Talent2 Oman : Oil & Gas, planning, commercial, civil Project Manager

+ Ask Question / Post resume
Results 1 to 2 of 2
  1. Post Count Number #1
    Super Moderator
    Join Date
    April 18th, 2008
    Location
    Tuticorin
    Posts
    7,026

    Talent2 Oman : Oil & Gas, planning, commercial, civil Project Manager

    Talent2 Oman : Senior Project Manager
    Website: http://talent2.com

    Keywords: Project Management, Oil & Gas, planning, commercial, civil & utilities, PMP


    Designation: Senior Project Manager
    Experience: 10 - 15 Years
    Location: Oman
    Education:
    UG - B.Tech/B.E. - Civil, Mechanical, Petroleum
    PG - Any PG Course - Any Specialization
    Industry Type: Construction/ Engineering/Cement/Metals
    Functional Area: Site Engg., Project Management
    Posted Date: 07 Jun

    Job Description:
    The role requires knowledge and understanding of all aspects of construction management, to include but not limited to an understanding of the commercial intent of the contract, risk, health & safety, progress and reporting methodologies.

    - The Project Manager, supported by a professional project planning and commercial organisation, will be responsible for assigned project(s) support, design, delivery and ongoing collaboration.
    - Responsibility for the planning, design, construction, risk management, commissioning and handover of the specific projects within set time, cost and quality parameters.
    - Act as the main interface between stakeholders during design, construction and commissioning of specific projects.
    - Manage and oversee the design and procurement of specific projects.
    - Coordinate the monitoring of the works and the availability of the facilities as per specific agreements, agreed schedules and sequencing plans.
    - Coordinate certification of specific facilities, turnkey works for payment purposes.

    Desired Candidate Profile:
    - Have 10 to 15 years experience on various construction, oil & gas or civil & utilities projects
    - You will need to be certified practitioner by a professional project management organization such as PMP or Prince II
    - Familiarity with software suites such a Primavera P3, P5 or equivalent is desired as is ease of use of MS Project, PowerPoint and Excel for ad hoc presentations.
    - Fluency in English is essential

    Company Profile:
    Talent2 is the first human resources (HR) company in the Asia-Pacific region to offer a complete range of outsourcing services, including executive search and recruitment, Human Resources Information System (HRIS), payroll, consulting and learning.

    Talent2 is about talent management for the future. Our aim is to help companies with their staffing needs and assist them to achieve their resourcing goals. We provide a full range of integrated services that cover the talent lifecycle. From planning and selection, hiring and on-boarding, to payroll and learning, we help our clients source the best employees for the job, manage them and get the best out of them.

    Executive Name: Ms. Jen

    Address:
    Not Mentioned

    Telephone: Not Mentioned

    Reference ID:
    PMX20

    Keywords: Project Management, Oil & Gas, planning, commercial, civil & utilities, PMP

  2. Post Count Number #2
    Guest Poster
    Join Date
    August 14th, 2008
    Location
    Your Heart, Delhi
    Posts
    76,213

    Re: Talent2 Oman : Oil & Gas, planning, commercial, civil Project Manager

    BIO DATA

    1. PERSONAL PARTICULARS
    NAME : T.J.JOHN, Contact Ph: 23711670, Mob: 66059963
    Position : Project Manager / Sr.Mech.Engineer
    DATE OF BIRTH : 04/08/1956
    NATIONALITY : INDIAN
    MARITAL STATUS : Married, (Living with family in Kuwait for 14 years)
    Visa Status : Residence visa, Transferable
    DRIVING LICENSE : Posses Kuwait Driving License
    Membership : Kuwait Society of Engineers (Reg.No.14972)
    Expected salary : Negotiable
    2. QUALIFICATION
    Bachelor of Engineering (Mech.),
    Post Graduate Diploma, D.P.M., (I/S. Project Management).
    ISO-9001:2000 internal lead auditor.
    ASNT: Level-II (RT).
    Computer Exposure:
    CAESAR-II (API-610/ANSI B31.3): Equipment / Piping Code stress checks analysis.
    Pipe net: Hydraulic design calculation, Salient surge analysis, M.S.Project, Primavera.

