St Laurn, Suites, Hinjewadi, Pune : Restaurant Hostess

+ Ask Question / Post resume
Results 1 to 2 of 2
  1. Post Count Number #1
    Super Moderator
    Join Date
    April 18th, 2008
    Location
    Tuticorin
    Posts
    7,026

    St Laurn, Suites, Hinjewadi, Pune : Restaurant Hostess

    St Laurn, Suites, Hinjewadi, Pune : Restaurant Hostess
    Website: http://stlaurnhotels.com

    Keywords: Restaurant Hostess

    Designation: Restaurant Hostess
    Experience: 0 - 2 Years
    Location: Pune,
    Hinjewadi
    Education:
    UG - Any Graduate - Any Specialization,Graduation Not Required
    PG - Any PG Course - Any Specialization,Post Graduation Not Required
    Industry Type: Hotels/ Restaurants/Airlines/Travel
    Functional Area: Hotels, Restaurants
    Posted Date: 09 Jun 2009

    Job Description:
    To serve to guests, maintain guest relations

    Desired Candidate Profile:
    to serve to Guests, maintain guest relations

    Company Profile:
    St Laurn is the rising brand name in the Indian Hospitality industry having two 5* operational properties at Pune & 3rd will be opening shortly at Ahmedabad, The positions are vacant at Pune for the new 220 pax New Garden Restaurant

    Executive Name: Sanjay jadhav

    Address:
    Not Mentioned

    Email Address: careers@stlaurnhotels.com

    Telephone: 09922970686

    Keywords: Restaurant Hostess

  2. Post Count Number #2
    IJT addict Guest-IJT's Avatar
    Join Date
    October 15th, 2010
    Location
    Looking for Job
    Posts
    20,894

    Name : p.prabu
    Email : prabu4881 AT yahoo.com
    Designation / Skillset : Welding Engineer
    Application for the position of Quality Control Engineer/Welding Inspector
    CSWIP 3.1 & ASNT Level II
    I am actively seeking a Quality control engineering opportunity in a demanding, fast-paced multi-tasking office. My seven years of QC Engineer experience have equipped me with a multitude of skills, and I would like to continue my growth
    Throughout my career I have demonstrated for my employers an exceptional facility for meeting organizational objectives and demands and my skills as a hostess have often been utilized by employers As you can see from my enclosed resume, I have acquired extensive experience in the field of Quality Control (PIPING) in Site as well as in Fabrication Shop. I also learned to work in teams and motivate other staff members. I am certain I would prove to be an asset at your concern as well.
    If my abilities meet the needs of your concern, I would welcome the opportunity to meet with you in person or to speak with you by phone to discuss how I can contribute to the success of Thru Point.
    Rgds,
    P.Prabu

    Resume :

