-
April 12th, 2009, 12:25 AM
Post Count Number #1
www.polyplex.com Hydro Group Noida : Hydro-mechanical Engineer
Polyplex Hydro Group Noida : Engineer(Hydro-mechanical)
Website: http://www.polyplex.com , http://www.indiahydro.in
polyplex.com
Designation: Engineer(Hydro-mechanical)
Experience: 3 - 7 Years
Location: Noida
Job Description:
The candidate should be good at:
-Knowledge of engineering system (Mechanical) for Hydro Plants. Key inputs on design optimization to new projects in tendering stage.
-Preparation & review of hydro plants layout & specifications of mechanical equipment.
-Knowledge of procurement, preparation & review of specifications, QA/QC,Budget Estimation etc.
-Review & Finalize Vendor drawing.
-Should have exposure to new technology in various hydro sub systems.
-Should have the ability to access, evaluate various technologies & prepare specifications for the same.
Desired Candidate Profile:
-Should be well versed with engineering & mechanical aspects of power plants/operations.
-Should be well versed with Penstock/Pressure Shaft,Gates,Hoists,TRC Machines etc.
-Should take ownership of jobs & good at teamwork.
-Should have good analytical & problem solving skills.
-Should have functional excellence,drive for results,able to withstand pressure, good interpersonal effectiveness.
-Should be innovative & be able to deal with ambiguity.
Company Profile:
Polyplex is the world’s 5th largest producer of thin polyester film with manufacturing facilities in India as well as Thailand and Turkey. Polyplex group, as a strategic diversification of its asset portfolio, is developing hydroelectric power projects.
India Hydro is a consortium of hydro electric power producing companies, having locations in Punjab, Uttaranchal, Himachal Pradesh and Sikkim.
The members of the consortium are as under: Punjab Hydro Power Pvt. Ltd, Kotla Hydro Power Pvt. Ltd, Bhilangana Hydro Power Ltd, Lachung Hydro Power Pvt. Ltd, Teesta Hydro Power Pvt. Ltd, Chunghthang Hydro Power Pvt. Ltd.
Address:
Polyplex Corporation
Polyplex Corporation
Third Floor, B-37, Sector-1,
Noida,U.P.,INDIA 201301
Keywords: Hydro - Mechanical Engineer. budget estimates, QA / QC Etc.
Last edited by muthukalee; November 3rd, 2011 at 05:18 PM.
-
June 3rd, 2011, 10:27 PM
Post Count Number #2
Resume
CURRICULAM VITAE
Apurav kumar
E-mail : apuravkumar1981 AT gmail.com
MECHANICAL ENGINEER :
With 2-3 years of experience in hydro project (site), Erection, Planning & SITE Coordination .
OBJECTIVE :- To perform in power sector project with innovative approach and hard work as a mission of carrier.
PROFILE :
- Professionally accomplished Mechanical Engineer (Site), with qualitative and invaluable experience in costing & site coordination with a flair for adopting modern construction and erection methodologies in compliance with quality standards.
- Disciplined with proven abilities to manage multiple assignments efficiently under tight delivery deadlines, ascertaining needs and goals, envisioning new concepts and future trends and following through with development, direction and accomplishment.
- Proficient in swiftly ramping up projects with competent cross-functional skills and follow-up on time deliverables within pre-set cost parameters. Expertise in project planning, scheduling & performing cost-benefit analysis as per the requirement.
- Undergone a Project of Computer Aided Design AND ANALYTICAL DESIGN of Hydro-Electrical Power Plant.
- Possess knowledge of MS office, MS excel, internet surfing.
PROFESSIONAL EXPERIENCE :
Shree Maheshwar hydroelectric power corp. Ltd Since Aug 08 :
Engineer (Mechanical/Hydroelectric)
- Presently planning and managing site erection work of mechanical and electrical parts, check accuracy as per drawing, coordinate with contractors, follow-up for material delivery as per site planning from store yard. Correspondence with Contractor Companies. Arrange meeting at site level with contractors’s engineers.
- Drawing up detailed site plan , analysis to ascertain technical viability
- Efficiently handled site safety.
Performed fabrication, assembling, Testing and Erection works , are following :
1 Fabrication of Scroll case shuttering plate
1. Fabrication and erection of Draft tube liner (16 Segment)
2. Erection of Draft tube cone.
3. Erection of Draft tube upper cone.
4. Execute first stage electromechanical embedments.
5. Assembling and erection of Runner envelope.
6. Straying installation in Kaplan turbine pit.
7. Pit liner installation.
8. 2nd stage pipes Embedments for cooling water, fire fighting, servo motor piping, instrumentation’s pipe and wires etc.
