-
May 27th, 2009, 11:38 AM
Post Count Number #1
Projeco Personnel Management Services Dubai/ UAE : Piping Foreman, Fabrication
Projeco Personnel Management Services Dubai/ UAE : Piping Foreman - Abu Dhabi / 10 No's
Website: www.projeco.com
Designation: Piping Foreman - Abu Dhabi / 10 No's
Experience: 7 - 12 Years
Location: Dubai/ UAE
Job Description:
Must have good experience in different Oil & Gas Piping & structures.
Must have good experience in P & ID Drawing, Sympols and Relevent International codes and standard.
Good experience in Fabrication, erection of Plant Piping & structures, valves, etc,.
Preparing Test packages, Punch list, documentation, etc,.
Desired Candidate Profile:
Must have worked as Piping Foreman in Oil & Gas / Refinery Construction Project.
Must have good Communication & leadership Qualities, etc.
Company Profile:
www.projeco.com
Projeco is a solutions & service provider offering technical and human resources support to the players in energy industry. Professionals having years of hands-on experience managing and dealing with the Technical & Engineering aspect of the Oil & Gas and Petrochemical Industry make up the team here at Projeco.
To apply, send CV to Email Address: rvasanth@projeco.com
Keywords: Piping, foreman
-
June 1st, 2009, 07:06 PM
Post Count Number #2
piping engineer/supervisor
CURRICULUM VITAE
ABDUL AZAD SIDDIQUE ABDUL AZAD SIDDIQUE
EMAIL ID : abdul.azad3123 AT rediffmail.com
JHARKHAND
POST APPLIED FOR : PIPING ENGINEER/PIPING SUPERVISER
Qualification :-
Professional qualification :
Successfully completed three years Diploma in Mechanical Engineering with 70.5%marks from AL-KABIR polytechnic Jamshedpur (TATA)in 2000.Jharkhand.
Educational qualification :
H.S.C.(Science) from Atomic Energy Central School. Jadugoda.(Jharkhand).
Additional qualification :
Advance metal cutting course and AutoCAD R-14/2000 from Indo Danish Tool Room, Jamshedpur.
Experience summary :-
Diploma in Mechanical Engineering with seven years experience of various project such as : Oil Refinary, Petrochemical and Gas Plant Project, which involves on construction and inspection. wide knowledge on isometric drawing, Piping General Plan, Piping & Instrument Drawing and Process Flow Drawing. Experience in line checking, punch-listing,as built design &fabrication supervision. have also knowledge in pre-commissioning/commissioning works.
Now presently working in Kellogg Brown &Root Saudi (KBR) as a Piping supervisor which are the leading oil, gas and hydrocarbon pipe line EPC construction, erection and plant Piping.
Organisation : Kellogg Brown & Root Saudi (KBR)
Designation : Piping Supervisor
Client : Saudi Kayyan (KSA)
Project : Saudi Kayyan Olefin Project
Duration : October 2008 to till now.
Duties& Responsibility :
1) To ensure that all sites activities are performed in environmentally safe are responsible manner.
2) Co-ordinate with client and sub-contractor in execution of remedial solution or any discrepancy between actual and design condition.
3) Supervising piping works to be performed as per our company quality policy and insure the compliance with established construction schedule and project requirements.
4) To ensure the proper execution of inspection and test in accordance with the field quality control plan.
5) Line checking as per test package and preparation of punch list items.
6) Verify the availability and adequacy of the material and drawing.
7) As built design and proposal of modification.
8) Test package preparation and testing procedure followed as per SABIC specification approved.
Organization : Nassir S. AL-Hajari Corporation
Designation : Piping supervisor
Client : AMC(Arabic Mitsubishi Co)
Project : AR-Razi project -5 Methanol Project
Working unit : Cooling Tower & Product Tank Area
Duration : September 2007 to Janurary 2008.