    EDUCATIONAL QUALIFICATION :-
    - Bachelor of Engineering (MECHANICAL)
    - First Class (70%)
    - Project on “Design and Fabrication of Semi-Powered Automatic hoist.
    TECHNICAL QUALIFICATION :-
    - CSWIP 3.1
    - ASNT LEVEL II
    - Visual Testing (VT)
    - Radiographic Testing (RT)
    - Ultrasonic Testing (UT)
    - Magnetic Particle Testing (MT)
    - Penetrant Testing (PT)
    - CERTIFICATION IN OILFIELD AND QUALITY CONTROL
    Subjects included :
    - Welding Engineering
    - Construction Materials
    - P&ID and Isometrics
    - Codes and standards.
    FAMILIAR WITH :-
    - ASME Sec IX, ASME Sec VIII,ASME Sec V, ASME B 31.3,AWS D1.1,API 1104
    PROFESSIONAL SUMMARY
    Having 7 Years of experience as a Mechanical Engineer and as QA/QC in pressure
    Parts steel structures and Oil and Gas Sector Companies
    EMPLOYMENT DETAILS : -
    Company : Hyundai Engineering & Construction Co Ltd
    Doha, QATAR.
    January 2008 to February 2011
    Name of the Project : QATAR FERTILIZER COMPANY PROJECT
    (AMMONIA & UREA-QAFCO 5)
    Position : QC PIPING Engineer
    Work Responsibility as Follows :-
    - Well-versed with Hydrostatic, Pneumatic and Air Jet leak pressure testing techniques.
    - Immense ability to interpret advanced isometric drawings, plan drawings, line specifications and welding procedures.
    - Skilled at all phases of piping and structural steel fabrication.
    - Profound ability to field measure, fabricate, install, and hydro test piping systems including offsets.
    - Verification of dimensions, fit up and weld preparation are in accordance with ASME B 31.3 and AWS D 1.1
    - Visual Inspection of structural members and weld joints as per acceptance criteria of ASME IX and AWS D 1.1
    - Raising Corrective Action/Non-conformance reports as required and monitors their development and resolution
    - Surveillance during welding to verify compliance with specified procedure
    Name of the Project : SHELL PEARL Gas to Liquid PROJECT (GTL)
    Position : QA/QC Engineer
    Work Responsibility as Follows :-
    PIPING :-
    - Verify the correctness of welding consumables (electrodes, filler wires, consumable inserts, gases etc) including the preheating and inter pass temperature of test specimen & products if required.
    - Verification of dimensions, fit up and weld preparation are in accordance with ASME B 31.3 and AWS D 1.1
    - Visual Inspection of structural members and weld joints as per acceptance criteria of ASME IX and AWS D 1.1
    - Raising Corrective Action/Non-conformance reports as required and monitors their development and resolution
    - Surveillance during welding to verify compliance with specified procedure.
    - Monitoring of Welders performance of the welders on the basis of radiographic
    inspection and continuous engagements of welders to promote corrective action
    - Verification that Post Weld Heat Treatment has been conducted in accordance with specification requirements
    - Interpretations of Weld drawings, weld symbols and Radiographic Films
    - Maintenance of comprehensive inspection reports
    - Making Hydro Test Package For Piping
    - Giving Mechanical Clearance For Pressure Tests
    - Familiar with P & ID and ISO Metric DWG
    STRUCTURE :-
    - Develop the erection sequence procedure and modify structure to meet the requirement in Site.
    - Dimensional inspection of all Structural columns as per Drawing.
    - Witnessing all inspection as per ITP.
    - Visual inspection of Welding according to AWSD1.1.
    - Installation and Inspection for Handrail, Stair and Grating.
    - Making Punch list that does not pass quality standard.
    November 2006 to December 2007
    Company : Tech Sharp
    Kalpakkam,Tamilnadu
    Name of the Project : Madras Atomic Power Station, NPCIL KALAPKKAM
    Designation : Quality Control Engineer/Inspector.
    Responsibilities : In-Charge of All Piping and QA/QC Activity, Welding, Testing of
    Steam & water system piping
    - Inspection of site-Fabrication and Inspection of Welding.
    - Maintenance of comprehensive inspection reports
    - Making Hydro Test Package For Piping
    - Raising Corrective Action/Non-conformance reports as required and monitor their development and resolution
    - Inspection of equipment from Receipt Inspection to Final Installation Inspection.
    - Documentation require for inspection
    - Reporting to client.
    - Familiar with P & ID and ISO Metric DWG
    July 2006 to October 2006
    Company : Taisei Corporation
    Doha,QATAR
    Tel no : +974-4462-1027
    Name of the Project : DOLPHIN PROJECT UPSTREAM AND COMPRESSION FACILITIES
    Designation : Quality Control Engineer/Inspector.
    Responsibilities : In-Charge of All Piping and QA/QC Activity
    Work Responsibility as Follows:-
    - Inspection of Materials.
    - HSE coordination - Check construction installation & make punch list that does not pass the quality standard required by the client.
    - Inspection of site-Fabrication. - Hydrostatic Testing & System Commissioning.
    - Inspection of Welding. - Witnessing of piping reinstatement as per P&ID Prior to System Handover to Commissioning.
    - Visual Inspection. - Client Walkover (punch list coordinator).
    - Sampling System Piping connections, Welding Inspection & their Hydrostatic Testing. - Review & Preparation of Mechanical Completion Packages.
    May 2005 to May2006
    Company : L&T on CONTRACT, Vizag
    Name of the Project: L&T (HED) VESSEL PROJECT.
    Designation : QC Inspector. (Piping and Equipment)
    Work Responsibility as Follows: -
    - Inspection of site-Fabrication and Inspection of Welding.
    - Maintenance of comprehensive inspection reports
    - Making Hydro Test Package For Piping
    - Giving Mechanical Clearance For Pressure Tests
    - Raising Corrective Action/Non-conformance reports as required and monitors their development and resolution
    - Conducting Hydro test for Tubular Products
    - Inspection of equipment from Receipt Inspection to Final Installation Inspection.
    - Documentation require for inspection
    - Reporting to client.
    - Familiar with P & ID and ISO Metric DWG
    February 2004 to Oct 2004
    Company : ARS HYDRO Service Pvt Ltd, Chennai.
    Designation : Site Engineer
    Work Responsibility as Follows: -

    - Inspection in Piping and Descaling process for Boiler.
    - Visual Inspection & Process control during Production
    - Layout checking of piping as per ISO drawing
    - Conducting Hydro test for Tubular Products.
    - Assuring Quality of the Product.
    - Carry out Final inspection of (layout inspection for coils & Bends) Products.
    - Liaison with the third party inspectors & Customers for clearance
    - Preparation of AFI for fabricated items
    - Inspection of Fabricated frames for the boiler.
    - Complete Documentation
    June 2003 to December 2003
    Company : Primarine Engineers, Kalpakkam.
    Designation : QA / QC Inspector.
    Work Responsibility as Follows: -
    - Preparing production schedule and follow-up of components.
    - Stage inspection.
    - Visual Inspection during Process of Products
    - Assuring Quality of the Product.
    - Carry out Final inspection of Products.
    - Liaison with the third party inspectors & Customers for clearance
    September 2002to May 2003
    Company : Brothers Engineers and Erectors Pvt. Ltd, Chennai.
    Designation : Maintenance Engineer
    Work Responsibility as Follows: -
    - Inspecting condenser line (Flushing Process).
    - Supervising and allotting jobs to fitters, welders and riggers.
    - Maintenance of Turbine, Diaphragms and valves.
    - Documentation as per Company standard.

    P.PRABU
    -------------------------------------------------------
    More Information about this submission and submitter:-
    ___________________________________________________
    Submission ID : 4340327
    Date & Time : 7th Jul 2011 4:16 AM (UTC)
    IP Address : 115.241.3.156
    Browser Info : Mozilla/5.0 (Windows NT 6.0; rv:5.0) Gecko/20100101 Firefox/5.0
    Predicted Country : India