-
April 7th, 2009, 10:57 PM
Post Count Number #1
www.lancogroup.com Lanco Group Vijayawada : Power plant Commissioning Engineer
Lanco Group Vijayawada : Senior Manager/Manager/ Deputy Manager - C&I
Website: http://www.lancogroup.com
Keywords: C&I - Site Engineering - Power plant
Designation: Senior Manager/Manager/ Deputy Manager - C&I
Experience: 8 - 13 Years
Location: Vijayawada
Job Description:
1) Pre commissioning and commissioning activities of GT control systems.
2) all local control panels for GTG sub systems
3) Gas Turbine Commissioning
Desired Candidate Profile:
1) The candidate should have experience in Commissioning of Combined cycle power (Gas Based).
2) Involved in complete C&I activities
Company Profile:
LANCO Group, a diversified conglomerate with an asset base of USD 500 million, is one of the fastest growing corporate entities in India. LANCO has more than two decades of experience operating in the core sectors of Power Generation, Power Trading, Realty, Engineering and Construction, Information Technology and Manufacturing.
Address:
Lanco Group
Plot No 229, Udyog Vihar Phase - 1
Gurgaon,Hariyana,INDIA 122016
To apply, send CV to Email Address: prince.mathew@lancogroup.com
-
June 4th, 2011, 09:39 AM
Post Count Number #2
8+Exp. in power plant Electrical project(90MW)
CURRICULAM VITAE
TAPASH KUMAR DALAI
E-mail : tapupower AT gmail.com
Objective :
To continuously improves myself through employing my technical Skills effective towards the benefit
of the company and in the process gain continuous Exposure, Reputation and experience.
TOTAL EXPERIENCE : - MAR- 2003 to till date,(8+ years) in POWER PLANT.
Working Experience :-
1. M/S - AARTI STEELS & POWER LTD.(90MW),ORISSA
as Sr.ENGINEER –ELECTRICAL(POWER PLANT)
Duration : From 15.05.2008 to till Date
PROJECT EXPERIENCE :-
Besides the power plant jobs as of erection team member active participation, right from project planning
( Cable schedule preparation, SLD preparation, Drawing preparation , Lighting arrangement of plant , Equipment inspection) to successful Errection & commissioning of 50 MW power plant equipments such as HT/LT
Panel & motor up to 630KW, AC Drives (ABB make), 63MVA Power Transformers, 5 MVA , 2.5 MVA Distribution
Transformers, 4.5MVA Converter Transformer, CT testing, PT testing, BATTERY Charger testing, Cable lying & 50MW
TG set with its related equipments.
Responsibilities :-
- Job Responsible includes planning & manpower Management. Looking after all sorts of Prevantive & Running
Maintenance activities of Complete Power Plant Electrical 90MW TGSet. with its auxiliaries,
Protection & metering system, synchronization of TG set with grid supply.
- 115 TPH AFBC, 200 TPH CFBC boiler &52 TPH waste heat recovery boiler with its axillaries and ESP (THERMAX) system.
- 132 kV LILO Transmission line and 132/33/11 kV switchyard with its associated switchgear.
- Power Distribution System consisting of 132KV SF6CB (ABB Make) /33KV VCB Panels (SIEMENS Make)/11kV VCB Panels / 6.6 kV
VCU Panels (ALSTOM Make )having Micom / Motopro/7SJ600/REM #545/SPAJ relays,VFD (ABB Make) LT switchgear panels
(PCC / MCC / PDB panels) having Schneider /ABB components.
- Knowledge of Setting of various microprocessor base realy like REM 545, PL300, SPAM 630 motor protection realy.
- Synchronization of TG power with Grid power as having power export and import facility. Starting of 1MVA
Diesel Generator and synchronization with another 1 MVA Diesel Generator in case of Black Out condition
- Also synchronize DG with Grid 11KV bus to maintain maximum demand within limit in case of TG failure.
- Operation & maintenance of ESP make ADOR POWERTORN & HIRECT.
- Co-ordination and monitoring with various departments for smooth functioning of the unit.
- Carrying out plant efficiency & defects analysis.
- Coordinating with State Load Dispatch Center.
- Coordinating and monitoring of various activities during Annual Shut Down.
- Identifying areas of improvement and recommending process modifications and equipment calibration to enhance operational efficiencies of the systems.
- Ensuring all operation activities are carried out as per SOPs(Standard Operating Procedures)
- Successfully developed and implemented Systems, procedures for plant operation.
- Responsible for Smooth Operation of the Power Plant with higher productivities & low equipment downtime.
- Efficient & effective operational and maintenance planning to reduce plant downtime.
- Trouble shooting & Trip analysis.
- Maintaining ISO 9000 and ISO 14000 records.
