www.hayes-lemmerz.com Kalyani Hayes Lemmerz Ltd Pune : Electrical Maintenance Engineer

+ Ask Question / Post resume
Results 1 to 6 of 6
  1. Post Count Number #1
    Super Moderator
    Join Date
    April 18th, 2008
    Location
    Tuticorin
    Posts
    7,026

    www.hayes-lemmerz.com Kalyani Hayes Lemmerz Ltd Pune : Electrical Maintenance Engineer

    Kalyani Hayes Lemmerz Ltd Pune : Asst.Engr/Jr.Engineer Electrical Maintenance

    Designation: Asst.Engr/Jr.Engineer Electrical Maintenance
    Experience: 5 - 10 Years
    Location: Pune

    Job Description:
    Attend the electrical brake down , Asst. in maintenance department to achieve the zero brake down target

    Desired Candidate Profile:
    Candidate should be Diploma in Electrical, Exp. 5 to 10 years in Hard core Electrical ,PLC , with excellent communication & computer literacy. Press shop experience will more preferred .

    Company Profile:
    Kalyani Hayes Lemmerz Limited, is a subsidiary of Hayes Lemmerz International, USA. Hayes Lemmerz is a global manufacturer, with 41 plants and 2 joint ventures worldwide. The company manufacturers Steel Wheels and for Trucks, Trailers etc

    Email Address: awaghe@hayes-lemmerz.com
    Website: http://www.hayes-lemmerz.com

    Keywords: Engineer Electrical Maintenance

  2. Post Count Number #2
    Guest Poster
    Join Date
    August 14th, 2008
    Location
    Your Heart, Delhi
    Posts
    76,213

    Re: Kalyani Hayes Lemmerz Ltd Pune : Electrical Maintenance Engineer

    Dear Sir,

    I am diploma electrical engineer working in design dept.in atlas copco support services pvt.ltd. pune having 5 years of total experience.

    Thanks and regards,
    Sagar Shevate
    9823998445

  3. Post Count Number #3
    IJT addict Guest-IJT's Avatar
    Join Date
    October 15th, 2010
    Location
    Looking for Job
    Posts
    20,894

    Vinod Saini
    477 ,DDA (L&T) Colony
    Sec-18B,Dwarka,
    New Delhi, India 110078

    August 22, 2009

    To
    Hiring Manager


    Dear Sir/Madam,
    I saw your listing on published paper for an experienced planning engineer. With this cover letter I am applying to fill this position-as I have had Eight years of experience to develop data required for planning underground Tunnel, and preparing plans and schedules to meet the key dates.
    I enjoy serving the public in this way and promise, if you hire me, to work well with your current team of planning engineers.
    May we meet in person to discuss this opening- If you are interested in doing so, please call me at +91 9654289804 to arrange a time that suits you and I'll be there. Thank you for considering my application and for reading my resume.

    Sincerely,

    Vinod Saini

    Enc: resume

    Resume

    Planning Engineer
    I would like to expand my career by seeking suitable post in your company. I am a Planning Engineer with Construction experience,mainly of Underground structures like Tunnels,Caverns & PowerHouses. My employer is Alpine GmBH & HCC India Joint Venture. I am currently working at Delhi Metro Railway Project New Delhi,for their Airport Metro Express line Link Project. I am fluent in English and Hindi. I would prefer to be accompanied on a long term basis, but would also consider unaccompanied positions.

    Resume reference: N.A
    Date last updated: Aug 20, 2009

    Education: Degree/Techn./Reg. –Civil Engineer
    Experience: 8 years or more
    Employment situation: In permanent employment
    Salary expectations: Negotiable
    Availability: Immediately
    Type of employment: Full Time
    Location: DL/Delhi
    Looking to work in: Metro Cities
    Age: 32
    Gender: Male
    Marital status: Married
    Own transport: No
    Driver's license: Yes
    Citizenship: Indian
    Right to work No, I need sponsorship
    English level: Intermediate
    Nationality: Indian

    Qualifications: Bachelor of Civil Engineering from Pune University in Year 2000,

    Experience: 8 + Years in Projects Supervision, Resource Management,Planning & Budget/Cost, Scheduling, Tunnel Construction,Daily Progress Reports.

    Systems used: Autocad 2004, Microsoft Project, Primavera P6, M.S Office.