    PROFESSIONAL EXPERIENCE:

    Accomplished 26 years experience in the execution of LSTK / EPC lump sum projects for Refineries, Oil field development, new construction / expansion projects for Infrastructure, Production Facilities, Process & Utility metallic / nonmetallic Piping system, Equipments, Pumps, Storage tanks, modification and revamp projects in Refineries, Oil & Gas Sectors, Gathering Centers, Gas Oil Separation Plant, Petrochemical complex, including for re-construction, periodical, emergency shutdown maintenance projects for onshore/offshore crude oil production facilities. Conversant in the areas of performance of project management functions, contract administration, establish and maintain project control system including create documentation structure, document control system and implement in the project in the aspects of engineering design, procurement, construction, prepare, follow-up, submittals, review clarifications, approval and other relevant documents for the project execution as per contract scope, specifications, including submit prequalification document with new client company, preparation and submittal of bid-proposal, project cost estimate, cost allocation and contract budget / cash flow projection for submission of tender-bids as well as for post awarded projects including for variation orders, prepare periodical detailed project reports (DPR),develop design and material specifications, prepare meeting agendas, minutes and progress status reports, control, expedite work progress, quality, safety, claims and closeout of the project.

    Since1994 till date working in Kuwait being involved in the execution of various EPC lump sum projects for KNPC, KOC, JO-Chevron and PIC/EQUATE on behalf of companies on deputation as well as for PMC/EPC contractors. Conversant with project planning, scheduling, project budget and cash flow projection-S curve, PMS, monthly invoicing, structuring project engineering and construction organization with defined roles for project key personnel to suit the project needs, expedition of project execution activities and monitoring work progress, follow up update project progress schedule, envisage and analyze bottleneck problem areas in the project execution, identify effective and efficient solution depending on the nature, interface, complexity and size of project under execution inline with project scope, technical specifications and complaint with relevant codes & standards, required quality level as per project QAP and HAZOP, PSHER study recommendation and safety procedures including participation in hazop study and recommendation and implementation in project execution.

    During the period 1989 to 93, for 4 years worked in Abu Dhabi for Umm-Al-Nar Refinery projects with Deutsch Babcock and from1985 to 89, 4 years worked in engineering and construction projects on secondment as field mechanical engineer for ARAMCO projects in Saudi including for execution of various short form, long term projects for ARAMCO-Ras Tanura Refinery, Jauyhima Gas plant, Safania Gas & Oil separation plant and on assignment for offshore facility projects in Marjan Oil Fields for rehabilitation / re-construction of collapsed Flare Stack as emergency shutdown maintenance projects including for replacement of offshore subsea pipelines and crude oil production facilities.

    Familiar with working in coordination with international design & engineering consultants, interface with PMCs to develop FEED, basic and detailed design, field engineering modifications to suit with existing systems at project site ensuring timely detailed design & drawing preparations, review with providing in-puts / feed backs of the site engineering survey reports working in close coordination with project construction team managers, multi discipline engineers. Conversant with design check as per PFD, P & ID, process parameters, equipment specifications, review / comment and approve the engineering design & drawings for piping, vendor packages, MTO for adequacy of material wall thickness, size and quantity for indented service including field engineering& design modifications equipment data sheets, develop DM description sheet for project material, check material availability and budgetary price in market, review and approve piping design layout drawings for new facility, systems / subsystems in the project based on optimization studies, work procedures and relevant project documents prior to start project construction activities. Familiar with ISO-9001:2000 quality management system, internal auditing, prepare NCR and follow up the disposition actions and close out.

    Conversant with KNPC, KOC, PIC / EQUATE project management, engineering and construction standards,
    streamlined work procedures, method statement for technically complex jobs, develop shutdown schedule, pre-commissioning, commissioning procedure, butt weld, full penetration weld joints configuration, WPS, welding procedure and welder qualification, heat treatment / stress relieving after fabrication in accordance with international manufacturing and construction standards ANSI/ASME Sec.II & IX ASME Sec.VIII, Div.I for vessels, separators, columns AWS DI- structural weld joint design, API 600 / API 6D and, API-650 /653 storage tanks, API 510 crude oil heaters, flare stack, flame arrestor, knock-out drums, metering skid, rotary equipments, API-610 centrifugal pumps, API-618 air compressors, receiver tanks , dryers and ANSI B31, NFPA-20, FM/UL-142 requirements for fire pumps and piping system. Familiar with visual inspection and NDT for critical jobs to ensure and establish maximum possible quality level of jobs being carried out at shop and field in the aspects of pipe fabrication, structural steel fabrication , piping site erection mitre joints, stub-ins, profile end cutting for large bore pipes for platform jacket pipes and structure, fabrication of additional nozzles by means of hot tapping on API storage tanks with full penetration radiography quality weld joints and projects for modification of existing facility structures and piping systems, hydrotest, for punch list clearance, equipment pre-start checks and pre-commissioning activities, mechanical completion, shutdown tie-in, simulation test of newly installed equipments/systems to determine its operational fitness with existing facility, start-up / commissioning, as-built drawings and project dossiers and the project close out.

