Saudi Arabia : CONTRUCTION, PLANNING, ELECTRICAL, MECHANICAL, CIVIL / ARCHITECTURAL, ELECTRICAL ENGINEER

+ Ask Question / Post resume
Results 1 to 12 of 12
  1. Post Count Number #1
    On probation
    Join Date
    June 21st, 2009
    Location
    riyadh
    Posts
    1

    Saudi Arabia : CONTRUCTION, PLANNING, ELECTRICAL, MECHANICAL, CIVIL / ARCHITECTURAL, ELECTRICAL ENGINEER

    CONTRUCTION ENGINEER with the following qualifications

    - Bachelor of Science in Civil / Structural Engineering
    - 4 to 5 years in experience in the execution and preparation of construction plans.
    - Experience in the re-design of any part of the shop drawings.


    PLANNING ENGINEER with the following qualifications


    - Bachelor of Science in Civil / Architectural Engineering
    - 5 years in experience in project planning and schedules.
    - Prima Vera Versed.

    ELECTRICAL ENGINEER with the following qualifications

    - Bachelor of Science in Electrical Engineering
    - At least 5 years in experience in construction, L.V. systems and light current systems.
    - Computer skilled.

    MECHANICAL ENGINEER with the following qualifications:

    - Bachelor of Science in Mechanical Engineering
    - At least 5-10 Years experience in construction field handling HVAC plumber and fire fighting works.
    - Gulf experience is advantage
    - Design knowledge in HVAC system will be additional advantage
    - Candidates shall be familiar in ASHRAE, SMACNA, NFPA and UPC and other International Standard.

    CIVIL / ARCHITECTURAL ENGINEER with the following qualifications:

    1. First class Civil / Architectural Engineering Graduate or Post graduate.
    2. About 10 to 12 years experience in Saudi Arabia or in Middle East.
    3. Experience in high standard projects as five star hotels, faculty buildings, MOI buildings etc. in KSA or in Middle East. The selected candidate required to work immediately for the following;
    · Material submittal & approval process,
    · Take quantities from drawings and cross check with BOQ,
    · Cross check the material between BOQ, drawings and specifications,
    · Make material list for the project and ask quotations from different suppliers,
    · Make price comparison sheets and negotiate for price,
    · Submit minimum three suppliers for approval with company profile, technical data, samples etc.
    ELECTRICAL FORMANE with the following qualifications:
    · At least 2 years experience in same field.

    Please send your CV to this E-Mail:
    headhunting@windowslive.com

    Please subject to the publication of benefit to all

  2. Post Count Number #2
    Guest Poster
    Join Date
    August 14th, 2008
    Location
    Your Heart, Delhi
    Posts
    76,213

    Re: Saudi Arabia : CONTRUCTION, PLANNING, ELECTRICAL, MECHANICAL, CIVIL / ARCHITECTURAL, ELECTRICAL ENGINEER

    Dear Sir or Madam
    I would like to apply for the position and sending you my resume attached. Please find details of my qualifications and my contacts in it.
    Thank you very much for your time. I look forward to hearing from you.
    Best regards,

  3. Post Count Number #3
    On probation
    Join Date
    October 23rd, 2010
    Location
    kanyakumari
    Posts
    1

    Re: Saudi Arabia : CONTRUCTION, PLANNING, ELECTRICAL, MECHANICAL, CIVIL / ARCHITECTURAL, ELECTRICAL ENGINEER

    R.RAJESHKUMAR
    No-64, Main Street,
    Saradha Nager,
    Parvathipuram
    Nagercoil-629003,
    KanyaKumari Dist,
    Tamil nadu.
    E-mail : rajeshdev2006 AT rediffmail.com .
    Cell No : +97455300232.

    CARRIER OBJECTIVE :
    To get a challenging position to develop my career as well as to update myself to the day-to-day developments in my field.
    ACADEMIC CHRONICLE :
    - BE (ELECTRICAL&ELECTRONICS) from Vinayaka Mission university salem, first class
    Completed on may-2009.

