April 26th, 2009, 05:15 AM
Post Count Number #1
Freelancer
Gulf Housing & Construction Doha : Supervisor
Gulf Housing & Construction Doha : Engineer/Supervisor
Designation: Engineer/Supervisor
Experience: 5 - 10 Years
Location: Doha
Job Description:
Should be a Degree/ Diploma holder in Electrical/ Electronic Engineering with 5 to 10 years of experience in Construction Industry, preferably in Tower Cranes, Material / Passenger Hoist and other Lifting Equipments. Should also have experience in fault findings on PLCS on Plant &Equipment. Job responsibilities - Supervision of subordinates, co-ordination with sub-contractors, erection of tower cranes and third party certifications, preventive maintenance, study of drawings along with routine engineering maintenance responsibilities and rigging procedures.
Company Profile:
GULF HOUSING & CONSTRUCTION CO. W.L.L. was established in Qatar in 1976 as a Building and Civil Works Contractor, incorporating a separate Division specializing in the manufacture of SPACEMAKER portable pre- fabricated buildings. The Company has grown to be one of the major construction companies in Qatar and has gained a proven reputation for quality workmanship on a wide variety of projects which have been completed on programme and within budget, and has achieved GRADE 1 status for Building Contractors, the highest grade classified by the Government of Qatar. We also hold ISO 9001 Certification.
In 1996 we formed a Partnership with then Tilbury Douglas, now Interserve Plc of U.K. and with this added strength and support of a major construction services provider, we can now undertake the most demanding of projects.
We have developed a broad client-base, both in the Public and Private Sectors, and have carried out Contracts for such national organization as Qatar Petroleum (QP), Qatar Fertilizer Company (QAFCO), Qatar Steel Company (QASCO), Qatar Public Telecommunications Corporation (Q-TEL), the Ministry of Municipal Affairs & Agriculture (MMAA) and MEW (Al Kahramaa).
We have also participated as a main subcontractor to International Contractors such as Bechtel, Chiyoda, JGC, LG, and Hyundai on large industrial projects for Qatar Petroleum, Qatargas, Rasgas and QAFAC. Recent major projects include the LNG Debottlenecking Qatargas Plant at Ras Laffan, Building works for QAFAC Plant at Mesaieed, Al Dafna Conference Centre for Doha Sheraton, an Olympic Standard Aquatic Facility for Qatar National Olympic Committee, new Qatar Main Office Building for HSBC, International School & Admin/Warehouse Building for RASGAS, Doha Airport Terminal Building Extension for Qatar Airways, Movenpick Business Hotel, Building work for NODCO Refinery Expansion Project at Mesaieed and NGL4 Project Civil and Building works for Hyundai at Mesaieed and Dukhan.
We have entered into our First Partnership Agreement with Commercial Bank for renovation, refurbishment of their Head Office and all branches throughout Qatar.
The 'SPACEMAKER' Division is the market leader in Qatar for the manufacture and supply of all types of portable pre-fabricated quality buildings ranging from Private Villas, Site Offices to Accommodation Camps for major projects. One such camp was for a workforce of 5000 at the QATARGAS Project.
We have also established 'AL MANJARA (Joinery)' Division which specializes in first-class joinery works for Banks, Hotels, Offices, etc. including complete fast-track fitted furniture for the Movenpick Business Hotel in Doha.
We have a current staff & labour force dedicated to our works within Qatar of above 9000 people.
Our past and present clients are always willing to repeat business with us due to their satisfaction with the quality of service provided on our completed projects.
Address:
Gulf Housing & Construction
76 Al Jazira Street
Fariq Bin Mohd
Doha,Doha,Qatar 6886
Email Address: uday@gulfhousingqatar.com
Website: http://www.gulfhousingqatar.com
Keywords: Tower Cranes,Lifting Equipments
Last edited by muthukalee; August 26th, 2011 at 11:12 AM.
-
July 18th, 2011, 07:59 PM
Post Count Number #2
heavy equipment machine operator
POST APPLIED FOR HEAVY EQUIPMENT MACHINERY OPERATOR WHEEL LOADER,DOZER,MOBILE CRANE,DUMP TRUCK,TELEHANDELER
CURRICULUM VITAE
NAME :- PARWAIZ MALLICK
Email- Parwaizmallick AT gmail.com
OBJECTIVE :
Seeking a rewarding position in the field within a progressive environment involving high degree of responsibility, offering challenging assignments which will capitalize on my accumulated knowledge, skill and experience to provide an atmosphere for professional growth based on performance and accomplishments with matching monetary benefits.
