Snc-Lavalin Engineering India Pvt Ltd Yemen : Piping Site Supervisor

+ Ask Question / Post resume
Results 1 to 4 of 4
  1. Post Count Number #1
    Site Admin
    Join Date
    April 17th, 2008
    Location
    Europe
    Posts
    11,588

    Snc-Lavalin Engineering India Pvt Ltd Yemen : Piping Site Supervisor

    Snc-Lavalin Engineering India Pvt Ltd Yemen : Piping Site Supervisor
    Website: http://www.snclavalin.com

    Keywords: Construction, supervisor, supervision

    Designation: Piping Site Supervisor
    Experience: 5 - 10 Years
    Location: Yemen
    Education:
    UG - B.Tech/B.E. - Mechanical,Diploma
    PG - Post Graduation Not Required
    Industry Type: Chemicals/ PetroChemical/Plastic/Rubber
    Functional Area: Site Engg., Project Management
    Posted Date: 08 May

    Job Description:
    Piping Site Supervisor
    This would be 6 months contract (extendable) starting from June mid, 09

    Desired Candidate Profile:
    Piping Site Supervisor -Site Construction Supervision

    Company Profile:
    SNC-Lavalin is one of the leading engineering and construction groups in the world, and a major player in the ownership of infrastructure and in the provision of operations and maintenance services. SNC-Lavalin companies provide engineering, procurement, construction, project management and project financing services to a variety of industry sectors, including agrifood, pharmaceuticals and biotechnology, chemicals and petroleum, environment, heavy construction, mass transit, mining and metallurgy, power and water management.

    Executive Name: Ms Malathy Mudaliar/ Athreya

    Address:
    Snc-Lavalin Engineering India Pvt Ltd
    779,'VEDANTA', 4th Floor, Makwana Road,
    Off Andheri-Kurla Road, Marol,
    Andheri (East)
    Mumbai,MAHARASHTRA,INDIA 400059

    Telephone: 91-22-67892657

    Reference ID:
    PIPING SITE SUPERVISOR 1

    Keywords: Construction, supervisor, supervision



    Mumbai
    SNC-Lavalin Engineering & Technology Pvt. Ltd.
    Mirchandani Business Park
    6th Floor
    Saki Naka, Andheri East
    Mumbai
    India
    400072
    Phone: (91-22) 6720-7000
    Fax: (91-22) 6720-7099
    SNC-Lavalin Engineering India Pvt. Ltd
    401, "Vedanta"
    4th Floor Makwana Road (near SM House)
    (off Andheri Kurla road)
    Mumbai
    India
    400059
    Phone: (91-22) 6789-2600
    Fax: (91-22) 2859-2393

    New Delhi
    SNC-Lavalin Inc.
    3rd Floor, Wing B
    Radisson Commercial Plaza
    National Highway 8
    Mahipalpur
    New Delhi
    India
    110037
    Phone: (91-11) 4761-9100
    Fax: (91-11) 4761-9200

    Noida
    Span Consultants Pvt. Ltd
    Mindmill Corporate Tower
    4th & 5th Floor
    Plot 24-A, Film City
    Sector 16-A
    Noida, Uttar Pradesh
    India
    201 301
    Phone: (91-12) 0468-7400
    Fax: (91-12) 0468-7444

  2. Post Count Number #2
    Guest Poster
    Join Date
    August 14th, 2008
    Location
    Your Heart, Delhi
    Posts
    76,213

    Re: Snc-Lavalin Engineering Ltd Yemen : Piping Site Supervisor

    [QUOTE=Manoj kumar]Dear Sir,
    This is reference to indian job talk forum I wish to submit my updated cv .
    please go trough it and do the needful.

    Thanks & Regards,
    Manoj Kumar
    CURRICULAM VITAE

    MR. MANOJ KUMAR Mob:09904182928
    E-Mail:manoj11_kumar AT hotmail.com
    Present address: C/O :- MR PK Jala H No: - 1 AF road Komal Nagar
    Jamnagar

    Carrier Objectives
    - To be part of a highly motivated team which gives challenging work life where my skills and abilities will greatly enhance the company’s growth. Also feel that being a hardworking mechanical engineer with over 12 years of experience shall contribute to the benefit of the company.

    Current status
    Organization : - Reliance Engineering Associates Pvt. Ltd., Jamnagar.
    Presently I am working as a Piping Engineer, responsible for Erection/Testing/Commissioning of clean fuel complex “Jamnagar
    Export Refinery Project”. During this period I am involved in day to day activity like Erection/ Loop Clearance /Hydrotesting /Precommisioning etc.