9. Assembled hub and runner blade.
10. Runner assembly and Runner shaft assembly with inner top cover.
11. Pivot ring erection with seal.
12. . top cover assembly and installation on stay ring with seal
13. Guide vanes erection.
14. Inner top cover installation with runner and runner shaft.
15. Thrust bearing, Guide bearing assembly.
16. Finalized drawing design of fire fighting system with help of consultant (ces) and contractor (BHEL).
17. Finalized drawing and design of ventilation system with help of consultant and contractor.
18. Prepared station layout.
19. Guide apparatus testing at BHEL, Bhopal.
20. Guide apparatus installation, testing and commissioning
21. Rotor assembly, testing and installation.
22. Stator assembly (3seg), testing and installation.
23. Centering and leveling of hole machine and confirm stator form and rotor form before spinning.
24. EOT Crane (115 ton, 60 ton) testing at site.
23. Spinning of machine.
- Documentation : It includes day to day follow up for drawings/ documents, written verbal communication with contractor and consultant for approval on drawings/documents, discuss on technical issue and submission as per prerecorded schedule.
EDUCATIONAL QUALIFICATION :
1.2004-2008 Bachelor of Engineering in Mechanical from Allahabad Agricltural Institute, Deemed university, Allahabad (Uttarpradesh) with 64 %
2. 1999-2001 Higher Secondary Examination Percentage 58.4%
3. 1998-1999 High School Examination Percentage 62%
Date of Birth : 08th Aug 1983
VOCATIONAL TRAINING DURING GRADUATION :
1. 30 Days Training in “HEC” (Ranchi) Manufacturing of mechanical components of power plant.
2. Four Week Training in “Cement plant ” at “Sindri” (Jharkhand)
OTHER ACTIVITIES & HOBBIES :
Listening song.
Game- Volleyball, Badminton
-
June 27th, 2011, 10:27 PM
Post Count Number #3
job
SACHIN THAKUR
E-mail :-sachinthakur1212 AT gmail.com
Seeking an opportunity to hone my skills and abilities in field of system that offers
knowledge & professional growth while being resourceful, innovative and flexible.
SYNOPSIS :-
Diligent and dedicated fresher in search of an opportunity to work with renowned company.
Paticularly interested in manufacturing & maintanice.
Inbuilt ability to used sond judgment decision making skills effectively perform in a self directed environment.
Strong team builder with proven ability to motivate team members toward achieving performance targets and maximum productivity.
CERTIFICATION :- AUTO CAD.
ACADEMIEA :-
Bachelor of technology in mechanical from PTU with 72% pursuing 8th sem.
10+2 (Non-medical) from H.P Board with 58% marks in 2007.
10th from H.P Board with 57% marks in 2003.
JOB RESPONSIBILITIES :-
Understanding the various manufacturing process and measures taken in a plant doning manufacturing.
Under standing the main motive of desgning and maintance.
Analysis the various recquirements and conditions for a good maintance and to generate the best possible out of them.
TECHANICAL COMPONENTS :
Good knowledge of AUTO CAD and CATIA
Proficient in MS word and INTERNET.
SUMMER TRAINING :-
P.T.L mohali 2 months.
Hydropower maintenance, NJHPC (SJVNL) Jhakri(shimla) -6 months.
ACADIEMEIA PROJECT :-
Thermo vaccum forming.
HOBBIES AND INTERST :-
Net Surfing
Music
Cricket
Basketball
STRENGTHS :-
Fast learner.
Can adapt change the pressures in workplace.
Can work effectively with diverse groups of people.
Friendly with upbeat attitude.
Ambitious, hard working and committed to excellence.
-
July 28th, 2011, 11:02 PM
Post Count Number #4
Hydro mechanical Engineer
CURRICULUM VITAE
(MAHENDRA S. RAMTEKE)
E-mail ID : m_sramteke AT yahoo.com
msramteke07 AT rediffmail.com
Educational Qualification :
- M.E. (Thermal Power Engineering) from Amravati University in July 2006 with 61.25%.
- B.E. (Mechanical Engineering) from Amravati University in July 1999 with 59.11%.
Computer Knowledge :
- CATIA V5 ( 3D Modeling )
- AutoCAD 2004, AutoCAD 2006, AutoCAD 2007
- MS – CIT ( Maharashtra State – Certificate of Information Technology )
Areas of Excellence :
- 8 Years of Experience in Cranes / Hydro mechanical / Heavy Engg. M/C Drawing and Design.
- Worked Extensively in Material Handling Equipment Mfg., Hydro mechanical, Irrigation & Infrastructure Industries.
- Worked Extensively in Mechanical, Structural drawings, Detailing and Assemblies.
- Successfully completed Projects in Auto-cad package for Hydro power, Irrigation Project.
Professional Experience Summary :
(1) Organization :- Tractebel Engineering Pvt. Ltd., New Delhi
- Designation :- ” Sr. Engineer - Hydro”
- Period From :- Sept 2008 To till Date
Company Profile :
Tractebel engineering is the SUEZ Group's engineering consultancy company for energy and infrastructure. We offer state-of-the-art engineering solutions and consultancy services to power, nuclear, gas, industry and infrastructure customers in the public and private markets. Tractebel Engineering is part of SUEZ Energy Services, one of the four business lines of SUEZ and the European leader in multi-technical services. SUEZ is an international industrial Group which provides sustainable and innovative solutions for the management of public utility services as a partner of public authorities, businesses and individuals.
