-
March 24th, 2009, 07:11 PM
Post Count Number #1
Mechanical Piping Supervisor Saudi Arabia : Al-Dossary Group
Al-Dossary Group of Companies Saudi Arabia : Mechanical / Piping Supervisor
Keywords: Mechanical / Piping Supervisor, Engineers
Designation: Mechanical / Piping Supervisor
Experience: 3 - 5 Years
Location: Saudi Arabia
Compensation:
NEGOTIABLE SALARY with FREE Food and Accomodation
Education:
UG - Diploma - Any Specialization
PG - Post Graduation Not Required
Industry Type: Chemicals/ PetroChemical/Plastic/Rubber
Functional Area: Production, Maintenance, Quality
Posted Date: 24 Mar
Job Description:
Position required for a Petro-chemical company (ARAMCO CONTRACTORS)
Desired Candidate Profile:
Candidates having Engineering Degree/Diploma qualification and 3 - 5 years experience in the related field. Interested candidates may send their CV by email. Interviews by the Client will be conducted from March 16 - 20 th at Cosmic Travels office.
Company Profile:
The Company a highly reputed Aramco Contractor for decades and specialized in the field of Petro Chemical Industries / maintenance services etc. Located in the Industrial city of Dammam, eastern province of Saudi Arabia.
Executive Name: Backer
Address:
Cosmic Travels and Placements PvtLtd
1st Floor, Lokesh Towers,
No. 18, Kodambakkam High Road,
Nungambakkam,
Chennai,Tamilnadu,INDIA 600034
Email Address: apply@cosmicmanpower.com
Telephone: 91-044-28269286
Keywords: Mechanical / Piping Supervisor, Engineers
-
June 7th, 2011, 02:24 PM
Post Count Number #2
Steve Mullin Boiler/piping supervisor
STEPHEN JOHN MULLIN
E-MAIL : info AT stevemullin.co.uk
WEBSITE : (please view for complete experience profile) www.stevemullin.co.uk
DRIVING LICENSE : FULL UK
PROFILE :
A hard working multi skilled and conscientious individual, who is capable of using his own initiative when necessary, and works well in multinational & multifunctional teams, yet is equally at ease on his own, being proactive, takes initiative also has ability to work under pressure and meet deadlines.
EDUCATION :
Bewsey High School Warrington : 1978-1984
Art, English, Maths and Technical Drawing CSE -GCSE
Further Education :
North Cheshire College (Padgate)
C & G Engineering 1987-1988
Deeside College Chester :
AutoCAD LT 98 Design & Construction 1999
Business IT & Computing Knowledge :
Microsoft : Word, Excel, PowerPoint, MS Project 98 & 2000
Autodesk : AutoCAD 2000, AutoCAD 2007, Autodesk Inventor Essentials
Additional Information
- Welding experience to date has been working with Stainless & Carbon Steel’s using TIG, MIG and MMA processes on seamless pipe work from 1 mm to 20 mm wall thickness and 2 mm to 30 mm thick plate work.
- Conversant with ASME/ANSI,AWS,API,BS, & ASTM Codes and Standards
- SCATS (CCNSG) No - 583195
- Confined Space Entry Certificate, Cert No :
- IPAF Scissor Lift Certificate, Cert No : OP/0213778
EMPLOYMENT HISTORY
AE&E Inova AG – Progressive Germany Ltd
Water Steam Cycle Pipe Erection & Pressure Testing Supervisor Jan 2011 – Present
On completion of the 2 boilers I was transferred to assist with the erection and pressure testing of the entire pipelines on the WSC systems, reviewing the P&IDs and all ISOs for correct installation of all systems prior to final inspections with the client and then releasing the systems for pressure testing to BS-EN 13480-5, finally completing the PT Test Pack Documents for hand over to the client.
Boiler Supervisor Aug 2010 – December 2010
During the role of Boiler Supervisor Stephen was employed after the project had already started which meant he had to get involved very quickly with the coordination off all daily boiler erections activities and work schedules, working very closely with the site management team Duro Dakovic Croatia. (at times over 100 men on site working on the 2 boilers)
Successful boiler pressure test line 2 in Newhaven!!!! (Information from AE&E)
Today we have successfully passed the boiler pressure test for the second boiler!!!
