-
May 29th, 2009, 10:27 AM
Post Count Number #1
Petrofac International Ltd. Sharjah UAE : Principal Pipeline Engineer
Petrofac International Ltd. Sharjah UAE : Principal Engineer Pipeline
Website: http://www.petrofac.com
Keywords: pipeline engineer,pipeline designer
Designation: Principal Engineer Pipeline
Experience: 18 - 28 Years
Location: Sharjah UAE
Education:
UG - B.Tech/B.E. - Any Specialization
PG - Any PG Course - Any Specialization,Post Graduation Not Required
Industry Type: Oil and Gas/ Power/Infrastructure/Energy
Functional Area: Engineering Design, R&D
Posted Date: 20 May 2009
Job Description:
Undertakes specified tasks/ areas of work within a discipline, as defined by the Group Lead Engineer or Principal Engineer. Supports and reports to Group Lead Engineer/ Principal Engineer. Capable of supervising and checking the work of Junior Engineers as delegated by the Group Lead Engineer/ Principal Engineer. Responsible for communicating technical/ project issues potentially impacting the project to the Group Lead Engineer/ Principal Engineer.
Desired Candidate Profile:
A)To be technically responsible for an area of work for the delivery and supervision of specific project deliverables for pipelines group.
B)Develops and produces technical deliverables including but not limited to: Basis of Designs, Philosophies, Specifications, Routing Studies, Mechanical Design, Material Selection, Corrosion Protection, Stress Analysis, Layouts, Drawings, Datasheets, and Technical Requisitions & Bid Evaluations as delegated by Group Lead/Principal Engineer.
C)Sufficiently competent to review and check work carried out by junior engineers, as delegated by Principal Pipeline Engineer.
D)Supports the Group Lead & Principal Pipeline Engineer with Technical Bid Evaluations. Reviews vendor documentation and comments to ensure design conformance.
E)Ensures equipment compatibility and conformance with client specifications and requirements.
F)Ensures compliance with company’s ISO Quality procedures.
G)Performs related duties as and when instructed by Group Lead/Principal Engineer.
Company Profile:
Petrofac is an international provider of facilities solutions to the oil & gas production and processing industries with a diverse client portfolio including many of the world’s leading integrated, independent and national oil & gas companies.
Through its three divisions, Engineering & Construction, Operations Services and Resources, Petrofac designs and builds oil & gas facilities; operates or manages facilities and trains personnel; and, where synergies are identified, co-invests to provide additional alignment.
Petrofac’s range of services provides a total solutions approach to meeting client’s needs across the full life cycle of oil & gas assets.
Petrofac’s successful track record, spanning 20 years and several hundred projects, is based on a partnership approach which demonstrates total commitment to the health and safety of everyone involved, and respect and responsibility for the communities in which it operates.
Operating out of four strategically placed international centres in Sharjah, UAE; Aberdeen, Scotland; Mumbai, India; and Woking, England, the Group has a further network of 14 offices worldwide.
Petrofac is a people business, with approximately 5,500 employees worldwide, spanning many cultures and disciplines but possessing the same drive and determination to meet the needs and expectations of its customers.
Executive Name: Deepthy Isaac
Address:
Petrofac International Ltd
AL Soor Street
PO Box - 23467
Sharjah,UAE,UAE 23467
To apply, send CV to Email Address: deepthy.isaac@petrofac.com
Telephone: 971-6-5740999
Reference ID:
Senior Engineer Pipelines
Keywords: pipeline engineer,pipeline designer
-
July 23rd, 2011, 01:32 AM
Post Count Number #2
QA/QC INSPECTOR PIPING AND WELDING
¬¬¬¬¬¬¬CURRICULUM VITAE
T.GEORGE JAGAN VAZ
Email : george65685 AT yahoo.com
george.theithrose AT almojilgroup.com
OBJECTIVE
To obtain a challenging position commensurate with my professional experience in a progressive, Growth oriented company. To work for organization that recognizes individual abilities, Talents and accomplishments.
CAREER SUMMARY
Over eleven years extensive working experience in India and abroad in engineering inspection &testing during fabrication in onshore and Construction & Installation of Oil/Gas & petrochemical Industry.
