June 4th, 2009, 11:33 AM
Post Count Number #1
www.alchemistgroup.com ALCHEMIST REALTY LTD Chandigarh : Civil, Site Engineer
ALCHEMIST REALTY LTD Chandigarh : Site Engineer
Website: www.alchemistgroup.com
Keywords: Site Engineer / Real Estate
Designation: Site Engineer
Experience: 3 - 5 Years
Location: Chandigarh
Compensation:
Negoitable
Education:
UG - Diploma - Civil
PG - Any PG Course - Any Specialization
Industry Type: Construction/ Engineering/Cement/Metals
Functional Area: Site Engg., Project Management
Posted Date: 03 Jun 2009
Job Description:
Responsible for construction activities.
Desired Candidate Profile:
Degree/Diploma in Civil Engineering.
Company Profile:
Alchemist Realty is a part of the Alchemist Group engaged in building restaurants, resorts and hotels.
Executive Name: Ms. Rashmi Sharma
Address:
Not Mentioned
Email Address: recruitment@alchemistgroup.com
Telephone: Not Mentioned
Keywords: Site Engineer / Real Estate
July 25th, 2011, 03:34 PM
Post Count Number #2
CURRICULUM VITAE
Engineer Civil,
Punj Lloyd Limited,
New Doha International AirportProject,
E-mail :ponnumega AT gmail.com
ponnumega AT yahoo.com
Objective :
To be a part of a professionally managed and well-established Organization where my abilities and experience can be well demonstrated & valued, which will accomplish for mutual growth and benefits.
Educational Qualification.
Diploma in Civil Engineer
Computer Knowledge :
- Windows 95/98/2000/XP.
- MS Word, MS Excel, MS Power point, MS ACCESS.
- AUTO CAD-2000-2007.
EXPERIENCE DETAILS :
Total Ten years sound experience in Various Construction Fields ( Building and Factories, Oil and Gas industrials , Pipe Line, Airport, ect,,) as an Engineer / Surveyor .
EXPERIENCE DETAILS :
(I) NAME OF THE EMPOLYER
M/s. Punj Lloyd Limited.
P.O. Box : 55174, Doha, QATAR.
A multinational Indian based, ISO9001 :2000 & OHSAS: 18001 certified EPC company, their engaged in construction of Refinery & Petrochemical Industrial engineering, works in all over world and India.
- Project Experience :
1) Project Name : New Doha International Airport --- CP16
Period : OCTOBER 2009 to till date ,
Client : Overseas Bechtel Inc ,
Job Title : Senior Surveyor .
Nature of job : Lay out of Admin and complex Buildings , Infrastructure , Underground Tanks , Above ground Tanks , Pipe lines , Roads and Kerp works . ect
..
Activities & Responsibilities :
- Reviewing & Preparing of site contour plan and contour level to company ensure compliance with the requirements.
- Reviewing & Location of site boundary line project operational control procedure, government standards, client management requirements.
- Reviewing & Preparing site key plan for project client management requirements.
- Locating & Preparing permanent Bench marks & temporary bench marks with site conditions.
- Reviewing & Locating of (pedestals, columns, equipment foundations, circular vessel foundations, finishing works, etc) as per drawing with client requirements.
- Locating & checking of bolts with site& client requirements.
- Maintaining site records, drawing files, survey report, etc as per office requirements.
- Operating & Using T 652 NIKON TOTAL STATION (THEODOLITE) & AUTO LEVEL as site condition.
II) NAME OF THE EMPOLYER :
M/s. Con . Cont . Consruction . Limited .
Mayilapor . Chennai .
An Engineering Construction company based on construction of Buildings and Factories fields in India .
- Project Experience :
1) Project Name : DHANALAXMI SRINIVASAN MEDICHAL
COLLAGE& HOSPITEL PERAMPALUR . TAMIL NADU.
Period : April2009 to September 2009,
Job Title : Assistant Engineer.
Nature of job : Engineering structure works like Bar bending schedule for all construction activities . Shuttering works and subcontractors bills
Activities & Responsibilities :
- Making & Checking of curvature shuttering , column shuttering, Beam shuttering etc as per site requirements.
- Reviewing & Preparing Bar bending schedule, and checking Reinforcement cutting, bending, tying, etc as per drawing site requirements.