Duties& Responsibility :
1) Supervise the team of foreman and pipe fitters.
2) To check and verify isometric drawing as well as P&ID before start fabrication & erection.
3) To carry out fit up inspection during prefabrication of piping spools before welding and carry out dimensional check and visual inspection of welding of the fabrication spool as per relevant isometric drawings.
4) Prepare and check materials and fittings for every isometric drawing.
5) Prepare work schedule, fabrication, erection &installation of pipes dealing with actual performance jobs.
6) Supervise the field installation, erection, hydro test& inspection of pipe
7) Submit weekly report regarding the progress on the assigned area.
8)To maintain and enforce a safe working environment.
Organisation : AL-Jaber Energy Services LLC
Designation : Piping Foreman
Client : GASCO(U.A.E) Onshore projects.
Project : Asab Gas Development Phase-2
Duration : December 2006 to April 2007.
Working Unit : Pipe rack & Under ground piping.
Duties& responsibility :
1) To carry out GRE pipe alignment fit up orientation and check the pipe & fittings or any components, which are used in assembling the joints.
2) Supervise the field installation, erection, hydro testing,excavation.
3) To check proper elevation of U/G Piping prior to back filling, monitaring daily report from charge hands.
4) Supervise erection &installation of fabrication pipe spools& process piping. Participated in hydro testing & air blowing.
5) To prepare & submit work completion report to the client.
6) To check the thickness after lamination and review the test package and conduct the hydro test.
7) Follow & maintain company standard of quality in accordance with company quality systems requirements.
8) Take care of own health and safety as well as others in the work place.
Organization : AL-Jaber Grinaker LTA (ALEC).
Post box : 45336,Abu Dhabi.-UAE.
Designation : Piping Foreman.
Client : TAKREER REFINARY (ADNOC)-U.A.E
Project : Low sulpher gas oil/Unleaded gasoline project TAKREER.
Duration : August 2004 to 20 Oct. 2005.
Working Unit : Pipe Rack& Product Tank Area .
Duties & Responsbilites :
1) To check & verify isometric drawing as well as P&ID before start fabrication & erection.
2) To carry out fit up inspection during pre fabrication of piping spools before welding &to carryout dimensional check & visual inspection of welding of the fabrication spools as per relevant isometric drawings.
3) To carry out dimensional &visual inspection of pipe supports after fabrication.
4) Coordination with senior& client inspector for the successful completion of above activities.
5) To plan &schedule labour , material before starting jobs for smooth working.
6) To maintain & enforce a safe working environment.
7) Submit weekly report regarding the progress on the assigned area.
8) Preparation as build drawing after completion of fabrication against isometric main drawing.
Organization : Petron Engineering Construction Ltd.
Designation : Piping Foreman.
Client : R.I.L Hazira,Surat,Gujrat.
Duration : 6thOct 2002 to 29thDec 2003.
Working Unit : Heater Area.
Duties & Responsibilites :
1) To carry out dimensional & visual inspection of pipe supports after fabrication.
2) Inspection of piping system after erection as per drawing & P&ID.
3) To preparate manifold for hydro testing and pneumatic testing.
4) To lead a team of insulators for the successful completion of insulation activities including cladding on hot or cold piping as per isometric drawings / project requirements.
5) To check the materials requirements as the isometric drawing like fiber glass / glass wool.
6) To prepare & submit work completion report to the client.
7) Study of drawing and planning if required material as per drawing.
Organization : Bridge and Roof Co. India Ltd.
Designation : Piping Foreman.
Client : Haldia Refinery, Calcutta.(W.B)
Duration : 6th June1999 to 20th Dec2000.
Working Unit : Pipe Rack.
Duties & Responsibilities :
1) To supervise piping fabrication & welding .Calculation of WDI from isometric drawings.
2) To calculation of pipe supports from relevant drawings & supervise the pipe supports fabrication.
3) Preparation & submit work of completion reports to fabrication in charge.
