assigned work
- Ability to plan and self organized, to complete the work within . stipulated timelines
- Quick on the uptake and strong analytical abilities.
- Adaptive and ability to make the most out of a given situation.
EDUCATIONAL QUALIFICATION
1.Post Diploma-Persuing post diploma in thermal power plant . From npti Nagpur
2.Diploma (mechanical engg.)-with 72.97% from govt. polytechnic
college Ashok nagar in 2009(M.P.)
3.S.S.C.(science)- 69.4%(M.P. Board)
Saraswati higher sec. school, Singrauli(M.P.)
4.H.S.C.(10th) - 81.2%(M.P. Board)
Saraswati higher sec. school, Singrauli(M.P.)
WORK EXPERIANCE
1.9 month work exp. in JSW steel limited,
Tornagallu dist-Bellary in wire rod mills in mechanical
Department.(since july 2010 to march 2011)
2.One year work exp. in mushasi auto parts pvt. India ltd. Bawal
as trainee (since april 2009 to june 2010)
COMPANY PROFILE 1ST
Worked with JSW steel ltd. Vijaya nagar, bellary Karnatka.was looking preventive and shutdown work maintenance of WRM (make MORGAN, USA)after completion off successful project with mechanical Maintenance department.(since july 2009 to march2010)
COMPANY PROFILE
MAP ID is one of the leading groups in the world manufacture key engine transmission &suspension components from its 18manMufacturingLocations in the worldwide for the auto mobile industry.
The main customers are HONDA, HERO HONDA, SUZUKI, FCCRICO, and group companies in INDONESIA, BRAZIL &JAPAN.
WORKING PROFILE
1. Experience in Plant Machinery installation, overhauling and maintenance of Rotary and Stationary equipments
2. Alignment and servicing of rotary equipments and machineries.
3. Bearing assembly work and its proper maintenance for long time smooth working.
4. Experience in assembly of Modules (blocks) ,Pinch rolls,gear box & It’s maintenance.
INTEREST & HOBBIES
- Playing chess
- Playing cricket
PERSONAL TRAITS
- Honest, Diligent, Hardworking, sincere and innovative
-
November 20th, 2011, 08:28 PM
Post Count Number #6
Post Applied for - Engineering ( C & I ) - Power sector
B.S.CHAUHAN
E-Mail : chauhanbs20 AT yahoo.co.in
Aiming for positions in Instrumentation & Control Engineering with a leading Organization
CAREER OVERVIEW
Electronics and Communication Engineer with over 17+ years of experience in Design & Engineering, Process Instrumentation, Control system ,PLC/SCADA systems, LT Electrical system ,Procurement, Planning etc.
In depth knowledge of Basic and Detailed Engineering of process instrumentation, control systems including ultrasonic & Radar instruments, sizing of control valve, flow meters, temperature elements, level Instruments, procurement etc.
Well versed with development of logic for PLC/SCADA system, Architecture/ configuration diagrams, logic diagram, process hookup diagram, P & ID’S, layouts etc.
Skilled in managing with understanding Process Instrumentation, Control System LT Electrical Systems of IS, IEC, Petroleum Act, API, NFPA ,TAC, ASME PTC, ASTM, ANSI, Hazardous area classifications & DIN standard code of practice.
Proven skills in managing Engineering of the projects including erection/commission of instrumentation & control and procurement of related item.
An effective communicator with excellent relationship management, leadership skills and
strong analytical, problem solving & organizational abilities.
ORGANISATIONAL CONTOUR
Since April’ 1997 with Unitech Machines Ltd., Gurgaon, a EPC organization in Power sector working as Senior Manager – Instrumentation & Control (Design & Engineering Div.)
THE GROWTH PATH
Joined as –Engineer
Promoted as – Sr. Engineer / Asst.Manager / Dy.Manager / Senior Manager ( Design &
Detailed Engineering –C & I)
I am a group head and Managing a team of 10 Engineers/Managers along with two
Draftsman. We are also supporting to Marketing at the tender stage/Procurement /Testing
at vender works and guide to Site staff for Testing, pre-commissioning, commissioning
activities etc.
