-
May 9th, 2009, 11:34 PM
Post Count Number #1
Snc-Lavalin Engineering India Pvt Ltd Yemen : Piping Site Supervisor
Snc-Lavalin Engineering India Pvt Ltd Yemen : Piping Site Supervisor
Website: http://www.snclavalin.com
Keywords: Construction, supervisor, supervision
Designation: Piping Site Supervisor
Experience: 5 - 10 Years
Location: Yemen
Education:
UG - B.Tech/B.E. - Mechanical,Diploma
PG - Post Graduation Not Required
Industry Type: Chemicals/ PetroChemical/Plastic/Rubber
Functional Area: Site Engg., Project Management
Posted Date: 08 May
Job Description:
Piping Site Supervisor
This would be 6 months contract (extendable) starting from June mid, 09
Desired Candidate Profile:
Piping Site Supervisor -Site Construction Supervision
Company Profile:
SNC-Lavalin is one of the leading engineering and construction groups in the world, and a major player in the ownership of infrastructure and in the provision of operations and maintenance services. SNC-Lavalin companies provide engineering, procurement, construction, project management and project financing services to a variety of industry sectors, including agrifood, pharmaceuticals and biotechnology, chemicals and petroleum, environment, heavy construction, mass transit, mining and metallurgy, power and water management.
Executive Name: Ms Malathy Mudaliar/ Athreya
Address:
Snc-Lavalin Engineering India Pvt Ltd
779,'VEDANTA', 4th Floor, Makwana Road,
Off Andheri-Kurla Road, Marol,
Andheri (East)
Mumbai,MAHARASHTRA,INDIA 400059
Telephone: 91-22-67892657
Reference ID:
PIPING SITE SUPERVISOR 1
Keywords: Construction, supervisor, supervision
Mumbai
SNC-Lavalin Engineering & Technology Pvt. Ltd.
Mirchandani Business Park
6th Floor
Saki Naka, Andheri East
Mumbai
India
400072
Phone: (91-22) 6720-7000
Fax: (91-22) 6720-7099
SNC-Lavalin Engineering India Pvt. Ltd
401, "Vedanta"
4th Floor Makwana Road (near SM House)
(off Andheri Kurla road)
Mumbai
India
400059
Phone: (91-22) 6789-2600
Fax: (91-22) 2859-2393
New Delhi
SNC-Lavalin Inc.
3rd Floor, Wing B
Radisson Commercial Plaza
National Highway 8
Mahipalpur
New Delhi
India
110037
Phone: (91-11) 4761-9100
Fax: (91-11) 4761-9200
Noida
Span Consultants Pvt. Ltd
Mindmill Corporate Tower
4th & 5th Floor
Plot 24-A, Film City
Sector 16-A
Noida, Uttar Pradesh
India
201 301
Phone: (91-12) 0468-7400
Fax: (91-12) 0468-7444
-
August 19th, 2009, 04:01 PM
Post Count Number #2
Re: Snc-Lavalin Engineering Ltd Yemen : Piping Site Supervisor
[QUOTE=Manoj kumar]Dear Sir,
This is reference to indian job talk forum I wish to submit my updated cv .
please go trough it and do the needful.
Thanks & Regards,
Manoj Kumar
CURRICULAM VITAE
MR. MANOJ KUMAR Mob:09904182928
E-Mail:manoj11_kumar AT hotmail.com
Present address: C/O :- MR PK Jala H No: - 1 AF road Komal Nagar
Jamnagar
Carrier Objectives
- To be part of a highly motivated team which gives challenging work life where my skills and abilities will greatly enhance the company’s growth. Also feel that being a hardworking mechanical engineer with over 12 years of experience shall contribute to the benefit of the company.
Current status
Organization : - Reliance Engineering Associates Pvt. Ltd., Jamnagar.
Presently I am working as a Piping Engineer, responsible for Erection/Testing/Commissioning of clean fuel complex “Jamnagar
Export Refinery Project”. During this period I am involved in day to day activity like Erection/ Loop Clearance /Hydrotesting /Precommisioning etc.