Despite a delayed start on site in mid March, the Newhaven project team has managed to execute the two boiler pressure tests now two weeks ahead the contractual schedule. This second pressure test is a big client payment milestone and it was important to achieve it in November so that the payment can be made in 2010. The already tight schedule with a 11 month erection time for a two line plant was accompanied by the usual difficulties of late deliveries, interrupted working progress and unprepared subcontractors for English construction sites.
Our special thanks go to the Newhaven Site Team which did anything possible in the last month to achieve the milestones.
ASL Industrial Solution Co, Ltd (Thailand)
Project/Installation Engineer Feb 2009 – January 2010
Final structuring of the new company in Rayong, offering the services of Air Cooled Heat Exchanger & Fin Fan Optimization, Service/Installation & Repair.
Completing site surveys within the oil and gas industry in all parts of Asia (Malaysia-Philippines-Indonesia & all other parts of Thailand) submit site proposals and complete RFQ –Tenders for the clients.
Supervising & overseeing the installation of Air Cooled Fin Fans and all associated piping systems.
Employing the new engineering staff for the company and setting out the new quality and engineering procedure documents and the new marketing strategy for the procurement of new orders.
ASL Air Exchanger Service Ltd (Middleborough)
Quality Manager/Assistant Project Manager July 2008 – Feb 2009
N.U.R Power Station - Kulim Hi Tech Park, (Malaysia)
Duties : Project Management & Supervision of the refurbishment on an ACC (Air Cooled Condenser – under vacuum).
This project is the first of its kind (that we know of) ever to be completed on a GEA A-Framed vacuum condenser; it consisted of installing 8736 stainless steel repair sleeves by means of the Hydro Loc Expansion Process.
The sleeves have been installed in the condenser due to the corrosion of the existing condenser tubes.
Tasks involved producing the project engineering schedule and updating weekly, submitting weekly and monthly reports to the clients On-Site Engineering Consultants (SKM – Sinclair Knight Merz).
Produce the quality plan and arrange welding procedures in conjunction with the local welding inspectors so that the welding could be completed in line with the clients site procedures, all welding completed was with T.I.G manual welding process (2,112 mtrs of C/S & 1,344 mtrs of 0.5mm St/St to 25mm C/S).
Arrange meetings with local sub-contractors and place orders for the engineering work to be completed, control of all engineering staff on site.
Over see the hot commissioning by others and sign off all the QA documentation for the project ready for hand over to the client via approval from the clients On-Site Engineering Consultants (SKM – Sinclair Knight Merz).
RJM International ltd (Winchester) Aug 2007 – June 2008
Mechanical & Installation Supervisor/Assistant Site Manager
AES - Kilroot Power Station (Belfast)
Duties : Management & Supervision of all mechanical installation works within the boiler and coal crushing mills, commissioning and mill balancing and boiler optimization, completion of as built drawings. Attending daily and weekly site meetings, updating the client with weekly reports and progress schedules, supervision of all mechanical fitters and welders, submitting method statements & Risk assessments for approval, and compiling the Project CDM H&S File ready for the final handover via approval from the clients On-Site Engineering Consultants PB Power (Parsons Brinckerhoff.) to be passed on to the client for contract completion.
NPTC – ASL (Thailand) Oct 2006 – Dec 2006
Mechanical Supervisor
Duties : Supervision of the refurbishment off air cooled heat exchangers at IRPC Petro Chemical Plant & PTT Petro Chemical Plant Rayong on their annual turnaround assisted by the NPTC Mechanical work force based in Rayong.
N G Johnson LTD & Ensign Site Services (Ellesmere Port) Jan 2006 – Aug 2007
Mechanical Erection Supervisor/Project Engineer : (London)
Duties : Supervision of the installation of a new Clinical Waste Incinerator for Grundons Waste Management Ltd in London, work scope encompassed, attending daily and weekly site meetings, updating the client with weekly reports and progress schedules, supervision of all cranage heavy lifts, Steel erectors, mechanical fitters and welders, method statement approval, receiving and updating drawings to suit new plant modifications, hot commissioning and final plant hand over to the client.