    Previous Organization:-
    1. Popuri Plant Tech. Pvt. Ltd.:- Jharsugudra from Oct-04 to Oct-06
    Job Profile: - Maintenance of Vibrating screen, Roller crusher, Conveyor, Rollers, Magnetic Separator, Kiln.

    2. Globalin Hydraulics:- Raurkela from Dec-97 to Jun-04
    Job Profile: - Hose pipe assembly of earthmovers, Testing of hose pipe & Maintenance of hydraulic machines.

    3. Simplex Engineering & Foundry Works Ltd.:- Raurkela from Jul-96 to Oct-96
    Job Profile: - Erection of various types of valves like Audco valves, Quick action valves, Butterfly valves, Gate valves, Globe valves.

    4. Orissa Industries Ltd.:- Raurkela from Nov-93 to Mar-94
    Job Profile:- Maintenance of Press machines,Vibrating Tube mill, Rollers, Vibrating Screens, Jaw Crushers.

    Core Competency:- 1) Piping fabrication/erection/commissioning
    2) Contractor handling.

    3) Miscellaneous maintenance of plant equipment.


    Educational Credential:-
    Examination Passed Year of Passing Percentage Passed From
    H.S.C. 1986 61% B.S.E. Orissa
    +2 (Science) 1989 47% C.O.H.C. Orissa
    D.M.E. 1992 58% S.C.T.E Orissa

    Personal Detail:-
    NAME : MANOJ KUMAR
    Father’s Name : R. D. Sharma
    Date of Birth : 24.12.1970
    Marital Status : Married
    Nationality : Indian
    Languages Known : English, Hindi, Oriya
    Permanent Address : B23, Sector-5, Rourkela, Orissa

    Time Required For Joining: - 1 Month

    Expected Package: - Negotiable

    MANOJ KUMAR

  3. Post Count Number #3
    Guest Poster
    Join Date
    August 14th, 2008
    Location
    Your Heart, Delhi
    Posts
    76,213

    Re: Snc-Lavalin Engineering Ltd Yemen : Piping Site Supervisor

    CURRICULUM VITAE
    Sunil kumar
    Experience- 6 Years / Planning, Execution and Project Management
    E-mail:
    sunnytechmech007 AT gmail.com
    sunnytechmech007 AT sify.com
    Corresponding Address
    Mukand Engineers ltd Room No-D-74; ward no 09, Tarni Market, Jajpur Road Orissa, India.
    Mob:- 91-8093492711
    Date of Birth: 15-02-1982
    Nationality: Indian
    Passport No. : H0374760
    Languages: English, Hindi
    Martial Status: Single
    Career Objectives
    - To be a part of result oriented professional team that provides a challenging, innovative work environment and opportunities for career and professional development.
    - To build my own knowledge base so that I can handle any eventual crisis either single handedly or better if with the co-operation of a supporting group.
    - To excel in any field that I need to get into and make turn the venture into a success

    EDUCATION:
    - Post graduation in Piping Engineering from IIT Powai. Of Mumbai.
    GRADUATION
    - Bachelor of Engineering :- Mechanical Engg (May, 2004); Bapuji Institute of Engineering Technological University, Belgaum in 2004


    KEY INDUSTRIAL EXPERIENCE:
    - Grassroots Refinery Project
    - Shut down job
    - Pre commissioning & Commissioning activities
    KEY EXPERIENCE & SKILLS:
    Key Experience Key Skills
    EPC Projects:
    Project Management
    Project planning, scheduling, monitoring and controls
    Material Planning, Execution, Documentation, Billing Project Planning Tools:
    Over all Completion of Project
    Project Internet and Intranet Internet and Intranet Tools
    MS Office Application & IT Support: MS Word, Excel, Access, Internet, Emails,auto-cad,PDMS
    EXPERIENCE:

    Period Company Project
    From Nov2010 to till date
    Mukand Engineers Ltd.
    M/s MUKAND Ltd (Bajaj Group), Bajaj Bhavan, Nariman Point Mumbai. A Multinational Company having 2000 cores turnover and having Steel Plant, Machine Building Division (MBD), Foundry, and Construction Division. I have been working in Construction Division, M/s Mukand Engineers Ltd.
    www.mukand.com
    1) N.N.I.L JAJPUR(STEEL PLANT)