Previous Organization:-
1. Popuri Plant Tech. Pvt. Ltd.:- Jharsugudra from Oct-04 to Oct-06
Job Profile: - Maintenance of Vibrating screen, Roller crusher, Conveyor, Rollers, Magnetic Separator, Kiln.
2. Globalin Hydraulics:- Raurkela from Dec-97 to Jun-04
Job Profile: - Hose pipe assembly of earthmovers, Testing of hose pipe & Maintenance of hydraulic machines.
3. Simplex Engineering & Foundry Works Ltd.:- Raurkela from Jul-96 to Oct-96
Job Profile: - Erection of various types of valves like Audco valves, Quick action valves, Butterfly valves, Gate valves, Globe valves.
4. Orissa Industries Ltd.:- Raurkela from Nov-93 to Mar-94
Job Profile:- Maintenance of Press machines,Vibrating Tube mill, Rollers, Vibrating Screens, Jaw Crushers.
Core Competency:- 1) Piping fabrication/erection/commissioning
2) Contractor handling.
3) Miscellaneous maintenance of plant equipment.
Educational Credential:-
Examination Passed Year of Passing Percentage Passed From
H.S.C. 1986 61% B.S.E. Orissa
+2 (Science) 1989 47% C.O.H.C. Orissa
D.M.E. 1992 58% S.C.T.E Orissa
Personal Detail:-
NAME : MANOJ KUMAR
Father’s Name : R. D. Sharma
Date of Birth : 24.12.1970
Marital Status : Married
Nationality : Indian
Languages Known : English, Hindi, Oriya
Permanent Address : B23, Sector-5, Rourkela, Orissa
Time Required For Joining: - 1 Month
Expected Package: - Negotiable
MANOJ KUMAR
-
August 14th, 2010, 08:05 PM
Post Count Number #3
Re: Snc-Lavalin Engineering Ltd Yemen : Piping Site Supervisor
CURRICULUM VITAE
Sunil kumar
Experience- 6 Years / Planning, Execution and Project Management
E-mail:
sunnytechmech007 AT gmail.com
sunnytechmech007 AT sify.com
Corresponding Address
Mukand Engineers ltd Room No-D-74; ward no 09, Tarni Market, Jajpur Road Orissa, India.
Mob:- 91-8093492711
Date of Birth: 15-02-1982
Nationality: Indian
Passport No. : H0374760
Languages: English, Hindi
Martial Status: Single
Career Objectives
- To be a part of result oriented professional team that provides a challenging, innovative work environment and opportunities for career and professional development.
- To build my own knowledge base so that I can handle any eventual crisis either single handedly or better if with the co-operation of a supporting group.
- To excel in any field that I need to get into and make turn the venture into a success
EDUCATION:
- Post graduation in Piping Engineering from IIT Powai. Of Mumbai.
GRADUATION
- Bachelor of Engineering :- Mechanical Engg (May, 2004); Bapuji Institute of Engineering Technological University, Belgaum in 2004
KEY INDUSTRIAL EXPERIENCE:
- Grassroots Refinery Project
- Shut down job
- Pre commissioning & Commissioning activities
KEY EXPERIENCE & SKILLS:
Key Experience Key Skills
EPC Projects:
Project Management
Project planning, scheduling, monitoring and controls
Material Planning, Execution, Documentation, Billing Project Planning Tools:
Over all Completion of Project
Project Internet and Intranet Internet and Intranet Tools
MS Office Application & IT Support: MS Word, Excel, Access, Internet, Emails,auto-cad,PDMS
EXPERIENCE:
Period Company Project
From Nov2010 to till date
Mukand Engineers Ltd.
M/s MUKAND Ltd (Bajaj Group), Bajaj Bhavan, Nariman Point Mumbai. A Multinational Company having 2000 cores turnover and having Steel Plant, Machine Building Division (MBD), Foundry, and Construction Division. I have been working in Construction Division, M/s Mukand Engineers Ltd.
www.mukand.com
1) N.N.I.L JAJPUR(STEEL PLANT)
Designation:- Assistant Manager
Details of Assignment: - Working as an Execution manager for N.N.I.L (STEEL PLANT) at JAJPUR which is .89 MT Steel Plant.
