www.hawcoindia.com Hardcastle Petrofer Pvt Ltd Vapi : Maintenance Electrical Engineer

+ Ask Question / Post resume
Results 1 to 4 of 4
  1. Post Count Number #1
    Super Moderator
    Join Date
    April 18th, 2008
    Location
    Tuticorin
    Posts
    7,026

    www.hawcoindia.com Hardcastle Petrofer Pvt Ltd Vapi : Maintenance Electrical Engineer

    Hardcastle Petrofer Pvt. Ltd Vapi : Maintenence Engineer
    Website: http://www.hawcoindia.com
    hawcoindia.com

    Keywords: Maintenance and Electrical Engineer

    Designation: Maintenance Engineer
    Experience: 3 - 7 Years
    Location: Vapi
    Industry Type: Chemicals/ PetroChemical/Plastic/Rubber
    Functional Area: Production, Maintenance, Quality

    Job Description:
    Candidate should be Degree / Diploma in Mechanical. Having 3 to 7 years experince in Chemical and Lubricant Industries.

    Desired Candidate Profile:
    Candidate should be experience of Maintenance department in Chemical & Lubricants Industries

    Company Profile:
    Professionally managed,fast growing,multi-product industrial house of repute has retained our service for selection of dynamic and professionals vaving leadership quality, sales flair and analytical skills.

    Email Address: akjain.hawcoindia@rediffmail.com

    Keywords: Maintenance and Electrical Engineer
    Last edited by muthukalee; October 22nd, 2011 at 01:21 PM.

  2. Post Count Number #2
    Guest Poster
    Join Date
    December 12th, 2009
    Location
    Chennai
    Posts
    1,417

    Re: Hardcastle Petrofer Ltd Vapi : Maintenence Electrical Engineer

    As per your add on goggle job here iam interested for the same .pls give me the contact no or mail id to forward my resume to you.

    Abhijit Joshi
    09904194114

  3. Post Count Number #3
    Guest Poster
    Join Date
    August 14th, 2008
    Location
    Your Heart, Delhi
    Posts
    76,213

    Re: Hardcastle Petrofer Ltd Vapi : Maintenance Electrical Engineer

    i am electrical engineer with one year experince in kisan irrigation ltd. pithampur indore (M.P.) . i want to job in your company.

  4. Post Count Number #4
    Guest Poster
    Join Date
    August 14th, 2008
    Location
    Your Heart, Delhi
    Posts
    76,213

    CURRICULUM VITAE



    Email ID. : Jitenpatel2007 AT yahoo.co.in

    OBJECTIVE
    To work in a stimulating, hard working environment in a challenging position, this can provide ample opportunities for both teamwork and individual contribution leading to organizational growth.
    SUMMARY OF QUALIFICATION
    - A dynamic Electrical Engineer with over 7 years of total experience in Erection, maintenance, testing and commissioning of substation, oil and gas project and Industrial equipment.
    - Gained experience in erection, testing and commissioning of Substations and switchyards in recent years.
    - In addition to that preparing Request for Inspections, Method Statements, Job Hazard Analysis and Day Work Records for additional Claims etc., on daily basis.
    - Adept in swiftly ramping up projects in close co-ordination with site management and ensuring to meet the time schedule under the guidance of Construction Manager – Electrical.
    - Deft at establishing and maintaining project documentation including drawings reviewing, filing and preparing and submitting progress reports to project monitoring group.
    - Excellent communication & interpersonal skills with strong analytical, team building, problem solving and organizational abilities.
    Experience :
    Presently Working with M/S AL-AHLEIA SWITCHGEAR CO. Kuwait. As a Site Engineer, Project Management Department. Major Work Involved in erection, shutdown work, testing, precommissioning and commissioning.
    Since 8th October, 2008 to till date
    Project : MEW/C/4050, 2009/2010
    Part A : Supply and installation of 5 Nos. of 132/11 KV S/S At Town “F” , Salmiya “J” & SHPT “B”
    Part B : Supply and replacement of 5 X 20 MVA Transformer at JABRIYA “M” (33/11KV S/S) AND SHUAIBA SMALL IND “M” S/S (33/11KV S/S)
    CLIENT : MINISTRY OF ELECTRICITY AND WATER, KUWAIT

    Project : MEW/C/4059,2009/2010, Supply and installation of 5 Nos. of 132/11 KV
    Substations at SAAD AL ABDULLAH, KUWAIT
    CLIENT : MINISTRY OF ELECTRICITY AND WATER, KUWAIT

    Project : MEW/C/3818, 2008/2009, Supply and installation of 5 Nos. of 132/11 KV
    Substations at JABER AL AHMED, KUWAIT
    CLIENT : MINISTRY OF ELECTRICITY AND WATER, KUWAIT

