-
June 10th, 2009, 08:03 AM
Post Count Number #1
Sobha Developers Ltd Chennai Mangalore Pune : Site Engineer, Planning Engineer
Sobha Developers Limited Bengaluru/Bangalore, Chennai, Mangalore, Pune, Trivandrum : Walk in for Site Supervisor / Site Engineer / Planning Engineer
Website: http://www.sobhadevelopers.com
Keywords: Site Execution, Diploma, Engineering, high rise,
Designation: Walk in for Site Supervisor / Site Engineer / Planning Engineer
Experience: 1 - 4 Years
Location: Bengaluru/Bangalore, Chennai, Mangalore, Pune, Trivandrum
Education:
UG - B.Tech/B.E. - Civil,Diploma - Civil
PG - Post Graduation Not Required
Industry Type: Construction/ Engineering/Cement/Metals
Functional Area: Site Engg., Project Management
Posted Date: 09 Jun
Job Description:
Walk in Interviews for Civil Graduates:
We require Diploma Civil / B.E / B.Tech Civil Engineers with out any history of arrears, Self-starters and result-oriented individuals with min. 1-2 years in similar position and experience in Construction Company having experience in execution of high-rise buildings, commercial buildings able to take up comprehensive responsibility of projects to deliver & handover within time and quality, being cost conscious.
Responsibilities:
1. Site Execution & Site Supervision
2. Tracking the Schedule on a daily basis.
3. Timely reporting and assist the Project Engineer / Project Manager in Project management related activities.
4. Ensure Safety & Cleanliness at site.
5. Ensure the Implementation of ‘Quality, Cost and Time' factors on every square inch of delivery.
Willing to work any where in South India, can who join immediately.
Venue:
Sobha Developers Limited
2nd Floor, Neeladri Plaza,
Opp PF Office,
#4, Rajaram Mohan Roy Road,
Bangalore, India. PIN - 560 025.
From Monday to Friday 9.00am to 12.00 pm only.
Contact Person: Ms.Smitha.
Desired Candidate Profile:
Walk in Interviews for Civil Graduates:
We require Diploma Civil / B.E / B.Tech Civil Engineers with out any history of arrears, Self-starters and result-oriented individuals with min. 1-2 years in similar position and experience in Construction Company having experience in execution of high-rise buildings, commercial buildings able to take up comprehensive responsibility of projects to deliver & handover within time and quality, being cost conscious.
Responsibilities:
1. Site Execution & Site Supervision
2. Tracking the Schedule on a daily basis.
3. Timely reporting and assist the Project Engineer / Project Manager in Project management related activities.
4. Ensure Safety & Cleanliness at site.
5. Ensure the Implementation of ‘Quality, Cost and Time' factors on every square inch of delivery.
Willing to work any where in South India, can who join immediately.
Venue:
Sobha Developers Limited
2nd Floor, Neeladri Plaza,
Opp PF Office,
#4, Rajaram Mohan Roy Road,
Bangalore, India. PIN - 560 025.
From Monday to Friday 9.00am to 12.00 pm only.
Contact Person: Ms.Smitha.
Company Profile:
Sobha Developers Ltd, a Rs. 10 billion Company and India’s largest backward integrated real estate developer is built on rock–solid values, bench mark quality standards, uncompromising business ethics, sharp customer focus, robust engineering, in–house R&D and transparency.
Executive Name: HR Manager
Address:
Not Mentioned
Telephone: Not Mentioned
Reference ID:
CIVIL
Keywords: Site Execution, Diploma, Engineering, high rise,
-
December 29th, 2010, 10:02 AM
Post Count Number #2
Re: Sobha Developers Ltd Chennai Mangalore Pune : Site Engineer, Planning Engineer
My resume for the post of planning Engineer.
Nikita Jadhav
Mail to :nikita88jadhav AT gmail.com
Career objective :
To function efficiently as a civil engineer in a reputed organization and deliver the best in me. To constantly upgrade my knowledge and skills, effectively enforce them in my work.
Technical profile :
Qualification Aggregate Board/University School/College Year of Passing
B.E 71.8% University of Pune D.Y.P.C.O.E 2010
T.E 60.53% University of Pune D.Y.P.C.O.E 2009
S.E 57.46% University of Pune D.Y.P.C.O.E 2008
F.E 55% University of Pune D.Y.P.C.O.E 2007
HSC 74% HSC, Maharashtra Saraswati Vidhyalay Union Junior college. 2006
SSC 77.86% SSC, Maharashtra Mount Carmel convent High School Pune 2004
Aggregate of six semesters :61.41%
PG Details : Appeared for Post graduation programme in Project Management offered by NICMAR,Pune (National Institute of Construction Management)
Project Work : Project Management for Telecom sector (TSP Model)
Introducing a TSP model by application of management techniques in order to minimise cost and enhance quality within stipulated time. Sponsored by Veena Industrial Limited.