    - Diploma in Electrical and Electronics from SUN INSTITUTE OF TECHNOLOGY, NAGERCOIL. First Class with Honors, April-2003.
    COMPUTER EXPOSURE :
    MS-WORD, Windows.
    Microsoft office suites.
    Auto CAD 2007.
    PRESENT EXPERICNCE :
    Concern : Q-TEC GROUP LIMITED W.L.L DOHA, QATAR.
    Designation : Electrical Engineer
    Nature of work : Installation of Electrical, Fire alarm & LAN system
    Project : EPIC FOR THE REPLACEMENT OF ABSOLETE SWITCH BOARDS IN
    PWI-1, 4, 5, 6, 7, 8, 9, FAHAHIL NORTH & SOUTH DEGASSING
    STATIONS IN DUKHAN FIELD.
    Client : QATAR PETROLEUM (ON SHORE PROJECT)
    Duration : May 12, 2009 to till date
    Job profile :
    - Under take familiarization with project and discipline specific inspection documentation to establish compliance with the specification and to ensure they are suitable for the intended.
    - Monitor/observe that all electrical parameters are with the specified limits and meet the project specification.
    - Preparing of contingency plans, participation in technical discussion and process of action plans as per client requirement.
    - Responsible for the over all maintenance such as lightings, electrical equipment, UPS, medium & low voltage switchgears, transformer & generator.
    - Making of Inspection Test Plan (ITP) report in which includes Mechanical acceptance test, Bus duct, Cable laying, cable tray, battery & earthling. ITP for power transformer, distribution transformer & lighting transformer.
    - Organize the preparation of equipment and material specifications and data sheets, including the preparation of Single Line Diagrams, Schematic Diagrams, Cable Schedules and Cable Drum Schedules.
    - Interconnection Schedules, Equipment Lay-outs, Cable Routing and Lay-out Drawings, Cable Trench/Tray Lay-out Drawings, Lighting System Lay-out and Details, Earthing / Lighting System.
    - Interface and regularly meet with client and vendor representatives, conduct internal staff meetings, ensure the progress of project in accordance to schedule allotted man hours and budgeted costs. Coordinate with projects.
    - Perform related duties as and when directed by Direct Supervisor department
    - Erection of electrical works in Continuous Process Industry. Through knowledge of HT/LT Switchgears, Transformers. Fabrications of cable cellar, base frame for HT/LT switch gear.
    - Fully conversant with hazardous area classification and statutory requirements for electrical installations. Mechanical works Inspection of Electrical materials.
    - Conversant with handling different contract/ tender specifications/data sheets and within budgeted man-hour and project schedules. Job Planning, Supervision of Electrical activities, Coordination with Clients, vendors.
    - Review contract requirements for project execution, organize the preparation of the Technical Document Register (TDR), and identify requirements and scope of work; review specifications and Data Sheets, Area Classification Drawings.
    - Verify scope of work, budgeted man hours, budgeted quantities, total of deliverables, and format of delivery, time schedules and other specifications for execution of the work. Monitor man-hour costs and team schedules.
    - Supervise the preparation of equipment and cable layouts, lighting layouts, earthing and lightning protection layouts, cable schedules.
    - Job involves the testing of Transformer, PCC panel, MCC panel, CT, PT, EMC, AS, LB, ELB panels.
    - Testing of Transformer involves Ratio test, Magnetic balance check, magnetizing current test & Vector group test, IR value test, vector group test.
    - Assist warehouseman on proper handling and storage of electrical equipment/ materials, their compliance to its respective specification and make sure that all are in good condition and free from any damage prior to installation.
    - Examines all test instruments prior to inspection and see to it that they are properly calibrated and with valid certificate.
    - Engaged in supervisory control of maintenance matter in electrical distribution section, up grading works and administrative control of above section.
    - Erection of 3.3kV/2.1kV, 3.3kV/0.433kV & 33kV/0.433kV substation at Qatar Petroleum in Dukhan field.
    - Installation testing & commissioning of 630 KVA,1000 KVA, 1250KVA transformer ,HT Panel, LT Panel, Battery charger, control panel wiring, loop checking, installation of tray work etc.
    - Installation of fire alarm system, PA system for the Qatar petroleum, laying of pair cables for PA system, Telephone, junction box manual call point etc.
    - Installation & maintains 500VA-100KVA single phase to 3phaseDC & AC UPS system. Installing, fabricating and commissioning of low voltage switchgear. Motor control panel, UPS and Automatic transfer switch, Generator and other electrical control panel board.
    - Participating in the company meetings and dialogues of various client and customer regarding sales and project design specification.
    - Planning, scheduling and monitoring for site activities.
    - To maintain and update electrical works program to ensure works completion within time scale.
    - Preparing of work schedule, manpower scheduling for completion of project on target date.
    - Performs other duties as maybe assigned by immediate superior.
    PREVIOUS EXPERICNCE :
    Concern : Suzlon Infrastructure & Services Limited, Pune-411 001
    Work Location : Sankaneri, Tirunelveli (Dt.), Tamilnadu
    Designation : Electrical Engineer
    Duration : Jun2003 to May 6, 2009
    Job profile :
    - Erection and Commissioning of switching yard (33KV , 11KV) for1500KW,1250 KW, 600KW and 350KW Wind Turbine Generators
    - 1750KVA, 1500KVA, 500 KVA Power Transformers Erection, Testing and Pre-Commissioning & Commissioning.
    - 33 KV, 11 KV -1600A Vacuum Circuit Breaker Erection, Testing and Commissioning.
    - Erection, Testing and Commissioning of 33KV, 11KV CTs and PTs
    - Erection, Testing and Commissioning of 33KV,11KV Lightning Arresters
    - Power Cable Laying ,Cable Termination Works
    - Earth Resistance ,Cable Insulation Resistance, All Electrical Equipments Insulation resistance testing Works
    - Arranging Materials required for switching yard.
    - Planning for erection work and delivery of materials to different locations.
    - Supervising the contractors work.
    - 33KV.11KV Line route survey, planning, executing the OHT line work.