PROFESSIONAL EXPERIENCE :
IN GULF :
Worked In BILT MIDDLE EAST (DUBAI) UAE as a HEAVY EQUIPMENT OPERATOR During The Period From 14TH July 2002 To 03RD March 2007.
Working In South West Middle East LLC Dubai (An ISO 9001 Company) as HEAVY EQUIPMENT OPERATOR (SHOVEL,TELE HANDLER,DOZER,MOBILE CRANE, EXAVATOR)From 1ST August 2007 to Till Now.
IN INDIA :
- Worked in Usha Martin Industries Ltd Jamshedpur as a FORKLIFT OPERATOR since 02nd April 1997 to 28th June 2002
EDUCATIONAL QUALIFICATION :
- Matric
SAFETY RULES FOR HEAVY EQUIPMENT MACHINERY :
- To Ensure some points before operation
- Check Engine oil level, Transmission oil level, Hydraulic oil level & Radiator water level.
- Check light,rotor warning light,glass,gear,break , tyre air & parking brake.
- Check all Hyd-Cylinder , & greasing every movement areas.
- Check battery condition.
SAFETY RULES FOR CRANES (SPECIALY) :
- To Ensure check some points extra for crane.
- Check properly Hoist rope & Hoock.
- Greasing properly rotar equipment & bearing.
- Check properly hydraulic jack for Reg & Stablizer
- Check properly level gauge & warning weight gauge ,automatic cut out switch & automatic warning lights.
WORK ABILITY :
- I operate different different companies equipment like as CAT,KOMATSU,VOLVO.
- I operate shovel like as Model CAT 950,938,966, 980,988 Komatsu 600.
- I operate Boom loader like as CAT 345, 340
- I operate articulated dump truck CAT 735,740,775.
- I can operate Boom truck (Crane mounted) like as FORD.
- I operate Front end loader & Forklift (10 to 20) ton.
- I operate Exavator , Exavation , Trunch & loading material.
- I operate Mobile Crane like a GROOVE RT 522,22 ton capacity as need as work like ereation , assemble & shifting & I operate tractor troly.
EXTRA ABILITY :COMPUTER BASIC
-
August 1st, 2011, 09:53 AM
Post Count Number #3
ABDUL SALEEM MUTTUMPURAM
E-mail : masaleem67 AT yahoo.co.in
: masaleem67 AT gmail.com
PROFESSION :
RIGGING SUPERVISOR
HEAVY LIFTTING SUPERVISOR
AREAS OF INTEREST & SPECIALIZATION :
Oil & Gas, Petrochemicals, Rigging Operations of Heavy lifting, Process Plants and Refinery Maintenance. Shut down & starts up activities, Erection & commissioning Projects, Manufacturing, Erection & Maintenance of site, Storage Tanks & Structural Fabrication & Erection.
PROFESSIONAL OBJECTIVE :
To work in a globally competitive working environment on challenging assignment with rapid professional growth.
ACADAMIC QUALIFICATION :
- SSLC from Board of Secondary Education, Kerala, India.
- MS OFFICE, Vex Computer Center, Kadaludi, Kerala.
TECHNICAL QUALIFICATION :
- RIGGING SUPERVISOR, BUREAU VERITAS TRAING COURES CERTIFIED.
SUMMERY OF EXPERIENCE :
22, years experience as a similar field in I.S.O. Certified Companies. Especially in Rigging Field.
12, year in Overseas and 10, Years in India TOTAL=22 YEARS
. Profile :
I have been involved in the oil/gas and other construction industry for 22 years in a variety of multifunction roles ranging from base rigger to rigging foreman to heavy lift foreman and rigging supervisor this has assisted in my development as an effective and efficient rigger both onshore. It has provided me with both the technical expertise and management skills necessary to bring about the completion of many successful projects. I am a firm believer in the importance of safety in the workplace, and this is reflected in my own work practices, and those of anyone reporting to me. I have extensive experience with the safe set up and operation of heavy duty cranes and winches, for both single and multi crane lifts, and i am familiar with all rigging and scaffolding equipment, standards and regulations. I am also able to produce lift plans and method statements for these operations. I am familiar with rigging loft and register documentation, and inspection procedures for cranes and loose lifting equipment. I have been involved numerous times with training schemes for various national workforces. I am computer literate.