EDUCATIONAL DETAILS
Diploma in Mechanical Engineering
(First class with honors)
Bachelor of Arts
(Economics)
PROFESSIONAL QUALIFICATIONS
AMERICAN WELDING SOCIETY (AWS)
(Certificate welding inspector - CWI)
Certificate number - 09103541
SAUDI ARAMCO APPROVAL (CODE A)
STATUS -1 APPROVED SAP # 70012538
ASNT LEVEL II in –
1. Radiography Testing
2. Ultrasonic Testing
3. Liquid Penetrant Testing
4. Visual inspection
5. Magnetic Particle Testing
FAMILIAR CODES :
ASME SEC II, ASME sec V, Sec VIII- Div-1, ASME sec IX, ASME B31.3, B16.1, B16.5, 16.9, AWS D1.1&
Saudi Aramco Specifications
PERSONAL STRENGTH
- Strong track records in achieving good safety and quality work in the construction Industry according the implemented standards.
- Flexible to take any type of job related in construction industry with good absorbing mind and interesting to develop knowledge in new area.
DUTIES AND RESPONSIBILITIES (GULF)
- Conversant with ASTM, ASME, NACE standards.
- Quality surveillance, Welding inspection, Documentation & Dimensional Check.
- RT Film Interpretation.
- perform line checking/prepare and check official test pack prior to release for hydro testing by ensuring that all welding inspection and NDT activities affecting the quality of welds contained in each piping spools of an isometric have been completed and accepted.
- Conduct fit-up and visual inspection of all piping and welding works from piping pre- fabrication to field installation.
- Familiarize with the Approved Quality and Inspection plan.
- Familiarize with the Approved Drawings, Governing Standards and Specifications.
- Checking the preheating, inter-pass temperature, weld sequence, welding parameter.
- Hydro testing and pneumatic Testing of erected piping systems.
- Checking weld summary as per the requirement.
- Supervision of QA/QC activities related to piping and welding.
- Familiar with various Welding process like GTAW, SMAW, SAW, FCAW.
- Preparing – PWHT of piping joints.
- Preparation of final documents including fit-up and welding reports NDT reports.
- Preparation of Tie-In activities (fit-up and NDT reports) and reinstatement.
- Pressure test certificates and as-built Drawings.
- Controlling welding repairs by taking corrective action.
- Witnessing Visual, PT, MPI, UT, RT and Pneumatic & Hydro Test.
- Inspection of all pipe supports, type required to install in the line and check based on the support detail.
- Conduct inspection on the re-instate line specifically in all test limits to confirm the proper gasket and installed as per drawing requirement.
- Conduct line check inspection as per test package with the complete sets of the latest isometric drawings with corresponding test limits and the P&ID and pipe arrangement drawing to match the requirements necessary to install in the line such as connection of valves and instruments and generate punch-list of all finding under categorical status.
- Conduct inspection particularly in piping check the materials as per isometric drawing requirements, the type of valves installed in the line, the flow erection for the check valve, globe valve, the hand wheel orientation and all components.
- Checking of Co ordinates and elevation by Piping plan & Isometrics.
- Preparation of Material request based on the isometrics and P&ID and pipe arrangement drawing.
- Checking of material preparation and fit up for orientation, alignment before offering for inspection.
- Preparation of daily accomplishment report.
- Instructing the welders to follow welding parameters as per WPS.
- Clarification of doubts raised by the welder, pipe fitters and fabricators in the job.
- Familiar with Hydrostatic testing work cycle such as Test Packs preparation, System Walk down, Punch Killing, preparation of Hydreotest etc.
- Assign and supervise the teams engaged on In Plant piping erection work.
- Arrange and manage Punch killing crews, Preparation of Hydro test equipment, Set up crew for hydro testing and assign work.
- Coordination with the client representative at site.
- Prepare work schedule, method statements and daily report.
PROFESSIONL EXPERIENCE :
Name of Firm : MOHAMMAD AL-MOJIL GROUP (MMG)
Designation - Sr.QC Inspector piping & welding (Batch # 46855)
Work site - KARAN UTILITIES & COGENERATION project (Saudi Aramco)
Client - Petrofac Saudi Arabia Ltd. (PSAL), Saudi Arabia.
Period - Oct 2010 to Still
Name of Firm : CONSOLIDATED CONTRACTOR INTERNATIONAL COMPANY
Designation - QC Inspector Piping & welding (Batch # 65685)
Work site - Ras Laffan Industrial City (Qatar Gas), QCS &QGX II Project
Client - CTJV (Chiyoda technip Joint Venture), Qatar.