My role :
- Design of hydraulic Gates, Hoists & Cranes.
- Preparation of detail project report (Hydro mechanical works).
- Review of detail project report (Hydro mechanical works).
- Preparation of preliminary drawings (General Arrangement Drawings).
- Preparation of proposal drawings.
- Attending technical discussion with clients & consultant to optimize the work.
- Quantity and cost Estimation of Hydro mechanical works. ( Hydraulic Gates, Rope Drum Hoist, Screw Hoist, E.O.T. Cranes, Gantry Cranes)
Major Projects Completed / in process :
- Project 1 : Arakot – Tuini Hydro Electric Project, Uttarakhand (3 x 27 MW)
Client : Uttarakhand Jal Vidyut Nigam Ltd., Uttarakhand
- Project 2 : Nandprayag Langasu Hydro Electric Project, Uttarakhand (4 x 25 MW)
Client : Uttarakhand Jal Vidyut Nigam Ltd., Uttarakhand
- Project 3 : Upper Marsyandi – 2 Hydro Electric Project, Nepal ( 600 MW )
Client : GMR Energy Ltd., Delhi
- Project 4 : Sarju – I, II, III Small Hydro Electric Project, Uttarakhand ( 7.5, 15, 10.5 MW )
Client : Jaguar Oversea Pvt. Ltd. Delhi
(2) Organization :- Aarti Infra Projects Pvt. Ltd., Nagpur, Maharashtra
- Designation :- ” Design Engineer”
- Period From :- July 2004 To Sep. 2008
Company Profile :
M/s Aarti Infra Projects Pvt. Ltd., one of the Contracting Company in Hydro mechanical And Material Handling Equipment (Irrigation & Hydro-Power) field in India. It takes turnkey contracts right from product design to finished project on site. It is equipped with excellent tool design and tool room departments. Its activities are Mechanical, Structural Equipment of Barrages, Dams, Power Houses, Cabins, and Workshop Sheds. Etc.
- Barrage Gates like vertical Gates (Fixed wheel & sliding Type), Radial Gates, Head Regulator gates, Sluice gates, Draft tube gates, Canal gates etc.
- Electrically operated Hoisting mechanism like Rope drum Hoists, Screw Hoist, Hydraulic Hoist and supporting structure, Gantry Cranes etc.
- Approach Bridges and supporting structure.
- Other Structural Steel items.
My role :
- Designing of Hydro Mechanical Equipment (Hydraulic Gates, Rope Drum Hoist, Screw Hoist, E.O.T. Cranes, Gantry Cranes)
- Preparation of preliminary drawings (General Arrangement Drawings).
- Preparation of proposal drawings.
- Preparation of Detailed drawings and Bill of materials for production/ purchase.
- Follow up of Design & Drawings with concerned Department for their final approval.
- Attending technical discussion with clients & consultant to optimize the work.
- Attending pre-bid meetings, tender evaluation etc.
- Quantity and cost Estimations.
Major Projects Completed / in process :
- Project 1 : Hydro-mechanical Equipment of AD- Hydro Electric Project, Himachal (2 X 96 MW)
Client : AD- Hydro Power Ltd. , New Delhi, INDIA
- Project 2 : Hydro-mechanical Equipment of Kuttiyadi Hydro Electric Project, Kerala (2X50 MW)
Client : Larsen & Toubro Ltd, ECC Div. Chennai, INDIA.
- Project 3 : Piping & Hydro-mechanical Equipment of Chandni Hydro Electric Project, Himachal (2X2.5 MW)
Client : Himalayan Crest Power Ltd, New Delhi, INDIA.
- Project 4 : Hydro-mechanical Equipment of Narmada Main Canal
Client : Sardar Sarovar Narmada Nigam Ltd, Gandhinagar, Gujarat, INDIA
(3) Organization :- Chandak Traders & Manufacturing, Nagpur, Maharashtra
- Designation :- ” Engineer ”
- Period From :- July 2000 To June 2001
Company Profile :
Fabrication of Structural Equipment and Material Handling System, Machining of various goods
CTC :
- Present CTC - 7.18 Lac
- Expected CTC - 9.0 Lac
-
September 4th, 2011, 01:32 AM
Post Count Number #5
RESSUME
RITESH PANDEY
E-MAIL :C4RITESH AT REDIFFMAIL.COM
CURRICULUM VITAE
Title : Mechanical Engineer,(Diploma in Year 2002)
Additional Qualification : MBA (Pursuing Symbiosis )
Main Technical Qualifications :
Mechanical Engineer having a field experience of 9+ years in several areas of hydro-electric projects including Site inspections/Quality Assurance, responsible for independent measurements & controls before concreting and/or allowance for main contractors’ mechanical erections, Site erections, non destructive tests of welded components, trash racks, penstocks, gates and fabrications; computer proficiency with most commercial software including AutoCAD.
Detailed Professional Experience :
2009 to till Date Karcham Wangtoo HEP, (1000 MW), Himachal Pradesh
Sr.Field Engineer. Jaiprakash Associates Ltd.