    PROJECT :
    DESIGN AND FAULT ANALYSIS OF KALLADA HYDRO ELECTRIC POWER STATION
    ABSTRACT :
    In this we mainly decided to do to find out of fault produced in generation and distribution of power in the KALLADA HEP.The installed capacity of the kallada hydro electric power station is 15MW.Here mainly have two units each generates as power of 7.5MW. In our project mainly aim to find out the design features and fault occur in the kallada HEP.After find out the faults in kallada HEP.We discussed about the reasons for this faulta and safety measures to avoid this fault.

    .
    PERSONAL DETAILS :

    Father’s Name : P.RAMAN NAIR
    Date of Birth : 15-02-1984
    Sex : Male
    Marital Status : Bachelor
    Nationality : Indian
    Passport No : F4642316
    Languages Known : Tamil, Malayalam & English
    Permanent Address : NO-64, Main Street, Saradha nager.
    Parvathipuram, Vetturni Madam (P.O), Nagercoil– 629003.


    I here by declare that the above furnished details are true to the best of my knowledge.
    Yours truly
    Place : Doha, Qatar. Date : R.RAJESHKUMAR

  4. Post Count Number #4
    Guest Poster
    Join Date
    August 14th, 2008
    Location
    Your Heart, Delhi
    Posts
    76,213

    chandra naga sekhar y

    E-mail : chandranagasekhar AT gmail.com
    CHANDRA NAGA SEKHAR Y
    OBJECTIVE
    EXPERIENCE
    Looking for an excellent opportunity to work as Mechanical Engineer with my excellent skills and Mechanical Engineering background that will help me to give better service to your company.

    SECTION ENGINEER (2+ years)
    [ 2008-2011 ] SRI RAM ENGINEERING & FABRICATION WORKS
    - Jeedimetla, Hyderabad-55
    EDUCATION
    B.Tech., Mechanical Engineering
    [ 2005-2008 ] Swarnandhra College of Engg.& Tech.(JNT University-Hyderabad), Narsapur (W.G.Dt.), A.P
    - First Class with 69.57% of marks.
    - Project Name - Modified Conveyor Technology (Visakhapatnam Steel Plant, Visakhapatnam, A.P.)
    Diploma in Mechanical Engineering (D.M.E)
    [ 2002-2005 ] S.M.V.M. Polytechnic, Tanuku, A.P
    - First Class with 69.75% of marks.
    - Project Name – Piston with connecting rod.
    S.S.C
    [ 1999-2000 ] Z P High School ,Lankalakoderu , A.P
    - First Class with 69.16% of marks.
    COMPUTER SKILLS
    Programming Languages : SWIFT INDIA, DS
    Design Software Skills : AUTO – CAD
    PRO – E , ANSYS
    TRAININGS / INTERNSHIPS
    - Internship with Rashtriya Ispath Nigam Ltd. (Visakhapatnam Steel Plant) Visakhapatnam, A.P. during the period of DEC 2007 to FEB 2008.
    - Imparted project/vocational training on major plant equipments and carried out an academic project on “Conveyor Technology” under the esteemed guidance of Engineering Executives from Coke Ovens & Coal Chemical Plant Dept.
    ACHIVEMENTS
    EXPOSER TO INDUSTRY
    - Secured First prize in BTECH 2nd year
    - Secured first prize in singing
    - Secured prize in essay computation “HOW TO DEVELOP INDIA 2020”
    - Secured rank in GATE examination
    - secured member in AMERICAN SOCIETY OFMECHANICAL ENGINEERING organization
    - secured member in INTERNATIONAL ASSOCIATION ENGINEERS organization
    - Member of Users Group, http ://www.engineering.com
    - Visited VIZAG STEEL PLANT, VISHAKAPATNAM.
    - Visited ROLEX PAPER MILLS LTD., PALAKOL
    - Visited VIJJESWARM GAS POWER PLANT, VIJJESWARAM.

