-
April 28th, 2009, 12:12 PM
Post Count Number #1
www.suganautomatics.com Sugan Automatics Pvt Ltd Hyderabad : Certified Energy Manager
Sugan Automatics Pvt. Ltd. Hyderabad / Secunderabad : CERTIFIED ENERGY MANAGER
Designation: CERTIFIED ENERGY MANAGER
Experience: 3 - 5 Years
Location: Hyderabad / Secunderabad
Job Description:
Responsibilities involve providing energy efficiency solutions for residential and commercial establishments. Shall be familiar with Building Management Systems, Energy Auditing and Energy Management.
Desired Candidate Profile:
Shall have expertise in Residential and Commercial Lightening / HVAC, Energy Auditing and Energy Management etc.
Company Profile:
Sugan Automatics is primarily focused in design and development of embedded products and providing solutions for optimal energy utilization.
To apply, send CV to Email Address: careers@suganautomatics.com
Website: http://www.suganautomatics.com
Keywords: Certification from Bureau of Energy Efficiency is preferable
Last edited by Guest-IJT; August 1st, 2011 at 12:39 PM.
-
August 7th, 2010, 12:22 PM
Post Count Number #2
Re: Sugan Automatics Hyderabad : Lightening, HVAC, Energy Auditing
Sir
I am an Energy Management passout from IISWBM, kolkata and have done graduation in B.E.( Electrical & Electronics). I have keen interest in energy audit sector. Previously I have performed various energy audit during my project period. My final project was in Tata Autocomp Systems ltd-hinjewadi plant and my job was to find out the scope of energy savings in the plant.Prior to that iI have done building audit of Income Tax building under the guidance of PCRA, kolkata. Looking forward to your kind reply.
With regards,
Abhi Banerjee
-
June 15th, 2011, 09:00 PM
Post Count Number #3
-
June 17th, 2011, 09:29 PM
Post Count Number #4
HVAC site engineer
RESUME
PARWAIZ ALAM
E-mail ID : p.alam895 AT gmail.com
JOB OBJECTIVE
To constantly be a learning individual and apply the same for the benefit of the organization I work for, therefore
contributing towards its success and achieve personnel satisfaction.
EDUCATIONAL QUALIFICATION
- S.S.C. [ West Bengal Board of Secondary Education. (W.B.) passed in the year 1996 ]
- Diploma Course [ Climate Control Technical Institute. (W.B.) passed in the year 1997 ]
- I.T.I. [ National Council for Training in Vocational Trades.(Bihar) passed in the year 2000 ]
Professional Experience : More than 8 years.
EXPERIENCE SUMMARY
1. Currently working with ‘M/s Sterling & Wilson Ltd.’ (Mumbai) as a HVAC site engineer.
- Duration of association : 1st March 2010 to till date
- Designation : Site Engineer
- Projects : as under
- Site ‘Nipro India Project’ (A pharma park) a project of ‘Shimizu Corporation.’ recently running at
Shirwal (Pune), with installation of full HVAC systems & utility systems.
- Site ‘MCA’ (A cricket stadium) a project of ‘Shapoorji Pallonji co. ltd.’ completed at Pune with
installation of 258 HP chiller plants (02 nos.) & 08 HP VRV systems (08 nos.), in Jan 2011.
Responsibilities
- Erection & installation of ducts, chillers, cooling towers, pumps, fans & other heavy equipments.
- Erection & installation of chilled water pipe lines, checking the welding joints & quality of welding.
- Insulation of ducts, chilled water pipes & quality checking of all the activity.
- Studying the engineering drawing, handling the manpower & material.
- Co-ordinating with vendors & contractors for the timely completion of the projects.
- Fore casting of material for the continuously work flow.
- Preparing of measurement sheet, checking the measurement with client & take the certification.
- Proper co-ordination with our other departments like purchase, planning, sales, accounts for corrective
completion of project.
- Maintaining the good relation with client, PMC, vendors, & contractor.
- Execution of the project as per approved drawings, specifications, scope of work & quality.
- Commissioning & testing of AC plant, different types of ventilation systems.
2. Worked with ‘M/s Coolair Systems’ (Mumbai) as a site supervisor.
- Duration of association : September 2002 to 12th December 2009.