Welding Inspections & Erection of Penstock Liners at Site
- Responsible for the erection of Penstock Liners at Pressure Shaft.
- Joint fit-up controls that include checking of proper root gaps, bevel angles and cleanliness of joints.
- Controls of joint pre-heating temperatures.
- Execution of DP-Tests of roots after welding runs.
- Interpass inspections of welds.
- Control of proper interpass temperatures.
- Final inspections of welds after completion.
Fabrication of Penstock Ferules & Appurtenances
- Fabrication of Penstock Ferrules Dia.5000mm using ASTM 517 (Grade – F) plates.
- Fabrication of Transition Pipes, Bends, Manholes & Reducers.
- Development of Bends, Reducer and Transition Pipes using AutoCAD.
- Familiar with welding procedures & Welder Performance Qualification test (WPQ) according to ASME Boiler & Pressure Vessel Code, Section IX.
- Pre-heating & Post-heating as per IS-2825.
- Identification & rectification of weld defects.
2002 to 2009 Baglihar HEP, 1st Stage (450MW), J&K :
Field Engineer. Jaiprakash Associates Ltd.
2nd Stage EP’s Erection Inspections of all Hydro-Mechanical Works
- Erection of Bonneted Slide Emergency Gate with Flap Gate.
- Erection of Stoplogs Gate of Out Fall & Draft Tube.
- Engaged in Quality Assurance / Inspections of components 0f 2nd Stage Embedded Parts (EP’s) of all Stoplogs at Dam Site and Power House.
- Inspection of 1st Stage EP’s at Power House.
- Responsible for making all Measurement Sheets and Approvals.
- Regular interaction with Lahmeyer International GmbH, Germany, Engineer in Charge of the project.
- Erection of 30 tons Gantry Crane for Out Fall Gate.
Welding Inspections & Erection of Penstock Liners at Site
- Responsible for the erection of Penstock Liners at Pressure Shaft.
- Joint fit-up controls that include checking of proper root gaps, bevel angles and cleanliness of joints.
- Controls of joint pre-heating temperatures.
- Execution of DP-Tests of roots after welding runs.
- Interpass inspections of welds.
- Control of proper interpass temperatures.
- Final inspections of welds after completion.
Fabrication of Penstock Ferules & Appurtenances
- Fabrication of Penstock Ferrules Dia.5500mm using ASTM 537 (Class – 1) plates.
- Fabrication of Transition Pipes, Bends, Manholes & Reducers.
- Development of Bends, Reducer and Transition Pipes using AutoCAD.
- Familiar with welding procedures & Welder Performance Qualification test (WPQ) according to ASME Boiler & Pressure Vessel Code, Section IX.
- Hydro testing.
- Identification & rectification of weld defects after detection in NDT.
-
January 1st, 2012, 05:09 PM
Post Count Number #6
Resume
RESUME
AKSHAY SHARMA,
Email : akilikes AT gmail.com
Objective :
To keep myself dynamic, cooperative, self motivated and become successful professional. To show my ability, dedication and enthusiasm for work and to be a part of the growth oriented team with a challenging environment.
Educational Qualification :
- Matriculation from CBSE Board (2007)
- Diploma in Mechanical Engineering from Govt. Polytechnic Hamirpur H.P. (2010)
Work Experience :
- Presently working with M/s Patel Engineering Ltd. posted at Sawra-Kuddu Hydro Electric Power Project 111MW Jubbal (Shimla) Himachal Pradesh since July 2010 as a Junior Engineer.
Job Profile : Handle work and man power at Site and Workshop. Maintenance of every machinery. Prepare monthly report. Crusher Plant (250 TPH) and Batching Plant (H3N-120) commissioning done.
Summary :
- Basic Knowledge of manufacturing and production
- I believe that applied knowledge is power
- Ability to execute ideas effectively
- Enjoy with clients and teams
Skill & Accomplishment :
- Communicate effectively
- Technical knowledge
- Leadership quality
Industrial Training :
- On job training in Himachal Pradesh Public Work Department (HPPWD) Hamirpur for the duration of 28 days.
Extra Activities;
- Best NCC Cadet AT RD Selection Camp, Best Athlete of Solan in 2007.
-
January 31st, 2013, 01:19 PM
Post Count Number #7
Er. K.C. AGRAWAL, B.E.(CIVIL) :
ASSISTANT DIRECTOR ( RETD.), :
CENTRAL WATER COMMISSION :
Designer of Hydro – Mechanical Equipment i.e. Hydraulic Gates, Hydraulic
Hoists, Rope Drum Hoists, Screw Hoists Gantry / Mono – Rail / E.O.T cranes
Sub : Recruitment of Designer for Hydro – Mechanical Equipment
Dear Sir,
I understand from the advt. appeared in Shine.com that your Organization is looking for Hydro-Mechanical designer/Consultant. Therefore , I am submitting my Resume for your considerations.