Promote as - AGM (Design I & C ) / DGM
KEY DELIVERABLES;
Design Engineering
- Referring client specification/Gathering product specifications as per system requirements & designing and modifying /upgrading existing designs.
- Prepare Instrument Index, Technical Data Sheets, Cable Schedule, Instrument schedule and Process Hook up Diagrams, I/O Counts, Logic diagrams, PLC/SCADA system, P&ID, etc.
- Developing single line diagram of LT MCC/ PCC, DG synchronization( Auto/Manual) scheme, Control drawings, Selection of switchgears, Relay based control panels schemes, Transformer sizing, calculations, Electrical drives, Battery chargers, Power supplies, UPS (On line/off line),Cable sizing etc.
- Developing detailed engineering for the Fire detection & protection system for Power Plants, Oil industries, Buildings etc as per fire protection system standard and code of practices.
- Developing detailed engineering for the Fuel oil handling, Transfer, Forwarding & storage system for Power Plants, as standard and code of practices.
- Creating layouts (cable, Tray & ear thing), designs and drawings to identify any weaknesses in designs and make relevant modifications in the same.
- Developing detailed engineering for the Building management system ( BMS ),I/O summary for office complex, as per standard and code of practices.
Project Planning / Execution
- Planning, estimation, tracking & implementation of project plans within budgets and deadlines.
- Coordinating projects for the set up facilities with accountability for strategic utilization & deployment of available resources to achieve organizational objectives.
- Identifying cost effective vendors for procurement equipments after determining quality and ensuring adherence to pre-set standards.
Maintenance/ Instrumentation
- Performing the functions of troubleshooting and predictive / breakdown / preventive maintenance for reducing downtime to minimum.
- Responsible for Design Automation & Control Systems involving configuration, Logics, and integration and testing of Human Machine Interface, PLC/SCADA Systems, FAT & SAT Procedure etc.
Quality Control
- Ensuring adherence to quality standards (ISO) and maintaining all related documents.
- Implementing latest quality tools and executing process enhancement projects.
- Identifying areas of quality failures and take steps to rectify the system.
Team Management
- Leading & motivating a team of instrumentation and control, Electrical engineers.
- Organising in house training internal/external programmes based on the training need analysis to elevate the skills & productivity of employees.
ATTAINMENTS :
- Successfully handled the following clients; NTPC (EOC), BHEL (PEM), DVC, HPGC, ALSTHOM, Reliance Energy, Jindal Power, TATA Projects, IOCL/ BPCL/HPCL etc.
- Interfaced with consultants such as; DCL, DESEIN Pvt. Ltd., TCE consulting Engineers, MECON etc.
- Gathered knowledge of the following system; Fire Detection & Protection system, Fuel oil unloading, Storage &Transfer System (LSHS / HFO, LDO & HSD), Utilities, HVAC, Building Management system (BMS).PLC/SCADA system, LT Electrical system etc.
- Executed key projects in Instrumentation & Control, LT Electrical system only viz :
a. Fuel Oil (LSHS & LDO) unloading, Transfer, forwarding & storage system and HSD system for Alsthom Power ( 2x 250MW ST-CMS Neyevli).
b. Fuel Oil (Crude oil & Gas Oil) unloading, Transfer, forwarding & storage system for Kosti Thermal Power Station, Sudan through BHEL Noida (4x125MW).
c. Fuel Oil (HFO & LDO) unloading, Transfer, forwarding & storage system for Thermal Power Station NTPC Jajjar (3x 500 MW).
d. Ash Water Recirculation system (AWRS) for Thermal Power Station NTPC Jajjar (3x500 MW) Power project.
e. Ash Water Recirculation system (AWRS) for Thermal Power Station NTPC Barh STPP (2x660 MW) Power project.
f. Station Piping Package ( Lift pump package,Water Intake, CW, Raw Water, ACW,DMCW, SW CCW, DW & PW and service air along with water cycle etc )for Thermal Power Station NTPC Jajjar (3x 500 MW).