Ensign Site Services (Ellesmere Port) May 2005 – Jan 2006
Position : Mechanical & Installation Supervisor
Schott Jena Glass, GmbH, Germany - Cleanaway Incineration Plant, Ellesmere Port
Corus Strip Steel Plant, Deeside - Sanden, Die Cast plant, France
Various fabrication/installation and commissioning works on a Camlaw Furnaces/Clinical and Chemical Incinerators during the annual plant shutdowns at the above sites
Henkel Consumer Adhesives (Winsford) March 2004-March 2005
Position : Projects Engineering Draughtsman & Sub Contractor Coordinator CDM-Project Connect 4, Construction of new 110,000 sq ft machinery and distribution centre
Duties : To produce machinery drawing layouts for the positioning of new plant and relocation of existing plant, including new Stainless Steel vessels, pumping systems, air, water and gas services for the plant and machinery.
To produce layout drawings for the planning supervisor to approve prior to submission to the local authorities for acceptance of the new building and also change of use notices, including the following, new effluent pit c/w new foul drainage, compressor/transformer house, sprinkler system, water holding tanks and subsequent services for the distribution centre and toilet block extension.
To procure fixed price quotations from manufacturers for the supply of new Stainless Steel vessels, new pipe work and pumping systems, place subsequent purchaser orders, expedite/inspect and sign off the manufactured items at the supplier manufacturing base.
Also appraise and obtain fixed price quotations for the installation and re-siting of all plant and machinery from sub contract site installation companies.
Produce working programmes of installation of all items of equipment, ensure receipt of all necessary method statements and risk assessments from sub contract companies and carry out random contractor safety audits, control and issue permit to work and hot work permits to contractors.
SJM Projects Ltd Wrexham 1999-2004
Design and installation of Stainless Steel and Carbon Steel vessels, pipe & pumping systems, supervising all trades including coded welders, fabricators, fitters and riggers, procure materials and organise daily work schedules for fabrication and plant shutdown on client sites, marketing and bringing in new enquiries/tenders, estimating and converting tender documents into firm orders.
Chester Fabrications Ltd (Wrexham) 1997-1999
Employed as workshop manager, duties included supervision of the manufacture of water cooled extraction ducting and water cooled panels for the steel industries, procurement of materials, produce and implement manufacturing schedules for multi skilled workforce, liaise with drawing office regarding design changes to issued drawings, also liaise with on site erection teams to ensure timely deliveries to site
Dolphin Fabrications Ltd (Flintshire) 1993-1996
Employed as Mechanical Fitter/Welder, Supervising a day works contract on the Pet foods site at the Prosper De Mulder Granox Plant in Widnes Merseyside, duties consisted of, setting up and alignment of process pumps and designing site run pipework systems and the installation and subsequent commissioning of whole process plant systems.
G W Engineering (Boiler valve Maintenance Ltd - Liverpool) 1991-1993
Employed as Mechanical Fitter, refurbishing medium pressure steam boilers on client sites within the UK, overhauling steam valves, safety, safety relief, main stop and blow down valves, refurbish boiler feed pump systems.
Play Structures Ltd (Warrington) 1990-1991
Employed as Construction Supervisor on various sites in the UK and Ireland, setting out and installing structural steel modules in leisure centres
Worsley Site Services Ltd (Leigh) 1988-1990
Completed final two years as apprentice Mechanical Fitter, carrying out refurbishment and the commissioning of high pressure water tube boilers, overhauling coal crushing equipment, coal feeder conveyor systems, working with rigging crews setting up heavy lifting winching systems for lifting equipment in excess of 30 ton units, carry out boiler breakdown repair work at very short notice working shifts of 24 hours to minimise boiler down time for the client.