I had retired as Assistant Director from Central Water Commission , Govt. of India in May 2000 after serving for more than 35 years , which includes nearly 22 years in the designs of Hydro – Mechanical Equipment in Gates Design Directorate ( N&W) beside 11 years in construction work i.e. 2 years in the construction of Aqueducts at Trishuli H.E. Project , Nepal and 9 years in the construction works at Badarpur Thermal Power Project , New Delhi .
While working in Gates Design Dte. , I had been associated with the designs of various gates and their hoisting equipment e.g. for some of the important projects namely Indira Sagar Project (M.P.), Sardar Sarovar Multipurpose ( Narmada ) Project (Gujarat), Kopili H.E. Project, Stage I & II ( Assam) , Dhansiri Irrigation Project ( Assam) , Mahi Bajaj Sagar H.E. Project ( Rajasthan), Godavari Barrage Project ( Maharashtra ){ Design of Hydraulically Operated FISH BELLY gates}, Sewa Hydel Project (J&K), Karnah Mini Hydel Project (J&K){ Detailed designs and fabrication drawings), Tenu – Bokaro Link Canal Project (Bihar){ Detailed designs and fabrication drawings} and many other projets .
After retirement , I am working as a freelance Designer in the field of Hydro – Mechanical Equipment i.e. Hydraulic Gates, Hydraulic Hoists, Rope Drum Hoists, Screw Hoists Gantry / Mono – Rail / E.O.T cranes and have provided detailed designs and drawings for Draft Tube gates and its operating 20 tonnes capacity Gantry Crane of Kurichu H.E. Project (Bhutan) , 40 tonnes capacity Electrically Operated Rope Drum Hoist & its Supporting Structure for Tail Race Tunnel gates of Larji H.E. Project (Himachal Pradesh) and detiled designs and drawings for various gates and their operating Rope Drum Hoists of Power House Complex of Igo Marchellong Mini Hydel Project (J&K) , Intake Service & Bulk Head gates and their hoisting equipment for Sewa H.E. Project, J & K.
I had provided my services as freelance consultant for Hydro – Mech. Equipment to M/s SMEC India Ltd. w.e.f. 15th Sept. 2005 till 20th May 2011).Provided my services as freelance consultant for Hydro – Mech. Equipment to M/S GVK Technical & Consultancy Services Pvt. Ltd. 23.08.2011 till 25th Sept.2012 AT Rs. 6000/- per day as Professional fees plus Service Tax as applicable plus Rs.1000/- per day as conveyance charges ( Non-taxable)
I would feel happy by providing my services , if an opportunity is given, to your Organization in the field of Hydro – Mechanical works.
Thanking You ,
Your’s faithfully
(K.C. AGRAWAL)
Resume
E.Mail : agrawal_kamal2002 AT yahoo.co.in
K. C. AGRAWAL
Father's Name Late Shri Lakshmi Prasad
Date of Birth May 17, 1940
Qualification :
i) B.E. ( CIVIL) – 1ST Division – 1995 , JAMIA MILLIA ISLAMIA , New Delhi
ii) DIPLOMA IN CIVIL ENGG. – 2ND Division – 1959 , STATE BOARD OF TECHNICAL EDUCATION , U.P.
iii) HIGH SCHOOL – 3RD Division – 1955 , BOARD OF HIGH SCHOOL & INTERMEDIATE EDUCATION , U.P.
Professional experience :
1) After retirement from government service on 31.05.2000 till date .
Working as a freelance consultant in the field of design and drawing of Hydro – mechanical equipment for various projects namely Larji H.E. PROJECT , Himachal Pradesh, Kurichu H.E. Project, Bhutan, Igo Mercellong Mini Hydel Project, Leh ( Ladakh), J&K and SMEC India Ltd..and many other companies. ( Annexure ‘B’)
2. I had been working as Hydro- mechanical consultant with
SMEC INDIA LTD. W.e.f. 15th Sept. 2005 till 20th May 2011
3. 21st NOV.1964 Till 31st May 2000 ( i.e. Upto the date of Retirement on Superannuation ) -
Positions held as under EMPLOYER
a) GOVERNMENT OF INDIA MINISRY OF WATER RESOURCES
CENTRAL WATER COMMISSION :
i) ASSISTANT DIRECTOR : w.e.f. 18th Feb. 1997 to 31st May 2000 and EXTRA ASSISTANT DIRECTOR w.e.f. 17th April1978 to 16th August 1988 & 24th June 1991i.e approx. 19 years at Main Commission office at New Delhi
NATURE OF DUTIES :
Design of Hydro– Mechanical equipment i.e. Hydraulic Gates & their Hoisting equipment such as Rope Drum Hoists , Hydraulic Hoists , Screw Hoists , Gantry Cranes , E.O.TS’ and Mono – rail Cranes etc. (annexure ‘B’)
ii) ASISTANT ENGINEER :
( W.e.f. 17th Aug. 1988 to 23rd June 1991 )
At Meghna Investigation Sub – division , Shillong (Meghalaya ).