- Designation : Site Supervisor
- Projects : as under
- Site ‘pfizer ltd’ a project of ‘Lamfa projects’ completed at Jogeshwari (W) with installation of 30 nos. of three phase ductable units (cap. 8.3 TR, 4.6 TR & 6.4TR), 35 nos. of single phase Hi-wall units (cap. 1.5 TR & 2.0 TR) in Nov 2009.
- Site ‘Imperial tower’ (two 60 storied buildings) a project of ‘Shapoorji Pallonji co. ltd.’ completed at Tardeo with installation of 146 nos. of three phase ductable units (cap. 4.2 TR each), 837 nos. of single phase Hi-wall units (cap. 1.5 TR, 2.0 TR & 2.2 TR), 294 nos. of inline & axial fans for fresh air & exhaust systems & 22 nos. of air washer units (Scrubber) for kitchen exhaust systems, in Aug 2009. (Running from Feb 2007)
- Site ‘DNA’ completed at Lower parel (W) with installation of 20 nos. of three phase ductable units (cap. 5.0 Tr & 8.0 Tr,) with round ductin, & site ‘Gaurav Jain’ completed at Pedder Road, with installation of 02 nos. of three phase VRV Systems, (cap. 6.0 HP each) with hard copper tubing, in 2006.
- Site ‘M. K. Jwellers’ completed at SEEPZ, Andheri (E) with installation of 02 nos. of three phase VRV Systems, (cap. 10.0 HP each), & site ‘Suruchi Chemicals’ completed at Santacruz (W) with installation of 01 no. of three phase VRV Systems, (cap. 10.0 HP), with hard copper tubing, in 2005.
- Site ‘Ipca Laboratories’ completed at Kandivli (W) with installation of 03 nos. of three phase ductable units (cap. 10.0 TR each) with hard copper tubing, & site ‘BPL Office’ completed at Malad (W) with installation of 36 nos. of single phase Hi - wall units (cap. 1.5 TR & 2.0 TR), in 2004.
3. Worked with ‘ M/s Fair engineering’ (Mumbai) as a HVAC Technician from November 2001 to August 2002.
Nature of work
Having knowledge of
- Installation, troubleshooting, repairing & maintenance of single & three phase window, split, ductable, slimline, cassette & other HVAC units.
- Installation, troubleshooting & maintenance of VRV systems.
- Operation & maintenance of packaged units.
- Operation & maintenance of chiller plant.
- Monitoring in fabrication, installation, & insulation of DUCTIN works.
4. Worked with ‘M/s Enviro controls engineers’ (Mumbai) as a HVAC Technician from November 2000 to October
2001.
Nature of work
Having knowledge of
- Installation, troubleshooting, repairing & maintenance of single & three phase window, split, ductable, slimline, cassette & other HVAC units.
- Operation & maintenance of packaged units.
- Monitoring in fabrication, installation, & insulation of DUCTIN works.
Hobbies : Music listening, Cricket playing & Internet
browsing.
Safety award - Found safety award for best staff on good performance & activity from ‘ Shapoorji
Pallonji co. ltd.’ on 13/08/08.
Other skills - Having knowledge of mechanical & electrical activities, & also have the knowledge
of basic computer( word, excel & power point )
-
September 13th, 2011, 10:17 PM
Post Count Number #5
CURRICULUM VITAE
RAVINDRANATH REDDY. BASAM
E-mail : reddybrn AT yahoo.com ; reddybrn2010 AT gmail.com
Objective :
- Looking for challenging career in Projects / O & M of any industrial field, in a suitable managerial category position, I have gained immense knowledge by working in Electrical field of erection, testing, commissioning and maintenance activities and would like to enhance my knowledge & skills in the future career development
Professional Experience :
- 28 years of Rich experience in Detail Engineering, Project planning & execution, Erection, testing, Commissioning, Operation and Maintenance of all major Electrical equipment and Protection system in Cement, Thermal & Gas Power and Fertilisers industries.
- Presently heading the Electrical department in 3x45 MW Gas Power Plant, responsible for complete Project electrical works and also second in position after the GM-Power Plant, following up and assisting to GM Power project in all project activities and heading the project in absence of GM.