    CAREER DETAILS : -
    M/s Alpine HCC Joint Venture, June 2008 - Present
    Position Held: Snr. Planning Engineer
    Review current status of both Engineering and Procurement for the Project (2975 Million Rupees) prepare a revised detailed Work schedule ( using MSP and Primavera P6) incorporating the physical status and all change orders. Assist the cost engineer in the revised control budget. Revise the drawing and document register to ensure all were identified and entered for the basis of scope. Prepare scenarios to show the impact of Design Change Notices to the completion of the Project. Revise Work Breakdown Structure and Daily Progress Reports and address same to HOD’s and Vertical Heads of Tunnling and transportation wing.Prominently Involved with client meetings on work progress and concerned presentations with highlighting concerned area of Project. Prepair Three Month Rolling Programmes & involved in contractual submissions like Mothly progress reports, Progress Charts, Time line Diagrams, Time Cycles and multiple layouts. Involved in quantity calculations of the worked activities and reconcile its material consumption with the procurement section and store department.

    M/s Continental Engineering Corporation Taiwan,15th Feb.2008 to 9th June2008
    Position Held : Senior Engineer

    Project was awarded by DMRC under Lot BC-16. Work experienced is Diaphragm wall construction and material management for the said work, liasoning with the people of organization to perform the work constraint free and completed each activity related to D-wall viz. Guide wall, utility diversion, graving ,sonic test, rebar cage construction and its inspection from DMRC Engineer,Concrete pouring etc.

    M/s Abir construction Pvt. Ltd. (Gurgaon), June 2006 to Feb 2008
    Position Held : Engineer Civil

    EPC based Project was alotted to Everest Power Pvt. Ltd. at Malana in Himachal Pardesh. 100 MW capacity Hydro Electric Project was 2nd on Malana main tributary of River Parbati. Work Assigned is regarding Planning and prepare detailing of drawings using AutoCAD, mainly involved in planning and updating the construction schedule of 14 km long hilly terrain road ,leading to dam site.Roads and under ground structures related protocol & targets were prepared and assign to Engineer at site. Prepared running bills of numerous contractors and prepare its deviation, extra item ,steel and cement consumption statements with respect of issued work orders.

    M/s Hindustan Construction Company (Mumbai), 1-Oct-2005 to 30-May-2006
    Position Held : Site Engineer, S-2 grade

    Pir Panjal VA(Jammu Kashmir) section of USB railway project was executed in consultation of GC- RITES, and client for the above said work was IRCON. I was deputed at 680 m long Adit tunnel of the main 11.6 KM long tunnel and got awared & expertised with the NATM Techniques, I performed shift incharge responsibilities and got interacted regularly with GC Rites Engineer to perform job as per contract design and NATM standards . I too performed my job with Quality Department,as fair Quality in the work was the key requirement of GC Rites.

    M/s Taisei Corporation Ltd Japan (Tokyo), 19-Dec-2003 to 25-Sept-2005.

    Worked as Site Engineer at Purulia pumped storage hydro electric project ( 4X225 MW) in West Bengal. Work assigned was related to construction supervision of Power house (Machine Hall, Transformer hall Caverns) and prepare checklist in order to get work done as per design and drawings, with approved consent of WBSEB client Engineer nspections were carried out for structures. Prepare the mandatory inspection sheet and get it signed from the client then allow the concerned activity to follow-up as per design procedure and methodology work was executed in joint venture with (HCC, L&T). Project planning was assessed during meetings and key dates of targets were achieved without constraints and better improvement plans.

    M/s Jai Parkash Industries Ltd, (New Delhi), 14-Aug-2001 to 12-Dec-2003.

    Worked as Field engineer at Baglihar Hydro Electric Project (3x150mw) Chanderkote Distt Doda J&K. I was deputed at power house complex site ,and mainly concentrated my work in Machine hall Cavern. Completed excavation from heading to benching till 2nd stage concreting of scroll case liner. Carried out all rebar cutting and placing with its BBS to shuttering and supporting works before concreting in structures like Unit pits, MIV foundation, Dewatering Pump sump, oil water separator columns, Gantry Crane beam and control block building.

    M/s P&R Engineering Services Pvt. Ltd.
    Worked as Junior engineer at Malana-1 Hydro electric project from Aug 2000 to July 2001 mainly I was performing my job in backfill concrete around UGL liner and concreting works of valve house chamber.

    Vinodkumar Saini
    New Delhi.

  4. Post Count Number #4
    Guest Poster
    Join Date
    August 14th, 2008
    Location
    Your Heart, Delhi
    Posts
    76,213