Period - March 2007 to April 2010 (3 years)
Al madani Contractor Company (Nov 2003 to Dec 2006)
(Supply to below companies)
Name of Firm : MOHAMMAD AL-MOJIL GROUP (MMG)
Designation - QC Inspector Piping & welding
Work site - JUPC, Linear Alfa Olefins Project, Jubail
Client - LINEAR CO,
Period - 6 months
Name of Firm : S.A.KENT
Designation - QC Inspector Piping & welding
Work site - M/S Shaybah refinery plant (Saudi Aramco),
Southern area Plants Shay bah Gosp – 2
Plant Access Code – 216 (Shutdown)
Period - 4 Month
Name of Firm : TRUBARABIA
Designation - QC Inspector Piping and welding
Work site - SHOAIHBA STEAM POWER PLANT stage II
Period - 7 Month
Name of Firm : Al – Suwaidi Industries Ltd
Designation - QC Inspector Piping
Work site - M/S SAUDI YANBU PETRO CHEMICAL PLANT (SABIC)
Ethylene – Glycol (shutdown turnaround 2005), Yanpet
Period - 5 Months
Name of Firm : GAMA
Designation - Piping Foreman
Work site - M/S BERRI GAS PLANT (Saudi Aramco)
Saudi Arabian Oil Company, unit475, Sulpherunit, Jubail.
Client - Technip
Period - 1 Year
Name of Firm : M.S.Engineerning (P) Ltd
Designation - Sr.Mechanical Supervisor
Work site - KILBURN CHEMICALS LIMITED, Tuticorin, India.
Period - June1999 to July 2003 (4 Years)
PERSONAL DATA
Name : T.GEORGE JEGAN VAZ
george65685 AT yahoo.com
george.theithrose AT almojilgroup.com
Expected Salary : Negotiable
Languages known : English, Tamil, Hindi, Malayalam.
I hereby declare that the above given information is true and correct to the best of my knowledge.
Yours faithfully
T.GEORGE JAGAN VAZ
-
September 20th, 2011, 11:02 AM
Post Count Number #3
Mechanical Engineer -Projects
80 % planing 20% execution is the world class organisation policy
-
December 2nd, 2011, 11:40 AM
Post Count Number #4
WELDING SUPERVISOR
RESUME
Name : P.K.VIJAYAKUMAR
Mail : vijyanniranam AT gmail.com
Education
- Passed S.S.L.C. Kerala Board Examination
Technical :
- Diploma in Mechanical Engineering ( year 2000 – 2003 )
- NDE certificate in MPT,LPT, RT – ASNT LEVEL – II
Industrial Exposure – 20 Years of Working Experience
A. Supervisor - Welding
Ersai Caspian contractor-Kazakhstan
2011 april to November 2011
Supervising and monitoring all kinds of welding including SS, DSS, CS, LTCS, Copper nickel,
Inconel pipes on barge & moduel
B. Supervisor - Welding
Arabian Industries LLC, Oman
September, 2008 to 2011 march
. Supervising and monitoring all kinds of welding including SS, DSS, CS, LTCS, Copper nickel,
Inconel pipes and vessels at site as well as work shop. Also coordinate with NDT, attending
repair jobs. Preparation of Weld Production Report and Fit up reports etc
C. Forman ( Welding), M/s. CCIC-Qatar-QVC Project, Qchem Project, RLX Project
May 2000 to January 2008
D. Welder , M/s. CCIC Safco Project , Saudi Arabia
1998 to 2000
E. Welder, M/s. Mari Time Industrial Service company Ltd. Inc , Sharja -UAE
1993 to 1998
F. Welder, M/s. M.R. Al-Khathalan Est. Saudi Arabia
1991 to 1993
-
February 7th, 2012, 05:04 PM
Post Count Number #5
PIPELINER
Dear Sir/Madam,
I am presently working with M/s Punj Lloyd Ltd since last 11 years ,now my role as a Senior Manager and having 15.9 Years of experience in handling diverse roles in Project Management, Co-ordination & Planning, QA/QC/HSE activities of major projects in Cross Country Pipelines/City Gas Pipelines/Water Pipelines , Plant works, Oil Refinery, Petro Chemical, Ammonia Fertilizer, Gas Cracker Complex, Refineries and portfolio, along with both Indian and International Clients (Multinational and Multicultural).
This in turn helped me to explore my talent and experience, realize my potential and increased my willingness to work as a key player in challenging & working environment of company.
Please find enclosed my updated CV for your kind observation.
Sajeevan. P.S
E-mail- sajeevtml AT yahoo.com
PROFESSIONAL SYNOPSIS
- A dynamic professional with 15.9 years of experience in Project Management, Contract Administration, Materials Management, Construction Management and Commercial Operations, along with committed and dedicated people .This in turn helped me explore my talent and experience, realize my potential and increased my willingness to work as a key player in challenging & working environment of company.
- Successfully carried out 17 major projects (8 -Cross Country Pipelines, 2- City Gas Pipelines, 5 -Refinery, 1- Petro Chemical, and 1- Fertilizer) in Oil &Gas Sector entail Construction.
