May 12th, 2009, 06:41 PM
Post Count Number #1
Hi-Tech Company Software Solutions Chennai, Japan : PDS/PDMS Admin
Hi-Tech Company Software Solutions (Chennai) Limited Chennai, : PDS/PDMS Administrator- CAD Petrochemical/refinery/Oil & Gas piping
Website: http://www.htssindia.in
Keywords: PDS, PDMS, PDS,Administrator, AutoCAD, CAD, Customisation, CAD customisation, ARX, Software developer, CAD design, IT, Chennai, Japan, Software, Vault, India, API, VBA, Autodesk, Autodesk products, AVEVA PDMS, Intergraphs PDS, Navis Works.
Designation: PDS/PDMS Administrator- CAD Petrochemical/refinery/Oil & Gas piping
Experience: 2 - 7 Years
Location: Chennai,
Japan
Compensation:
'Best in the Industry'
Education:
UG - B.Tech/B.E. - Any Specialization
PG - M.Tech - Any Specialization,MCA - Computers
Industry Type: Oil and Gas/ Power/Infrastructure/Energy
Functional Area: IT-Other
Posted Date: 12 May 2009
Job Description:
The selected candidate should be responsible for
1. They will be posted in the IT department as a member of the project development team for PDS/PDMS Administrator. The development place shall be our offshore development centre at Chennai or our client place at Japan
2. Responsibilities as a Layouts engineer: Feed and Detailed engineering activities,
- Preparation of Equipment location plans.
- Piping design studies for design areas.
* Inter-discipline coordination.
- Vendor drawing reviews/comments.
- Isometrics checking and Transfer of deliverables
- Proactive design during FEED activities, coordinating with stress check for high critical piping.
- Interact with vendor, other global operating centers and various disciplines on issues related to piping routing/layout.
- Maintaining quality records and ensured quality compliance of all system deliverables.
- Coordinate with unit heads and PDS designers for alternate routing feasibility study.
3. Responsible as a PDS Administrator /CAD-Coordinator:
- PDS administration activities (Project setup, maintenance, updations)
- CAD coordination/Support activities
- Isometrics-coordination activities
- PDS Spec updations, PDS -Table updations, PDS Library updations.
- To raise Material requests for addition of database components.
- To assist and solve designers requests in PDS and other support software’s.
- Prepare Piping assembly standard programs and Customised Reports in PDS as per Project needs.
- Ensure quality compliance of all system deliverables by use of comprehensive check lists.
- Initiate knowledge base and prepared reports, which can be used as a guide in future projects.
4. Real time software development using VC++/C++/C/VBA/.NET/JAVA in Autodesk products (mostly in AutoCAD, Navis works) or any other software Like AVEVA PDMS, Intergraph’s PDS®
5. The development environment may be using Object ARX, Vault or any third party software
6. May do the minimum level of design/drawing in respective AutoCAD, Navis works, or any other related software product for self testing and specification prepartion.
7. To build the good image of the company by the way of good team member, good programmer, high level of job understanding, punctuality in job, dress code, adopting local Japanese culture, periodical reporting to the concerned officer, updating the new technology in the field, etc.
8. If necessary they have to learn the new application software in compatible with AutoCAD for the development purpose.
8. Should know the Quality standard, code standards, different type of testing techniques for self testing of the developed code.
Desired Candidate Profile:
1. Sound knowledge in VBA/.NET/JAVA /VC++/C/Oracle/ SQL / MS Access.
2. Knowledge on computer graphics and data base handling of 2D / 3D /4D cad system especially Autodesk products
3. Through knowledge on Autodesk products (mostly in AutoCAD, Inventor, Navis works) and PDS software Like AVEVA PDMS, Intergraph’s PDS®
4. Candidates preferably from Engineering background shall be given opportunity
5. PH.D can apply
Company Profile:
Hi-Tech is in the field of CAD customization for the last 12 years. Hi-Tech, are one of pioneers in this field since incorporation. We do 2D, 3D, 4D CAD customization and ERP customization. Recently our group opened a New Company in Japan as a 50-50 Joint venture company between India and Japan. We undertake various projects from Japanese CAD giants and in future we capture the CAD market in Japan significantly. We are the Authorized developers of Autodesk products.
Executive Name: Dr.C. Mathiazhagan
Address:
No.4, Bharathi Nagar
4th Street
T. Nagar
Chennai,TN,INDIA 600 017
Email Address: nihongomathi@dataone.in
Telephone: 91-044-28344529
Keywords: PDS, PDMS, PDS,Administrator, AutoCAD, CAD, Customisation, CAD customisation, ARX, Software developer, CAD design, IT, Chennai, Japan, Software, Vault, India, API, VBA, Autodesk, Autodesk products, AVEVA PDMS, Intergraphs PDS, Navis Works.
June 13th, 2011, 09:58 AM
Post Count Number #2
IJT addict
Name : SASIKUMAR
Email : engrsasi AT gmail.com
Designation / Skillset : Mech.Engineer
Resume :
SUMMARY OF EXPERIENCE :
Work experiences in various engineering and construction projects with major industries (16 Years, Petrochemical) as MECHANICAL AND PIPING ENGINEERING with CONSTRUCTION AND SITE MANAGEMENT.
