Utkal Builders Ltd Bhubaneswar : Construction Site Engineer

+ Ask Question / Post resume
Results 1 to 13 of 13
  1. Post Count Number #1
    Super Moderator
    Join Date
    April 18th, 2008
    Location
    Tuticorin
    Posts
    7,026

    Utkal Builders Ltd Bhubaneswar : Construction Site Engineer

    Utkal Builders Ltd Bhubaneshwar : GM Projects, Construction Manager, Senior Project Manager
    Website: http://www.utkalbuilders.com

    Keywords: Project Manager,Construction Manager, Senior Site Engineer

    Designation: GM Projects, Construction Manager, Senior Project Manager
    Experience: 10 - 15 Years
    Location: Bhubaneshwar
    Compensation:
    Salary as per the industry standards
    Education:
    UG - B.Tech/B.E. - Civil
    PG - PG Diploma - Civil
    Industry Type: Construction/ Engineering/Cement/Metals
    Functional Area: Site Engg., Project Management
    Posted Date: 05 Jun 2009

    Job Description:
    Candidate should be a civil engineer, will be entrusted with the complete project / construction management, contract management, quantity surveying of our residential (G+11 & G + 22 storied) and commercial (G+17 storied) projects in Bhubaneswar, Orissa. He should be well qualified and experinced in the construction of high rise buildings (15 stories above) in senior level capacity.

    Desired Candidate Profile:
    Project Manager or Construction Manager with minimum 10 years of rich experience in the development of high rise multi storied buildings in the big real estate companies of India. He should have worked in a senior level in an Organisation and have mangaed large projects single handedly.

    Company Profile:
    Utkal Builders is the largest developer in the city of Bhubaneswar, Orissa. The company is launching 20 lakh sqft of residential and commercial projects in the next 6 months.

    Executive Name: Sarad Baid

    Address:
    Utkal Builders (P) Ltd
    777, Saheed Nagar
    Bhubaneshwar,Orissa,INDIA 751007

    Email Address: sales@utkalbuilders.com

    Telephone: 91-674-2543294

    Keywords: Project Manager,Construction Manager, Senior Site Engineer

  2. Post Count Number #2
    letwithlija
    Guest

    Re: Utkal Builders Ltd Bhubaneshwar : Construction Site Engineer

    I'm Lija Mohanty from bhubaneswar. I'm an Architect having 3 yrs & 5 months of experience in planning , designing of multistoried buildings,hotels,malls,institutional buildings etc. now I'm working under an ISO Certified company in bhubaneswar.If u have any requirement of architect pls contact me in this no:- 09861322817,09438748001.

  3. Post Count Number #3
    Guest Poster
    Join Date
    December 12th, 2009
    Location
    Chennai
    Posts
    1,417

    Re: Utkal Builders Ltd Bhubaneshwar : Construction Site Engineer

    Dear Sir,
    I am having 2 yr field experience on the post Quantity surveying.I ve completed my B.tech under B.P.U.T with 7.6 C.G.P.A.Is there any chance for me in your company for Orissa region.

  4. Post Count Number #4
    Guest Poster
    Join Date
    August 14th, 2008
    Location
    Your Heart, Delhi
    Posts
    76,213

    Re: Utkal Builders Ltd Bhubaneshwar : Construction Site Engineer

    sir, i'm fresher civil engg,i have passed under bput with 6.5 s.g.p.a in 2010.if i need you please contact my telph no 9040532685.

  5. Post Count Number #5
    Guest Poster
    Join Date
    August 14th, 2008
    Location
    Your Heart, Delhi
    Posts
    76,213

    Re: Utkal Builders Ltd Bhubaneswar : Construction Site Engineer

    sir i m gruadate having 3 years of experience in managerial works .bt i want to join on construction company in orissa.plz do tht needful for me .
    lemon.asim@gmail.com
    mob -9437056712,9853555522
    also having govt contractor licence in civil .

  6. Post Count Number #6
    Guest Poster
    Join Date
    August 14th, 2008
    Location
    Your Heart, Delhi
    Posts
    76,213

    Re: Utkal Builders Ltd Bhubaneswar : Construction Site Engineer

    Are there flats available by Utkal Builders for booking at Cuttack Bhubanswar Road. If so then what is the price for Sq. Ft? What are the other specifications?