    Areas of Specialization / Major Achievements:
    As regard to scope and extend of EPC projects executed in past and recently completed the key achievements collectively as follows:
    1) Executed process, utility piping system EPC projects so far, up to an extend and not less than 800,000 inchdia (approx.) of CS., special alloy, medium and high alloy SS pipe material of various large and small diameter sizes including FEED, detailed design & engineering, fabrication, site installation, pigging, cleaning, hydrotest, flushing, drying, pre-commissioning, hot tapping, shutdown tie-in and commissioning works, including non-metallic RTR / GRP, HDPE Process / Effluent / Drain and wash water lines, design packages, code stress check analysis & interpretation, write up for stress analysis conclusion report, hydraulic calculation, salient surge
    analysis, technical clarifications in the aspects of piping design, adequate supports, thrust blocks, selection of piping material, class, design wall thickness calculation, review approval of PFD, final P&IDs incorporating Hazop study recommendation, review, approve AFC drawings, control shop and field fabrication including preparation of WPS for special alloy steel, Qualifying welding procedures and welders, installation of HCV,MOV, FCV & ESD valves, including buried valves and providing valve pits, develop, prepare hydrotest packages and conduct hydrotesting, punch list clearance, mechanical completion, shutdown tie-in, commissioning with associated civil, Elec.& Instrumentation, CP., fire proofing, surface preparation, hot insulation and painting works in the previously executed projects.

    Special Note:
    Well experienced in the Onshore and Offshore scaffolding works including hanging scaffolding, scaffolding for structural steel erection for equipment / process platforms up to 12 meter high, pipe racks erections, sand blasting, painting and insulation works through the previously executed projects for ARAMCO-Saudi Offshore (Marjan Oil fields) facility platforms new construction / periodical maintenance projects, Saudi, PIC-Urea Plant-II, KOC GC-28 expansion project etc...in Kuwait including WPS, PQR,WPQ for Welding of special alloy steel, CS. Piping and structural with radiography quality welding, inspection interpretation including for fibreglass lined, painted surface, insulation works, fabrication and erection jobs and installation of Cathodic protection System.

    2) Executed EPC project for procurement, installation and commissioning of API 610 centrifugal pumps more than 70 units up to 1050 M3 / hr. capacity including D.E.Pumps, vertical booster pumps of various type & make: Sulzer-Germany, Ebara-Japan, Meckley pumps, Reddy Buffalo and Patterson-USA in previously executed EPC projects for KNPC and KOC including pump selection, proposal, clarifications and approval on final data sheets & drawings for pumps, witness factory performance and string test, construction of pump civil foundation with anchor bolts, site installation works, tie-in with piping system, pre-commissioning / commissioning activities including simulation tests to confirm performance of newly installed pumping system incorporated with the existing fire fighting systems and subsystems in the facility.

    3) Executed project for construction of 3 Nos.new API 650 storage tanks 10,000 M3 capacities with
    conventional and hydraulic jacking system ( For storage of Gas Oil, Wash water and fire water respectively) for MEW-Mina Al-Zour power house expansion project of 1000MW new GTs. Executed rehabilitation project for 4 numbers crude oil storage tanks inside MGC, JO-Wafra, fabrication installation of additional inlet & outlet nozzles on existing tanks shell at SUG, Joint Operations, Wafra. Similarly, executed construction of two product storage tanks of size 22 mtr.Dia., for ADNOC-Abu Dhabi and executed rehabilitation maintenance project for Umm-Al- Nar Refinery for existing 4 numbers internal floating roof tanks of 32 meter dia.,10,000M3 capacity including replacement of tank bottom plates, shell patch-up repair, replacement of floating roof seal, tank welding, internal / external coating, spray & form cooling system on tank, allied piping for filling, recirculation, 12” return lines respectively to tanks and modification, sectionalization and replacement of piping, refurbish drain pits, replacement of existing crude oil pump house inside / outside headers, bypass, sectionalization, branch lines and drain lines at Umm-Al-Nar Refinery, Abu Dhabi, during the tenure 1989 to 93 with D. Babcock.