- Reviewing & Preparing Finishing work( Black work, plastering, painting, False cleaning, Floor & wall tilling etc ) as per drawing site requirements.
- preparing & Checking of sub contractor bills, client bills quantity as site conditions.
2) NAME OF THE EMPOLYER :
M/s. Larsen And Toubro Limited ( E . C. C . DIVITION .)
Mount Poonthamalli Road , manappakkam . Chennai.
An Engineering Construction company based on construction of Buildings and Factories fields in India .
1) Project Name : INFOTECH TECHNOLOGY CENTER II
Period : January 2005 to March 2006.
Client : LARSEN AND TOUBRO INFOTECH ,
Job Title : SUB B SITE ENGINEER.
Nature Of Job: Engineering building finishing works and Engineering structure works like Bar bending schedule for all construction activities . Shuttering works and subcontractors bills
.
Activities & Responsibilities:
- Reviewing & Locating of columns, Piles, curvature walls, chimney shape of building etc as per drawing with client requirements.
- Making & Checking of curvature shuttering, Beam shuttering etc as per site requirements.
- Reviewing & Preparing Bar bending schedule, and checking Reinforcement cutting, bending, tying etc as per drawing site requirements.
- Reviewing & Preparing Finishing work ( Black work, plastering, painting, False ceiling, Floor& wall tilling etc) as per site requirements.
- Reviewing & Providing External work ( Storm water pipe line, sewage water pipe line, storm water ditch, Electrical cable trench & pipe lines, kerb walls etc) as site requirements with design coordination.
- Preparing & Laying of landscape works and CC pavers black paving, BT Road works as per drawing with design coordination.
- preparing & Checking of sub contractor bills, client bills quantity as site conditions.
2) Project Name : FLIGHT KITCHAN PROJECT CHINNAI
Period : April 2006 to January 2007.
Job Title : SUB B SITE ENGINEER.
Nature Of Job: Engineering building finishing works and Engineering structure works like Bar bending schedule for all construction activities . Shuttering works and subcontractors bills
Activities & Responsibilities:
- Reviewing & Locating of columns, Piles, curvature walls, chimney shape of building etc as per drawing with client requirements.
- Making & Checking of curvature shuttering, Beam shuttering etc as per site requirements.
- Reviewing & Preparing Bar bending schedule, and checking Reinforcement cutting, bending, tying etc as per drawing site requirements.
- Reviewing & Preparing Finishing work ( Black work, plastering, painting, False ceiling, Floor& wall tilling etc) as per site requirements.
- Reviewing & Providing External work ( Storm water pipe line, sewage water pipe line, storm water ditch, Electrical cable trench & pipe lines, kerb walls etc) as site requirements with design coordination.
- Preparing & Laying of landscape works and CC pavers black paving, BT Road works as per drawing with design coordination.
- preparing & Checking of sub contractor bills, client bills quantity as site conditions.
2) Project Name : R M Z PROJECT HYDERABAD
Period : January 2004 to Sept 2007.
Job Title : JUNIOR SURVEYOR.
Nature of job: Lay out of Admin and complex Buildings , Trenches , Pipe lines , Roads and Kerp works . ect
.
Activities & Responsibilities:
- Reviewing & Preparing of site contour plan to company ensure compliance with the requirements.
- Reviewing & Locating of site boundary line project operational control procedure, government standards, client management requirements.
- Reviewing & Preparing site key plan for project client management requirements.
- Locating & Preparing permanent Bench marks & temporary bench marks with site conditions.
- Reviewing & Locating of columns of building etc as per drawing with client requirements.
- Operating & Using SOKIA (TOTAL STATION )THEODOLITE & AUTO LEVEL as site condition.
3) Name of the Employer:
M/s. Nasser S. Al-Hajri Corporation
P.O. Box: 495, Dhahran Airport, KSA 31932
A Saudi Arabian based, ISO9001:2000 & OHSAS: 18001 certified company, engaged in Refinery & Petrochemical Industrial Construction and Maintenance works in Middle East.
1) Project Name : SAHARA AL-WAHA, PD /PP, PROJECT
Period : 1 February 2007 to 31January 2008 .
Job Title : SURVEYOR.
