-
March 23rd, 2009, 12:13 AM
Post Count Number #1
Technical Content Writer, Developer Bangalore : www.ojoin.com Marketing India Pvt Ltd
Ojoin Marketing India Pvt Ltd Bengaluru/Bangalore : Technical Content Writer / Content Developer
ojoin.com
Website: http://www.ojoin.com/
Keywords: Technical writer, Technical Content Writer, technical Developer, Technical Content Developer, Content Analyst
Designation: Technical Content Writer / Content Developer
Experience: 3 - 5 Years
Location: Bengaluru/Bangalore
Compensation:
Salary is not a constraint for the right match
Education:
UG - B.A - English,B.Sc - Any Specialization, Computers
PG - M.A - Communication,MCA - Computers
Industry Type: Advertising/ PR/MR/Events
Functional Area: Content, Journalism
Posted Date: 21 Mar
Job Description:
Writing for websites, blogs, emails, marketing materials and other creative publications for various technical clients.
Will be required to grasp complex technical subjects and present it in a clear way.
Study Clients & develop fresh content.
Desired Candidate Profile:
Degree in Computer Science, English, Technical Writing or related field.
Must have passion for writing and Strong command of English language.
Experience in editing technical material.
Have a flair for spontaneous & creative writing
Company Profile:
Ojoin Marketing (I) Pvt. Ltd. is part of Outerjoin Inc, USA, a fast growing, young and energetic marketing services company with an enviable list of clients and big plans for the future. We are an innovation leader in the online marketing world.
Executive Name: H Kumar
Address:
Not Mentioned
Email Address: sales@ojoin.com
Telephone: 408-394-7688
Reference ID:
Technical Content Writer1
Keywords: Technical writer, Technical Content Writer, technical Developer, Technical Content Developer, Content Analyst
Last edited by Guest-IJT; December 17th, 2011 at 04:29 PM.
-
July 6th, 2011, 04:02 PM
Post Count Number #2
IJT addict
Name : Ranganath Chakraborty
Email : ranganath_chakraborty1967 AT yahoo.co.in
Designation / Skillset : Senior Inspection Engineer
Dear Sir/Madam,
Good morning to you.
It is with reference to the possible vacancies existing in your esteemed organization for the position stated in the subject (Position 9 & 11).
Enclosed please find the updated CV and other testimonials in respect of undersign for your review and possible consideration please.
Presently I have been working in Saudi Arabia with Saudi Aramco through ABS Group Saudi Arabia Ltd for (BERRI GAS PLANT AND ABU ALI PIPE LINE) Projects. Also I am a certified Auditor (Certification # 01198105) through IRCA for Saudi Arabia.
In my last project (Qatar Gas II LNG Storage Tank Facilities Project) I had been assigned with multiple responsibilities of E&I QAQC/CERTIFICATION Engineer (Core scope), being a part of Internal Quality Audit Team, monitoring NCR and related Corrective action.
I may be contacted on the contact number given (00966532446749).
On my being selected I shall make myself available for your service as per the time speculated by your esteemed organization.
The following details are furnished for your review as these may have been asked by you.
1) Current Salary (CTC) : USD 4500.00 with 48 hrs/week + Accommodation + Transportation + Food.
2) Expected Salary : USD 8000.00/As per the Company standard.
3) Total Experience in Years : 19 years 3 months
4) Experience in QAQC Scope of activities : 10 years 5 months.
5) Experience in Oil & Gas Industry : 7 years (approx).
6) Current Organization : Saudi Aramco thru ABSG Saudi Arabia as Client Representative (SAPID).
7) Current Location : Al Jubail, Saudi Arabia BGP(Berri Gas Plant)
8) Current Designation : Sr. Inspr Engineer E&I and CP
9) Date of Birth : 03 April 1967
10) Required days for joining : One month
11) Passport Availability : 26 Jul 2019
12) Driving License : Saudi Arabia (Valid till 2019), India (Valid till 2017)
13) Experience in Planning : Refer CV (8 years)
14) Nationality : Indian
Looking forward to receive your informative response please.