Software efficiency : AutoCAD, MS Project.
Experience : Presently working in an infrastructure company, Soma Enterprise Ltd. Thane (Mumbai) in Planning Depatment. Preparing DPR and monitoring stores and cash flows.
Achievements :
- Second Prize in paper presentation in state level technical event Kruti-2K9
- Participation in Mathematic evaluation examination held by the London Academy.
Extra Curricular :
- Event coordinator in state level technical event
- Participation in Youth Convention on “Man making education”
- Participation in Dance and singing competitions.
Personal Details :
Name : Jadhav Nikita Nalesh
Date of birth : 4th March 1988
EMAIL : nikita88jadhav AT gmail.com
Leisure interests :
Choreography in dance, badminton, watching movies, listening to music, physical working out.
Place : Pune
-
December 29th, 2010, 02:00 PM
Post Count Number #3
Re: Sobha Developers Ltd Chennai Mangalore Pune : Site Engineer, Planning Engineer
Nikita Jadhav
Ph.No : 9860671270(M)
Mail to :nikita88jadhav AT gmail.com
Career objective :
To function efficiently as a civil engineer in a reputed organization and deliver the best in me. To constantly upgrade my knowledge and skills, effectively enforce them in my work.
Technical profile :
Qualification Aggregate Board/University School/College Year of Passing
B.E 71.8% University of Pune D.Y.P.C.O.E 2010
T.E 60.53% University of Pune D.Y.P.C.O.E 2009
S.E 57.46% University of Pune D.Y.P.C.O.E 2008
F.E 55% University of Pune D.Y.P.C.O.E 2007
HSC 74% HSC, Maharashtra Saraswati Vidhyalay Union Junior college. 2006
SSC 77.86% SSC, Maharashtra Mount Carmel convent High School Pune 2004
Aggregate of six semesters :61.41%
PG Details : Persuing for Post graduation programme in Project Management offered by NICMAR,Pune (National Institute of Construction Management)
Project Work : Project Management for Telecom sector (TSP Model)
Introducing a TSP model by application of management techniques in order to minimise cost and enhance quality within stipulated time. Sponsored by Veena Industrial Limited.
Software efficiency : AutoCAD, MS Project.
Experience : Presently working in an infrastructure company, Soma Enterprise Ltd. Thane (Mumbai) in Planning Dept. Job Profile is to prepare DPR and monitor stores and cash flows on daily basis.
Achievements :
- Second Prize in paper presentation in state level technical event Kruti-2K9
- Participation in Mathematic evaluation examination held by the London Academy.
Extra Curricular :
- Event coordinator in state level technical event
- Participation in Youth Convention on “Man making education”
- Participation in Dance and singing competitions.
-
August 19th, 2011, 06:52 PM
Post Count Number #4
RESUME
ram026.pes AT gmail.com
RAMPRASAD.M
Career Objective
To work in an environment where I can grow as a team member besides gaining knowledge and contribute my level best to the company to achieve its goals.
Educational Qualification :
BE Details :
Qualification College University Year Semester Percentage
2011 VII- 75.33
B.E in
civil engineering
PES College of engineering
Visveswaraya Technological University 2010 VII 71.44
2010 VI 74.56
2009 V 80.67
2009 IV 69.22
2008 III 68.66
2008 II 67.35
2007 I 60.25
Aggregate Of 8
semesters 70.94%
Qualification Examination :
Examination Board School/College Year Percentage
P.U.C Karnataka State Board Mahajana PU College, Mysore 2007 75.50
S.S.L.C
Karnataka State Board Lalitha High school, Mysore 2005 87.36
Software/Technical Skills
- Total Station.
- Auto CADD.
- STAAD.PRO
- Microsoft office 2003/2007.
Extra Curricular Activity
- Participated in “AISIRI” and “PANDORA”, state level VTU fests in the year 2009 and 2010 respectively.
- Active participation in organizing various activities (Roadies, Skit-competition etc) in Annual College Fest 2009 and 2010..
- Active member of organizing committee of “VINYAS” in the year 2009 and 2010 – State Level Civil Technical Fest.