  7. Post Count Number #7
    Guest Poster
    Join Date
    August 14th, 2008
    Location
    Your Heart, Delhi
    Posts
    76,213

    Civil Engineer Resume
    BIBHU KALYAN DUTTA
    MAIL ID-bibhu.rmec AT gmail.com
    Have vast professional experience in Civil engineering. I have handled various critical and challenging projects from design stage to implementation stage and ensured that the projects gets implemented as per specification in stipulated time with quality. Having equipped and expertise with various latest engineering tools and techniques, cost evaluation techniques and tools which I applied in my professional career to produce cost-effective solutions for the organization I worked with. I can handle high pressure environments with ease and open mind and also a good team player. I have efficient communication skill to present my points precisely to listeners.
    Objective :
    Seeking to take up managerial position in the field of Civil Engineering and take challenging, creative and diversified projects.
    Education :
    - H.S.C from jhadeswar high school,jajpur,2000
    - DIPLOMA, Civil Engineering, B.S.E.T, BHADRAK, 2005 having 63.17
    Skills :
    - Expertise in AutoCAD
    - Could operate effectively with Microsoft office tools namely word, excel, power point, access.
    - Have worked with various versions of Windows Operating system
    - Have good problem solving with analytic thinking
    - Open minded to work in complex environment and projects
    Work History :
    TOWER INFRA PVT LTD (TIPL) from 10 sept 2005 to 10June 2006 as a site engineer
    RMEC PROJECT LIMITED
    (A vender of reliance project working for GSM and CDMA and also worked for TATA INDICOM.)
    DURATION
    15 June 2006 to till date
    As cluster head15 June 2006 to 2009 dec31
    Salary 15,000.00
    Responsibilities :
    Working as site engineer and then worked as cluster head (asst engg) me handling civil and Electrical work for my cluster.
    - Controlling the work of civil , electrical, tower erection and RF work also
    - In civil part I was very serous for good and quality work. From site layout to final casting all activity I was take in my responsibility.
    - In electrical part I was active for clean and nice work and also take in my own risk till the site handover to Clint project team.
    - Giving A.T to tower team, shelter team after giving and clearing punch points
    - Planning and discuss how the works progress easily and quickly.
    - I coordinated and supervised engineers, contractors, staffs under me and made the process clear that I get the report of daily activity of each staff by end of day; Supervising all civil activities of T.S.P i.e. excavation of earth work in foundation, p.c.c., rod binding for raft and column according to specification, column casting by using templates for tower as per drawing and design. Also visit civil work for DG and shelter foundation of the site.
    - Organizing all activities in sites till RFI which includes tower Errection, shelter Errection etc.
    - Checking bills and measurements.
    2010 JAN TO 2011 FEB AS ASST MANAGER
    As asst. manager working for H.P.C.L and or jindal project
    Handel the work for infra structure for a petrolpump, mechanical civil and electrical for site develop
    Also handle the billing section from Site Measurement to release bill from Clint
    EXPERIENCE FROM PROJECT As a Senior I Take up my projects in the organization. I used specialized engineering tools and techniques to efficiently solve the projects in a professional approach. I also provided technical guidance in Civil Engineering area and also trained other engineers in my team and took the responsibility of delivering the final project with quality on time.
    In this organization I am taking all responsibility for project
    - Making D.P.R and discus with my seniors for our project daily
    - Checking bill and measurement of venders of civil.
    - Contact to Clint and solve there problem
    - Allot vender for civil project
    - Solving the problem of vender
    - Pass the final measurement and bill of vender
    o .Dally meeting with management team for progress of project
    5 years and 6 months
    Current salary ----20,000 /month

  8. Post Count Number #8
    Guest Poster
    Join Date
    August 14th, 2008
    Location
    Your Heart, Delhi
    Posts
    76,213

    diploma civil job

    Diploma in civil engineering with 1.8yrs experience in building project

  9. Post Count Number #9
    Guest Poster
    Join Date
    August 14th, 2008
    Location
    Your Heart, Delhi
    Posts
    76,213

    Dear Sir,

    I would like to inform you that, i have TWENTY TWO years experience in construction company of repute in the post of Administrative & Liaisoning officer along with handling the statutory clearance. Presently I am at my home town, searching jobs at BBSR. If you have any vacancy for the same post in your organization, you may call me for an interview for which i will be ever grateful.