WORK EXPERINCE IN OVERSEAS : ------ 12 YERAS
Working with : AL JABER ENERGY SERVICES from March 2007 to December 2009 as
RIGGING SUPERVISOR
Organization : AL JABER ENERGY SERVICES (WGI) QATAR
Project : COMMON SULPHUR PROJECT-(QATAR GAS)
Season : March 2007 to December 2009
Position : RIGGING SUPERVISOR
Duties : Supervisor all rigging heavy lift and steel erection
.
Duties : Supervision of rigging and crane crews for various shutdowns and construction.
Duties :Supervise rigging heavy pipe installation and steel erection for construction projects.
Control the all rigging team and taken more work from rigging crew with under safety.
Control the all lifting equipment under safety and company policy and also control fuel expense.
Duties :oversee erection of new aerial tramways supervise all rigging scaffolding site wide.
Develop and implement safe operating procedures.
Extensive use heavy-duty winches and cranes.
Develop lift study format and oversee heavy lift programmer.
Inspection and approval of all rigging lifting equipment.
Control Mobil and loose lifting equipment inspections.
Advice on erection of inspect scaffolding for general and load bearing purpose
- Working with : BECHTEL/GASCO/ AL JABER ENERGY SERVICES from April 2006 to March 2007. As RIGGING SUPERVISOR.
Organize : AL-JABER ENERGY SERVIES- ABUDHABI
Project : ONSHORE GAS DEVELOPMENT PHASE III (HABSHAN-III) ABU DHABI
Season : March 2006 to April 2007
Position : RIGGING SUPERVISOR
Duties : Supervisor all rigging heavy lift and steel erection
Duties :Supervision of rigging and crane crews for various shutdowns and construction.
Duties daily crane, man lift and other equipment inspections,
Duties Supervise rigging, pipe installation and steel erection for construction projects.
Control the all rigging team and taken more work from rigging crew with under safety.
Control the all lifting equipment under safety and company policy and also control fuel expense.
Duties oversee erection of new aerial tramways supervise all rigging scaffolding site wide.
Develop and implement safe operating procedures.
Extensive use heavy-duty winches and cranes.
Develop lift study format and oversee heavy lift programmer.
Inspection and approval of all rigging tackles & gear and lifting equipment.
Control Mobil and loose lifting equipment inspections.
Advice on erection of inspect scaffolding for general and load bearing purpose
Working with AL JABER GRINAKER :– TECHNIP from Feb 2004 to March 2005. As RIGGING GENERAL FOREMAN and HEAVY LIFTTING
Project : UNLAISE GAS PROJECT (ADNOC), RUWAIS
Season : Feb 2004 to 2005
Position : RIGGING GENERAL FOREMAN
Duties : General foreman heavy lift equipment erection
Duties develop lift study format and oversee heavy lift programmer.
Control the all Rigging teems and taken more work from Supervisor all rigging heavy lift and steel erection.
Duties general foreman, rigging and heavy equipment installation and 110mt steel structural modular erection for construction projects.
Control the all rigging team and taken more work from rigging crew with under safety.
Develop and implement safe operating procedures.
Extensive use heavy-duty winches and cranes.
Develop lift study format and oversee heavy lift programmer.
Inspection and approval of all rigging lifting equipment.
- Working with AL JABER ENERGY from July 2000 to Nov 2001. As RIGGING FOREMAN.
Organization : BECHTEL/AL JABER ENERGY, Mechanical rigging job&
Pipe erection job
Season : July 2000 to Nov 2001
Position : RIGGING FOREMAN
Project Done : PETRO-CHEMICAL ADNOC, ABUDHABI
- Working with CREMENCO (KNPC) from Aug 1999 to Feb 2000. As RIGGING FOREMAN.