EDUCATION :
a) PGD in Piping Design and
Engineering with PDMS : M I T. Pune
b) Bachelor of Technology in
Mechanical Engineering : Regional Engineering College,
Calicut.
Calicut University, Kerala. (1992)
c) TEC In Engineering Management : Govt. ITC (Industries) New Delhi
d) High school : Govt. High school, Calicut, Kerala.
SOFTWARE PROFICIENCY :
PDMS
PRIMAVERA
WINPCS
ICAPS
Application : Ms Office, Ms Word, Ms Excel.
ASSOCIATE MEMBERSHIP :
a) Associate Member in ASME. (No.9411224)
PROFESSIONAL EXPERIENCE :
Mechanical Lead :
Daelim Saudi Arabia Ltd (LDPE Project)
For SAUDI KAYAN PETROCHEMICAL COMPLEX.
KSA
Oct 2010 to Till date
Daelim Saudi Arabia Ltd (Polycarbonate Project)
For SAUDI KAYAN PETROCHEMICAL COMPLEX.
KSA
Jan 2010 to Oct 2010
Senior Mechanical/Piping Engineer :
Mitsubishi Heavy Industries Ltd (AMC)
for AR RAZI-V, Methanol Projects
KSA
Nov-2006,Nov-2007
Chiyoda Petrostar Ltd
for SIPCHEM.Methanol Project.
Po.Box.10080, Al Jubail Ind.City 31961.
KSA
Apr-2003,Oct-2004
Simon Carves (Middle East) Ltd.
(Semb Corp Engineers and Constructors Group of Companies)
Crystal Expansion Project(TiO2 and Chlorine Plants) in Yanbu Al-Sinaiyah, Saudi Arabia.
Aug-2001,Sept-2002
Mitsubishi Heavy Industries Ltd., (AMC)
Po.Box.11238, Jubail Ind.City 31961.
KSA
for 1& 2 PE Project in Eastern Petrochemical Company (SHARQ)
Jan-2000,Aug-2000
NATURE OF RESPONSIBILITIES :
: Construction Supervision.
: Evaluation of work after performance.
: Assist in setting up the technical unit for testing.
: Provide safety assistance for clearing the area with coordination from
Various departments.
: Pressure test & Over all leak test.
: Controlling of task force team.
: Review of test package.
: Inspection of piping layout, testing
: Monitoring and directing site executions.
: Inspections and rectify of mechanical constructions. Piping/equipment.
: Monitoring of welders performance.
: Preparation of inspection documents as per approved inspection test
plan.
: Coordination with subcontractor, and day by day work evaluation.
: Preparation for commissioning activities with vendors/preparations of
programs.
: Responsible for executing the UG/AG systems.
: Execution of flushing system.
: Reporting to Project manager.
: Layout engineering
: Piping design Modification with PDMS
: ISO draft & 2D draft
: 3D modeling for Red line Drawings with PDMS
: MTO calculation
: Review of subsystems & test packages.
: Air Blowing & Water Flushing for Different System Cooling Water, Sea
Water, Fuel Gas System, Demine System, Propylene System, Waste
Water System And Condensate System Etc...
: Mechanical Running Test of Different Pumps Cooling Water, Sea Water,
Boiler Feed Water, Demine System, Condensate System and Air
Compressor, etc...
: Leak Test for Fuel Gas System, Sea Water Chemical System, Boiler
Chemical System Etc…
: Chemical Injection for Cooling Water, Sea Water & Boiler System
: Steam Blowing For High Pressure Steam, Medium Pressure Steam, Low
Pressure Steam Lines To Be Done Successfully
: Boiler, Demine system & Air compressor full lode test and performances
test Preparation
: Steam Turbine Start Up Work For Various Type Of Turbine Done
Successfully
: Preservation and maintenance and trouble shooting of failures of
process Equipment.
: Scheduling of preventive maintenance and carrying out of works as per
Schedule.
: Maintaining of History reports of individual mechanical Equipment for
failure analysis.
: Assembly of pumps centrifugal (Single Stage & Multi Stage)
Reciprocating and Rotary Pumps.
: Assembly of Mechanical Seal (Single/Double) and Stuffing box.
: Assembly of Gear Boxes (Agitator, Conveyer, Bucket elevator and etc...)
: Alignment of all Equipment with respect to motor (Using Rim and face
and, Reverse indicator method.)
: Servicing the centrifugal compressors (single, multi stages)
Reciprocating & Screw compressor
: Having the experience in types of heat exchangers (shell &tube, plate
type, Fin-fan coolers)
: Servicing Gate Valve, Ball Valve, Globe Valve, Diaphragm Valve, M.O.V,
N.R.V etc…
: Running maintenance, Breakdown maintenance, Start up and Shutdown
maintenance of plant.
: Work operation & Maintenance going through PSMS (Process Safety
Management System).