    Mukesh Bhandakkar E-mail : mukeshbhandakkar AT gmail.com
    B.E - Mechanical
    ________________________________________
    CAREER OBJECTIVES
    A responsible and demanding position which requires extensive knowledge base of technical applications in Project management and maintenance activities which offers a good challenging opportunity to prove myself and enhances my career growth.
    ________________________________________
    Bachelor of Mechanical Engineering .
    Nagpur University, 2004-2008 with 64.42 %
    ________________________________________
    Work Experience
    Working as a project Engineer (contract basis) at ACC limited, Chanda Cement Works. From 3rd January 2010 to till date.
    Current pay 18000 per month.
    Job Profile as a Project Engineer
    - Replacement of kiln shell (3750 mm diameter) with tyre at pier-2 position.
    - Replacement of roller and change of scrapper plate of vertical roller mill (pre grinder unit) for old plant.
    - Maintenance work for waste gas fan (3000 mm) due to shaft defects.
    - Changing of trunnion of rotary ball mill, inlet and outlet side.
    - Attended alignment of Girth gear for new kiln(5500 mm diameter and83 meters long),alignment of pinion shaft with torsion shaft by false shaft method.
    - Erection cum Alignments for pumps and pre heater fans with laser and dial gauge techniques.
    - Replacement of belts, skirts and maintenance work for E.S.P chain conveyor.
    - Aware with fabrication works, both plate work and structural.
    - Change of input shaft white metal journal bearing of flender gear box kmpp751due to modification of journal bearing from flender.
    - Major repair for cement rotary ball mill 5600 mm long, replacement of shell, girth gear, pinion and alignment procedure as per design.
    - Breakdown maintenance of kmpp 751 gear box due to sieze of white metal bearing in 1st stage of planetary ,dismantling of gear box on site , replacement of kmpp751 by kmps gearbox, Fabrication of extended HP and LP line for kmps gear box .Alignment for rupex–arpex coupling and motor with gear box.
    - Trail and Correction for swing out arrangement of raw mill (gerb pieffer, made).
    - Flushing of hydraulic system of gear box lubrication and hydraulic suspension system.
    - Inspection of motor bearing drive end side, under supervision of BHEL Engineer.
    - Erection cum maintenance of pipe conveyor.
    - Modification of s roller losche mill 5600mm diameter, capacity 250 tons per day.
    - Maintenance work for SF bar cooler due to cracking of cross bar.
    - Operated hot gas generator, (made by singhaniya system pvt ltd).
    - Auxiliary chain drive alignment with coupling.
    - Change of oil seal of hydraulic arm of suspension system.
    - Erection of bucket elevator, both, belt and chain.
    - Erection of air slide.
    - Ultrasonic flaw detection testing for shafts and joints of shell.
    - Maintenance work for supporting roller journal bearing due to scoring on roller shaft.
    - Aware with skew setting of kiln or cold kiln alignment by thedolite.
    - Aware with safety measures and P.P.E
    ________________________________________
    Prior to that,
    I worked as a Trainee Engineer – HAJEE A.P. BAVA & CO ,
    At Chanda cement expansion project 7500 TPD from 08/08/2008 to 20/12/2009 (Duration – 16 Months) with a pay of 10000 per month.
    Job Profile as a G.E.T – FABRICATION DEPARTMENT.
    - Inspection of steel structural and plate work.
    - Coordinating with Contractors in yard for quality checks and to look after the supplies and distribution of materials and manpower.

    Reporting To : Project manager
    ________________________________________
    Technical Trainings
    1) Undergone, on site mechanical training for kiln 7500 TPD by FLsmidth on pyr-procerssing system.
    2) Undergone FAG training for condition monitoring system.
    3) Undergone training required for Health and safety awareness and motivation.
    4) In-Plant Training (2006) at Chandrapur super thermal power station
    ________________________________________
    Academic Projects and Case Study
    Final Year Project : “High Pulley Press Exerciser Cum Power Generator”.
    Mini Project : Paddy Husk Stove.
    Seminar : High pulley press exerciser cum power generator
    Case Study : HPCL bottling plant.


    Key Strengths
    - Skillful in enhancing systems to bring greater cost efficiency levels & energy/ power reductions, good skill for better project handling
    - Effective Oral and Written English Communication Skill gained by performing Customer liaison duties, writing various letters and reporting to my superiors. An effective communication with an ability to relate with the people at any level
    - Strong Technical and Professional Skills in the field of site execution &Project management through my Education Qualifications and my work experience
    - Effective at Time Management and Task Prioritization to achieve deadlines and delivering important projects.
    - Working effectively in Team Environment with Adaptability to achieve common organizational goals and to identify and resolve issues.
    - Proven Leadership Skill by taking Initiative and Motivating other team members
    - Computer / Programming Skills : Windows Platform, Ms-Office with good Command on Ms-Excel, Ms-Word and Ms-PowerPoint
    ________________________________________
    Areas of Interest
    As a Technical Expert – Maintenance in cement.
    As a Project Engineer – Erection of mechanical structures and equipments in cement industry.
    ________________________________________
    I hereby declare that the above information is true to the best of my knowledge.
    Date : 20.07.2011
    Place : PUNE MUKESH BHANDAKKAR