- Condition based monitoring of the equipment along with preventive maintenance. Ensure all preventive and corrective
Previous working :-
MSP STEEL& POWER LTD,(36MW) Jamgaon,(C.G)
Position : - ELECTRICAL ENGINEER (O&M)
Duration : - From 10/03/2003 to 30/04/2008
Responsibilities :
- Responsible for independent handling as a shift in charge of 36MW TG Set Operation with Grid power.
- Responsible for maintenance of all Switchgear panels (440volt),LTmotor (Squirellcage&Slip Ring induction motor), VCB, Air circuit breaker, Transformer, Generator Protection Panel, AVR Panel, Relay Testing, Breaker Testing all electrical equipment use in power plant.
- Responsible for Monthly Energy bill calculation of Gridco along with daily energy calculation of plant.
- Knowledge of A.C drives. Making of feeder.
- Knowledge of machining of various parts used in generator, turbine, AFBC boiler.
EDUCATION :-
1. B-Tech in Electrical Engineer From Rajastan University , Bhubaneswar
in the year 2009 .
2. Diploma in Electrical Engineering, from S.C.T.E &V.T , ORISSA
Year of passing 2002 .
3. Diploma in computer Application. Knowledge of MS Word, MS Excel,
Power Point.
Achievment :-
Various modifications in the plant resulting into the safe and easy and
uninterrupted Power Generation operations, Savings in auxiliary power
-
March 23rd, 2013, 11:14 AM
Post Count Number #3
SIVARAM PRASAD.Y
Email : svrm34 AT gmail.com
RESUME :
Objective :
To be associated with a progressive organization that provides an opportunity to apply knowledge and skills in order to abreast with latest trends and to be part of the team that works towards the growth of the organization and there by gain satisfactions in all aspects in the process.
Professional Qualifications :
1) B.Tech, in Mechanical Engineering with 62% from Mannan Institute of Science & Technology, JNTU, Hyderabad in the year of 2011
2)Intermediate,in MPC with 75% from Sri Visakha Junior College,Repalle,Guntur District in the year of 2007
3)S.S.C with 74% from Govt High School,Repalle,Guntur District.In the year of 2005
4) Computer Skills :
1) Catia (part design), MS Office etc.
Experience :
- Capitalization of Refinery Plants by splitting the total packages into individual equipments and components following design drawings and physical verification at site. This includes quantifying and apportioning cost as per market value.
Quick Learner, Team worker, Analyzer, Motivator, Result Oriented.
Total Experience : 1˝ Year
Presently I am working in Vardaan Projects limited as a Project Engineer. This is an Engineering consultancy organization providing techno-financial services, such as Capitalization, Valuation, Lander Engineering services as per IFRS guide lines. located at Hyderabad.
Company profile : The organization provides value based engineering solutions and services to clients in the field of Oil & Energy, Iron & Steel, Cement, Automobiles and Construction industry etc.
ROLE :
- Collection of design data such as layout drawings, schematic drawings, P&I drawings, and execution drawings.
- Review of all drawings and supplementing missing data by collecting necessary data from field.
- Bifurcating the total Plant & machinery into various individual equipments and components based on equipment identification, specification operating life and material of construction.
- Collection of the SLD (single line diagram) for preparing the electrical equipments list like transformers, switchgears etc. as per the electrical cable schedules we prepare the cable quantity.
- Reviewing all the contract documents (work order/purchase orders)/CWIP (capital work in progress) we will arrive the direct cost.
List of Project did :
1. Jindhal South West Limited, (JSW), Bellary : - Steel Plant Equipments like Blast Furnace, Corex, Oxygen Furnace, Cast House, Coke Ovens, Sinter & Pellet plants Plate Mill Cold and Hot Rolling Mills, CPP valuation work
2. Essar Oil Limited (EOL),Jamnagar : - Crude Oil Pumping & receiving stations COT, PIT (Process Intermediate Tanks) area, all refinery units like CDU/VDU, HMU, ISOM, DCU, DHDT, VGO, Utilities, ETP etc. Capitalization work
3. Essar Steel Limited, Hazira : - Steel Plant Equipments like Blast Furnace, Corex, Oxygen Furnace, Cast House, Coke Ovens, Sinter & Pellet plants Plate Mill Cold and Hot Rolling Mills Pipe Mill, Equipment Capitalization work
4. HPCL & HMEL, Batinda :- Crude Oil Pumping & receiving stations COT, PIT (Process Intermediate Tanks) area, all refinery units like CDU/VDU, HMU, ISOM, DCU, DHDT, VGO, Utilities, ETP etc. Capitalization work
Personal Profile :
- Nationality : Indian
- Date of Birth : 10-06-1990
- Sex : Male
- Martial status : Un Married
I here by declare that all the information provided above is correct to the best of knowledge and belief.
Thanking you
Yours sincerely
Y.SIVARAM PRASAD