- Was proficient in Badminton and participated at the state level competitions in the year 2007.
- Has actively participated in various sports like cricket, carom and athletics.
Hobbies
Singing songs, painting, trekking, playing various games and sports.
-
October 5th, 2011, 02:30 PM
Post Count Number #5
B.Tech Fresher
RESUME
******
SOUMYARANJAN NAYAK
Mail :-soumya.nayak12321 AT gmail.com
OBJECTIVE :
..................
To join a reputed and Professional organization, which may provide me with full exposure of my resource and a vast platform so that I can upgrade myself in a better way and bring laurels to that company with my excellent Technical knowledge .
TECHNICAL SKILLS :
...............................
Languages-- C, C++, JAVA (J2SE),VC++(Visual Studio 2010) HTML, JavaScript
RDBMS -- MS SQL ,Oracle 10G (Intermediate)
OS -- Windows 2000/XP , Linux(beginner)
Others -- Microsoft Office, Adobe Photoshop & Admirable at software Installation
EDUCATIONAL QUALIFICATION :
.............................
1)B.Tech(Computer Science) : BIET,BHADRAK (B.P.U.T)Orissa (2011) with 7.42 CGPA
2)+2(Science) :N.C (Jr) College,JajpurC.H.S.E,Orissa (2007) with 67.22% marks
3)10th : Bhandaripokhari High School, Bhadrak B.S.E. , Orissa (2005) with 76% marks
Project Details :-
...............................
Minor Project :
E Vehicle Reservation System
(Technologies - Java & Mysql)
Major Project :
Crime Record Maintenance System(MFC application)
(Technologies - VC++ , Oracle )
-
November 18th, 2011, 11:53 AM
Post Count Number #6
vidhya_sarathy resume
CURRICULUM VITAE
P.VIDHYA SARATHY
vidhya.sarathy AT yahoo.com
_________________________________________________________________________
OBJECTIVE :
I look forward to a career that is characterized by continuous learning and diversity in nature of work, that brings with it challenges and opportunities to grow with the organization.
EDUCATIONAL QUALIFICATION :
INSTITUTE YEAR PASSED PERCENTAGE
BE Civil Engineering Jerusalem College of Engineering 20I0 74%
H.S.C Sri Ahobila Math Oriental Higher Secondary School 2006 77%
S.S.L.C Government Girl’s Hr.Sec.School 2004 89%
EXPERIENCE :
- Worked in Bharat Engineering Construction Company (P) Ltd as an Assistant Engineer from
May 2010 to July 2011.
- Having site knowledge in underground drainage project that is Construction of manholes, laying
Pipe lines and writing measurement book.
- Having good knowledge in drawing a plan using Auto cadd, and design the building by means of
Staad pro.
- Performing Key role such as Planning, Billing and Tender Submission.
- Having good knowledge in work schedule for a project using Microsoft Project.
PROJECT DETAILS :
- Mini Project : - Analysis, Design and Estimation of a two storey office building.
- The Design project deals with analysis, design and estimation of a two storey office building with a total plinth area of 138 square meters.
- Loading are calculated as per guidelines of “INDIAN STANDARD CODE”.
- The structure is considered as a framed one and frame analysis has been carried out by “MOMENT DISTRIBUTION METHOD”.
- The results of manual analysis are compared with results obtained from “STAAD.PRO”.
- The designs of all the structural members have been carried out by using “LIMIT STATE METHOD”.
- The code books IS 456 – 2000, SP16 are used for the design purpose.
- Estimation of quantities incurred in the construction of building is carried out using the “LONG WALL AND SHORT WALL METHOD”.
- Major Project :-Design of Solid Slab Bridge.
- The project deals with analysis, design and estimation of solid slab bridge.
- The loadings are calculated as per I.R.C code books.
- From the dead load and live load analysis the maximum bending moment is found.
- The design of all structural members has been carried out by using “WORKING STRESS METHOD”.
- Total estimate of the quantities incurred in the construction of the bridge is
Rs.48, 55,144.
SOFTWARE KNOWLEDGE :
Software Known : Auto Cadd, Stadd.Pro
Language Known : C.
Packages Known : MS-Office.
-
February 22nd, 2012, 01:52 PM
Post Count Number #7
ITC civil certificate holder needs construction supervisor job in Karnataka
Hi, ia m Jayachandran, male, aged 44 , needs Civil construction supervisor job in Karnataka,i have 17 years experience as civil supervisor.
email id is balakumaranjayan2yahoo.co.in