g. Fuel Oil unloading, Transfer, forwarding & storage system for HPGC through Reliance Energy, Panipat (2x 500MW, Yamuna Nagar (2x300MW).
h. Fuel Oil unloading, Transfer, & storage system for Reliance Energy, ROSA (2x300MW ) (UP).
i. Fuel Oil unloading, Transfer, & storage system for Reliance Energy, Paricha UPRVUNL (2x250MW) (UP).
j. Fire Detection & Protection System, N2 Pursing system & Fuel Oil unloading,
k. Transfer & storage system for BHEL/DVC/NTPC (2x250MW, 3x660 MW & 2x500MW).
l. Fire Detection & Protection System, N2 Pursing system & Fuel Oil unloading, Transfer & storage system for TATA Projects for MAHAGENCO Bhusawal (2x500MW).
m. PLC / SCADA system with OFC connectivity between PLC, Remote I/o’s, have an OPC with client DCS for NTPC Sipat stage I & II.
n. PLC / SCADA system with OFC connectivity between PLC, Remote I/o’s, have an OPC with client DCS for NTPC Simadari Projects.
o. Electrical substation (1500KVA) , Electrical Panels ,DG sets (600KVA-2Nos & 250KVA -1N0) synchronization panels, HVAC, Utilities, MS, lightings, Ear thing & HSD System etc.
I had handled lots of other project with all major clients and consultants in power sector.
Commenced career with Western India Industries Limited, Delhi as Jr. Engineer – Projects from Feb 1993 –Apr 1997.
Visited China for the Assessment of main STG, BTG and BOP packages of 2x 135 MW and 2x60MW Thermal power plants pertaining to Electrical and instrumentation system with the association of Chinese consultant. Scope includes identifying the reusable existing E&I equipments in India and Assessment of remaining Electrical, control & Instrumentation system for complete power plant requirements.
ACADEMIC CREDENTIALS
- Engineering Degree in Electronics & Tele-communication (AMIE) from Calcutta in 2000.
- Engineering 3’years Diploma in Electronics & Tele-communication from Technical Board of
Education, Lucknow (UP) in 1991.
IT SKILLS
Microsoft Word, Microsoft Excel, MS projects, ERP, MIS, E-mailing System and general awareness of Smart Plant Instrumentation (SPI) and SPE etc.
-
June 30th, 2012, 08:12 PM
Post Count Number #7
resume
ABHISHEK KUMAR CHATURVEDI
E-mail :abhishek.chaturvedi365 AT gmail.com
Keenly interested in innovative, result oriented tasks and seeking for challenging opportunity and position myself, so as to utilize my knowledge towards the progressive growth of the organization.
2011 B.E. degree in Electronics & Communication Engineering
From Jagad Guru Dattatray College of Technology, Indore
Affiliated to RGPV University and secured an aggregate Of
67.88%
2007 XII from Sarswati Shishu Mandir, Chachai, Distt. Anuppur
(MP Board) and secured an aggregate of 62.2%
2005 X from Sarswati Shishu Mandir, Chachai, Distt. Anuppur
(MP Board) and secured an aggregate of 76.2%
- Good Analytical and optimist approach to problems.
- Quick grasping of new technologies and eagerness to explore and learn.
- Possessing excellent teamwork spirit.
- Recently I have work with radix media tech pvt ltd company as a software developer
Since few month
Works on hyper text markup language(html),data validation,photoshop
- EDC, Control System, Network Analysis, Digital Electronics
.
- photoshop
- Hyper text markup language(html)
- Basic knowledge of c
- Done major industrial training at Doordarshan, Indore (M.P.)
- Mobile & PC Control Robot
- It was created to minimize the complexity of robot development. By combining a powerful PC-Class platform with a object oriented software development system robot that detects an object in its arena and give information about that object.
I do here by declare that the particulars of information and facts stated here in above are true, correct and complete to the best of my knowledge and belief.
PLACE :
DATE :
ABHISHEK KUMAR CHATURVEDI