MC & TO Engineer:
Lurgi GmbH (APSA)
for SIPCHEM CO Project.
KSA
Apr-2008,Apr-2009
Uhde Arabia Ltd (Uhde GmbH)
For SAFCO IV, Ammonia & Urea Projects
KSA
Apr-2005,Aug-2006
NATURE OF RESPONSIBILITIES:
: Analyze the contract in terms of Mechanical completion requirements
: Preparation Technical Database for ICAPS / WINPCS from IFC drawing.
: Interface coordination.
: Assist in the development of Mechanical completion schedule.
: Verify, review, the final field engineering with tracking & modification of
PDMS.
: Verify that sub contractor ITP/QVD is in line with the requirement of
Mechanical completion.
: Set up a QC- system to meet contractual and project specific
Requirements.
: Assist in the generation of test packs.
: Track and expedite the progress of Mechanical completion of systems.
: Ensure that all time of physical mechanical completion of sub-systems.
: All contractually required documentation is in place and verify that all
Work have been carried according to contractual requirements.
: Get approval from the Client for Mechanical completion acceptance of
subsystems And systems.
: Hand over the systems /sub systems to the commissioning team.
: Establish and implement project work breakdown structures, tasks &
Resources.
: Control of system management for ICAPS (Integrated Commissioning
And Progress system)
: Attend day today meeting with client and various department.
: Review of sub systems with test pack
: Field engineering & co ordination.
: Review of NCR’s, confirmation and closure.
: Preparation of MC punch item.
: Preparation of corrective action plan & implementation.
: Co ordinate and organize all construction group to project completion.
: Checking and categorize Punch items with respected branch.
: Monitoring and directing punch clearing as priority systems.
: Organize inspections with client and sub contractor.
: Final joint inspection with client for each system.
: Preparation of final completion document and hand over to client.
Quantity Survey Lead :
Sabic (PMT-PP & PH).
For SAUDI KAYAN, PP & PH Project.
KSA
May-2009,Nov-2009
NATURE OF RESPONSIBILITIES:
: Analyze and understand the overall project scope of work.
: Check as built works are in contracts terms and condition.
: Mode of payment, progress billing, type of contract and other related
commercial, Technical ties based on the latest revision of the approved
existing contract.
: Check and examine the percentage of site and shop activities based on
the client approved bid estimates.
: Coordinate with the estimating department for any changes or revisions
or any Additional works, change orders not included in the existing
contract.
: Establish progress milestone base on the approved bid estimates on
shop and site activities which includes but not limited to preparation,
preassembly, installation, demolition, fabrication, excavation.
: Pre- commissioning and other forms of site and shop activities whether
in civil, structural, piping, mechanical, electrical and instrumentation
works.
: Prepare a detailed material take off database in all areas of work base
on the approved bid estimate summary and verify for possible
variations.
: Coordinate with the planning department for daily work schedule,
manpower loading and man hours budget.
: Establish project cost codes summary from cost control department to
itemized all resources, materials and services involved in the project.
: Daily site work inspection in all areas for productivity and progress and
Up date database for completed work percentage.
: Establish monthly billing statements to the client base on the completed
site and shop activities.
Project Engineer:
Impregilo S.P.A.
King Abdul AzizHospital & Housing Project, Dammam.
KSA
Impregilo S.P.A.
Saudi Arabian National Guard Hospital & Housing Project. Al-Hassa
KSA
Mar-1996,Nov-1999
Southern Central Railway,
for Railway Project, in India.
Signal & telecommunication Dept. (Construction)
INDIA
NATURE OF RESPONSIBILITIES:
: Participate in the development of the Project Work Breakdown
structure.
: Implement company standard planning procedures and project specific
planning and scheduling, using planning systems such as Primavera P3
and associated project controls modules.
: Direct the planning team in the development of planning network
schedules for specific projects and the production of Baseline analyses,
‘S’ curves and resource histograms.
: Direct the planning team in the definition and assignment of roles and
resources to activities of work and organize the timely production of
critical path analyses and related resource leveling operations, as
directed by the corporate Planning Manager.
: Liaise closely with engineering, procurement, construction and other
disciplines to provide schedule and progress information to project
management.
: Assist with the execution of schedule risk analysis on specific projects,
using company standard risk systems and reporting the key project
risks to Project Management.
: Attend Project Controls departmental meetings as required.
: Liaise with company HR to process current recruitment offers and
requisitions.
: Act as a point for all planning related queries raised by Planning Control
personnel.
: Development, Management and Training of the company Planning Team
as appropriate.
: Interface with worldwide locations on their processes, documentation
standardization, and structure.
I here by state that the information furnished above is true to the best of my knowledge and belief.
SASIKUMAR.K.P
-------------------------------------------------------
More Information about this submission and submitter:-
___________________________________________________
Submission ID : 4243412
Date & Time : 12th Jun 2011 12:46 PM (UTC)
IP Address : 213.236.43.133
Browser Info : Mozilla/4.0 (compatible; MSIE 7.0; Windows NT 5.1; InfoPath.2)
Predicted Country : Saudi Arabia