-
March 24th, 2009, 07:01 PM
Post Count Number #1
www.saipem-india.com Project Services Ltd Chennai : Piping Material Engineer
Saipem India Project Services Ltd Chennai : Piping Material Engineer
Website: http://www.saipem-india.com
Keywords: Material engineer , Piping material engineer , Piping material specialist , piping material
Designation: Piping Material Engineer
Experience: 5 - 10 Years
Location: Chennai
Education:
UG - B.Tech/B.E. - Any Specialization
PG - Any PG Course - Any Specialization
Industry Type: Oil and Gas/ Power/Infrastructure/Energy
Functional Area: Other
Posted Date: 24 Mar
Job Description:
Preparation of Plot plan, Piping Layout, Equipment Layouts.
Preparation & Checking of Isometrics, Bill of material, Pipe Supports,
Preparation of Piping class, Piping Material Specification.
Preparation of Technical Specifications, Material validation Technical Bid Analysis, Purchase Order Requisition.
Preparation of RFQ, MTO.
Creation of Piping Classes in GESPI is an added advantage.
Desired Candidate Profile:
Preparation of Plot plan, Piping Layout, Equipment Layouts.
Preparation & Checking of Isometrics, Bill of material, Pipe Supports,
Preparation of Piping class, Piping Material Specification.
Preparation of Technical Specifications, Material validation Technical Bid Analysis, Purchase Order Requisition.
Preparation of RFQ, MTO.
Creation of Piping Classes in GESPI is an added advantage.
Company Profile:
100% subsidiary of Saipem Group, leading International EPC Contractor (Part of the Eni S.p.A Italy), involved in Offshore/Onshore, Oil and Gas Sector, LNG, Maritime Works, Pipeline, Refinery, Petrochemical and Chemical Projects worldwide. Our activities include
Project Management
Engineering
Procurement
Site Supervision
Commissioning and
Maintenance.
Executive Name: Vinod
Address:
Saipem India Project Services Ltd
YARLAGADDA TOWERS, # 4, Fourth Lane,
Off Nungambakkam High Road,
Nungambakkam
Chennai,Tamil Nadu,India 600034
Email Address: g.vinodkumar@saipem-india.com
Telephone: 9884415334
Keywords: Material engineer , Piping material engineer , Piping material specialist , piping material
Last edited by Guest-IJT; May 16th, 2011 at 12:41 PM.
-
May 16th, 2011, 12:41 PM
Post Count Number #2
IJT addict
Sir can please give me this opportunity.
PROFESSIONAL RESUME
Name : M.KAMALAGANESH
Date of Birth : 1978
Marital Status : Married
Qualification : Mechanical (ITC)
Year of Passing : 1998
Address : No.60/23, Buddhar Street,
East Tambaram,
Chennai – 600059
E-mail : kmokamal AT gmail.com
Present Number : 0091 8056110082
Passport Details : B3737996
Work Expertise : Total year of experience: 10 Years
In preparation of Electrical system drawings
and Power plant GAS line & GIS drawings
-Conversant with Auto-cad 2000, 2007 &
2009 -Conversant with operation Packages Like,
DBASE, MS word. MS Office up to XP PACKAGE
Languages : Tamil & English
Field of Specialization
Presently Working:- From May 2008 to Till date
Working: - EMIRATES TECHNICAL ASSOCIATES (ETA),
Power Projects Division (PPD)
P. O. BOX – 3532
Salam Street,
Abu Dhabi, U.A.E.
Field of Specialization Electrical AutoCAD (Drafting) / Design Assistant
ETA is one of the leading multinational Contractors, who are engaged in construction, erection, installation and commissioning of 220kV, 132kV, 33kV Substations and 11kV switching stations to various facilities viz., TRANSCO
(Abu Dhabi Transmission & Despatch Company)
Role & responsibilities drafting: -
Preparation of design and single line diagrams, Equipment layout and co-ordination drawings in the substation. Earthing layout, cable Ladder (or) tray layout, cable route layout and with in bill of materials. Lighting layouts, small power layouts, lightning protection layouts, potential equalizing grid layouts, switchgear fixing layouts, cable support structure layouts and panel support structure layouts etc. Finally to prepare the As built drawing when the installation of a system is completed. To maintain the drawings / documents as per ISO norms.