Thanks and regards
Ranganath Chakraborty
QAQCProject Professional
ABSG Saudi Arabia for Saudi Aramco,
E Mail : ranganath_chakraborty1967 AT yahoo.co.in,
chakraborty.ranganath AT aramco.com
Resume :
POST APPLIED FOR : QAQC/ PROJECT /CERTIFICATION PROFESSIONAL
OBJECTIVE :
With the optimum use of skill, knowledge and experience, want to be a part of growth and development of the organization and better utilization of scope of work in the areas assigned.
QUALIFICATION (TECHNICAL AND OTHER SPECIFIC) :
Bachelor of Engineering (Electrical) from Bangalore University( 1993)
Diploma in Electrical Engineering from E&ITI, AF Govt. of India (1989)
Diploma in Instrumentation Engineering (Provisional- 2006)
Diploma in Railway Engineering from IPWE, New Delhi, Govt. Of India(2005)
Certificate of Graduation by Govt. Of India (2003)
SPECIALISATION :
Certified Auditor, IRCA, Certification No. 01198105 (Saudi Arabia) after completion of Lead Auditor Course through LRQA, India from IRCA, London.
IEEE membership, Member No. 91197724, Region : R8- Europe, M East, Africa
IAEI (International Association of Electrical Inspectors) membership, Member No. 7070555
Quality Assurance Service(QAS) course approved by DGQA, India(2000)
Primavera 6.0 from PMI, USA through KLG Systel , India (Rep no.2370) (2007)
Industrial Security Officer Course from ISSTS, Nasik, India (2006)
Security training certificate from Indian Air Force (1989-2006)
PTW, H2S certificate/ escape mask training from Qatar Gas, Qatar (2008)
TOTAL EXPERIENCE :
Overall 20 Years (Approx) Experience in the Field of Engineering related to Quality Control, Production, Maintenance and Construction (Oil & Gas and Other), out of which 11 years (approx) has been in the field of QAQC/Inspection.
PROJECTS HANDLED INDEPENDENTLY
CAPITAL PROJECTS: 1. Control Sulfur Emission Project in Berri Gas Plant for Saudi Aramco
2. Waste Water Plant Project in Juaymah Gas Plant for Saudi Aramco
3. LNG Storage Tank Facilities Project in Ras Laffan For Qatar Gas, Qatar
4. Khursanyah Gas Plant Project (KGP) For Saudi Aramco
5. Abu Ali Pipeline Project (GOSP) for Saudi Aramco
6. Avionics Maintenance Project in India for Govt. Of India
MEDIUM VOLUME PROJECT: 1. 16 MMR PLC up gradation project in Berri Gas Plant for Saudi Aramco
2. Metering Skid Facilities Project of Saudi Kayan for Saudi Aramco
3. Metering Skid Facilities Project of Al Nazi Factory for Saudi Aramco
4. Metering Skid Facilities Project of AAC for Saudi Aramco
5. RFID Project in Berri Gas Plant for Saudi Aramco
6. Substation Project (Power Plant) in Punjab for Govt. of India
7. Calibration Room/ IMMOLS Set Up Project in Kanpur for Govt. of India
EXPERIENCE IN MIDDLE EAST:
PROJECT: ABS CONSULTANCY, SAUDI ARABIA FOR SAUDI ARAMCO IN BGP (BERRI GAS PLANT , ABU ALI PIPE LINE AND THIRD PARTY PROJECTS)
PERIOD: 08 NOV 09 TO PRESENT
POSITION: Sr. Inspection Engineer Electrical & Instrumentation and Cathodic Protection. (Reporting to Quality Director- Sarifuddin Ahmed/ Mr. Gondal H. Mumtaz/Mr. Ramasamy K.)
RESPONSIBILITIES: Carrying Out Inspection Activities Related To E&I And CP For Assigned Project. Review of documentation/QCP/ITP, review of E&I drawings, scheduling of man hours and other project related assignments. Presently having responsibilities of looking after three sites (Berri Gas Plant control sulphur emission project, plc up gradation project, Abu Ali pipe line project and National Chevron Philips (third party) project) as client representative (Saudi Aramco, SAPID).doing root cause analysis, risk based inspection and working on sap within Saudi Aramco facilities are the scope of work individually being performed by me. The responsibility is including but not limited to monitoring and inspecting HVAC activities taking place in the areas assigned. Involved in scheduling the assigned responsibilities as well as planning for timely completion of the projects based on strategic data and other factors.