    Recently executed projects:
    Present Company : M/s.Arabi Enertech, Mina Abdullah Refinery, Contract No.CB/FP PD/2001.
    Position : Project Construction Manager (KNPC Approved)
    Project brief : The scope of above project EPC for upgrading of existing fire
    Protection system in and around Shipping pump house, Crude charge
    pump house, Inter refinery transfer (IRT) pump house and transfer and
    blend pump house in Mina Abdullah Refinery including fabrication
    and erection of cement lined A/G. & U/G. piping, pipe supports & fire proofing.
    Previous Company: KOC / Alghanim International (Oil & Gas Sector),
    Position : Project Manager (KOC Approved)
    Period : From Oct.’2005 to April’ 2009
    Project brief : Contract No.KOC-23968, replacement and upgrading of existing fire water
    pumping and piping systems with higher capacity D.E.pumps-48 Units with controllers, procurement and installation of piping system, associated instrumentation,electrical and civil works including design flow calculation, stress analysis, material selection, expedition of procurement and inspection activities,
    simulation test at 14 GCs and 2 Booster stations, BS-140 & 150 (at 16 locations)
    in South East and North locations of KOC crude oil production facilities.

    Client / Company : KOC / Combined Group Co., Ahamadi
    Position : Project Constn. Manager
    Period : From Nov.’2003 to Oct’ 2005
    Project brief : LSTK project, contract No.12383, (KOC-EF1396), Installation of 36” dia.
    Pipe line for R/B Crude from M/F B1 to NTF and GC-27, West Kuwait,
    Expansion / modification project for export thru North tank farm, modification /
    new piping system for optional segregation / blending of light & medium crude
    oil at manifold T-18, CMM and participation in HAZOP study & implementation,
    piping code stress analysis, surge analysis, procurement, installation of 3 numbers
    new export and booster pumps, metering skid, allied piping system including 36”
    and below sizes, MOVs, FCVs, 2 nos. air compressors, air receiver tanks, air
    dryer at CMM area, fire fighting ,F & G monitoring and control systems around
    newly constructed facility, steel structural shed, Jib crane, over head crane, pig
    launcher & receiver, fabrication and site erection of piping system, replacement
    of isolation valves to tanks, structural steel fabrication and erection for shelter
    extension works etc. 5
    Client / Company : KOC / ATECO, GC-17, new construction EPC Lump sum project.
    Position : Project Manager (KOC Approved)
    Period : From Oct.’2000 to June 2003
    Project brief : LSTK project for Procurement, Construction and installation of desalter, booster,
    export and wash water pumping and piping system including procurement and
    installation of 3 units wash water pumps, 3 units of vertical booster pumps, 3 units
    of desalter pumps and 3 units of export pumps with associated civil, electrical and
    instrumentation works respectively. Managed to carry out complete basic
    and detailed design & engineering with ATESCO in-house facility and including
    piping system stress analysis conclusion write-up, clarifications, obtaining
    approval and successfully completed and handed over the project in time.

    Client / Company: JO/ DG-PNZ, Seconded from KREMENCO,
    Position : Sr.Construction Engineer Co-ordinator (JO/PNZ Approved)
    Period : From June’1997 to 2000
    Project brief : Deputed as project in-charge for the existing J.O. service Contractor M/s. Al-
    Shauwyer Contg. Company on behalf of JO / PNZ- Development Group (DG) and
    was responsible for overall supervision and control directly in the performance of
    the contract for the execution of new construction projects on behalf of D.G.team
    leader and Sr. Design Engineer, JO /DG-American Texaco including field engineering, construction expedition, verify/accept contractors daily time sheets for equipments and manpower. During the tenure I was directly involved and managed execution of various new construction, upgrading /modification and rehabilitation ongoing projects concurrently at various Sites location at SC-9, SC-11, SC-18, SC-14,
    SC-21, SUG and MGC for the crude oil surface production facilities.

    Client / Company: EQUATE / Seconded to Fluor Daniel (EIS) project,
    Position : Project co-ordinator (OSBL Piping in-charge- FLUOR Approved)
    Period : From May’1994 to 1997
    Project brief : Worked on behalf of Fluor Daniel piping Supdt. Executed complete Utility and
    process OSBL piping systems for Ethylene, Glycol and polypropylene plants
    including RTRP lines having designed pressure up to 866 PSI and low/medium and
    high alloy SS material piping, test pressure up to1300 PSI, line purge out and drying
    pre-commissioning works, including fabrication and installation of cement lined
    underground fire water piping, installation of above ground / underground valves,
    leak testing of newly completed drain lines, pre-commissioning checks, shutdown
    tie-in and commissioning works.