Responsibilities:-
- To develop pipeline installation, commissioning, operation and maintenance analysis and procedures. Project description with the help of GAD and P&ID
- To work with as per relevant standards and Codes of Practice and competent in the design, specification and selection of pipeline systems to meet the requirements therein.
- Successfully completed Hydraulic & grease lubrication piping & supporting of different sizes.
- Currently working in Off-site Piping, completely responsible for development of specific work methods and procedures, piping standards and specifications to ensure quality control is maintained based on piping material classes, Verifying Mechanical clearance, hydro testing, and final Box Up from Client.
- Project Scope Estimation, Front Analysis (Engineering, Material, Gross & Net front),
- Co-ordination with Engineering, Procurement & Construction for progress data collection and updating The regular monitoring and reporting of progress of the procurement activities on the project or sub section of project
- Project updating and generation of Progress Reports / Presentation on the project status on a Daily, Weekly & Monthly basis to cover all important project parameters
- Verifying the contractor’s bill as per work order and the job done.
- Responsible for work and time study so as to maintain smooth functioning of project plan. Resource planning (man power and Machinery) as per job scope and target.
- Controlling the machinery and equipments at the site as per site
requirement and priority
Period Company Project
From Aug 2009 to Nov 2010
Mukand Engineers Ltd.
M/s MUKAND Ltd (Bajaj Group), Bajaj Bhavan, Nariman Point Mumbai. A Multinational Company having 2000 cores turnover and having Steel Plant, Machine Building Division (MBD), Foundry, and Construction Division. I have been working in Construction Division, M/s Mukand Engineers Ltd.
www.mukand.com
2)BOKARO(STEEL PLANT)
Replacement of 300 Ton Capacity Converter at SMS- II, Bokaro Steel Plant
Designation:- Assistant Manager
Details of Assignment: - Working for Replacement of 300 Ton Capacity Converter at SMS- II, at Bokaro Steel Plant
JOB RESPONSIBILITY
- Preparation of Scheme for Dismantling of Old Converter and Erection of New Converter.
- Assembly of 300 Ton capacity Converter as per drawings and under the supervision of Ukrainian experts.
- Distribution of job between the engineers, supervisors, and other workmen for proper progress of work and also make schedule for work and inputs to achieve the target.
- Preparation of Daily, Weekly & Monthly progress report as well as monthly plan for the site work.
- Follow up with vendors for timely delivery of the bought out Materials like structural steel, Hydraulic Oil, Electrodes etc.
- Preparation of MIS, Monthly budget, cash inflow out flow statement, Client billing & follow up for release.
- Drawing & documentation control.
EXPERIENCE:
Period Company Project
From July 2008 to Dec 2009
Mukand Engineers Ltd.
M/s MUKAND Ltd (Bajaj Group), Bajaj Bhavan, Nariman Point Mumbai. A Multinational Company having 2000 cores turnover and having Steel Plant, Machine Building Division (MBD), Foundry, and Construction Division. I have been working in Construction Division, M/s Mukand Engineers Ltd.
www.mukand.com
2) Naphtha cracker of I.O.C.L Ltd. Panipat -.
Designation:- Assistant Manager
Details of Assignment:- Working as a Execution manager for Naphtha cracker of I.O.C.L at Panipat which is named (Naphtha cracker Project) .
Responsibilities:-
- To develop pipeline installation, commissioning, operation and maintenance analysis and procedures. Project description with the help of GAD and P&ID
- To work with as per relevant standards and Codes of Practice and competent in the design, specification and selection of pipeline systems to meet the requirements therein.
- Successfully completed Reactor piping & supporting.
- Currently working in Off-site Piping, completely responsible for development of specific work methods and procedures, piping standards and specifications to ensure quality control is maintained based on piping material classes, Preparation of Loop file, Verifying Mechanical clearance, hydro testing, and final Box Up from Client.
- Project Scope Estimation, Front Analysis (Engineering, Material, Gross & Net front),
- Co-ordination with Engineering, Procurement & Construction for progress data collection and updating The regular monitoring and reporting of progress of the procurement activities on the project or sub section of project
- Project updating and generation of Progress Reports / Presentation on the project status on a Daily, Weekly & Monthly basis to cover all important project parameters
- Verifying the contractor’s bill as per work order and the job done.