    E.mail-somenesh@yahoo.in

  10. Post Count Number #10
    Guest Poster
    Join Date
    August 14th, 2008
    Location
    Your Heart, Delhi
    Posts
    76,213

    utkal builders ltd, bhubaneswar

    sir,i furnish my cv for the post of general manager.
    nk mohapatra
    Civil Engineer with M.E. in Water Resources Development from university of Roorkee with experience in different capacities in State Government and in Public Sector including work experience in formulating small and mini Hydro power Projects.
    - Current Designation : Chief Engineer,Civil (Retired on 31.05.2011)
    - Current Company : Water Resources Department, Government of Orissa
    - Current Location : Bhubaneswar
    - Functional Area : Site Engineering / Project Management
    - Role : Civil Engineer-Other
    - Date of Birth / Gender : 11 May 1953 / Male
    - Total Experience : 33+ Years
    - Annual Salary : Rs 9.00 lakhs
    - Expected Salary : Negotiable
    - Highest Degree : M.Tech (Civil)
    - Email : mohptra AT yahoo.co.in
    - Key Skills : water resources project construction management involving material, finance, contract, LA & R&R management as Project Chief; handled monitoring of personnel, budget, expenditure, physical and financial progress of ongoing irrigation projects of state as Director Monitoring and Director Personnel in additional charge
    Summary
    - Water Resources Project construction management involving material, finance, contract, human resources, estimates and tendering, site construction supervision and Land Acquisition & Rehabilitation & Resettlement management , taking review meetings and reporting to Engineer-in- Chief, Water Resources, Orissa and Department of Water Resources, Govt of Orissa as Project Chief;
    - Assisted by one Superintending Engineer (civil), one Project Director (R&R) of Orissa Administrative Service super scale grade, One Special Land acquisition Officer of Orissa Administrative Service senior grade, one Financial Advisor and Chief Accounts Officer of Orissa Finance Service senior grade, One Personal Technical Assistant of the rank of Executive Engineer(civil), One Private Secretary, Non-Technical, One Establishment Officer, Four no s Section Officers and Senior and Junior Assistants;
    - The Superintending Engineer is assisted by :
    o One Executive Engineer( civil) in charge of construction of Earth Dam, 3 no of Dykes, one Concrete Spillway with colony buildings, roads, cause way, Inspection Bun glows etc.;
    o two Executive Engineers (civil) in charge of Canals, head regulators, cross regulators, falls, cross drainage works like aqueducts, super passages and canal falls and bridges and culverts, canal bank roads and colony buildings;
    o one Executive Engineer (civil) in charge of cluster rehabilitation villages with construction of houses, schools, hospitals, temples, community houses, water supply, ponds and tube wells;
    o one Executive Engineer(Mechanical) to look after installation of spillway gates, head regulator gates, hoisting and lifting arrangement for gates, installation of diesel generator and other electrical installations.
    - Previous to this handled monitoring of personnel, budget and expenditure, physical financial progress of on-going irrigation projects of state as Director (Monitoring & Evaluation) and Director Personnel in additional charge and reported to Corporate Chief, Engineer-in-Chief, Water Resources and Government of Orissa.
    - Had handled the post of Chief Construction Engineer of Potteru Irrigation Project, Balimela which involved maintenance of Balimela Dam Project, Satiguda Irrigation Project(Ayacut-9900 Ha), Putter Irrigation Project (Ayacut-61,000 ha) besides handling the interstate water distribution of Balimela reservoir between Orissa and Andhra Pradesh under monitoring of Central Electricity Authority and reporting to Government of Orissa (2005-2008).
    Work Experience
    Water Resources Department, Government of Orissa as Chief Engineer
    Jul 2009 till 31st May 2011
    Chief Engineer of a major irrigation project under construction envisaging construction of an earth dam, 3nos dykes, a concrete spillway with radial gates 10 nos and 2nos canals and its distributaries and minors with irrigation potential of 30,000 hactres.Cost Rs.1200crores
    Water Resources Department, Government of Orissa as Director, Monitoring & Evaluation & Additional Charge of Director Personnel
    Jul 2008 to Jul 2009