4) Follow and maintain company standard of quality in accordance with company quality systems requirements.
Organization : Singhbhum Copper Mines ( Jharkhand )
Designation : Foreman (Maintenance)
Client : Hindustan Copper Mines ( Jharkhand )
Duration : 10th Feb 2001 to 30th Aug 2002.
Working Unit : Underground Mines Piping &machining work shop.
Duties & Responsibilities :
1) To supervise piping fabrication & welding ..
2) To calculation of pipe supports from relevant drawings & supervise the pipe supports fabrication.
3) Preparation & submit work of completion reports to fabrication in charge.
4) Maintaining of reciprocating pump & check out the pump.
5) To maintain and enforce a safe working environment.
Nature of work:
- Study of drawing and planning of required materials as per drawing.
- Pre fabrication of spool and same will be erected in field as per drawing specification/site suitability.
- Fabrication and erection of various types pipe supports as per specification.
- Preparing Manifold for hydro testing and pneumatic testing.
- As build drawing preparations after completion of fabrication against Isometric main drawing.
- Erection of tanks, vessel, heat exchanger ,Intercooler, cooler, compressor, valves and filter separator.
Personal Profile:
Father's Name : Mr. Abdul Gafur
Date of Birth/Place : 03.09.1976/Jadugoda
Martial Status : Married
Nationality/Religion : Indian/Islam
Languages Known : English, Hindi& Urdu
Current Location : India
Availability: One month after selection.
Driving License Details:
Driving License : L.M.V. No.6122/96 PVT,Jamshedpur(INDIA)
Place :Al-Khobar, Kingom Of Saudi Arabia
Date :
Signature
(ABDUL AZAD SIDDIQUE)
-
July 14th, 2011, 09:23 PM
Post Count Number #3
Jagadish vincentraj
E – Mail : jagadish.slm AT gmail.com
Mechanical with 2 years & 2 Month of design experience in Oil & Gas sector. Experienced in concept to detailed engineering of Heat exchangers and Pressure Vessels.
- Design : Static Equipment design including pressure vessels and heat exchangers as per international codes like ASME, TEMA, API 661 and API 660
- Preparation of Strength calculations using PV Elite software.
- Engineering : Completeness and consistency check for process data sheets, selection of materials and preparation of design basis.
- Preparation of material requisition, Technical Delivery conditions.
- Co-ordination with sub-vendors, customers, and client’s engineering consultants and internal departments.
- Attending to fabrication shop problems related to equipment drawings and design.
- Equipment sizing and design.
- Providing Engineering supports to all departments regarding static equipment.
- Knowledge of equipment general arrangement, Tube layout and external drawings.
- Conversant with Mechanical design package for S&T Heat Exchangers and Columns
PV Elite Ver. 2009
PV Elite Ver. 2010
PV Elite Ver. 2011
Academy Profile :
Bachelor of Mechanical Engineering (with First class) in May 2009
Anna University, Paavai Engineering College, Namakkal, Tamil Nadu.
Experience History :
- M/s. Precision Equipments (Chennai) Pvt. Ltd., Established in 1981, Leading Manufacturer in India for shell and tube heat exchangers, pressure vessels, Special purpose machines, Auto mobile components, columns, bullet, etc.,
Designation : Mechanical Engineer
- Designing of Heat Exchangers and Pressure Vessels.
- Performing the design calculations on PVElite for client submission.
- Consolidation of fabrication drawings and bill of materials.
- Preparation of material requisition and Technical Delivery Condition.
- Providing engineering supports to all departments regarding static equipment
- Cross verification of thermal design calculation of vendor’s proposals.
- Cost effective sizing of thick wall expansion joint bellows.
- Co-ordination with third party inspection like IBR, M/s. Lloyds, M/s. BVQI& M/s. DNV etc.
- Preparation of IBR design calculations.
- Preparations of design calculations for ‘U’ stamp Equipments.