PROJECT: QGII ON SHORE PROJECT LNG TANK FACILITIES UNDER ISHIKAJIMA-HARIMA HEAVY INDUSTRIES (IHI) CO. LTD, JAPAN (CONTRACTOR: CTJV, CLIENT-QATAR GAS), QATAR
PERIOD: 07 JAN 08 TO 30 APR 09
POSITION: Senior QAQC Engineer (Reporting to FQM- Mr. Trevor Walker)
RESPONSIBILITIES: Monitoring And Carrying Out Inspections Related to E&I Activities and Other For LNG Tank Facilities Project which includes Installation Of FT, PT, Manual Call Point, Control Valves (Globe & Butterfly), PG, Instrument Tubing, Emergency Push Button, Pump Hoist, Cathodic Protection, Functional Testing Of Skin Temperature Elements, Cable Tray Installation(Instrument & Electrical),Pump Motor Installation, Lighting Fixture And Receptacle Installation, Lightning Protection Installation And Under Tank Heating System Installation Etc. Apart from the direct inspection, carrying out Root Cause Analysis, Risk Based Inspection and working on SAP within IHI facilities are the scope of work individually being performed by me, also Quality Audit, making of QA/QC related documentation, Preparation and Carrying Out Loop Test, revision of ITPS’ & QCPS’, assisting in making of revision of drawing as per constructional requirement, Commissioning Of Cathodic Protection System, DCPS (Dry Chemical Powder System) for LNG tanks facilities etc. The responsibility is including but not limited to monitoring and inspecting HVAC activities took place in the areas assigned. Involved in scheduling the assigned responsibilities as well as planning for timely completion of the projects based on strategic data and other factors with the use of system tools as like primavera.
PROJECT: KHARSANYA GAS PLANT (KGP) PROJECT UNDER CCC, WLL
(CONTRACTOR: BTJV, COMPANY- SAUDI ARAMCO), SAUDI ARABIA
PERIOD: 15 FEB 2007 TO 31 AUG 2007
POSITION: QA/QC INSPECTOR (INSTRUMENTATION) ( Reporting to Deputy Manager- Suleiman Farid)
RESPONSIBILITIES: Installation Inspection Of Cable Tray, Conduit, Cable Laying, Duct Banks And Other In Substations, PIB'S, MCC'S And In Field Installations, Also Loop Checking Along With Documentation As Per NEC, SAES And Other Adopted Standard (ISO 9001-2000 Etc) And Preparation Of Quality Audit Report. Apart From the Stated Responsibilities Doing Root Cause Analysis, Risk Based Inspection and working on SAP within Saudi Aramco Facilities are the Scope of Work individually Being performed by me. The responsibility is including but not limited to monitoring and inspecting HVAC activities took place in the areas assigned. Involved in scheduling the assigned responsibilities as well as planning for timely completion of the projects based on strategic datas and other factors.
EXPERIENCE IN INDIA:
PROJECT: MAJOR OVERHAUL PROJECT (AVIONICS) AND GENERAL CONSTRUCTION PROJECT UNDER INDIAN AIR FORCE IN MAHARASHTRA, INDIA
PERIOD: SEP 2005 TO DEC 2006
POSITION: QAQC E&I SUPERVISOR (Reporting to Department Head)
RESPONSIBILITIES : Supervisory Inspection of calibration of Pressure Gauges, Pressure Release System, control valve, flow metering, grounding & bonding, meggering and installation of conduits/cable trays. It includes review of E & I drawing, documentation (QC related), and imparting training to subordinates. Apart from the stated responsibilities doing root cause analysis, risk based inspection and working on IMMOLS/IPRMS within facilities are the scope of work individually being performed by me. The responsibility is including but not limited to monitoring and inspecting HVAC activities took place in the areas assigned. Involved in scheduling the assigned responsibilities as well as planning for timely completion of the projects based on strategic data and other factors.