- Responsible for preparing the specifications and tender documents of new project.
- Participating in detail Engineering review of the present new project and attending the
review meetings with consultants, designers & Manufacturers.
- Held responsible position as HOD and was accountable for reliable operation and maximum availability of plant Electrical equipment for achieving highest capacity utilisation through planning, delegation and monitoring of Preventive, predictive and breakdown maintenance activities at or below the stipulated maintenance cost. Also accountable to maintain controls on R&M expenditure, CAPEX budgets, procurement of spares, and inventory.
- Hands on experience with latest testing equipments and techniques, Digital & Numerical Protection systems, UPS systems, IGBT based VFDs, Generator Digital & analogue Excitation systems, Digital & Analogue Automatic Voltage Regulators, Synchronisation systems, Fault locaters, Disturbance recorders etc.
- Accountable for obtaining the required statutory approvals, and also to maintain the PSMS, ISO 9001, 14001 and OHSAS standards.
- Participated in supervising and witnessing of the commissioning activities of the new modernized (DCS) Power & Desalination plant.
- Participated right from construction, erection, testing and commissioning of one million ton capacity cement plant along with the “Krupp polysis” & “Holtech Engineering” Consultants.
- Taken up activities like preparing tendering specifications, detailed engineering review and commissioning of the upgrading projects of electrical equipments in Cement, Fertilisers, Power and Desalination plants.
- Good knowledge in MS-OFFICE, Maintenance Management system, Oracle based ERP, SAP 4.7, and materials coding system.
- My vast experience gives me confidence to play multi disciplinary role in any latest industrial scenario.
Qualification : Diploma in Electrical Engineering.
(B.Tech – Final year, Correspondence course)
Trainings and Seminars : a) Power Electronics by IIT faculty, Madras
From 16/9/88 to 22/09/88
b) Operation & Maintenance of ESP’s & Fabric filters by National council for cement & build.
Materials, from 8/11/89 to 10/11/88
c) M.S. Office 97 one week from 23/08/99 by
Info world solutions
d) Digital Protection relays, Ver. Sepam
2000, by Schneider Electric, service dept.
3 days from 11th Sept. 2002
e) Certified in “Thomas profiling” by Thomas
Assessments Pvt. Ltd.
f) Business Excellence Assessor Training
conducted by CII – institute of Quality
Passport No. / Date of expiry : H 9816871 / 14.06.2020
Work Experience :
Present Employment : M/s Dangote Cement works Ltd,
Power Plant, Ibese Project,
Ibese, Ogun State, NIGERIA.
The captive power project consisting of 3 x 45 MW Gas turbo Generators (SIEMENS) for catering the Power supply to the Cement plant, capacity of 2 x 6000 tons per day cement production with all latest technology and equipment.
Present Position : Deputy General Manager (Electrical)
Power Project,
From 11th October 2010 to till date
Nature of Responsibilities and Experience :
- Responsible for detail Engineering review of the new project and attending the review meetings with consultants, designers & Manufacturers.
- Preparing the project schedules, Man power planning and implementation of the same.
- Responsible for preparing the specifications and tender documents for project
equipment.
- Review of the quotations, evaluation of the vendors and participating in Techno-commercial discussions to finalize the contracts etc. and generating of work orders.
- Coordinating with section heads, contractors for Erection activities and responsible for execution of erection activities.
- Providing guidance to subordinates for receiving of goods, stocking and maintaining the proper records.
- Complete responsible for Project Electrical Erection and Commissioning works such as 45 MW Generators, 45 MW 11/33 KV Transformers, 33 KV SF6 Switch Gear, 11KV & 0.4 KV switch Gears, VFDs, UPS, Battery chargers, Black start DGs (2x1.6MVA) etc.
- Completed Erection and Commissioning of Temporary Power plant (1x5.6 MW & 1x7.2 MW Dual Fuel Turbo Generators) make : Turbomach, and looking after O&M.
- Assisting to GM Power project in all day to day project activities.
Career prior to present position
a. M/s Penna Cement Industries Ltd
Ganesh Phahad, Nalgonda, A.P.