- Handling IS and IBR Regulations.
- Handling the various customers standards like M/s.EIL, M/s.PDIL, M/s. Linde Engineering, M/s. Uhde, M/s. Saudi Aramco, M/s. Samsung Engineering, M/s. Lurgi, M/s L&T, M/s.Jacobs ,M/s.Petrofac and etc.
Major Projects Worked :
a) M/s TECNIMONT ICB, for M/s. MRPL, Mangalore.
Project : Phase III Refinery Project.
- Preparation design calculations using PV Elite for customer submission
- Performing strength calculations as per ASME section VIII div-I, TEMA.
- Complete preparation of fabrication drawings, Tube sheet layout, Tube bundle details, Saddle drawings and other related drawings.
- Performing strength calculation of tube sheet as per UHX, Saddle support as per Zick analysis, TEMA and local load calculation as per WRC 107/297
- Complete fabrication drawing review namely GA, Tube sheet layout, Tune Bundle drawings and Saddle detail
b) M/s. Toyo Engg. (I) Ltd, Mumbai, for M/s. IOCL, Paradip.
Project : Paradip Refinery Project.
Handling Detail design and Engineering include
- Amine Regenerator Reboiler
- Rich / Lean Amine Exchanger
- Stripper Reboiler
- Preparation design calculations using PVElite for customer submission.
- Performing strength calculations as per ASME section VIII div-I, TEMA, Local load analysis as per WRC 107/297, Calculation of tube sheet as per UHX
- Complete preparation of fabrication drawings, Tube sheet layout, Tube bundle details, Saddle drawings and other related drawings.
- Performing strength calculation of tube sheet as per UHX, Saddle support as per Zick analysis, TEMA and local load calculation as per WRC 107/297
c) M/s. Samsung Engineering, for M/s. ONGC, Dahej, Gujarat.
Project : Dual Feed Ethylene Cracker Project.
Handling Detail design and Engineering include
- Naphtha Preheater
- Ethane Preheater
- Depropanizer feed cooler
- Reboiler Gasoline stbiliser.
- Vendor co-ordination for Nozzle FEM Analysis.
- Provide the MDS for fabrication drawing.
d) M/s Linde Engineering, for M/s. Abu Dhabi Polymers Company Ltd.,
Project : Ruwais Eu3.
- Preparation Strength calculations using PV Elite Software.
- Calculation of MAWP and MAPnc Condition.
- Calculation of Test Pressure for Indiual Components.
- Preparation Design Calculations for ‘U’ stamp Equipments.
- Preparation MDMT calculation for selective materials.
e) Currently Working M/s Foster Wheeler Energy Ltd., for M/s IOCL , Paradip Refinery, India.
Project : Paradip Refinery Project
- Preparation of strength calculations using PV Elite.
- Providing Mechanical datasheet for fabrication drawing preparation.
Proposals Worked :
- Designed and Prepared technical proposals of shell and tube heat exchangers for, M/s. Technip, M/s .Simon Carves, M/s. Saipem, M/s Foster Wheeler Energy, M/s Petrofac, M/s. Litwin & M/s. Jacobs etc.
Responsibilities Include :
- Preparation of Mechanical Design of S&T Exchangers and Pressure Vessels.
- Preparation of setting plan drawings.
- Preparation Technical proposals and Bid documents.
- Attending technical and pre-bid meetings.
-
April 24th, 2013, 10:06 AM
Post Count Number #4
CURRICULUM VITAE
SURESHKUMAR .S
Madras-600068
Tamilnadu,S.India
E-mail : aswin_rahul AT yahoo.com
sureshtech1970 AT gmail.com
SR. INSTRUMENT TECHNICIAN
Educational Qualification :
- S.S.L.C from the Board of Public Examination 1985 with 73%, Chennai-68
- H.S.S.C From the Board of Public Examination 1987 with 64%, Chennai-68
- I,T.I Instrumentation from the Board of Trade examination 1991,Chennai-98
SKILLS
- Diploma in MS Office with “O” Grade 2004 in NICT Institute Chennai-68
- Diploma in Auto Cadd with “O” Grade 2004 in NICT Institute Chennai-68
- National Technical Certificate Grade 3 Marine Mechanics from Institute of Technical Education at Sembawang Shipyard P/L,Singapore.