    Responsibility :
    Lead a team of Technicians for Erection & Pre-Commissioning activities.
    Support project managers in all technical concerns.
    Ensure engineering is compliance with contract.
    Coordinating with sub-contractors/Equipment suppliers for Technical issues.
    Manpower planning and allocation of works.
    Trouble Shooting for Previous Energized Substations.
    Supervision of 132KV Single Bus bar GIS Switcher gears installation, (Hyundai make) including the bay assembly, Bus bar fixing, gas filling etc.,
    Involved in Installation and Testing of 30MVA, 132/11KV Power Transformers and 11/.433KV Distribution Transformers.
    Involved in Installation of 11KV Double bus bar metal clad Switch gear with vacuum breakers and testing of the Switchgear.
    Involved in Installation of LT Panels such as LV & DC Distribution boards, MCCs, Control and Relay Boards and Neutral earthing resistors Panels, also involved in testing of the same with respective Control & Protection Schemes.
    Installation of Earthing grid for Substations, Cable tray installation and Cable laying.
    Also involved in Supervision of Installation and testing of Fire Protection systems, HVAC systems and Air Handling Units.
    Project : MEW/C/3981, Replacement of 20 MVA transformer at FAIHA”M” substation
    KUWAIT.
    CLIENT : MINISTRY OF ELECTRICITY AND WATER, KUWAIT
    Installation, testing and commissioning of 20MVA, 33/11 KV transformer and its accessories at FAIHA “M” substation.
    Project : MEW/C/3757, Supply and Installation of 9 X20MVA Transformers. KUWAIT
    CLIENT : MINISTRY OF ELECTRICITY AND WATER, KUWAIT

    Supply and installation, testing and commissioning of 9x20 MVA ,33/11 KV transformer and it accessories at three substation namely JAHARA”A”, SALMIYA”B”, HAWALLI”B”.
    Responsibility :

    Supervision of Erection activities of 33/11 KV, 20 MVA Transformer. Also involved in testing and commissioning of transformer.
    VECTOR GROUP TEST, TURNSRATIO TEST, BDV TEST, IR VALUE, OPEN CIRCUIT, TEST, SHORT CIRCUIT impedance TEST. And Testing of Transformer REF relay, Differential relay, OC/EF Relay.
    BUCHOLZ RELAY, OLTC SURGE RELAY TEST. PRV TEST, OTI, WTI TEST, Functional check of OLTC, etc.
    Replacement of existing Relay, MW, MVAR, CT in 11kv SWGR & control panel, 33kv SWGR & control relay panel, 6.6kv NER panel.
    2) M/S CONSILITED CONTRACTOR INTERNATIONAL COMPANY (CCIC), ABUDHABI.
    From APRIL 2007 to FEB 2008.
    Worked as a Site engineer. (ELECTRICAL CHARGE HAND)
    PROJECT : HABSAN GAS COMPLEX EXPANSION (HGCE)
    CLIENT : ABUDHABI GAS INDUSTRIES LTD. (GASCO)
    MAIN CONSULTANT : FLOUR MIDDEL EAST LTD.
    The project consist of expanding capacities by additional construction of new substation, modification of existing substation, installation of transformer, HV , LV Switch gear,UPS, Fire alarm system, HVAC plant, and all s/s related equipment.
    The project consist of installation with related equipment in accordance with project drawings and vendor instruction, arrange for necessary tools, other logistic and resources to achieve maximum productivity.
    Site erection work detail :
    Power transformer capacity of 7.5 MVA,Bus duct(cast resin) rating of 4000A and 3000A, HV switchgear, LV switchgear, Variable Speed Drive panel, Battery monitoring system, Battery charger, UPS, Small power socket, Lighting DB, Fire alarm system, Telecommunication system, HVAC plant, Cable tray, Cable tray support, Earthing and Lightning protection.

    11 kv cable megger, HV Test for HV and LV switchgear, CT & PT Testing, control cable continuity & megger, A meter , VAR meter, PF meter, MW meter, TRANSDUCER Testing,
    My special duty was coordination with client for all types of work permits, supervision of site construction work, daily reporting, monitoring all activity.
    3) M/S BORASARA MACHINES, GUJARAT, INDIA.
    From 2006 to Feb 2007.
    Worked as Maintenance Engineer.
    Plant equipment consist of 2 MVA transformer, 11kv switchgear,415Volt LV board, CNC machines, AC and DC motor, D.G.set, Lath machine, etc.
    Responsibility :
    Involved in routine maintenance of transformer, switchgear, AC/DC Motor, CNC Machine, and all other plant equipment.
    Reporting to maintenance in charge for preventive maintenance and weekly maintenance.
    4) M/S SHUBHNEN DÉCOR PVT LTD, SILVASSA, INDIA.
    From Aug 2004 to March 2006.
    Worked as Trainee Engineer.
    Plants consist of 750 KVA Transformer, 0.415 kV switchgear, LVAC board, AC distribution system, UPS, Hydraulic power pack etc.
    PERSONAL PROFILE :
    FULL NAME : PATEL JITENDRABHAI BHAGUBHAI

    QUALIFICATION : B.E. ELECTRICAL. MAY/JUNE 2004

    LANGUAGE KNOWN : GUJARATI, ENGLISH, HINDI.
    EMAIL : jitenpatel2007 AT yahoo.co.in

    Declaration
    I hereby declare that the information declared above is true to the best of my knowledge.
    Yours sincerely
    PATEL JITENDRA