Organization : K N P C, Refinery maintenance, Big Exchanger Removal &
Ree Insttalation&Work Permit Holder
Season : Aug 1999 to Feb 2000
Position : RIGGING FOREMAN
Project : REFINERY MAINTENANCE, KUWAIT
- Working with SAUNGYONG ENG (KNPC) from March 1998 to July 1999. As RIGGING
- FOREMAN,
Organization : K N P C, Pipe line Erection 48 inch Plant out said
Season : March 1998 to July 1999
Position : RIGGING FOREMAN
Project : ACID GAS REMOVAL ( KNPC ) KUWAIT
- Working with AL GHANIYAM NASS (TECHNIP) from March 1996 to July 1997. As RIGGING FOREMAN.
Organization : AL GHANIYAM NASS / TECHNIP, Heavy structural&
Modular Structural Erection
Season : March 1996 to July 1997
Position : RIGGING FOREMAN
Project : EQUATE POLYTHYLINE, KUWAIT
- Working with FATRA GENARAL CONSTRUCTION from March 1994 to July 1995. As RIGGING CHARGEHAND.
Organization : FATRA, Ship Ripering yard Maintenance
Season : March 1994 to July 1995
Position : RIGGING CHARGEHAND
Project : PETRO CHEMICAL, JUBAIL, SUADI ARABIA
WORK EXPERIENCE IN INDIA:--------10 YEARS
- Plant working As a RIGGING SUPERVISOR.
- From April 1990 to June 1992 Worked With MORUMU GAO CONSTRUCTION. As RIGGER SUPERVISOR
From July 1992 to Sept 1993 Worked With TAYYIL BROTHERS. At SUGAR PLANT. As ERECTION FOREMAN. RIGGER CHARGEHAND.
RESPONSIBILITIES:
- Erection in the Site
- Preparation of Structural Drawings
- Site Management
- Organization of site
- Organization of daily planning crane working area
Professional Summary:
- Extensive Experience in Structural drawings Preparation.
- Experience in Structural Erection.
- Maintained & Control in All level Crane.
- Extensive Experience in Site Maintenance & Control.
- Ability to Communicate and work with people at different levels in the organization.
- CO-Ordination for rigging operations of heavy equipment,structure,modular structure
- Have good knowledge on selection of crane, heavy lift equipment and tools transportation plant
- Conversant with all regulation&standards
- Should have knowledge on handling and storage of heavy equipment, structure,pipe
- Should be abile to le Knowledge of load calculation, safety factor calculation and rigging tools
- Knowledge of all crane and its load charts
- Knowledge of good job planning, making lifting plans and reading all type drawing
- Should have working on crane following, Manitowoc 1200ton, Damage 650ton, Libber 500ton,-
- Terex 300ton, Kobelco 250ton, Grove 110ton
- ad a team and provide guidance to rigging team
-
January 8th, 2012, 05:37 PM
Post Count Number #4
mechanical piping supervisor
CURRICULUM VITAE
A. SATHIK BASHA
E-Mail : sathikyasu AT yahoo.co.in
Objectives :
A position requiring my knowledge, skills and experience as a Mechanical Supervisor and any suitable aspire to work in a highly competitive and challenging environment and commitment to perform quality work.
Experience Summary
Total 23 years’ Experience in Fabrication Work
Organization : M/s. HITACHI Plant Technology Ltd.(Dubai Branch)
Job Position : Mechanical Supervisor (Piping)
Year : May 2008 to October 2011
Projects : a) Dubai Metro Car Park Project
b) Princess Tower
(Tallest Residential Tower in the World)
Organization : M/s. THE MADRAS ALUMINIUM COMPANY Ltd.,
(METTUR) - INDIA
Job Position : Fabrication Supervisor
Year : October 2006 to March 2008
Project : Red Area Evaporator Tank Work
Organization : M/s. CHEMPLAST SANMAR Ltd.,
(METTUR) - INDIA
Job Position : Piping Supervisor
Year : December 2003 to July 2006
Organization : M/s. SOUTHERN CONSTRUCTION COMPANY
(METTUR) - INDIA
Job Position : Fabrication Foreman
Year : March 1996 to August 2003
Organization : M/s. KANORIA CHEMICALS & INDUSTIRES Ltd.,
(Uttar Pradesh) - INDIA
Job Position : Fabrication & Erection Foreman
Year : October 1988 to January 1996
Shut-down & maintenance Jobs for the below companies
1. M/s. Hindustan Aluminium Co Ltd., U.P.
2. M/s. Bihar Castics & Chemicals Pvt Ltd, Bihar
3. M/s. Mardia Chemicals Pvt Ltd, Gujarat
4. M/s. Hindustan Heavy Chemicals Ltd., Calcutta. ( West Bengal)
Job Responsibilities
Fabrication of high pressure vessels
All types of pipe lines (PVC, FRP, MS, Stainless Steel, Nickel, HDPE)
Structural Fabrication
Storage Tanks Fabrications
Boilers Ducting work
Boilers pipe line work
Acid proofing FRP work and Epoxy work.