  5. Post Count Number #5
    Guest Poster
    Join Date
    August 14th, 2008
    Location
    Your Heart, Delhi
    Posts
    76,213

    Electrical Site Engineer Job In Sauudi Arabia

    Dear Sirs
    Kindly mail me the vacancies detail available at Saudi Arabia

  6. Post Count Number #6
    Guest Poster
    Join Date
    August 14th, 2008
    Location
    Your Heart, Delhi
    Posts
    76,213

    Electrical designing engineer in construction

    Waseem Khan
    E-mail : wasimkhan_786 AT yahoo.com


    OBJECTIVE : To become a successful professional in the field of Electrical Engineering and to work in an innovative and competitive world that gives scope to enhance my knowledge and skills.
    STRENGTHS : Good communication skills, hardworking, go-getter and quick learner
    QUALIFICATION : B.Tech (Electrical and Electronic Engineering)
    ACADEMIC :
    EXAMINATION BOARD\UNIVERSITY YEAR AGGREGATE
    B.Tech Jawaharlal Lal Nehru Technological University 2004-2008 58.24%
    Intermediate (12TH) Board of Intermediate Education, Hyderabad 2002-2004 56%
    S.S.C (10TH) Board of Secondary Education, Hyderabad 2002 56%
    TECHNICAL SKILLS :

    Operating systems :
    Windows95/98/2000/XP
    Packages :
    MS office
    Achievements : National cadet cop (NCC)_ B-certificate certified
    Experience -1 in INDIA :
    Worked as Electrical Engineer in Blue Star Limited (Construction) since May 2008 to till Date and also took care of maintenance of substation of 33/11 in my final year (Academic) since January to April
    PROJECT PROFILE :
    Title : Aparna Sarovar
    Team Size : 4
    Role Site Engineer
    Company (organization) : Blue Star Limited, Secunderabad.
    Roles and Responsibilities : Involved in Design and execution all faces of
    Electrification of residential 20 floors residential complex beginning from
    Slab Conduit Laying, chipping, conduiting, Box Fixing, and Wiring.
    .
    Title : Maintenance of Sub-Station 33/11 KVA
    Team Size : 4
    Role Team Member
    Company (organization) : Central Power Distribution Company of A.P .Limited
    To keep critical equipment like PTRs, DTRs, VCBs protective mechanism and substation structures in satisfactory working condition for ensuring quality and uninterrupted power supply maintenance of substation is very important.
    The smooth operation of the power distribution system depends on how well it is maintained. This includes the operation and maintenance of all its components.
    Experience-2 in GULF : Worked as Electrical engineer (Electrical designing engineer in LV site in residential construction) in OMAN, Muscat since 5 month…
    NATURE OF WORK :
    *PREPARATION OF SHEP DRAWINGS
    >For lightning system layout
    >Power system layout
    >Cable tray and opening shaft layout
    >Cable rating layout
    >Ear thing and lightning protection layout
    * LOAD CALCULATION OF
    > Lighting system
    >Power system
    >Motor control center (MCC)
    *LINE DIAGRAM AND LOAD DISTRIBUTION DIAGRAM OF
    >Lighting system
    >Power system
    >Motor control center (MCC)
    *CABLE TRAY SIZING OF
    >Power cables
    >LC cables
    *CABLE FEEDER AND BREAKER SIZING TROUGH
    >Voltage drop calculation
    >Short circuit current calculation
    >By considering correction factor with ambient temperature
    *LUX/ILLUMINATION CALCULATION
    >Interaction with suppliers for compromising the qualities
    >Bill of quantity/estimation
    >cost or pricing
    >casting (Bill of quantity*Cost)
    >Testing
    >Handling over
    >Maintenance
    CURRENTLY WORKING EXPERIENCE-3
    Currently working as an senior electrical designing engineer in electrical residential construction in GENERAL DEVELOPMENT SERVICES LLC, Muscat Oman since January 2011 to till date.