- Responsible for work and time study so as to maintain smooth functioning of project plan. Resource planning (man power and Machinery) as per job scope and target.
- Controlling the machinery and equipments at the site as per site
requirement and priority
EXPERIENCE:
Period Company Project
From April 06 to July 2008
Mukand Engineers Ltd.
M/s MUKAND Ltd (Bajaj Group), Bajaj Bhavan, Nariman Point Mumbai. A Multinational Company having 2000 cores turnover and having Steel Plant, Machine Building Division (MBD), Foundry, and Construction Division. I have been working in Construction Division, M/s Mukand Engineers Ltd.
www.mukand.com
3) Green Fuel Emission Project of Hindustan Petroleum Ltd. -.
Designation:- Assistant Manager
Details of Assignment:- Working as a Execution manager for Hindustan Petroleum Project at Mumbai which is named (Green Fuel Emission Refinery Project) which after commissioning will make this refinery Euro IV & III capable Petrol , Diesel plant.
Responsibilities:-
- To develop pipeline installation, commissioning, operation and maintenance analysis and procedures. Project description with the help of GAD and P&ID
- To work with as per relevant standards and Codes of Practice and competent in the design, specification and selection of pipeline systems to meet the requirements therein.
- Successfully completed 5Km(20000 IM) of under ground piping, 5000 RM of steam tracing piping, 100000 IM of AG piping( OSBL), and 5000 IM of unit piping.
- Currently working in Off-site Piping, completely responsible for development of specific work methods and procedures, piping standards and specifications to ensure quality control is maintained based on piping material classes, Preparation of Loop file, Verifying Mechanical clearance, hydro testing, and final Box Up from Client.
- Project Scope Estimation, Front Analysis (Engineering, Material, Gross & Net front),
- Co-ordination with Engineering, Procurement & Construction for progress data collection and updating The regular monitoring and reporting of progress of the procurement activities on the project or sub section of project
- Project updating and generation of Progress Reports / Presentation on the project status on a Daily, Weekly & Monthly basis to cover all important project parameters
- Verifying the contractor’s bill as per work order and the job done.
- Responsible for work and time study so as to maintain smooth functioning of project plan. Resource planning (man power and Machinery) as per job scope and target.
- Controlling the machinery and equipments at the site as per site
requirement and priority
Period Company Project
From August 04 to March’06
Mukand Engineers Ltd.
M/s MUKAND Ltd (Bajaj Group), Bajaj Bhavan, Nariman Point Mumbai. A Multinational Company having 2000 cores turnover and having Steel Plant, Machine Building Division (MBD), Foundry, and Construction Division. I have been working in Construction Division, M/s Mukand Engineers Ltd.
www.mukand.com
- PX-1 Project, IOCL, Panipat
Designation:- Jr. Manager
Details of Assignment: - Posted as Site Engineer for all major activities related to job progress at site(PX-1 Project, IOCL, Panipat )
Responsibilities:-
- Develop and maintain the piping deliverable plan in conjunction with fabrication, Erection and testing requirements.
- Coordinate fabrication and field construction enquiries/ technical queries for resolution. Report discipline performance to lead Engineer.
- Project reporting on the project status on a Daily, Weekly & Monthly basis to cover all important project parameters. Ensure all assigned personnel are aware of the requirements of the project schedule and their role in timely delivery of the piping scope of work.
- To develop project specific work methods and procedures, piping standards and specifications to ensure quality control is maintained.
- Maintaining the functioning and Quality of blasting and painting of pipes as per quality parameters as per standards
- Preparation of Loop file, Verifying Mechanical clearance, hydro testing, and final Box Up from Client.
- Completed Pre commissioning & commissioning activities of loops, catalyst filling of
Reactor & regenerator, PSA vessels.
- Controlling the machinery and equipments at the site as per site
requirement and priority
-
August 29th, 2011, 10:29 PM
Post Count Number #4
piping engineer / piping supervisor
Hi,
i am interested to join with snc-lavalin, if any opportunity pls contact for this
email : akhtarmhmim AT gmal.com / mohammed.shamimakhtar AT saipem.eni.it
thanks