In the final year I was selected to be placed on the permit to work issuing procedure system
CEGB Fiddlers Ferry Power Station, Apprentice (2 year scheme) 1986-1988
Craft training in Mechanical Fitting, encompassing College and course work, shown all aspects of safety awareness whilst working on an operational power station, working with tradesmen on the day to day maintenance of the plant and machinery
End Systems Commissioning Ltd, Apprentice Engineer 1985-1986
Redpath Dorman & Long, Apprentice Draughtsman
-
July 10th, 2011, 08:43 PM
Post Count Number #3
Mr.
RESUME
Mohamed Fazal
E-mail : afm_fazal AT yahoo.com
ABOUT ME
Keen conscientious and I enjoy meeting people. I get on well with people and can work either on my own or part of a team. I can adapt to any environment and would like to use my skills to contribute positively to any work situation. I am keen on a structured career.
EDUCATION
- Passed G.C.E. (A/L) in Commerce stream (2001).
Subject Grade
Accounting C
Business Studies C
Economics S
Common General Test 058 Marks.
- 1998 G.C.E. (O/L) Examination
Subject Grade
Science C
English C
Mathematics C
Tamil Language & Literature C
Social Studies C
Commerce& Finance C
Religion C
Sinhala S
PROFESSIONAL QUALIFICATION
- Currently following Professional certificate of marketing, conducted by Charted institute of marketing (CIM)
- Passed Fundamental of marketing as a subject of certificate level of charted institute of marketing. (CIM)
- I have successfully completed Bachelor of Pharmacy conducting Ceylon medical college council via Kama Raj University in India.
- Registered qualified pharmacist Under Ceylon medical council
- Registered student of charted institute of marketing.
- Completed programming of visual basic in the Golden Key Institute of Computer Technology Ltd.
Employment History
Medical Delegate
Platinum Pharmaceutical Pakistan ltd,
CIC Pharmaceuticals
Kew road
Colombo 02
From April 2010 to date
Area : North western, North central and Negambo
Medical Representative,
Brooks Pharmaceuticals
Mansel Ceylon limited
AEC Building (2nd Floor)
140, Vauxhall Street
Colombo 02
From April 2007 to April 2010
Area : Colombo suburbs, Sabargamuwa and upcountry
Medical Delegate
Platinum Pharmaceutical Pakistan ltd, agency
Harcourt’s (pvt) limited
14 Station Road
Dehiwala
From May 2006 to April 2007
Area : Negambo (Peliyagoda up to puttlam, in Kandy road up to nittambuwa)
Medical delegate (Trainee)
Platinum Pharmaceutical Pakistan ltd.
Mansel Ceylon (pvt) ltd
140, Vauxhall Street
Colombo 02
From November 2006 to May 2006
Area : Negambo (Peliyagoda up to puttlam, in Kandy road up to nittambuwa)
Assistant Pharmacist
Cargills (Ceylon) Ltd
From April 2003 to November 2006
Professional Experience
Medical Promotion officer – Platinum Pharmaceutical ltd
Company Profile :
- Platinum Pharmaceutical is the Company of manufacturing the dental care products in Pakistan and market leader in Pakistan for oral care Pharmaceuticals
Work Involved :
- Promoting dental care pharmaceuticals as a selective target audience of
1. Maxillofacial Surgeons
2. Dental Surgeons
3. Dental Students
4. Dental Technicians
- Regularly visit to the target audience and ethically promote our product and identify their needs and wants.
- Analyze the feedback using Retail pharmacy and the distributer.
- Shared responsibility to ensure implementation of ethical promotion related activities (Sales representatives, Coordinator’, Divisional manager, Brand Manager)
- Ensure good PR between Target audience, pharmacy, and Pharmacy representatives from time to time plan and carryout activity which will enhance such PR.
- Coordinating and monitor the distributor in order to achieve the channel targets.
- Daily calls reports and monthly meeting with the management on channel growth and relative conflicts
- Conducting the product quality awareness workshops of over the counter products for the distributor and the sales team.
- Shared responsibility of new product development in the local market
Medical Delegate - Brooks Pharmaceutical (pvt) ltd
Company profile :
- Brooks Pharmaceutical is one of the company in which manufacturing several Europe product with consisting license under brand leader.