- Project coordination/Expediting for all site work with vendors, Clients/Consultant including site engineers for materials & Engineering/Designing issues etc..
- A Project planner with expertise in planning, executing and spearheading construction projects involving, Contract Administration in compliance to various quality standards, conducting meetings with client & consultant on contractual matters regarding progress of works, claim situations and other construction issues.
- Deft in managing erection, commissioning of downstream Oil & Gas Plants involving resource planning, in-process inspection, team building & co-ordination with internal / external departments & statutory authorities.
- Excellent communication & interpersonal skills with strong analytical, team building, problem solving and organizational abilities.
- Thorough knowledge of ROU opening and pipe laying issues related to landowners, Anticipate and assure preventive actions to sort out problem areas such as delivery of long lead items and ROU issues.
- Resolving issues related to Local Agitation and Challenging execution in Cross Country Pipelines/ City Gas Pipelines.
- Monitoring and coordinate the Project Management Team ensuring effective implementation of project plan,Coordination QA/QC,HSE Dept., Maintain all data required for the report, Material delivery,
test reports etc.
- Successful Implementation of Quality Management Procedures and Systems as per International Standards and maintaining quality documents for commercial and industrial construction.
- Effective liaison skills to communicate with Consultant, Subcontractors, Laboratories & Suppliers for smooth functioning of site operations.
- Capable of leading project activities even in sensitive localities.
- Hands on experience on Pile integrity testing, Pile load test, witnessing rebar testing in third party lab, Cube testing, field density testing etc.
- Coordination & Inspection for E & I site works.
- Creating Qc awareness and Audit participation
CARRIER PROFILE
[Nature of Duties and Responsibilities’ in Cross Country /City Gas Pipe line/Plant
works, Oil &Gas Refinery, Petro Chemical, Ammonia Fertilizer, Gas Cracker
Complex, and diverse portfolios]
- Conceptualize the entire project in terms of various parameters such as tendering ordering material receipt and site execution especially for executing cross country pipeline projects.
- Involvement in all Pipeline activities as Liaisoning /Survey/ROU/ Trenching/Bending/Stringing/Main Line Welding/NDT/ Joint Coating/Crossings –Railway, Rivers ext.../ Lowering/Tie-In Welding/Backfilling/Valve Stations works/Hydro test/Restoration/ Commissioning.
- Manage construction related issues in pipelines.
- Identify personnel and actions to assure development of target projects.
- U/G & A/G Piping, Structure, Tanks Fabrication / Erection, Loop clearance and Hydro testing, IBR Piping works and Equipment Erection (Rotary &Static).
- All type of Documentation works & handling QA.QC (Include NDT, WPS/WQT, PQR)
related works including Punch list
- Monitor & maintain equipment calibration records. Coordination with third party laboratories
and clear all updated test records and invoice.
- Auditing sub contractor’s premises and audit participation.
- Controlling QC awareness and Weekly Meeting.
Domain experience :
- Punj Lloyd Ltd - 20th March 2000 to till date
Designation : Sr.Manager (As a Sr.Engineer to Sr.Manager)
- ARIO BROTHERES Pvt. Ltd -From 24th May 1999 to 13th March 2000
Designation : Site In charge
- JAIHIND Projects Ltd. -From 5th April 1996 to 18th May 1999
Designation : Engineer
MAJOR CROSS COUNTRY PIPELINE PROJECTS HANDLED WITH M/s PUNJ LLOYD LIMITED
1.Bhadrewadi Radhanpur Pipe Line Project-PIIN2 Spurline EPCC project for Cairn Energy Pvt.Ltd (Radhanpur- Gujarath), PMC-IDEA
Project Duration : May 2009 to April 2010
Role in project : Construction Manager.
2.Dabhol Panvel Gas Pipe Line Project Phase-II part B(DPPL) for Gas Authority India Ltd – Maharashtra (Areas of Local Agitation), PMC- Engineers India Ltd
Project Duration : Aug 2008 to April 2009
Role in project : Construction Manager.
3.East West Gas Pipe Line Project (EWPL)for RGTL –Gujarat (Spreads 7A.8A, 7A
PART 1, 7B PART 2).
Project Duration : August 2007 to July 2008
Role in project : Construction Manager.
4.Dahej Uran Pipe Line Project (DUPL) for Gas Authority India Limited- (Dehaj, Gujarat), PMC- Tracteble Engineers, 35 Km Spread (Marshlands).
Project Duration : Jan 2007 TO July 2007
Role in project : Site in Charge/ Construction Manager.