    Designation:- Assistant Manager
    Details of Assignment: - Working as an Execution manager for N.N.I.L (STEEL PLANT) at JAJPUR which is .89 MT Steel Plant.
    Responsibilities:-
    - To develop pipeline installation, commissioning, operation and maintenance analysis and procedures. Project description with the help of GAD and P&ID
    - To work with as per relevant standards and Codes of Practice and competent in the design, specification and selection of pipeline systems to meet the requirements therein.
    - Successfully completed Hydraulic & grease lubrication piping & supporting of different sizes.
    - Currently working in Off-site Piping, completely responsible for development of specific work methods and procedures, piping standards and specifications to ensure quality control is maintained based on piping material classes, Verifying Mechanical clearance, hydro testing, and final Box Up from Client.
    - Project Scope Estimation, Front Analysis (Engineering, Material, Gross & Net front),
    - Co-ordination with Engineering, Procurement & Construction for progress data collection and updating The regular monitoring and reporting of progress of the procurement activities on the project or sub section of project
    - Project updating and generation of Progress Reports / Presentation on the project status on a Daily, Weekly & Monthly basis to cover all important project parameters
    - Verifying the contractor’s bill as per work order and the job done.
    - Responsible for work and time study so as to maintain smooth functioning of project plan. Resource planning (man power and Machinery) as per job scope and target.
    - Controlling the machinery and equipments at the site as per site
    requirement and priority

    Period Company Project
    From Aug 2009 to Nov 2010
    Mukand Engineers Ltd.
    M/s MUKAND Ltd (Bajaj Group), Bajaj Bhavan, Nariman Point Mumbai. A Multinational Company having 2000 cores turnover and having Steel Plant, Machine Building Division (MBD), Foundry, and Construction Division. I have been working in Construction Division, M/s Mukand Engineers Ltd.
    www.mukand.com
    2)BOKARO(STEEL PLANT)
    Replacement of 300 Ton Capacity Converter at SMS- II, Bokaro Steel Plant

    Designation:- Assistant Manager
    Details of Assignment: - Working for Replacement of 300 Ton Capacity Converter at SMS- II, at Bokaro Steel Plant
    JOB RESPONSIBILITY
    - Preparation of Scheme for Dismantling of Old Converter and Erection of New Converter.
    - Assembly of 300 Ton capacity Converter as per drawings and under the supervision of Ukrainian experts.
    - Distribution of job between the engineers, supervisors, and other workmen for proper progress of work and also make schedule for work and inputs to achieve the target.
    - Preparation of Daily, Weekly & Monthly progress report as well as monthly plan for the site work.
    - Follow up with vendors for timely delivery of the bought out Materials like structural steel, Hydraulic Oil, Electrodes etc.
    - Preparation of MIS, Monthly budget, cash inflow out flow statement, Client billing & follow up for release.
    - Drawing & documentation control.
    EXPERIENCE:

    Period Company Project
    From July 2008 to Dec 2009
    Mukand Engineers Ltd.
    M/s MUKAND Ltd (Bajaj Group), Bajaj Bhavan, Nariman Point Mumbai. A Multinational Company having 2000 cores turnover and having Steel Plant, Machine Building Division (MBD), Foundry, and Construction Division. I have been working in Construction Division, M/s Mukand Engineers Ltd.
    www.mukand.com
    2) Naphtha cracker of I.O.C.L Ltd. Panipat -.

    Designation:- Assistant Manager
    Details of Assignment:- Working as a Execution manager for Naphtha cracker of I.O.C.L at Panipat which is named (Naphtha cracker Project) .
    Responsibilities:-
    - To develop pipeline installation, commissioning, operation and maintenance analysis and procedures. Project description with the help of GAD and P&ID
    - To work with as per relevant standards and Codes of Practice and competent in the design, specification and selection of pipeline systems to meet the requirements therein.
    - Successfully completed Reactor piping & supporting.
    - Currently working in Off-site Piping, completely responsible for development of specific work methods and procedures, piping standards and specifications to ensure quality control is maintained based on piping material classes, Preparation of Loop file, Verifying Mechanical clearance, hydro testing, and final Box Up from Client.
    - Project Scope Estimation, Front Analysis (Engineering, Material, Gross & Net front),
    - Co-ordination with Engineering, Procurement & Construction for progress data collection and updating The regular monitoring and reporting of progress of the procurement activities on the project or sub section of project
    - Project updating and generation of Progress Reports / Presentation on the project status on a Daily, Weekly & Monthly basis to cover all important project parameters
    - Verifying the contractor’s bill as per work order and the job done.
    - Responsible for work and time study so as to maintain smooth functioning of project plan. Resource planning (man power and Machinery) as per job scope and target.
    - Controlling the machinery and equipments at the site as per site
    requirement and priority
    EXPERIENCE:

    Period Company Project
    From April 06 to July 2008
    Mukand Engineers Ltd.
    M/s MUKAND Ltd (Bajaj Group), Bajaj Bhavan, Nariman Point Mumbai. A Multinational Company having 2000 cores turnover and having Steel Plant, Machine Building Division (MBD), Foundry, and Construction Division. I have been working in Construction Division, M/s Mukand Engineers Ltd.
    www.mukand.com
    3) Green Fuel Emission Project of Hindustan Petroleum Ltd. -.

    Designation:- Assistant Manager
    Details of Assignment:- Working as a Execution manager for Hindustan Petroleum Project at Mumbai which is named (Green Fuel Emission Refinery Project) which after commissioning will make this refinery Euro IV & III capable Petrol , Diesel plant.
    Responsibilities:-
    - To develop pipeline installation, commissioning, operation and maintenance analysis and procedures. Project description with the help of GAD and P&ID
    - To work with as per relevant standards and Codes of Practice and competent in the design, specification and selection of pipeline systems to meet the requirements therein.
    - Successfully completed 5Km(20000 IM) of under ground piping, 5000 RM of steam tracing piping, 100000 IM of AG piping( OSBL), and 5000 IM of unit piping.
    - Currently working in Off-site Piping, completely responsible for development of specific work methods and procedures, piping standards and specifications to ensure quality control is maintained based on piping material classes, Preparation of Loop file, Verifying Mechanical clearance, hydro testing, and final Box Up from Client.
    - Project Scope Estimation, Front Analysis (Engineering, Material, Gross & Net front),
    - Co-ordination with Engineering, Procurement & Construction for progress data collection and updating The regular monitoring and reporting of progress of the procurement activities on the project or sub section of project
    - Project updating and generation of Progress Reports / Presentation on the project status on a Daily, Weekly & Monthly basis to cover all important project parameters
    - Verifying the contractor’s bill as per work order and the job done.
    - Responsible for work and time study so as to maintain smooth functioning of project plan. Resource planning (man power and Machinery) as per job scope and target.
    - Controlling the machinery and equipments at the site as per site
    requirement and priority
    Period Company Project
    From August 04 to March’06

    Mukand Engineers Ltd.
    M/s MUKAND Ltd (Bajaj Group), Bajaj Bhavan, Nariman Point Mumbai. A Multinational Company having 2000 cores turnover and having Steel Plant, Machine Building Division (MBD), Foundry, and Construction Division. I have been working in Construction Division, M/s Mukand Engineers Ltd.
    www.mukand.com
    - PX-1 Project, IOCL, Panipat

    Designation:- Jr. Manager
    Details of Assignment: - Posted as Site Engineer for all major activities related to job progress at site(PX-1 Project, IOCL, Panipat )
    Responsibilities:-
    - Develop and maintain the piping deliverable plan in conjunction with fabrication, Erection and testing requirements.
    - Coordinate fabrication and field construction enquiries/ technical queries for resolution. Report discipline performance to lead Engineer.
    - Project reporting on the project status on a Daily, Weekly & Monthly basis to cover all important project parameters. Ensure all assigned personnel are aware of the requirements of the project schedule and their role in timely delivery of the piping scope of work.
    - To develop project specific work methods and procedures, piping standards and specifications to ensure quality control is maintained.
    - Maintaining the functioning and Quality of blasting and painting of pipes as per quality parameters as per standards
    - Preparation of Loop file, Verifying Mechanical clearance, hydro testing, and final Box Up from Client.
    - Completed Pre commissioning & commissioning activities of loops, catalyst filling of
    Reactor & regenerator, PSA vessels.
    - Controlling the machinery and equipments at the site as per site
    requirement and priority

  4. Post Count Number #4
    Guest Poster
    Join Date
    August 14th, 2008
    Location
    Your Heart, Delhi
    Posts
    76,213

    piping engineer / piping supervisor

    Hi,
    i am interested to join with snc-lavalin, if any opportunity pls contact for this
    email : akhtarmhmim AT gmal.com / mohammed.shamimakhtar AT saipem.eni.it
    thanks