Projects Involved (Abu Dhabi - UAE):-
1. 132/11kV Substation at DELMA ISLAND and associated works - Abu Dhabi UAE,
Contract No: N-3273 - (Client – M/s. Transco)
2. New 132/33kV GIS Substation in KHOR KHWAIR – Abu Dhabi UAE,
Contract No: N-4263.1B - (Client – M/s. Transco)
3. 220/33kV Grid Station at UMM AL OUSH COMPLETE NEW SUBSTATION – Abu Dhabi UAE, Contract No: N-2107 - (Client – M/s. Transco)
4. 132/22kV Grid Station at RAHA BEACH – Abu Dhabi UAE,
Contract No: N-4886 - (Client – M/s. Transco)
5. New 132/22kV Primary Substation for RAHA-A – Abu Dhabi UAE,
Contract No: N-5208 - (Client – M/s. Transco)
6. New 132/11kV Primary Substation for Danet Development at Sector E40 –
Abu Dhabi UAE, Contract No: N-5208 - (Client – M/s. Transco)
7. New 132/11kV Substation at W41 - Abu Dhabi UAE,
Contract No: N-5208 - (Client – M/s. Transco)
Period: From Oct. 2005 to 2008 April
Field of Specialization Electrical AutoCAD (Drafting) / Design Assistant
LARSEN & TOUBRO LIMITED,
ECC Division – EDRC (Electrical)
Mount Poonamallee Road
Manapakkam, P.B. No. 979,
Chennai – 600 089. INDIA
Projects Involved (India): -
1. Plant Electrification of 4x250 MW STPP for O.P. Jindal Power Ltd. At Raigarh.
2. 400 kV Khammam & Gazuwaka (Extn) Substation associated with System Strengthening - V For PGCIL At Andhra Pradesh
3. 400/220 kV Hassan (New) Substation package associated with System Strengthening VII in southern Region For PGCIL At Hasaan
4. SUBSTATION PACKAGE FOR RAIPUR, ITARSI, PONDA, SEONI and VAPI For PGCIL At Raipur Itarsi Ponda Vapi
5. 400kV/220kV/33 kV Switchyard For 4x250 MW Units Raigarh Thermal Power Project For Jindal Power Ltd. At Raigarh
6. Bisalpur - Jaipur Water Supply Project For Rajasthan Urban Infra Structure Development Project At Jaipur, Rajasthan
7. New 400/220 kV Ranchi S/S associated with Kahalgaon-II,Ph –I Transmission system For PGCIL At Ranchi
8. 400kV Ranchi Substation Extension associated with Kahalgaon – II,Ph-II Transmission System For PGCIL At Ranchi
9. Construction of 400kV & 220kV Bays at Mertacity(Package-I), Ratangarh, Jodhpur & Heerapura (Package-II) For RRVPNL At Rajasthan
10. Construction/Extension of 220kV Maharanibagh(New Delhi) GIS Substation - Deposit Work of Delhi Transco Ltd (DTL) For Power Grid Corporation of India Ltd At Maharanibagh, New Delhi
Period: From Aug. 2004 to 2005 Aug.
AutoCAD Draftsman (Electrical),
Tebodin & Partner LLC,
P.O.Box: 716,
Ruwi, P.C.-112
Muscat,
Sultanate of Oman
Projects Involved (Oman): -
1. Replacement of YA to YB LP Gas line.
2. Marmul Chem. Injection Tie-in
3. Power Supply to CP unit
4. SNGTP to Qarn Alam Gas Pipeline FED
5. Port Control Facilities DD
6. As-built drafting Dhiab-Rahab Pipeline Replacement
7. As-built drafting and SAP-PM update Sur PRT
8. Hubara booster station DD
9. Sahmah booster station DD
Period: From Jan. 2004 to 2004 June
AutoCAD Draftsman (Electrical)
Mansa Entech Consultancy Bureau (Pvt) Ltd.,
Chennai, India.
Period: From Jan. 1999 to 2003 Dec.
AutoCAD Draftsman (Electrical, Civil & Structure)
Excel Engineers & Consultants Limited,
Chennai, India.
Excel Engineers & Consultants Limited, are one of the leading Design Engineers in the field of Electrical Substation & Switchyard Designing, Protection of Substations Equipments, Outdoor lighting, Substation Building designing & Transmission Line Tower designing.
Projects Involved (India): -
Project: Power System improvement Project, Andhra Pradesh
Client: KEC International
Project: Power System improvement Project, Kerala
Client: SPIC-SMO
Project: Power System improvement Project, Kerala
Client: BSES Kerala
Project: Transmission line Project, Kerala
Client: SPIC-SMO.
I hereby, declare that the above mentioned details are true to the best of my knowledge and belief.
Date: 12-08-2009
Place: Chennai.
Yours faithfully,
(M. KamalaGanesh)
-
July 13th, 2011, 06:14 PM
Post Count Number #3
CURRICULAM VITAE
POSITION APPLIED FOR : SR- STORE KEEPER.
V.K. SENTHILKUMAR
Email ID : senthilraj9 AT yahoo.co.in
senthilraj9 AT gmail.com
Educational Qualification : BA.,
Technical Qualification : Diploma in Material Management
Computer Knowledge : Working experience in ERP – YOGA SOFT System.