    Reporting to State corporate head on preparation and management of Budget, monitoring of expenditure of all on going irrigation projects of state both under plan and nonplan schemes, monitoring of physical progress of ongoing irrigation projects, monitoring of works under different funding like AIBP, RIDF, Twelfth Finance, maintenance of critical structures; holding review meetings , submission of reports to Government, handling MIS ,e-tendering, procurement cells and handling the personnel management of the state head.
    Water Resources Department, Govt. of Orissa as Chief Construction Engineer, Potteru Irrigation Project,Balimela
    Aug 2005 to Jul 2008
    In charge of Potteru Irrigation Project, Balimela Dam(Joint) Project, Satiguda Medium Irrigation Project for their maintenance, water supply to their ayacut, water supply to power house, formation of Pani Panchayat. Management of funding of Nonplan, 12th Finance Commission, NABARD (RIDF) Funding, Flood Damage Repair, Food For Work assisted by 3 no of Executive Engineers, 1Asst Financial Advisor, 12nos A.Es and 50 Junior Engineers and other account and establishment assistants. Directly reporting to Engineer-in-Chief, Water Resources and Government in the Department of Water Resources
    Water Resources Department, Govt. of Orissa as Executive Engineer, Telengiri Head Works Division, Ambaguda
    Sept, 2004 to Aug, 2005
    In charge of construction of a new medium Irrigation project envisaging construction of an earth dam, 2no dykes, 1no canal and a central concrete spillway. The work comprised forest clearance, reservoir periphery survey, land acquisition and resettlement, payment of land acquisition compensation, and Rehabilitation and resettlement activities, estimation and tendering of earth dam, spillway, dykes, survey of canals, construction of roads to dam site, construction of quarters at Dam site, installation of transformers and electric lines to dam site, procurement of construction materials, excavation of foundations of spillway, drilling and water loss testing of spillway foundation, testing of soil samples of borrow area and dam base
    Water Resources Department, Govt. of Orissa as Executive Engineer, Upper Kolab Irrigation Division no. iv, Kotpad
    Aug,2003 to Sept, 2004
    In charge of a Canal division handling irrigation supplying canal, maintaining the canal, canal banks, canal bank roads, making arrangements for ensuring water flow in Jaura nalla during monsoon flow in river Indravati
    Water Resources Department, Govt. of Orissa as Executive Engineer, Earth Dam Division, Chitrakonda
    September,2001 to Aug 2003
    Incharge of Dam Division handling maintenance of Main Dam, 3 no dykes, Spillway, Tunnel Intake; handling water distribution to Balimela Power House(4X80MW) in Orissa and Upper Sileru Power House in A.P. Also was incharge of Satiguda Medium Irrigation Project for maintenance of Dam, Spillway, Head regulators,canals for irrigation water supply to its command of 9065Ha.
    MECON Ltd, Ranchi, Jharkhand as Manager, Hydel, PP&EE Section
    Sep 1995 to Dec 1999
    Formulation of Hydel projects, project report preparation, feasibility study, site inspection, preparation of offer for renovation, modernization and uprating of old hydel projects, installation of micro hydel projects in remote hilly terrains etc.. Taken up pre-feasibility report for 9 small hydel projects of Bihar, Installed 5 Portable micro Hydel sets in 3 remote sites of south Bihar. Associated in preparation of cost estimate report for Renovation, Modernization and Uprating (R,M&U)of units 3 & 4 of Hirakud Power House, Orissa; associated in preparation of tender specification for R,M &U of Hirakud Power house, Orissa; associated in Assets Evaluation for 5 Major Hydel Stations of Orissa, associated in preparation of Basic Study Report, DPR and Tender Specifications for 4 hydel stations of Tamil nadu Electricity Board under technical collaboration with ICCS, Noida and RSW, Canada.
    Energy Department, Govt. of Orissa as Assistant Director, civil in the office of The Chief Engineer, Electrical Power Project Planning and Development, Bhubaneswar
    1990-1995
    - Prepared and checked concept Report, Feasibility reports for small hydel projects
    - Checked and approved vendor drawings and design for execution of a small canal drop hydel project.
    - Prepared Tender specification and finalized techno-commercial evaluation for conducting survey and Investigation, Geological. Investigation and DPR preparation for 320 MW Sindal Hydel project and 400 MW Hirakud ‘B’ and Chiplima ‘B’ hydel projects.