PROJECT: MAJOR SERVICING PROJECT (AVIONICS) AND SUBSTATION (POWER) PROJECT UNDER INDIAN AIR FORCE IN PUNJAB, INDIA
PERIOD: JUN 2000 TO SEP 2005
POSITION: E & I SUPERVISOR (Reporting to Department Head)
RESPONSIBILITIES: Supervision of servicing of instrumentation and electrical equipments i.e. hydraulically & pneumatically operated Pressure Gauges, Precession Instruments (Navigational), cable routing, witnessing installation of grounding cable and servicing of avionics equipments. It includes execution of Techno-Administrative duties, reviewing of instrumentation drawing, guiding subordinates to execute and briefing superior about the job progress. The responsibility is including but not limited to supervision HVAC activities taking place in the areas assigned. Involved in scheduling the assigned responsibilities as well as planning for timely completion of the projects based on strategic data and other factors.
PROJECT: MAJOR OVERHAULING PROJECT (AVIONICS) AND CONSTRUCTION (CALIBRATION ROOM, SUB STATION) PROJECT IN KANPUR, INDIA
PERIOD: NOV 1995 TO JUN 2000
POSITION: QC INSPECTOR (E&I) (Department Head)
RESPONSIBILITIES: Receiving Inspection for materials being indigenised, witnessing of material testing, inspection of servicing, calibration of instruments, installation inspection of cable trays, conduits, routing etc. it includes documentation as per NEC and other adopted standards. The responsibility is including but not limited to monitoring and inspecting HVAC activities took place in the areas assigned.
PROJECT: MAINTENANCE PROJECT (AVIONICS) AND GENERAL CONSTRUCTION PROJECT (HVAC)
PERIOD: MAY 1989 TO OCT 1995
POSITION: LEAD E & I TECHNICIAN (Reporting to Senior Supervisor)
RESPONSIBILITIES : major servicing of MIG series (Mig-23 BN) aircraft electrical and instrumentation systems and equipments, calibration of general instruments used for installation set up, maintenance of complex defence installations, technical documentation in accordance with the adopted standard and other specific. The responsibility is including but not limited to monitoring and executing HVAC activities taking place in the areas assigned.
SKILL:
Take up management job with the overall responsibilities of controlling the QA/QC team under one distinguished umbrella.
Co-Ordinate planning and scheduling of man hours, material and other tools to complete any project towards timely completion.
Capable of making the quality control/quality maintenance procedure in accordance to the adopted standard as per the requirements(activity wise)
Capable of planning manpower control as per the requirement of the project and execute according to that.
Organize TQM system and controlling the project as per the requirements proposed during contract agreement.
Reviewing of all types of drawing and guiding the subordinates in accordance that.
Involve in the process recruitment to get the skilled manpower for smooth execution of project.
Instruct the subordinates technically and administratively to get the maximum out of them by making them quality and safety aware.
Continuous interaction with management representatives to ensure smooth running of the project.
REFERENCE
1. Mr. Shrikant M Desai, Senior Inspr Engineer, ABSG Saudi Arabia for Saudi Aramco, Cont: 00966544588270, E Mail: mutalisx AT aramco.com
2. Mr. T Ishigaki, Site Manager, IHI Co. Ltd for QGII LNG Tank
Facilities Project,
3. Mr. T Ikeda, Asst Manager (E&I), IHI Corporation, Japan
Contact: +81-9098149657, E Mail: takayuki_ikeda AT ihi.co.jp
4. Mr. Sarif Uddin Ahmed, Sr. Inspection Engineer,
E Mail: Mohammed.Ahmed AT satorp.com
5. Mr. Suvendu Mukhopadhyay (Ex- Indian Air Force), Operation Manager, Writers Corporation, India. E Mail: suvendu.mukhopadhyay AT writercorporation.com
The above stated information are true to the best of knowledge of undersign..
(RANGANATH CHAKRABORTY
-------------------------------------------------------
More Information about this submission and submitter:-
___________________________________________________
Submission ID : 4240849
Date & Time : 11th Jun 2011 2:45 PM (UTC)
IP Address : 198.36.39.4
Browser Info : Mozilla/4.0 (compatible; MSIE 7.0; Windows NT 6.0; SLCC1; .NET CLR 2.0.50727; .NET CLR 1.1.4322; .NET CLR 3.5.21022; QS 4.2.1.0; InfoPath.2; .NET CLR 3.5.30729; .NET CLR 3.0.30618)
Predicted Country : Saudi Arabia
-
February 18th, 2013, 05:01 PM
Post Count Number #3
I have a good communication skill. Can I apply for Content writer job?