  7. Post Count Number #7
    Guest Poster
    Join Date
    August 14th, 2008
    Location
    Your Heart, Delhi
    Posts
    76,213

    Electrical engineer(B.E) with 2.5 year experience

    Sir,
    I am Arunachalam, i got experienced in substation maintenance and H.T erection i scored 70.8% (No history of Arrears) in BE. Also i studied in DEEE

    Name : ARUNACHALAM .I
    Email : arunthoma227ster29 AT gmail.com
    QUALIFICATION
    1. Bachelor Degree : Bachelor of Engineering (B.E)
    Study of field : Electrical and electronics engineering
    Institution : P.G.P College of engg and Technology, namakkal
    Academic percentage : 71.8 %
    Year : 2005-2008
    2. Diploma : DEEE
    Study of field : Electrical and electronics engineering, karur
    Institution : The Karur Polytechnic College
    Academic percentage : 86 %
    Year : 2003-2005
    3. Higher secondary : Hsc (State board)
    Institution : S.S.V higher secondary school, kodumudi
    Academic percentage : 72 %

    3. S.S.L.C : State board
    Institution : S.S.V higher secondary school, kodumudi
    Academic percentage : 86 %
    EXPERIENCE
    Employment History
    1. Company Name : Beeta power controller From: Nov 2010 to till now
    Position : Electrical supervisor
    Role : Erection and commissioning of electrical machines
    Work Description : 1.Creating H.T service documentation to relevant client company
    2. Prepare the quotation and tender
    3. Incharge on the site work.
    2. Company name : Precision Knitters From: Aug 2009 to Nov 2010
    Position : Electrical engineer
    Role : Maintenance and trouble shooting in electrical circuits
    Work Description: 1.Monthly maintenance in transformer and generator
    2. day to day maintenance in electrical machine
    3. Company name: Tamil nadu Electricity Board (TNEB) 230/110 KV Auto SS

    Industry : State government
    Position : Electrical engineer trainee
    Role : Maintenance in sub station breaker, CT, PT, Auto transformer, EHT
    Tower Line
    Work Description: 1.Monthly maintenance in (230/110 KV) Auto transformer, Line
    CT, PT
    2. Station Battery Maintenance for weekly
    3. Switching operation
    PROJECT DETAILS
    Title -Motor Monitoring control through power line
    Done At -Southern Iron Steel and company limited (SISCOL) Salem
    Description - Motor’s speed controlling in at remotely while on power cable to
    Implement for Single phase only and also measure the current
    Voltage and speed in Rpm

  8. Post Count Number #8
    Guest Poster
    Join Date
    August 14th, 2008
    Location
    Your Heart, Delhi
    Posts
    76,213

    Application for civil engineer

    CURRICULUM VITAL
    RAJNEESH KUMAR SINGH

    E-mail : - rajneesh_tomerjee AT yahoo.co.in
    Career Objectives
    To seek a challenging opportunity in a Construction Company, this provides an opportunity to enhance my personal skills & to learn the latest techniques in the construction industry.
    Career Summary
    - Having 6th years of experience in Various Civil Construction Works
    - Currently working as an Asst. Manager Civil (Billing)in Coastal Projects Ltd at Chuzachen Hydro Electric Project (Rongli,East Sikkim)
    - Having more than 5 years of experience in Hydro Power, Underground works & 1 year irrigation Projects.
    - Responsible for the Quantity surveying and Civil Site Execution.
    - Supervision of all civil work which includes blasting, rock bolting, grouting, Shortcrete, Slipform equipments & lining equipments.
    - Preparation of monthly R.A. bills and site measurements along with client/consultant representative including coordination.
    - Preparation and submission of Methodologies and getting approval for the each activity such as under ground excavation, Surge shaft, HRT Lining, Grouting and Structure work etc.
    - Rate Analysis of items outside the scope of the Contract & Deviated items.
    - Duties include Cost Estimation, and Quantity Estimation.
    - Preparing Reports (Daily, Weekly, Fortnightly, Monthly & Quarterly)
    - Knowledge of Computer Applications (Auto CAD & Land development)
    - We have created the world record in maximum (2.588Km) length of pipe line concreting in tunnel lining works at Chuzachen H E Project Rongli East Sikkim.