And Oracle base ERP - CONTRAMAN system.
CARRIER PROFILE :
Total Working Experience : 15 years in the multiple company’s Store Activities.
Working experience : Experience in Locating the Tools & Tackles, Electrical components, Piping materials, and Construction materials etc., maintain the stock level and release the request for procurement and maintaining the records.
EXPERIENCE DETAILS :
1. GULF PETROCHEMICAL SERVICES & TRADING LLC ,
MUSCAT – OMAN.
Working as a “STORE KEEPER”
Duration of Service : From February 2009 to Till now.
Nature of Job : Oil &Gas Projects like OXY, OGC, PDO & Muscat Sewage
Pipe line projects and Construction project’s material handling, timely deliver to the sites, Insurance claiming, Transport management, documents preparation and maintaining etc.,
2. CONSOLIDATED CONSTRUCTION CONSORTIUM LTD., (CCCL)
Working as a “STORE KEEPER”
Duration of Service : From Dec 2001 to Jan 2009.
Nature of Job : Involving raising the material requests for construction
Materials, maintaining the re order level, monthly stock
Monitoring, material issuing and documentation
Maintaining.
3. THIRUMALAI CHEMICALS LTD.,
Worked as a “Asst. STORE KEEPER”,
Duration of Service : from January 1996 to Nov 2001
Nature of Job : Involved tools and materials maintaining and issuing and doing
the periodical stock checking and maintained the house keeping
Documentation.
EXPERIENCE DETAILS
- Maintaining equipment and materials in stock ready for use and raising material requisitions for necessary equipment materials.
- Liaising with all departments to ensure effective and efficient provision of equipment and materials.
- Undertaking systematic and regular in victories of all stock areas and items and report discrepancies immediately.
- Preventing uncontrolled use of stock
- Ensuring work related information system are current accurate and readily available.
- Ensuring equipment and materials are clearly and correctly identified and stored incorrect locations and make readily available.
- Having enough knowledge to receive the materials is to standards specified with in QA procedure.
- Keeping the tools and equipments in right place.
- Following the right procedure against damaged equipments or waste or other material for disposal with proper documentation.
- Maintaining the stores areas in clean and tidy conditions preventing accumulation of debris.
- Having enough knowledge about industrial hazards and aware of all personal protective equipments and working with all team member with good communication.
-
February 17th, 2012, 02:16 PM
Post Count Number #4
A.K.YUVARAJ
Email : akyuvaraj89 AT gmail.com
Career Objective
To reach a stage where I can become a target for my successors. To be the most envious personality around and to be remembered for my reliability, sincerity, teamwork and love for my work.
Educational Qualification
B.E MECHANICAL ENGINEERING (2006-2010) : 75%
Paavai Engineering College, Namakkal
Anna University.
Higher Secondary (HSC) : 67%
HOLY CROSS MATRIC HR SEC SCHOOL, Salem
Secondary School (SSLC) : 86%
GOVERNMENT HR SEC SCHOOL, Salem
Area of Interests
- Maintenance Engineering
- Material Engineering
Extra-curricular Activities
- A NSS volunteer from 1st year and has attended various camps conducted at various places
- Participated in ANIMATRONIX workshop in KURUKSHETRA’09 conducted by COLLEGE OF ENGINEERING, GUINDY.
- Attended in-plant training at METTUR THERMAL POWER PLANT.
- Done project on “AUTOMATED GUIDED VEHICLE” which I have presented in PROJECT DISPLAY conducted by DR.MGR ENGINEERING COLLEGE.
- DONATED BLOOD several times at various blood banks.
Strengths
- Working effectively as a team.
- Adjust with situation existing.
- A self motivated person
Leisure Interests
- Playing Cricket & basketball
- Yoga and Meditation
Working Experience
- Working as a TECHNICAL CONSULTANT in Hofincons Infotech and Industrial Services Pvt. Ltd. Chennai, Since Feb2011.
- Worked assistant QA/QC Engineer in L&T Workshop
Project Details
Project
Title : Material, Equipment Master and Bill of Materials
Client : GPEC, Gujarat
Site : On-Site
Team Size : 10
Responsibilities
o Identification of Noun Modifier (Class) and frame template (Characteristics)
o Cataloguing of all maintenance spares & generic (consumables) for plant operating equipments.
o Preparation of Equipment, Material, Assembly BOM for all object type
o Updating the Existing BOM as per Equipment Maintenance with supporting document of Datasheet, Part list, Cross-section
o Identify and suggest the possible duplicates.
Declaration
I hereby declare that the information furnished above is true to the best of my knowledge.
Place : CHENNAI
Date :
(A.K.YUVARAJ)