Plant is having capacity of 1.3 million tons per annum cement production with all latest technology and equipment and 2x37.5 MW Thermal Power Plant.
Position : Asst. General Manager (Electrical)
From 06th October 2008 to 27th September 2010
Nature of Responsibilities held and Experience :
- Accountable to handle the entire Electrical department activities and manpower as head of the department and reporting to the GM (works)
- Responsible for trouble free running of the plant Electrical Equipment to achieve zero break downs and highest availability of the equipment for production.
- Responsible to provide proper guidance to sub-ordinates to execute day to day activities, safety procedures, planning for opportunistic & preventive maintenance, trouble shooting, spares management etc.
- Attending daily production meetings to review the regular activities and future plans.
- Responsible for obtaining statutory approvals for new projects and old plant installations from Electricity authorities.
- Responsible for O & M of Electrical Equipment like 132 KV outdoor switch gear, 15MVA 132/6.6KV Transformers, HV & LV Switch gears, Emergency DG, HT Motors up to 1500KW, VFDs, Dc Drives, ESPs etc.
- Attended directly 2x37.5 MW Thermal Power plant Erection works in absence of Electrical in-charge of the Power plant and was responsible to provide guidance to the electrical team of power plant for erection and commissioning works.
b. M/s Coromandel Fertilisers Ltd, Kakinada, Andhra Pradesh, India.
(Formerly known as Godavari Fertilisers and Chemicals ltd)
This is a part of well reputed MURUGAPPA GROUP of Company. Plant is having capacity of 1.2 Million tons per annum complex Fertilisers like DAP and NPK products, 20,000 tons of Ammonia and 20,000 tons of Phosphoric acid storage and handling capacity.
Position : Manager – Electrical
From 07th October 2006 to 27th September
Nature of Responsibilities and Experience :
- Accountable to handle the complete Electrical department activities and manpower as head of the department and reporting to the Vice President (W)
- Responsible for trouble free running of the plant, to achieve zero break downs of electrical equipment and highest availability of the equipment for continuous production.
- Responsible for preparing the specifications of new projects & spares for existing equipments, spares management maintaining the inventory levels, and expenditure with in the stipulated limits.
- Preparing the monthly reports and performance reports for plant head and MD’s review meetings.
- Responsible for maintaining of the plant equipment conditions and records as per ISO 9001, 14001, PSMS and OHSAS and playing roles as internal Auditor and auditee.
- Organising the Energy and power quality audit and implementation of Energy conservation schemes like installation of Variable speed drives, energy savers & timers for lighting circuits, modification of the logics to reduce idle running of the equipment, identifying and de-rating of the Motors wherever possible.
- Participated and played key role in preparing and presenting the presentation on Energy conservation for “National Award for Excellence in Energy Management 2007” competition conducted by CII – Hyderabad and won the award.
- Taking up of capital nature jobs for plant performance improvement, like replacing the old relay logic operating systems with PLCs, installation of VFDs and installation of Energy monitoring systems.
- Attending daily production meetings to review the regular activities and future plans.
- Responsible for implementing the new projects and getting statutory approval for new and old plant installations periodically.
- Preparing of Capex & Revenue budget proposals, follow up the same to maintain the allotted budget under control.
- Review of the quotations, evaluation of the vendors and participating in Techno-commercial discussions to finalize the contracts etc.
- Many other regular activities as head of the department.
c. M/s Saline Water Conversion Corporation, Al Khobar, Saudi Arabia.
Plant is having capacity of 5x150 & 4x125 MW Turbo Generators & 110 Million gallons/day (18units) Multistage Desalination Plants.
Position : Electrical Engineer
From Oct.1990 to September 2006
Nature of Responsibilities and Experience :
- Responsible for preparing and execution of the preventive, major break down and shut down over hauling maintenance schedules of all plant electrical equipments and elect. Protection system such as 5X150 MW & 4X125 MW Steam Turbo generators, Excitation system, Protection system, Gen. Automatic voltage regulators, synchronizing system, high speed bus c/o system of 6.6 KV bus bars, UPS systems up to 72 KVA, Rectifiers for Chlorine generation, 230 KV (SF6) switch gear, 15.75, 6.6 & 0.4 KV switchgears, Transformers up to 188.75 MVA, HV & LV switch gear, Motors up to 3600 KW and variable speed HV motors with slip recovery system etc.