    - Executed agreement, monitored and administered contracts of the following vendors/consultants
    1. M/s REDECON for survey and investigation of Sindol H.E. Project
    2. M/s Foundations consultants for Geological Investigation of Sindol H.E. Project
    3. M/s WAPCOS Ltd. For preparation of DPR for Sindol H.E. project
    - Scrutinized survey drawings/data, Gelogical data and interacted with vendors and consultants for completion of work
    - Managed Hydrological observation and studoes for 3 GF stations maintained and operated by State Irrigation Deptt. For Sindol Hydel Project
    - Studied accuracy and consistency of data and communicated to consultant and interacted with irrigation authorities and consultants
    - Besides technical work, served the office administration as Drawing and distribursing offcer for the Chief Engineer’s establishment.
    Water Resources Department, Govt. of Orissa as Assistant Director, Hydro Electric Designs Directorate, Bhubaneswar.
    1986-1990
    - Monitored survey and investigation of the Hydro-electric projects of the state being executed by the field divisions
    1. Sindol H.E. project (250 MW)
    2. Manibhadra H.E. Project (900 MW)
    3. Mandira H.E. Project (33.5 MW)
    - Identified and formulated new projects, prepared concept reports and feasibility reports for small Hydel projects
    - Prepared compliance Report on comments of CWC/CEA on 9 MW Baragarh Canal Head Regulator Hydel projects for final clearance of the project from CEA.
    Water Resources Department, Govt. of Orissa as Assistant Engineer, Planning; O/o The Engineer- in –chief,Water Resources, Bhubaneswar
    1983-1986
    1983 to 1984 Dec.- deputed to university of Roorke, Water Resources Development Training Centre for undertaking ME in (WRD) civil.
    1984-86
    - Engaged in planning of new major/medium irrigation projects of Orissa.
    - Associated for preparation of Irrigation Master Plan
    - Office correspondences in connection with interstate agreements.
    - Prepared and checked feasibility reports an irrigation projects submitted by field divisions.
    - Checked and minor irrigation projects for further investigation and execution
    General technical correspondence on planning matters for Engineer-In-Chief.
    Water Resources Department, Govt. of Orissa as Assistant Engineer, Padampur Irrigation Division, Padampur
    1980-1983
    Sub- Divisional officer (Asst. Engr.)
    - Was in charge of an irrigation sub-dividioon, responsible for all administrative, technical and financial work pertaining to the sub-division, reporting to the Executive Engineer of the Irrigation division.
    - Conducted topographical survey and investigation of Ong Dam Project (a major irrigation project)
    - Conducted hydrological investigation and data base management by maintaining a rain gauge site and two Gauge-Discharge observation sites on river Ong.
    - Conducted geological investigation and drilling at the dam site and spillway site by engaging departmental technicians, interacting with GSI geologists, doing logging of samples and maintaining records
    - Facilitated interstate agreement on submergence area by interacting with interacting irrigation authorities of MP and conducting joint survey of the area
    - Prepared the DPR of the Ong Dam Project and submitted to Gov. of Orissa and CWC for clearance.
    - Prepared estimates, tender, evaluation and recommendation of tenders and site execution and supervision for construction of Division office building, Inspection Bunglow, staff quarters for 9 nos. F type twin blocks (600 sq. ft. each), 6 nos. E type twin blocks (750 sq. ft. each), 3 nos. D types (900 sq. ft. each), I no. C type (1200 sq. ft.), Colony road, Electrical installations, Water supply and sanitary system.
    - Prepared site layout plan, land alienation and acquisition for colony site by interacting with revenue officers.
    - Prepared the Environmental Impact Assessment survey report for Ong Dam Project and submitted for environmental clearance.
    - Prepared proposal for forest clearance for submersed area and submitted and pursued for clearance
    Water Resources Department, Govt. of Orissa as Junior Research Assistant (Junior Engineer), Chief Research & Quality Control Officer, Cuttack
    1979-1980
    Managed lab testing of concrete and soil for compressive strength of concrete, grain size analysis, Plastic and liquid limits, c-F value, permeability, in situ O.M.C. and bearing capacity for Medium Irrigation Projects of Orissa
    - Was in charge of construction of office buildings, sheds