NATURE OF DUTIES :
Hydrological observations i.e. Gauge & Discharge observations on south flowing rivers from INDIA into BANGLADESH . (annexure ‘B’ ).
iii) SUPERVISOR (CIVIL) :
a) At Badarpur Thermal Power Project , New Delhi
( W.ef. 10th Sept. 1969 to 16th April 1978 )
NATURE OF DUTIES :
Supervision of construction of Water Treatment Plant including Acid Resistance Lining works , Fuel Oil Facilities Stage I &II Ash Handling Pump House, Construction of roads and Preparation of Tender and Contract Agreement documents etc.
(annexure ‘B’).
b) At Warangal Investigation Division, Hyderabad , A.P.
( W.e.f. 10th Jan. 1967 to 9th Sept 1969
NATURE OF DUTIES :
Misc. works at Divisional Head quarters.
c) At Trishuli Hydro – Electric Project , NEPAL
( W.ef. 21st November 1964 to 9th Jan. 1967
NATURE OF DUTIES :
Supervision of construction of TWO Aqua – ducts across river TRISHULI .
2. OVERSEAR (CIVIL) :
( W.e.f. 1st Feb . 1960 to 25th May 1964 )
EMPLOYER
M/S RAZA BUAND SUGAR CO. LTD. RAMPUR AND ITS SISTER CONCERN M/S RAMPUR DISTILLERY & CHEMICAL CO. LTD. RAMPUR , U.P.
NATURE OF DUTIES :
Construction and Maintenance of Factory including construction of machine foundations , Residential
Buildings and Roads etc. ( annexure ‘A’) .
EmoEmoluments at retirement :
Rs. 11575/- + allowances in the pay scale of Rs. 8000-275-13500
Place : Greater Noida - 201308 ( K. C. AGRAWAL )
Dated : 19.07.2011
ANNEXURE ‘A’ :
Details of practical experience w.e.f. 1st Feb. 1960 to 25th May 1964.
While working with M/S Raza Buland Sugar Co. Ltd. and its sister concern M/S Rampur Distillery & Chemical Co. Ltd., Rampur , U.P. I was the independent in charge of their CIVIL ENGINEERING section directly responsible to the Chief Engineer. During my stay in the organization I have got executed following important works under my supervision :
1. Planning & estimation of merger of Buland Sugar Factory Plant with Raza Sugar Factory Plant involving the following construction works, which were carried out successfully.
a) Boiler foundations of John Thompson make each having evaporation AT 50,000 Gls./ Hrs at 200 pressure including the foundation for their chimney of 7.0 ft. dia & 100 ft height .
b) Spray Pond of 5.0 lacs Gallons capacity alongwith its hot and cold water Channels including Pump House.
c) Building of Buland Boiling House and Sugar House at the back of Raza Boiling House.
d) Foundations for staging of 8 nos. High Speed Centrifugal Machines.
e) Foundation for 300 KW Alternator.
f) Foundation for 100 HP High Speed Vaccum Engine.
g) Foundation for 50,000 mounds capacity Molasses storage tank.
h) Construction of Sugar Godown of 80,000 sugar bags capacity.
i) Construction of Rum storage building including tank foundations.
j) Construction of Distillation & Fermentation Tower.
2. Day to day repairs and maintenance of factory , office and Residential Buildings including roads, sewerage & water supply system etc.
3. Surveying , preparation of construction drawings ,estimates , calling tenders & quotations , supervision of construction works and preparing contractor’s bill etc.
ANNEXURE ‘B’ :
Details of practical experience w.ef. 21st Nov. 1964 till 31st May 2000
A. First posting was at TRISHULI H.E. PROJECT , NEPAL , where worked w.e.f. 21st November 1964 to 9th January 1967 and supervised the construction of following works .
i) Construction of two Aqua- Ducts across river Trishuli , which consisted of
Following works :
a) Stone masonry works in piers , abutments and R.C. Pipes and Trough.
b) R.C. Trough to carry water from right bank to left bank.
c) 12 m diameter R.C. Pressure pipe to carry water from left bank to right bank.
d) Two steel bridges each having two spans of 190 ft. and 90 ft.
B. 2nd posting was at WARANGAL INVESTIGATION DIVISION , HYDERABAD, A.P., w.e.f. 10th Jan. 1967 to 9th Sept. 1969 , where I worked at divisional headquarter as Supervisor (HQ) to assist the Executive Engineer in day to day misc. works .
C. 3rd posting was at BADARPUR THERMAL POWER PROJECT , NEW DELHI w.e.f. 10th Sept. 1969 to 16th April 1978 , where I worked for the following works :
a) Construction of building of Water Treatment Plant – Stage –1 and foundations of equipment and Acid Resistance Lining work.
b) Construction of Ash Handling Pump House and foundations of equipment .
c) Construction of Fuel OIL & Facilities consisting of Pump House and foundations of equipment and oil & lubricant tanks of Stage I &II.
d) Construction of road along boundary wall of the project .
e) Preparation of detailed Estimates, Tender Documents , Contract Agreement
Documents, Scrutiny of Extra / Substituted / Absurdly High or Low Rated Item Statements and assistance to the Executive Engineer in finalizing the Technical Specifications and Terms & Conditions as may be put forwarded by tenderers .