    Project Details
    The Chuzachen Hydro Electric Project is located in the East District of Sikkim on the River Rangpo and Rongli. The Project head race tunnel of 4.50m circular diameter, 7.9 km in length, with five Adits of total length 2.1 kms, with surface Penstock of Length 802.0m, and 137m high, 12 m dia surge shaft.
    Client : GATI INFRASTRUCTURE LTD
    Consultant : Colenco
    Contractor : SEW & Coastal JV (Main Civil Contractor)
    Worked as Asst. Engineer from March 2009 to October 2009 in Patel Engineering Ltd at Lohrinagpala Hydro Electric Project Uttarkashi (Uttrakhand)
    Project Details
    The Lohrinagpala Hydro Power Electric project is located at District Uttarkashi in Uttrakhand on the River Bhagrithi (Ganga). The Project construction of under ground Power House of 600 MW, transformer cavern, MAT, CVT, 2nos.475m length inclined pressure Shat, Switchyard, 14.5 Km head race tunnel of 7.50m circular diameter with three Adits and 124m high 16 m dia surge shaft.
    Client : NATIONAL THERMAL POWER CORPORATION LTD
    Contractor : Patel Engineering Ltd.
    Roles and responsibilities
    - Supervision for all kinds of civil and underground works at Power house sites including grouting works and treatments of cavities and shear zone for tunnels. Civil assignments with Geo-technical as well as geological supervision including support design in underground caverns, power house cavities, mass concreting and etc.
    - Executional works in Power house including transformer hall, machine hall, cable tunnel. Switch yard, pressure shafts, TRC and HRT.
    - Supervision of RCC structures which includes checking of reinforcement in Columns and Beams and preparing the bar bending schedule, as per drawings
    - All types of Survey work with help of Total Station, Auto level & Profiler.
    - Profile Marking, Survey Points fixing, Tunnel alignment checking, L & Cross section taken.
    - Plotting & Quantity work out for billing.
    - Preparation of Sketches for Methodology for major activities like Excavation, Concrete, Formwork, etc.
    March 2006 to March 2009
    Worked as a Asst. Engineer from March 2006 to March 2009 in Patel Engineering Ltd (one of the leading Construction Company in INDIA) who are appointed as Main Civil and Hydro-Mechanical work.
    Sewa Hydro-Electric Power Project (J&K)
    Project Details
    The Sewa Hydro-Electric Power Project is conceived to harness a part of vast hydro-electric potential of river Sewa in the state of Jammu & Kashmir.
    The Project comprises construction of Power House Complex 3 x 40 MW through, 1.8 km in length Horizontal Presser Shaft,175m vertical pressure shaft ,Surface penstock length 835 m Dia 2.4m , 111m high surge shaft, Switchyard, power house complex and generating equipment. A huge quantity of concrete will be required for construction of various works of the project.
    Client : National Hydro Electric Power corporation ltd.
    Engineer-in-Charge : Sanjay Darbari
    Contractor : Patel Engineering Ltd – Main Civil & Hydro-Mechanical work.
    Roles and responsibilities
    - All types of Survey work in Tunnel, Surface Penstock, Valve House, Surge Shaft and Switchyard & Power House.
    - Prepare civil drawings as per requirement
    - To liaise with sub contractors, consultants, client and site representative
    - Supervision of all execution works at Power House, Surface Penstock and Surge Shaft in checking of reinforcement & Shuttering as per drawing etc.
    - Executional works in Power house including transformer hall, machine hall, cable tunnel, Switchyard, surge shaft, pressure shafts and TRC
    - Duties include rate analysis, quantity estimation, Reconciliation of materials and cost estimation.
    - Preparation of departmental /sub-contractors bills, Progress reports & Construction Programs & Verifying bills submitted by the sub-contractors.
    - Preparing Reports (Daily, Weekly, Fortnightly, Monthly & Quarterly)
    May 2005 to March 2006 :
    Worked as Site Engineer in SEW Construction Ltd at Nagar Kurnool (AP)
    Client : Andhra Pradesh Irrigation Department.
    The scope of work Fresh Canal, Distributaries, Supper Passes, Under Passes & Culverts.
    Project Details
    80 km length Achempet Branch Canal, 1.20 Lacks Acre Aye cut / Command are fixing.
    Roles and responsibilities
    - Survey work for command area fixing & canal alignment fixing.
    - Liaisoning between Land Owner to resolve all contractual and financial matters amicably to avoid arbitration or reference to the Dispute Adjudication Board
    - Rate Analysis of items outside the scope of the Contract
    - Preparing Schedules for day to day activities
    Self Assessment
    - Can work on my own or as part of a team.
    - Good motivator and have the proven ability to lead a team.
    - Analytical and problem solving skills.
    - Ability to work in a fast paced multi-cultural environment.
    - Hard, conscientious worker.

  9. Post Count Number #9
    Guest Poster
    Join Date
    August 14th, 2008
    Location
    Your Heart, Delhi
    Posts
    76,213

    Electricial engineer

    Please select my resume to appropriate field.