  5. Post Count Number #5
    Guest Poster
    Join Date
    August 14th, 2008
    Location
    Your Heart, Delhi
    Posts
    76,213

    electrical maintance

    RESUME
    Gite Dattatraya Baburao
    Email :dattagite23 AT gmail.com

    CAREER OBJECTIVE :
    To obtain a position in a growth oriented firm utilizing my strong technical and Organizational skills & to work in a challenging and creative environment and effectively contribute towards the goal of the organization.
    Current Employer : “Cable Corporation India. Ltd.”, Sinnar, Nashik”
    Designation : “Graduate Engineer Trainee (Electrical Maintenance)”
    Period : From 5th Sep 2010, till the date.
    WORK EXPERIENCE :
    Work Experience in Cable Corporation of India ltd :
    Electrical/Electronics maintenance of nokia maillefer Cable extrusion lines, ASA make wire drawing m/c, CORTINOVIS make armoring m/c, Caballed make Bunching m/c. Maintenance of supply transformer, 1500 KVA. HT & LT side breakers.

    Over All Handled PLC’s :
    Siemens S5 –100U/135U With CPU 103/928/928B,I/O module, communication processor like CP527 & its programming. Siemens S7-300. BCH make PLC. Allen-Bradley
    D.C. drives : Kirloskar make D.C. Servomotors & drives. Siemens analog & digital DC drives like 6RA20, 6RA21, 6RA22, 6RA23 & 6RA24, 6RA70,Gemco make.
    A.C. drives : ABB A.C. drives (ACS800 & ACS200) .
    Utilities : Diesel Generator: Kirloskar make 400 KVA & 750 KVA D.G. sets, ELGI , Atlas Copco make air compressor..

    Over all Role and Responsibilities :
    - Make daily & monthly MTTR & MTBF for all machines. Work on 5s & kaizen.
    - Maintain power factor to unity achieve goals in KRA & improvement projects assigned by management
    - Hands on experience in maintenance and troubleshooting of DC Motors up to 320 Kw, AC Motors up to 50 Hp, 750 KVA DG sets & it's operation, 33 Kv substation with 33 Kv VCB, ACB's , High Voltage Test units for cables and other utilities.
    - Planning preventive maintenance of LT distribution which includes L & T make ACB’s Different Switch gears and Automatic power factor controller panels.
    - Looking after all departmental activities which include Breakdown, Preventive and Predictive maintenance.
    - Vendor Development for spares procurement and project work.
    - Planning and implementation of preventive maintenance for plant machines.
    - Job allocation to workers, monitoring and controlling machine breakdowns, responsible for monthly output targets.
    - Studying & analyzing various machine faults, taking corrective and preventive actions to bring down the faults
    - Spares planning/Inventory management, updating the spares list for timely availability of spares
    Required.

    Project Work conducted up to six month period :
    Modification Work : 1)D.C analog drive replaced with new existing AC drive due to regularly breakdown for bobbin rewinding machine.

    Educational Qualification :
    B.E in Electrical Egg. From SVIT Chincholi Nasik, Pune University With 60.93% IN 2010
    H.S.C from Nasik Board with 49%
    S.S.C from Nasik Board with 74.26%
    SEMINAR & ACHIEVMENTS :
    - Project on “ Online parameter measurement and diagnostics of electrical machine. ”
    - Presented a seminar on “Rotary ultrasonic motor actuated by travelling flexural wave ”.
    PLC’s :
    - Certificate in Basic Industrial Automation (7 Days course) Conducted by TAACT.
    - A certified course of AutoCAD
    - Certified PLC programmer (CPP) training course include SEIMENS - S7 PLC completed in TACT, Nashik.
    Interpersonal skills :
    Punctual and Disciplined
    Have good level of persuasiveness.
    Can work effectively in team, as well as individual.

  6. Post Count Number #6
    Guest Poster
    Join Date
    August 14th, 2008
    Location
    Your Heart, Delhi
    Posts
    76,213

    resume

    RESUME
    Name :- Priyanka.A.Bhagat.
    E-mail :- priyanka161291 AT gmail.com
    Academic Qualification :-
    Examination passed Board/ University Year Percentage
    SSC Pune 2007 60.00
    Diploma EXTC MSBTE 2010 72.00
    Bachlor in Computer
    Appliction (BCA) SNDT(Mumbai) 2012 63.42
    Objective :-
    - My aim is to associate with an organization, which helps me to adopt knowledge and skills in industry and work with a team which works towards the growth of organization and giving satisfaction to me and all.
    Work Experience : Fresher
    Computer Proficiency :-
    - MS-CIT
    - Oracle
    - Internet
    - C,C++
    - DBMS
    - Visual Basic
    - HTML
    Personal Skills :-
    - High motivation and strong determination
    - Hard working and willingness to learn
    I, Priyanka Bhagat do solemnly declare that the statement furnished above is true and best of my knowledge and belief.
    Date : 1/06/2012 Priyanka A .Bhagat.
    Place :