D. On promotion to the Group ‘B’ post of Extra Assistant Director / Assistant Engineer w.e.f. 17th April 1978 to 17th Feb . 1997 and on further promotion to Group ‘ A ’ post of Assistant Director/ Assistant Executive Engineer w.e.f. 18th Feb 1997 till 31st May 2000 ( i.e. till retirement on superannuation ) I had worked in GATES DESIGN Dte. ( N & W ) and worked for :-
i) Preparation of preliminary designs , technical specifications , specification drawings of vertical lift gates , radial gates & stop logs and their hoisting equipment such as Rope Drum Hoists , Screw Hoists ,Hydraulic Hoists , Monorail / Gantry Cranes for various Hydro-Electric projects such as Mahi Sagar H.E. Project ,Rajasthan , Kopili H.H. Project ,Assam, Dhansiri Irrigation Barrage Project , Assam, Sardar Sarover ( Narmada ) Project, Gujarat, Indira Sagar Multipurpose Project, M.P. , Ranganadi H.E. Project, Arunachal Pradesh , Ghatghar Pumped Storage Scheme, Maharashtra etc.
ii) Preparation of Detailed designs and fabrication/ shop drawings for vertical
Lift gates and Rope Drum Hoists for Intake of Tenu – Bokaro Link Canal Project, Bihar , all gates for Karnah Mini Hydel Project , J&K .
iii) Development and detailed design of HYDRAULICALLY OPERATED FISH BELLY type gate which
are to be installed for the first time India , at Godavari Barrage , Maharashtra .
iv) Vetting of detailed design calculations and shop drawings of deferent types of gates and hoists of various projects e.g. Mahi Bajaj Sagar Project, Kopili H.E. Project , Tehri Dam Project , Indira Sagar Project , Chandil Dam H.E. Project, and various mini hydel projects of J&K State .
E. As Assistant Engineer , I was posted in Meghna Investigation Sub– division, Shillong , Meghalaya w.e.f. 17th
August 1988 to 23rd June 1991and worked for :-
Supervision of Gauge & Discharge Observations on southward flowing five rivers from India to Bangladesh under J.RC.
F. After retirement from Central Water commission on 31.05.2000
1. Worked as a freelance Designer in the field of Hydro – Mechanical Equipment i.e. Hydraulic Gates, Hydraulic Hoists, Rope Drum Hoists, Screw Hoists Gantry / Mono – Rail / E.O.T cranes and have provided detailed designs and drawings for Draft Tube gates and its operating 20 tonnes capacity Gantry Crane of Kurichu H.E. Project (Bhutan) , 40 tonnes capacity Electrically Operated Rope Drum Hoist & its Supporting Structure for Tail Race Tunnel gates of Larji H.E. Project (Himachal Pradesh) and detailed designs and drawings for various gates and their operating Rope Drum Hoists of Power House Complex of Igo Marchellong Mini Hydel Project (J&K) , Intake Service & Bulk Head gates and their hoisting equipment for Sewa H.E. Project, J & K.
2. Worked as freelance consultant / advisor to Cosulting Engineering Ltd. and Helcrow Consulting India Ltd. , Scott Wilson India Ltd., Tata Consulting Engineers, Soma Enterprises Ltd. , and Nirman Virdhi Constructions Ltd. on as and when needed bases.
3. Worked as HM CONSULTANT for SMEC India Ltd. for Hydro-Mechanical equipment w.e.f 15th Sept. 2005 till 20th May 2011.
4. Worked as freelance Consultant for Hydro – Mech. Equipment with M/S GVK Technical & Consultancy Services Pvt. Ltd. 23.08.201 till 24th Sept. 2012.
-
April 20th, 2013, 06:21 PM
Post Count Number #8
RESUME
SANJEEV KUMAR
E-mail : sylvania696 AT gmail.com
OBJECTIVE :
To learn and function effectively in an organization and able to deliver to the bottom - ine. To constantly upgrade my knowledge and skill and make a difference whatever I do.
TECHNICAL PROFILE :
2011 B.TECH. Degree in mechanical
From bhai gurdas institute of engg. & Tech.
affilated to P.T.U. and and secured an agg.of 64%.
2007 XII from H.P. BOARD, DHARMSLA and secured
agg. of 50%.
2005 X from H.P. BOARD, DHARMSALA and
secured an agg. of 55%.
EXPERIENCE one year three month experience in Afcons infrastructure ltd.
TECHNICAL SKILLS :
SIX months training in auto profile
Six weeks training on cold rolling mill from tata tinplate ltd .
Solid edge
Auto Cad
MS POWER POINT
MS EXCEL
ACHIEVEMENTS :
Have participate in game which is (badminton,volleyball,athlatics)and won prizes.