  10. Post Count Number #10
    Guest Poster
    Join Date
    August 14th, 2008
    Location
    Your Heart, Delhi
    Posts
    76,213

    details of civil engineers vacancies

  11. Post Count Number #11
    Guest Poster
    Join Date
    August 14th, 2008
    Location
    Your Heart, Delhi
    Posts
    76,213

    Apply for Mechanical Engineer

    S. VIJAYARAJ.
    E-Mail : s.vijayaraj24 AT yahoo.com
    ________________________________________
    Seeking top level assignments in an organisation of repute for the total operations with an organisation of repute.
    Industry Preference : Automobile/Auto Components
    (Sheet Metal Fabrication, Press Parts & Machining parts etc.)
    SYNOPSIS
    - Senior, Result-Oriented Leader, Very extensively travelled with proven success of 23 years of experience in Manufacturing, Production Planning & Control, Product Development, Quality Control/Assurance, Supplier Management and Man Management.
    - Previously worked with M/s. Nippon Thermostat India Ltd as Assistant General Manager– Operations.
    - A strategic planner with expertise in managing production activities, streamlining processes/ procedures to facilitate smooth production process & enhance productivity.
    - Proven track record in implementing cost saving measures to achieve substantial reduction in terms of production cost, raw materials, man power and machine utilisation.
    - Extensive experience in managing inventory control & resourceful at strategizing techniques for maximum utilization of manpower; ensuring compliance to quality standards & maintaining all related documents.
    - Gained exposure in cost optimisation, technology transfer, workstation simplification, productivity enhancement, layout optimisation and training; manufacturing automotive components, profitability improvement, Japanese interpretation, setting up Greenfield Projects from concept to commissioning and beyond.
    - Conversant in latest manufacturing concepts like In-time Manufacturing, Kanban, Total Quality Management, Six Sigma Green Belt and Toyota production systems.
    - Demonstrated analytical, problem solving and organisational ability coupled with strong communication and relationship management.
    CAREER CONTOUR
    APR’ 2000–OCT’ 2011 : M/s. Nippon Thermostat India Ltd. Chennai as Asst. General Manager– Operations.
    Growth Path : Joined as Asst. Manager (Works) : APR’ 2000-MAR’ 2002
    Deputy Manager (Works) : APR’ 2002-MAR’ 2005
    Plant Manager : APR’ 2005-MAR’ 2010
    Asst. General Manager (operation) : APR’ 2010-OCT’ 2011
    APR’ 2006- OCT’ 2011 : M/s. Precialp Precision India Pvt. Ltd., Chennai.
    As Asst. GM (Operations)-Looking both company’s Nippon Thermostat India Ltd.& Precialp Precision India Pvt. Ltd.
    OCT’ 1995–MAR’ 2000 : M/s. Western Thomson (India) Limited, Chennai
    As Production Engineer-Press Section
    OCT’ 1993- OCT’ 1995 : M/s. Static Reliable Systems Pvt. Ltd., Chennai
    As Production Manager-Sheet Metal Fabrication and Machining section
    OCT’ 1992-APR’ 1993 : M/s. Balaji Engineering Works, Chennai
    As Engineer- Production& Quality Assurance-Press Section and machining section
    SEP’ 1988-AUG’ 1992 : M/s. Modern Fabricators, Chennai
    As Engineer-Production Engineering- Sheet Metal Fabrication and machining section
    APR’ 1987-JAN’ 1988 : M/s. Siva Sakthi Engineering works, Chennai
    As Engineer- Production Engineering- Sheet Metal Fabrication and Pipe line fabrication.
    KEY DELIVERABLES
    Manufacturing Operations
    - Managing overall operations with a view to ensure timely accomplishment of production targets within the time and cost parameters.
    - Overseeing overall Procurement activities, implementing effective techniques to bring efficiency in operations, improve quality standards & achieve maximum cost savings.
    - Analyzing various processes/applications and recommending process modifications to enhance operational efficiency, implementing TPM & Lean manufacturing for enhancing OEE.
    Production Planning & Control
    - Handling budgeting for production / machinery and manpower as well as production activities of the manufacturing division & preparing weekly rolling plan & responsible for delivery on time.
    - Developing new process concepts for production optimization, yield improvement and developing guidelines for sequencing of manufacturing activities in the organisation.
    - Minimizing performance bottlenecks for achieving high productivity with minimum consumption of material & machine and monitoring expenses.
    Quality Assurance
    - Implementing Quality Management System and ensuring adherence to the same while ensuring compliance of various quality measures.
    - Conducting regular system & process audits to strengthen processes, reduce process variations, reduce incoming & in process rejection, customer complaints & appraisal costs.
    - Successfully implemented and sustained systems such as ISO/TS-16949.
    - Involved in generating innovative ideas for Cross Functional Team (CFT) for new product development activities like APQP, SPC, MSA and FMEA.
    Supplier Management
    - Processing the system and procedures for effective inventory control for ensuring ready availability of materials to meet the production targets.
    - Steering strategic sourcing through identification of cost effective vendors/suppliers for procurement with an aim of reducing cost while improving quality & reliability.
    - Assessing performance of vendors based on various criterions such as percentage rejections, delivery conformance, cost reduction, response time, credit terms, etc.
    Team Management
    - Directing, leading and motivating workforce; imparting continuous on job training for accomplishing greater operational effectiveness/ efficiency.
    - Working on succession planning of the workforce, rendering technical guidance to the staff & resolving interpersonal issues & working towards a harmonious work environment.
    - Identifying the training needs of subordinates and grooming them for higher responsibility.
    Significant Highlights :
    As Asst. GM–Operations M/s. Nippon Thermostat India Ltd. Chennai
    - Reported to the Directors and was held responsible since project stage with Japanese Auto components major to supply products for OEM’s Maruti, SPIL, Swaraj Mazda and Collaborators NTCL Japan.
    - Successfully implemented localization (in house) of critical parts of Press parts for Thermostat as part of VAVE for Maruti Suzuki India Limited.
    - Pressing Section & Machining Section-Raw material savings and process improvement initiatives for cost saving.
    - Existing systems/ processes streamlined the Assembly Section. Results obtained to improve the production
    - Successfully finalization of cost for supplier parts and machines with consolations with Director.
    - Successfully finalize Asset management of an organization building, facilities, equipments and stores etc.