- Participated in reviewing of detailed drawings of the new project, supervising and witnessing of the testing and commissioning of our new power and desalination plant (4X125 MW Steam Turbo generators and 60 MIG/day). I have gained immense
knowledge in testing, commissioning, maintenance and trouble shooting of different types of critical electrical equipment.
- Participated during major overhauling of the Generators and main exciters by manufacturers (Siemens and Toshiba).
- Attending the meetings with planning, operation and other maintenance departments and coordinating with respective departments to prepare and take up maintenance and overhauling activities.
- Preparing specification for spare parts and system upgrading with latest equipments for protection system, UPS, switch gear equipment etc,
- Responsible for tender documents and quotations review, material inspection and preparing repair request for renovation works etc.
- Review of Operation, Maintenance and Instruction Manuals of the new plant and preparing standard job instruction for the preventive maintenance activities.
- Preparing Incident reports, weekly, monthly activities reports and staff evaluation reports and conducting group safety meeting.
- Hands on experienced in using of modern testing equipment and techniques like Sverker - 650, 750 & 760 models, Freja 300 & RTS21 models and Siemens test kits, Disturbance recorder like “Rochester make model RT–116,Cable fault locaters, Hipot test kits (A.C. & D.C.) Etc. and also in testing of modern numerical & static protection relays like ABB make, models REL & RET-316, REG-100 series, SPAJ, RXLK, RXEG, RAGEA etc, Siemens make, 7UR, 7UT, 7SJ, 7 SL series models etc, Alstom make, MCGG, KCGG, KCEG, MCEG series models, GE make, SR & : G series models etc, Merlin Gerin make Sepam model LT - 1000 & 2000 series models and some other make different models.
- Good knowledge in trouble shooting of electrical power & control schemes, Protection systems of Generators, H.V. switchgear & motors
- Fair knowledge in working with DCS, PLC (Siemens & GE Fanuc), SCADA systems.
- Conversant with German, American and Japanese Electrical Power, control / Logic and protection drawings.
d. M/s India Cements ltd. Chilamkur, Kadapa, Andhra Pradesh, India.
Plant is having capacity of one million ton per annum cement production and 3X2.75 MW & 2X4 MW Power Generation (D.G sets).
Position : Asst. Electrical Engineer
From Sept 1982 to October 1990 (8 years)
Nature of Responsibilities and Experience
- Worked right from the project construction. Participated in erection, testing and commissioning of one million ton per annum cement plant with various types of plant electrical equipments like 132KV out door substation with 2 x 25MVA 132KV/6.6KV Transformers, 6.6 KV switch gear & MOCBs, HV (6.6 KV) slip ring motors with liquid rotor starters up to 2250 KW, 6.6 KV / 800 V. double winding Transformers, Thyristorised power & control panels for DC motors up to 1100 KW 800 V, Electrostatic precipitators, Stacker and Reclaimers, Weigh bridges, Thyristor panels, Cement packing & loading machines.
- Taken up high voltage motors up to 1850 KW and DC motors up to 1100 KW over hauling works.
- Testing, commissioning and periodical testing of English Electric make protection relays (Electro magnetic) for 132 KV & 6.6 KV switchgear, Transformers and Motor feeders.
- After commissioning undertook preventive, break down maintenance, trouble shooting, overhauling and testing of above said equipments.
- Also participated in execution of erection, testing and commissioning of 3 x 2.75 MW & 2 x 4 MW DG sets, which added after the commissioning of main project.
- Prepared and executed modification schemes of existing power, control and protection systems to accommodate DG sets in parallel operation with grid.
- Prepared schemes for DG sets synchronizing, load sharing and auto-load disconnection to hold only critical loads on DG sets in case of grid power supply failure.
- I have discharged above duties in the capacity of shop floor in charge.
e. M/s Oriental Electrical Eng. CO.
Position : Apprentice Supervisor.
From December 1981 to September1982
Nature of Responsibilities and experience
Assistance for civil construction activities, erection of motors, control switch boards and lighting works for civil construction activities.