- PICWS in GASCO-ASAB3 will Expire 31/Dec/2015
- 2B/3 Driving Licence from Singapore
- Motor Cycle with gear/Motor car Driving Licence in India
- Language Known English,Tamil,Malayalam,Hindhi
STRENGTHS :
Sincere, hard working and determined.
Skills in Establishing, Maintaining rapport with People & to work in a Team.
Proven ability to grasp concepts quickly and meeting deadlines.
HIGHLIGHTS :
1. Experience in Oil & Gas Plant.
2. Experience in Power Plant.
3. Experience in plant Commissioning
4. Electrical&Instrumentation Control in Petro-Chemical Industry
5. Experience in Mark 6 Gas Turbine.
6. Experience as commissioning Instrument Technician
7. Working knowledge plant Maintainance
8. Construction Control, Installation and all E & I activities inSemi Submersible,Dynamically-Positioned Offshore Drilling Rigs,New Ships,LNG Ships,FPSO,FPU.
Work Experience :
Standard engineering / recommended practice includes ANSI, API, ISA, BSI and IEC. DCS & PLC includes Yokogawa-centum XL/CS-3000, Honeywell-TDC3000 & TPS, Foxboro-IA, Prosafe, Triconex-TMR, Mark VI (Gas Turbine control system) and Other subsystem constitutes Bently Nevada 3300&3500 System, Enraf Tank level gauging system - familiar from these system for loop and trouble shooting
Programmable logic controller
operation test procedure (OTP) ESD all levels EDP. Pump control and alarm system familiar to read and work with P&ID’S Instrument code and symbol, loop diagram instrument lay out diagram, shout down logic diagram. Cause and effect diagram .ladder logic diagram etc. able to find out the problems of shutdown system from interlock logic diagrams.
FIRE AND GAS DETECTION :
This experiences out lines a preventive maintenance& installation flammable gas detector. Toxic gas detector, infrared fire detectors fusing plug optical pegging system.Type smoke detectors. Manual call point co2 fire extinguishing system.
Rotating machinery control system :
This experience outlines a preventive maintenance for Bentley Nevada vibration transmitter Used in TURBINE & COMPRESSORS. Calibration, testing, troubleshooting of radial Shaft vibration probe, shaft axial vibration probe, key phaser, positioner transmitter spark plug, Flame detector .
FIELD BUS FOUNDATION SYSTEM :
Control valve :- Fisher FIELDVUE, ABB kent, Masoneilen, voltax, orbit
Calibration, troubleshooting & overhauling of different type of control valve such as Globe valve, butterfly valve, gate valve, On/Off ESD valve. And also Calibration and stroke checking of digital valve controller by HART communicator.
- During the carrier, I have hands on practice of using hand held hart communicator emerison-275&375,475 for configuration.
- Good experience in day to day maintenance, pre commissioning, commissioning and shut down activities.
Employment history :
April 2013 to Still :
Company : VELOSI QATAR
Position : Senior Instrument Technician
Project : Qatat Petrolium
Nature of job : Shutdown
Client : QATAR PETROLIUM
Oct 2012 to Dec 2012 :
Company : U T S KENTZ ABUDHABI
Position : Commissioning Instrument Technician
Project : ASAB 3 NGL Project
Nature of job : Commissioning, Start-up & Maintenance,Centrifugal compressor 20MB5 Air Compressor,Booster Compressor (ELLIOT)
Client : TECHNIP
OWNER : GASCO
Oct 2010 to Sep 2012 :
Working as a site supervisor and sub-contractor in various concern.