PERSONAL INFORMATION :
Date of birth :15-05-1989
Gender :Male
Nationality :Indian
Marital status :Single
Language :English, Hindi & Punjabi
Pradesh pin code :174013
LEISURE INTERESTS :
Listening to music
Playing badminton & volley ball
Riding bikes
Net surfing
Swimming
DECLERATION :
I do herby declare that the particulars of information and facts stared herein above are true, correct and complete to the best of my knowledge and belief.
PLACE :
DATE :
-
September 20th, 2014, 10:23 AM
Post Count Number #9
Experience in execution, erection & commissiong of hydro electric project
Curriculum vitae :
SANJITH B.G
PERSONAL OBJECTIVE :
To pursue a career in a highly dynamic, intellectually challenging and creative environment to further sharpen my skills and contribute to the organization growth by exploring my skills and abilities.
EDUCATIONAL QUALIFICATION :
** DIPLOMA EEE in 2005 at Govt. polytechnic, K R pet
** S.S.L.C from Govt. High School, in 1998.
WORK EXPERIENCE :
1. Company name : Pussaince De L’eau Power systems Pvt Ltd.,
Designation : Asst. Manager.(SS & AS)
Duration : 2006 to 20.07.2012.
Company and job profile :
Pussaince De L’eau provides end to end solutions for Hydro Power Plants with unit capacity of 50 MW. PDL Scope covers complete business development, contract execution, complete system engineering, inspection and delivery of goods from both imported and indigenous suppliers, erection at project site, pre commissioning checks, commissioning, operation and handing over the project to the end customer.
Technical Experience :
** Erection and commissioning of the TG Equipments, pre commissioning checks, commissioning, operation and hand over at site.
Work Responsibilities :
** Supervision for site leveling, Equipment’s Foundation marking.
** Supervision for unloading of TG Equipments,
** Erection and installation of Turbine, Generator, Transformer & power house auxiliary equipments like
1. Erection of turbine,
2. Erection of Generator,
3. Stator assembly, testing and installation.
4. Rotor assembly, testing and inserting.
5. Thrust bearing, Guide bearing assembly (DE & NDE).
6. Exciter assembly, testing and position.
7. Erection of Distributor assembly(Upper & lower nozzle assembly).
8. Erection of Inlet Pipe.
9. Erection of Dismantling joint before MIV.
10. Erection of MIV (Main inlet Valve)
11. Erection of turbine cone pipe, Guide vane assembly.
12. Erection of Draft tube assembly.
13. Erection of Panels.
14. Lying of Cables (Control & power) as per schedule & Drawings.
15. Termination of cables as per schedule & drawings.
16. Checking of logic circuits as per drawings,
** Erection and installation of Switch yard Equipments.
** Supervision for routing of the cooling water piping, oil piping for cooling and control of the Turbine Generator Equipment’s.
** Co-ordination with customer & supplier for the completion of the project within the Target Date.
** Maintaining material inward register, Site registers, construction drawings, Electrical & Mechanical drawings and Supplier documents.
** Preparation of site status/Progress and the same send to concerned Person/department
Projects Handled :
1. Awa Projects (2x2.5 MW – Pelton Turbine) - Commissioned Successfully.
2. Sahu Projects ( 2 x 2.5 MW- Frances Turbine)- Commissioned Successfully.
3. Simaron power Pvt,LTd,. (2 X2.5 MW-Frances Turbine)- Commissioned Successfully.
4. Jirah (2x2.5MW – Pelton Turbine) - Commissioned Successfully.
5. Mauji-II ( 2 X 3.5 MW – Pelton Turbine) – Commissioned Successfully..
6. BeasKund ( 3 x 3 MW-Frances Turbine) –Commissioned successfully.
7. Kurmi (3 X 2.65 MW- Frances Turbine) – Commissioned successfully.
WORK EXPERIENCE :
2. Company name : Kut Energy Pvt Ltd,.(3 X 8 MW)
Designation : Manager.(E&M)
Duration : 1.9.2012 to TILL DATE.
Work Responsibilities ;
** Supervision for site leveling, Equipment’s Foundation marking.
** Supervision for unloading of TG Equipments,
** Supervision of Erection / installation of Turbine, Generator, Transformer & power house auxiliary equipments.
** Maintaining material inward register, Site registers, construction drawings, Electrical & Mechanical drawings and Supplier documents.
** Preparation of site status/Progress and the same send to concerned Person/department
SKILL SETS :
Office Tools : MS Office 2010.
STRENGTHS :
Goal Oriented, Good team player with excellent communication skills and ability to learn/grasp things quickly. Easy and flexible adaptation to various working environment.
PERSONAL DETAILS :
1. Father’s name : - B.T Gopala raju.
2. Date of birth : - 28st September 1981.
3. Marital status : - Married.
4. Languages known : - Kannada, Hindi, English, Tamil.
5. Hobbies : - Listening to music, Biking.
6. Interests : - Cricket, Volley ball, chess.
I hereby declare that the above particulars furnished by me are true to the best of my knowledge and belief.
Date :
Place : (SANJITH B.G)
Reference :
1. Mr. Nagaraju Sr, Manager- Electrical Head.
2. Mr. Gowtham Rajashekar -Mechanical