All types of equipment and chemicals needs
HVAC Chiledwater piping&Flashing Work
Education Qualification
Qualification : 10+2 (Higher Secondary)
(Vocational Group)
Computer Qualification :
- Auto Cad (Basic)
- MS office ( MS word power point & excel )
- Internet operating system
-
March 15th, 2013, 08:45 AM
Post Count Number #5
Where will you conduct the interview?
-
March 31st, 2013, 11:42 PM
Post Count Number #6
ISHTIAK ALI
E-mail :- acchaykhan AT gmail.com
Seeking an opportunity of Production/Site In-charge Interiors & joinery Fit out in reputed organization.
PROFESSIONAL PROFILE :
- A result oriented professional with 13years of International exposure Interior wood work commercial building, bank, shop etc.
- Expertise in handling a diverse range of operations entailing F&B operations, training and budgeting.
- Proven track record of developing procedures, service standards and operational policies, planning & implementing effective control measures to reduce running costs of the projects.
- Expertise in designing & implementing training programs for bringing keen customer focus, high energy level and team spirit in the employees.
- Excellent written, communication, inter personal, liaison and problem solving skills with the ability to work in multi cultural environment.
AREAS OF EXPERTISE :
Operations Management :
- Managing the highly automated machine and tools to complete project.
- Responsible for making system to complete the project as on target date.
- Ensure profitability of operations and supervise all aspects of project management including manpower -planning, monitoring site to ensure compliance with quality & safety standards.
- Co-ordinate with operating staff for upkeep of project or site equipment in perfect working order
Designing :
- Assessing specification of project, arrange for resources to ensure timely completion of project as per drawing.
- Conducting studies to identify any weaknesses in designs and securing final approval for the same.
- New Project handling.
Raw Material Planning and Management
- Networking with the project/maintenance team to ensure effective delivery of inventory keeping in consideration the pre-discussed drawings/parameters.
- Interfacing with the purchase dept for on time procurement of technically approved indented material.
- Governing the inventory function of raw materials involving for storage and use of material so as to improve storage condition & reduce expenses & wastage to minimum. Through operating mini store on site
Client Relationship Management :
- Ensuring high quality services, resulting in customer delight and optimum resource utilization for maximum service quality.
- Ensuring maximum customer satisfaction by closely interacting with potential clients & understand their requirements and customizing the product and services accordingly.
Operations Management :
- Conducting training sessions to team for smooth flow of projects work.
- Handling operational functions like pre-shifts staff briefings, creating the duty roster, shift management.
- Imparting appropriate training on site, Service Excellence and Teamwork to site and support service staff.
- Organizing and conducting practical and theoretical training programs, to enhance skills and motivational levels.
WORK EXPERIENCE :
As a Senior site in charge with Avon Contracting & Fit–Out W.L.L. 08 Sept.2012 (till date )in Qatar
Interior/Fabrication/Joinery/Fit-Out Solution “ www.avoncontracting.com”
As a Site installation head with K. K. Furniture Pvt. Ltd Oct ‘2011 – 31 Aug. 2012 (INDIA)
Furniture designer and contractor in Gwalior (India) they are dealing in interior designs e.g. bed room, Kitchen, Showrooms, offices etc.
As a site in-charge with Al Fara’a Interior Joinery Division LLC Abu Dhabi Al Ain Since Aug. 08 to Aug'11
Business Activities, Furniture Contractors, Interior Decoration, Building Joinery work-Turnkey Interior fit outs commercial tower uae gvt. Project
"www.alfaraa.com"
Notable Accomplishments Instrumental in planning & executing all pre opening activities, including staff recruitment for all levels of the project commissioning
- Played key role as site supervisor to control manpower
- Supervise MEP/HVC work
- Instrumental in planning & executing all pre opening activities, including staff recruitment for all levels of the project commissioning
- Successfully implemented safety and quality standard during project work.