    - Prepared estimates, tenders, evaluated tenders, administered and monitored contracts, did supervision of construction work, made payment of contractor bills
    - Preparation of the annual budget of the division
    - Administration and monitoring of work of field laboratories at work sites for medium irrigation projects of Orissa .
    Irrigation and Power Department, Govt. of Orissa as Junior Engineer, O/O The Chief Engineer, Irrigation, Bhubaneswar
    1977-1979
    Junior Engineer
    Estimation of water in respect of Orissa’s share in connection with Krishna-Godavari Water Dispute Tribunal.
    Educational Qualification & Training
    B.Sc. (Eng.), Civil- 1976 in First Class from Sambalpur University, Orissa.
    M.E. (WRD), Civil- 1985 in First Class from University of Roorkee, U.P.
    Short Term Courses :
    1. Attended short term course on “Water Resources System Analysis and Computer Applications” (July 17-27, 1996) held in Department of continuing education, University of Roorkee
    2. Attended International course in Small Hydro Development 10-14 Nov, 1997 held in Kathmandu (Nepal).
    3. Successfully completed EARA approved Advanced Environmental Management Systems Auditing course (UK). 3rd-7th August, 1998 imparted by DNV/EMS/0998/INDIA.
    4. Participated in the training programme on “Integrated Management of Chilika Lake” 09.12.2000 – 22.12.2000 held at Institution of Engineers (India), Orissa State Centre.
    IT Skills
    Skill Name Version Last Used Experience
    MS OFFICE Windows 2007 2011 0 Years 3 Months
    INTERNET 2011 3 Years 2 Months
    Publication of Technical Paper
    - Associated author of a paper under technological advancement section of ENERGY INDIA, Feb. 2000 on Renovation, modernisation and uprating of hydel power plants-a preferred option for capacity addition.
    - Carried independent experimental work on a special problem entitled ‘Electrical Strain Gauge Type Pore Pressure Transducer”
    Brief contents of the paper/special problem
    Renovation, modernization and uprating of hydel power plants – a preferred option for capacity addition
    Most of the hydel power plants built before 30/35 or more years have reached unacceptable reliability levels due to ageing of the equipment and/or inadequacy/limitation of technology as was during the period. To bring the power plants back to their original operating conditions the plants need to be renovated on urgent basis. The opportunity is utilized to modernize and uprate the power plants through adoption of the state of the art technology with comparatively much less additional investment. MECON carried out Residual Life Assessment and Life Extension studies and formulized various techno economic proposals to Renovate, Modernize and Uprate large hydel projects throughout the country. This article outlines various aspects of R, M & U study carried out including benefit analysis of various alternatives considered for four hydel projects in Tamil Nadu.
    Electrical Strain Gauge Type Pore Pressure Transducer
    The strain gauge type pore pressure transducer uses strain-gauge as a sensing element to convert physical qualities into electrical quantities. It is based on the principle that change of resistance in the wheat stone bridge formed by the strain-gauge/strain gauges is converted into voltage and measured.
    This transducer utilizes strain gauge to measure the deflection of a diaphragm. A porous stone is fitted near the diaphragm end. The pore fluid from the adjoining soil enters the pore of porous stone and then after accumulating in the space in between diaphragm and stone deflects the diaphragm due to the pressure of the pore fluid, The deflection of the diaphragm produces a change in the electrical resistance of the strain gauges, which is measured by means of a Wheatstone bridge. In the experiment a strain gauge type pore pressure transducer of internal diameter 8.3 cm for capacity up to 5.0 kg/cm2 has been designed, fabricated and tested.

  11. Post Count Number #11
    Guest Poster
    Join Date
    August 14th, 2008
    Location
    Your Heart, Delhi
    Posts
    76,213

    I am Nihar ranjan senapati. I have passed my B.Tech and have secured 7.00.

  12. Post Count Number #12
    soumya ranjan samal
    Guest

    Supervisior

    I am a civil engg completing diploma in 2015 secured 75% also continue b.tech.

  13. Post Count Number #13
    Unregistered
    Guest

    22nd July 2016

    I am Raja Kishor Biswal from BBSR. I am a civil diploma engineer. I am having 1 year experience in building construction.