5.Mundra Delhi Pipe Line(MDPL) Project for Hindustan Petroleum Corporation Limited
(Jaipur/Rewari) ,PMC- Engineers India Ltd, 55 Km Spread(Areas of Local Agitation) .
Project Duration : Dec 2004 to Nov 2005
Role in project : Site in Charge/ Construction Manager.
6.Mora Sachin Palsana Pipe Line Project for Gujarat Gas Corporation Limited (Surat).
Project Duration : Dec 2005 to Jun 2006
Role in project : Frontend/Backend In charge.
7.Dahej Vijaypur Pipe Line Project (Spread-II) for Gas Authority India Limited- (Godhra- Gujarat), PMC- Engineers India Ltd.
Project Duration : Dec 2003 to Jun 2004
Role in project : Frontend/Backend In charge.
8.Mumbai Manmad Manglya Pipe Line Project for Bharat Petroleum Corporation Ltd. (Indore- M.P.) PMC- Engineers India Ltd.
Project Duration : Jan 2002 to Nov 2003
Role in project : Backend In charge.
MAJOR CITY GAS PIPELINE PROJECTS HANDLED
1.Mahanagar City Gas Pipe line Project for Mahanagar Gas Limited (MGL) Mumbai, India, PMC- TIES Engineers, with ARIO BROTHERES Pvt. Ltd.
Project Duration : 24th May 1999 to 13th March 2000(9 Months and 21 Days)
Role in project : Site in Charge.
2.Gujarat Gas City Gas Pipe line Project for Gujarat Gas Corporation Limited (Surat), with Jai hind Project Ltd.
Project Duration : April 1998 to 18th May 1999.
Role in project : Site in Charge
MAJOR REFINERY/PETRO CHEMICALS/FERTILIZER PROJECTS HANDLED
1.Strategic Storage of Crude Oil Project-EPCC Project for ISPRL(Indian Strategic Petroleum Reserves Limited)
PMC- Engineers India Ltd, with Punj Lloyd Ltd.
Project Duration : Jan 2012 to till Date.
Role in project: Project Coordinator.
2.Coke Drum Structure Package (CDSP) Of Delayed Cocker Unit –EPCC Project, PH-III (CDSP- DCU Unit) for M.R.P.L. (Mangalore Refinery Petrochemicals Limited-ONGC), PMC- Engineers India Ltd, with Punj Lloyd Ltd.
Project Duration: May 2010 to December 2011
Role in project: Project Coordinator.
3.Panna Mukta Tapti Joint Venture Project for ONGC at Hazira (Gujarat, Surat) PMC- DNV / British Gas / Gujarat gas, with Punj Lloyd Ltd.
Project Duration: July 2006 to Dec 2009
Role in project: Project Coordinator.
4.Hydro Cracker Unit (HCU) for Indian Oil Corporation Ltd. at Panipat (India), PMC- Engineers India Ltd, with Punj Lloyd Ltd.
Project Duration: Jul 2004 to Nov 2004.
Role in project: Site Sr.Engineer.
5.C R U Project for Cochin Refinery Unit (Cochin, Kerala), PMC- Engineers India Ltd, with Punj Lloyd Ltd.
Project Duration: 20th March 2000 to Dec 2001.
Role in project: Site Sr. Engineer.
6.G.P.C.L Project Services (IPCL) Shutdown works for Indian petrochemical corp. Ltd (G.P.C.L) – Dahej, PMC- Engineers India Ltd, with Jai hind Project Ltd.
Project Duration: March 1997 to March 1998.
Role in project: Site Engineer.
7.IFFCO Fertilizer Shutdown works for IFFCO Fertilizer - Kalol, Gujarat, India, PMC- PDIL, With Jai hind Project Ltd.
Project Duration: April 1996 to February 1997.
Role in project: Site Engineer.
EDUCATION:
- Diploma in Mechanical Engineering (Three years Regular) from Kerala Universal College of Engineering Alappuzha Passed 69% in 1996,Sl.No.-1036/96
- BE in Mechanical Engineering (Three years) from Institute of Business Management and Engineering Delhi Passed 67% in 2000, Enrolment no.-99743211.
- MBA (4 semester with dual specialization) - Project Management& Operations Management (Two Years) From Institute of Business Management and Engineering Delhi Passed 68% in 2003, Enrolment no.-20143221.
- ISO-Internal Audit Coarse from Bureau Veritas India
Computer Knowledge : MS-DOS, Windows NT, MS Office, D.T.P,
Internet and Web Application etc.
All the information given above is true to the best of my knowledge
Place:
Date:
Sajeevan.P.S