- ROTANA HOTEL
- MANHATTAN BUILDING
- ARJUN ROYAL ROTANA HOTEL
- AL AIN MALL
- NEL BIN HARMAL
- NEL BIN HARMAL SERVICE STATION
- ZONES CORP
As a senior site supervisor with Sigma Interior LLC Dubai (UAE) Nov’06 – Nov’07 :
Business Activities Furniture Contractors, Interior Decoration, Building Maintenance, Joinery work-Turnkey Interior fit outs commercial tower & European furniture in UAE, Asia
Notable Accomplishments :
- Instrumental in planning & executing all pre opening activities, including staff recruitment for all levels of the project commissioning.
- Played key role as site supervisor to control manpower
- Successfully implemented safety and quality standard during project work.
As a site manager with K. K. Furniture Pvt. Ltd Oct ‘2002 – oct’06 :
Furniture designer and contractor in Gwalior (India) they are dealing in interior designs e.g. bed room, Kitchen, Showrooms, offices etc.
Notable Accomplishments
- Fitting and installing trim, doors, stairs, molding and hardware.
- Measuring, cutting and joining materials made of wood or wood substitutes
- Repairing and renovating wooden structures
- Preparing cost estimates for clients
- Reading and interpreting blueprints, drawings and sketches
- Supervision of Concerned employee
- Dealing with all Customer (Industries)
- Handling of Document like Account’s and labour record
- Preparation of attendance sheet for all employee’s
- Material handling Manpower handling to achieve the targets.
- Planning for additional, manpower as well as material.
Production supervisor Oct 2002- Dec 2005 :
- Supervising all aspects of production.
- Control the flow of work to meet the customer deadlines; from checking and managing the product specification to taking responsibility for the finished product by monitoring and maintaining quality.
- Review all drawings and cutting list prior to the start of production to ensure that the chances of errors on paper being translated into production is minimized and accuracy in production processes associated with each job is achieved.
- Check the suitability and quality of materials and all operations during the production process through to the final quality check and dispatch.
- Review and make recommendations for the smooth running of the department.
- Work across the production cycle to ensure the flow of work meets customer deadlines & quality requirement for the product.
- Allocating work to, and overseeing the work of the production team.
- Allocate operational duties as required to meet deadlines and / or filling gaps in resources in all areas.
- Outsource work as required from the agreed contractor lists.
- Maintain stocks of materials and consumables
- Ensure all production equipment is maintained and serviced appropriately.
- In conjunction with Safety Manager / Officer ensure Production Department complies with current HSE legislation.
- Provide a positive 'can do' approach to management, whilst leading the team by example.
- Deploy staff effectively and ensure they are performing to agreed standards.
- Manage staff leave and working arrangements within the production department to ensure all operational areas are adequately staffed.
As a Senior executive with G.P. Construction Pvt. Ltd Jan’00 – Sep’02 :
Notable Accomplishments :
Supervision of Concerned employee
Dealing with all Customer (Industries)
Handling of Document like Drawing, Expenses record.
Arrangement of manpower as well as Material planning.
Material handling & Furniture
PREVIOUS ASSIGNMENTS :
1999 – 1999 Cadbury India Ltd.
TRAINING PROGRAMS :
- I got 1year apprentices (Industrial Training) in cadbury India Ltd.
- I got six month Training Personnel Dept. in Cadbury India Ltd.
- 5s training.
IT CREDENTIALS :
- Knowledge of Computer MS office- 2010, Auto Cad 2010
- Packages :- Dbase , word star , Foxpro , louts 123 Ms-office Word pro, Ami pro Freelance , leap ( Hindi Version )
- Language :- Cobol, Basic C++
- Operating :- Ms-Dos, Windows 98
- Loder :- PLC Programming
- Store :- Stock Control System Programming
- Typing :- Hindi , English
ACADEMIC CREDENTIALS :
MBA Pursuing QA QC Sikkim Maniple University
B.Com Bachelor of Commerce
ITI Computer Application(DPCAS)
ITI Carpenter
Apprentice Computer Application(DPCAS)
Vocational degree Electronic TV
Salary :
Present salary CTC
Expected salary Negotiable
Personal Vitae :
E-Mail acchaykhan AT gmail.com