    As Asst GM-Operation at Precialp Precision India Pvt. Ltd.
    - Lead the operations since project stage and was reporting to the Director.
    - Reported to the Directors and was held responsible since Production, Quality Assurance. Auto components supply parts for Customers M/s. Turbo Energy Ltd, M/s. Honeywell Turbo India Pvt. Ltd. & Collaborators Precialp, France.
    As Production Engineer-Press Section at M/s. Western Thomson (India) Limited, Chennai
    - As Press Section-Production Engineer, responsible for Press parts Production and Planning, Quality control and Manpower control, Rejection / Rework Control etc.
    As Production Manager-Sheet Metal Fabrication and Machining section At M/s. Static Reliable Systems Pvt. Ltd., Chennai
    - Efficiently manufactured Sheet metal Fabrication for Structure works, Press Parts etc.
    - Press Section and Machine shop responsible for Production and Planning, Manpower Planning etc.
    - Customer Support for M/s. Ashok Leyland Ennore, M/s. Ennore Thermal Power Station, TNEB etc.
    As Engineer- Production& Quality Assurance at M/s. Balaji Engineering Works, Chennai.
    - As Press Section-Production Engineer, responsible for Production, Quality control etc.
    - Customer Support M/s. Ashok Leyland, M/s. API ( Clutch assemble parts)
    As Engineer-Production Engineering at M/s. Modern Fabricators, Chennai
    - As Press and assembly section-Production Engineer, responsible for Production.
    - Sheet Metal Fabrication & Press Parts-Raw material savings and process improvement for cost saving.
    - To supply the Fabrication and machining items for both BG and MG Railway coaches for customers M/s. Integral Coach Factory, Chennai and M/s. Rail Coach Factory, Punjab, India.
    As Engineer-Production Engineering at M/s. Siva Sakthi Engineering works, Chennai
    - As Engineer response for Production Sheet Metal Fabrication and Pipe line fabrication
    ________________________________________
    WORKSHOP ATTENDED
    - Work shop on Effective communication skills (ACMA)
    - Successfully learned Manufacturing Process (ABK – AOTS)
    TRAININGS ATTENDED
    - Involved in TPM (ABK – AOTS) and FMEA : ( Madras Productivity council)
    - Attended training on Production Cycle Time Reduction, Positive Work Culture and Productivity organized by Madras productivity Council.
    - SPC study and 7 QC Tools (Tot stat Quality consultants)
    - Trained as Internal Auditor QMS ISO/TS : 16949 : 2002 (K. Bharat Srinivasan QMS consultant Chennai)
    - Involved in Six sigma Black belt program & Six sigma Green belt program
    - Well trained in SMED : Single minute exchange of Dies (National Productivity Council)
    - Exclusively trained with collaborators Nippon Thermostat controls–Japan for Japanese process and automations and quality assurance systems.
    - Exclusively trained with collaborators Precialp, France for Machining and special process and automations and quality assurance systems.
    - Successfully undergone training session at France-Precialp for Production & Quality Activities (7 times went to France during 2005 to 2010 for various projects)
    ________________________________________
    IT SKILLS
    Well versed with AutoCAD 2004, MS office, Minitab and Internet Application.
    ________________________________________
    ACADEMIA
    1986 B.E. Mechanical Engineering Madras University, India.

  12. Post Count Number #12
    Guest Poster
    Join Date
    August 14th, 2008
    Location
    Your Heart, Delhi
    Posts
    76,213

    Mail similiar jobs

    Dear sir
    Please mail me electrical project engineer jobs in saudi Arabia.