Works involve :
Promoting dental care pharmaceuticals as a selective target audience of
1. Consultants specially Surgeons
2. General practitioner
3. Dental practitioner
4. Clinical Staff like Senior Regis tar, Registrars H O And SHO
- Regularly visit to the target audience and ethically promote our product and identify their needs and wants.
- Analyze the feedback using Retail pharmacy and the distributor.
- Shared responsibility to ensure implementation of ethical promotion related activities (Sales representatives, Coordinator’, Divisional manager, Brand Manager)
- Ensure good PR between Target audience, pharmacy, and Pharmacy representatives from time to time plan and carryout activity which will enhance such PR.
- Coordinating and monitor the distributor in order to achieve the channel targets.
- Daily calls reports and monthly meeting with the management on channel growth and relative conflicts
- Conducting the product quality awareness workshops of over the counter products for the distributor and the sales team.
- Shared responsibility of new product development in the local market
Medical Delegate – Platinum Pharmaceutical ltd
Company Profile :
- Platinum Pharmaceutical is the Company of manufacturing the dental care products in Pakistan and market leader in Pakistan for oral care Pharmaceuticals
Work Involved :
- Promoting dental care pharmaceuticals as a selective target audience of
5. Maxillofacial Surgeons
6. Dental Surgeons
7. Dental Students
8. Dental Technicians
- Regularly visit to the target audience and ethically promote our product and identify their needs and wants.
- Analyze the feedback using Retail pharmacy and the distributer.
- Shared responsibility to ensure implementation of ethical promotion related activities (Sales representatives, Coordinator’, Divisional manager, Brand Manager)
- Ensure good PR between Target audience, pharmacy, and Pharmacy representatives from time to time plan and carryout activity which will enhance such PR.
- Coordinating and monitor the distributor in order to achieve the channel targets.
- Daily calls reports and monthly meeting with the management on channel growth and relative conflicts
- Conducting the product quality awareness workshops of over the counter products for the distributor and the sales team.
- Shared responsibility of new product development in the local market
Assistant Pharmacist –Cargills Ceylon ltd
Company profile :
- Cargills is the large supermarket chain in srilanka and it has contain 117 outlets overall island
Work Involved :
- Dispensing Pharmaceuticals upon a prescription and over the counter products.
- Maintain the prescription book and submit to the authorized officer whenever they a request.
- Maintain the pharmacy counter as system wise in order to facilitate the dispensing
- Merchandise over the counter products
- Preparing the monthly roaster among the team member
- Daily perpetual by the system wise to reduce the stock taking adjustment and adjust the physical stock.
- Preparing the order in order to internal purchase twice a week.(consider the weekly sales)
- Monthly grand stock taking
- Participating pharmacy related discussion meeting and training such as patient counseling
- Understand the company decision making process to make efficient local branch operation
LEADERSHIP & SPORTS
- President of commerce union at the collage(2000/2001)
- Vise president of Muslim majlish at the collage.(1998/2002
- Treasure of the “trust” house at the collage.
- Participated In College Sports Meet Activities.
-
July 29th, 2011, 09:55 PM
Post Count Number #4
Curriculum Vitae.
G. UNNIKRISHNAN NAIR
Email : unni. nayanam AT gmail.com ; unni.nayanam AT live.com
Application for the post of :Piping Supervisor ( Fabrication & Erection )
Educational Qualification - Degree (University of Kerala – 1977-1980 Batch)
Technical - Diploma in Mechanical Engineering
Computer Knowledge in Cobol , Basic, dbaseIII plus, Ms words & Excel.
Languages Known
Work Experience -
- English, Hindi & Malayalam
Total 19 Years in Gulf & India
ERSAI Caspian Contractor L.L.C ; KAZAKHSTAN
Piping Supervisor ( Senior )
Galfar Oman (P.D.O Harweel Project )
Piping Supervisor
Q.G.M Group L.L.C , Hamriyah Freezone , Sharjah. U.A.E
Rig Construction Supervisor .