Jan 2010 to July 2010 :
Company : U T S KENTZ ABUDHABI
Position : Commissioning Instrument Technician
Project : GASCO ASAB 2 NGL Project
Nature of job : Commissioning, Start-up & Maintenance,Turbine MS5002D DLN Centrifugal compressor BCL 505/N NUOVO PIGNONE/GE
Client : TECHNIP
OWNER : GASCO.
March 2009 to December 2009 :
Company : U T S KENTZ ABUDHABI
Position : Instrument Foremen
Project : P O1532_SBM TDS-2000 Semi-Submersible,Dynamically- Positioned Offshore Drilling Rig.
Nature of job : Installation,Cable ladder and cable tray mounting,Pole light erraction,Glanding and Termination,commissioning activity.
Client : iNe (Innovative Technologies Ltd)
Owner : SBM
Feb 2009 to Mar 2009 :
Company : U T S KENTZ ABUDHABI
Position : Senior Instrument Technician
Project : Gasco Ruwaise Train 2 Upgrading (Shut Down) :
Nature of job : Turbine control panel wiring modification,RTD Installation for BearingTemperature Radial Probe Installation,UV Scaner Function check,Calibration of Pressure and Flow Transmeter.
Owner : GASCO
Dec 2008TO Jan 2009 :
Company : U T S KENTZ ABUDHABI
Position : Senior Instrument Technician
Project : Compressor,Incinerator,Furnace Modification in
Thammama C Gasco
Nature of job : RTD calibration,Loop check and Function check,Wiring Modification in LCP,Pre commissioning,Comissioning
Activity
Owner : GASCO
Sep 2000 to Oct 2008:
Working as a Sub Contractor in various concern in Tamilnadu,India Oct 1997 to July 2000
Company : Jurong Technologies Industrial Corpn.Ltd,Singapore
Position : Senior E&I Technician.
Project : 1. Hull No.1057 New ship construction Cable laying and Termination of E&I equipment
2. LNG Fenima,LNG Hartcourt and LNG Bonny Main Engine Bridge control system upgrading
3. P 37 (FPSO) Installation and Commissioning of marine and process Instruments
4. P 40 (FPU) Cable laying and Termination of E&I equipment
5. Tuas Power Station (600 MW) Field calibration of instruments
6. Modec Venture (FPSO) Installation,calibration commissioning of marine and Process Instruments
7. Seraya Power Station (250*9 MW) Field calibration of instruments
May1995 to May 1997:
Company : Jurong Engineering Limited,Singapore
Position : Instrumentation Technician
Project : 3*250 MW Turbine Generators Pulau Seraya Power Station Stage3 Development Turbine Generator & Auxiliary Equipment Contract
Client : Parsons Power Generation Systems Limited
Nature of job : Presenting the system for client's inspection Performing
Loop checking,Assistance incommissioning & pre-
commissioning involving calibration of all field instrument.
May 1994 to Apr 1995
Company : Jaisun & Hutchison Controls pvt Ltd
Position : Instrument Technician
Project : Madras Refineries Limited
Nature of job : Erecting & calibrating of Level Troll,Pressure and Flow
Transmeter,Continuty Test,Loop check etc.
May 1992 to Mar 1994
Company : BLUE STAR Ltd
Position : Instrument Technician
Project : Madras Refineries Limited
Nature of job : Glanding and Termination of Control cables,continuty
test,Insulation test, Pressure and Temperature gauge
mounting as per the Instrument layout.
EXPERIENCE:
- Over 7 Years Experience in Abroad.
- Over 11 Years Experience in India.
Personal Information:-
Name : SARANGAPANI SURESHKUMAR
Nationality : Indian
I do hereby declare that the above information given by me is true to my knowledge.
Date :- April 2013 Thanking You
Place :- Chennai (SURESHKUMAR)