Activities & Responsibilities:
- . Reviewing & Preparing of site (contour plan and contour levels) to company ensure compliance with the requirements.
- Reviewing & Location of site boundary line project operational control procedure, government standards, client management requirements.
- Reviewing & Preparing site key plan for project client management requirements.
- Locating & Preparing permanent Bench marks & temporary bench marks with site conditions.
- Reviewing & locating of pedestals, columns, equipment foundations, circular vessel foundations, finishing works, etc as per drawing with client requirements.
- Maintaining site records, drawing files, survey report, etc as per office requirements.
- Operating & Using TCR- 1203 TOTAL STATION (THEODOLITE) & AUTO LEVEL as site condition
2) Project Name : SAUDI KAYAN PETRO CHEMICAL,
Period : 1 February 2008 to February 2009 .
Job Title : SURVEYOR.
Activities & Responsibilities:
- . Reviewing & Preparing of site (contour plan and contour levels) to company ensure compliance with the requirements.
- Reviewing & Location of site boundary line project operational control procedure, government standards, client management requirements.
- Reviewing & Preparing site key plan for project client management requirements.
- Locating & Preparing permanent Bench marks & temporary bench marks with site conditions.
- Reviewing & locating of pedestals, columns, equipment foundations, circular vessel foundations, finishing works, etc as per drawing with client requirements.
- Maintaining site records, drawing files, survey report, etc as per office requirements.
- Operating & Using TCR- 1203 TOTAL STATION (THEODOLITE) & AUTO LEVEL as site condition
4) Name of the Employer:
M/s. Srinivasa And Company,
Abids, Hyderabad. A. P. . INDIA
An Engineering Contracting company in the fields of Fabrication of Structural members, Petrol Bulk works..
Position Held : Site Engineer.
Duration : Nov 2001 June to Oct. 2003.
Activities & Responsibilities:
- Reviewing & Locating of columns of building etc as per drawing with client requirements.
- Making & Checking of curvature shuttering, column shuttering, Beam shuttering etc as per site requirements.
- Reviewing & Preparing Bar bending schedule, and checking Reinforcement cutting bending, tying etc as per drawing site requirements.
- Reviewing & Preparing Finishing work ( Black work, plastering, painting, ceiling, Floor&wall tilling etc) as per drawing site requirements.
- Reviewing & providing External work (Storm water pipe line, sewage water pipe line, storm water ditch, Electrical cable trench& pipe lines, kerb walls etc )as site requirements with design coordination.
- Preparing & Laying of landscape works and CC pavers black paving, BT Road works as per drawing with design coordination.
- Erecting & Construction of petrol bank tank and boundary walls as per drawing with client requirements.
(5) Name of the Employer:
M/s. S.R.V.Construction ,
Malkajgiri , Hyderabad. A. P. . INDIA
An Engineering Contracting company in the fields of Railway works..
Position Held : Site Engineer.
Duration : May 2001 to Oct 2001.
Activities & Responsibilities:
- Preparing the quantity survey as per drawings.
- Preparing & Checking of sub contractors bills and client bills as per drawings.
- Constuction of boundary walls as per drawing and client requirements.
(6) Name of the Employer:
M/s. Birla Ready Mix ,
Nacharam , Hyderabad. A. P. . INDIA
An Engineering Contracting company in the fields of Ready Mix works..
Position Held : Quality Control Engineer.
Duration : April 2000 to March 2001.
Activities & Responsibilities:
- Preparing Raw material control documents as company requirements.
- Checking & Finding raw material test (Sieve analysis test, impact test, flakiness, Elongation test, silt, moisture, density test, etc ISO 456- 2000.
- Checking & Finding Binding material test ( Fineness test, normal consistency test, initial setting time, compressive strength test, etc) as ISO 456- 2000 .
- Checking & Finding concrete test ( slump test, density test compressive test, workability test, etc ) as ISO 456- 2000 Requirements.
- Preparing & Checking MIX DESIGN (M5 TO M35 AS Cheractor strength Method) as per ISO 456- 2000.
Personal:
Full Name : Ponnu.G
Declaration:
I hereby declare that the above details furnished by me are to the best of my knowledge and belief.
Place: Qatar. Signature :
Date :
(Ponnu . G)