Nov. 1997- June. 2002 Madina Group WLL, Doha , Qatar.
Position Held Piping Supervisor
Jan. 1992- March 1997 Metal Crafts (Engineers & Contractors) Mumbai, India
Position Held Piping & Structural Supervisor
Plant Experience .
Feb. 1992-Jan. 1997 Reliance petroleum Hazira , Gujarat, India Through E.C.C Construction Group
Fabrication Supervisor ( Structural/Piping )
Nov. 1997 – June 2002 Madina Group WLL, Doha , Qatar.
Position Held Fabrication Supervisor ( Structural/Piping )
April 2000 – May 2001 Qatar Vinyl Project – Mesaieed , Doha , Qatar (Through IEMSA Impianti S.r.l )
Position Held FOREMAN ( Structural / Piping )
Aug. 2001- May 2002 Mansal Offshore , Qatar (Through Madina Group )
Position Held FOREMAN ( Rig Maintenance )
June 2002 – Sept. 2008 Q.G.M Group LLC , Hamriya Freezone,
Sharjah, Dubai .
Position Held RIG CONSTRUCTION SUPERVISOR
Jan. 2009 – June. 2009 GALFAR Group , OMAN
Position Held
Nov.2009 – Nov.2010 Piping Supervisor ( Fabrication & Erection )
ERSAI Caspian Contractor L.L.C ;KAZAKHSTAN
Piping Senior Supervisor ( Fabrication & Erection )
Rig Experience Structure. : (Hull Steel) Side Shell, Cantilever, Sub base, Sub Structure, Drill floor, Accommodation, Leg Extension, Helideck, Turret/Buoy etc.
Plant & Rig Experiences Piping : HPMUD, Cement, Choke & Kill LPMUD, Foam & Firewater System Bilge & Ballast System, MUD Processing System, Service Lines, Oil & Gas Plant, Refinery Piping / Structural Fabrication & Erection etc.
PROJECT EXPERIENCES
1. Independently Completed & Commissioned one of the Petro Chemical Plant (Aromatic Plant) for RELIANCE PETROLEUM INDUSTRIES-Gujarat-India.
2. Independently Completed & Commissioned QVC Plant for QGPC-QATAR thru KRUPP UDE-Italy from Sub Contractor MADINA Group-Qatar.
3. Independently Completed The Maintenance (Shutdown) work for BP-ARCO in Qatar Offshore thru MANSAL OFFSHORE.
4. Independently Completed & Commissioned The New Drilling RIG project for THULE POWER-Norway thru QGM GROUP-UAE.
5. Worked for the HAWEEL Project for PDO-Oman.
6. Independently Completed The Piping & Structural Fabrications for EXXON MOBIL Project in Kazakhstan thru ERSAI Caspian Contractor L.L.C- Kazakhstan.
-
July 30th, 2011, 07:07 PM
Post Count Number #5
ALEXANDER.D
E-mail : alex09686 AT gmail.com
OBJECTIVE :
Seeking a position to expose my skills and abilities to the satisfication of the esteemed concern and pleasing the heads and my subordinates and the clients.
EDUCATIONAL QUALIFICATIONS :
Sr. No Qualifying Degree Name of Instution Studied Year of Passing Percentage
1 Bachelor degree in
MECHANICAL ENGG. Vinayaka missions university, Aarupadai veedu institute of tech,chennai.
Apr 2011 64%
2 Diploma in
MECHANICAL ENGG. Krishnaswamy Memorial Polytechnic College,Cuddalore.
Apr 2007 63%
3 10 th Std. St joseph’s Matrc Hr. Sec School,cuddalore. Apr 2000 64%
CERTIFICATIONS :
- CNC LATHE & MILLING
- MECHANICAL CADD
- PRO/E
- M S OFFICE
AREAS OF INTEREST :
- Fabrication and Erection
- Production
- Refinery
- Off shore
- Aeronautical mechanic
- Boiler
- Turbine genarators
- Piping
- Automobiles
OTHER ACTIVITIES AND HOBBIES :
- Reading books and listening music
- Playing foot ball